CN209204670U - A kind of master craftsman of the Spring and Autumn period's lock - Google Patents

A kind of master craftsman of the Spring and Autumn period's lock Download PDF

Info

Publication number
CN209204670U
CN209204670U CN201822024962.7U CN201822024962U CN209204670U CN 209204670 U CN209204670 U CN 209204670U CN 201822024962 U CN201822024962 U CN 201822024962U CN 209204670 U CN209204670 U CN 209204670U
Authority
CN
China
Prior art keywords
building block
hole
slot
building
width
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822024962.7U
Other languages
Chinese (zh)
Inventor
龚永明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Kosi Yizhi Toy Innovation Research And Development Center Co Ltd
Original Assignee
Shenzhen Kosi Yizhi Toy Innovation Research And Development Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Kosi Yizhi Toy Innovation Research And Development Center Co Ltd filed Critical Shenzhen Kosi Yizhi Toy Innovation Research And Development Center Co Ltd
Priority to CN201822024962.7U priority Critical patent/CN209204670U/en
Application granted granted Critical
Publication of CN209204670U publication Critical patent/CN209204670U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Toys (AREA)

Abstract

The utility model embodiment discloses a kind of master craftsman of the Spring and Autumn period's lock, master craftsman of the Spring and Autumn period lock is made of five building blocks of ABCDE, wherein, the form and dimension of two building blocks of AE is identical, two building blocks of AE are equipped with and offer through-hole, B building block is equipped with B building block through-hole and B building block through slot, C building block is entered in B building block through-hole by B building block through slot, C building block is equipped with C building block through-hole and C building block through slot, D building block is equipped with D building block through-hole, first D building block through slot and the 2nd D building block through slot, D building block passes through D building block through-hole, first D building block through slot and the 2nd D building block through slot are put into C building block;Five building blocks of ABCED are moved and are formed self-locking on through-hole, B building block through-hole, B building block through slot, C building block through-hole, C building block through slot, D building block through-hole, the first D building block through slot and the 2nd D building block through slot according to unique sequence.

Description

A kind of master craftsman of the Spring and Autumn period's lock
Technical field
The utility model relates to puzzle field, in particular to a kind of master craftsman of the Spring and Autumn period's lock.
Background technique
Currently, building blocks combination in the prior art, geometry is simple, and overlapped between each other, and arbitrariness is very strong, knot Structure relationship is relatively simple, to take exercise people spatial thinking ability it is limited, be not easy to cause the interest of people, be suitble to population-wide compared with It is small, generally it is only suitable for young children.
Utility model content
For overcome the deficiencies in the prior art, the purpose of this utility model is that a kind of master craftsman of the Spring and Autumn period locks, when splicing, can be taken exercise The spatial imagination and manipulative ability of people, and assembled and disassembly sequence is fixed, after assembly is good again can it is self-locking made of educational toy, It can also be placed on indoor decorative effect simultaneously.
The purpose of this utility model adopts the following technical scheme that realization:
A kind of master craftsman of the Spring and Autumn period's lock, master craftsman of the Spring and Autumn period's lock are made of five building blocks of ABCDE, wherein the shape of two building blocks of AE Shape and size are identical, and two building blocks of the AE, which are equipped with, offers the through-hole mobile for the B building block, the B building block It is equipped with the B building block through-hole and B building block through slot mobile for C building block, the C building block passes through the B building block through slot Into in the B building block through-hole, the C building block be equipped with for accommodate tri- building blocks of ADE C building block through-hole and For the mobile C building block through slot of the B building block, the D building block is equipped with logical for the mobile D building block of the B building block Hole, the first D building block through slot and the 2nd D building block through slot, the first D building block through slot and the 2nd D building block through slot are located at D The two sides of building block through-hole, the D building block pass through the D building block through-hole, the first D building block through slot and the 2nd D building block Through slot is put into the C building block;Five building blocks of the ABCED are logical in the through-hole, B building block according to unique sequence Hole, B building block through slot, C building block through-hole, C building block through slot, D building block through-hole, the first D building block through slot and the 2nd D product It moves and is formed self-locking on wooden unit through slot.
The length of one embodiment according to the present utility model, the through-hole is matched with the width of B building block, the through-hole Width and B building block thickness matching.
One embodiment according to the present utility model, the length of the through-hole are equal to the width of B building block, the through-hole Width is equal to the thickness of B building block.
One embodiment according to the present utility model, thickness and B building block through-hole after tri- building blocks of the ADE are cumulative Length matching, the thickness matching of the width of the B building block through-hole and C building block.
One embodiment according to the present utility model, the thickness after tri- building blocks of the ADE are cumulative are equal to B building block The length of through-hole, the width of the B building block through-hole are equal to the thickness of C building block.
One embodiment according to the present utility model, the width and length and the C building block of the B building block through slot Thickness matching.
One embodiment according to the present utility model, the thickness after tri- building blocks of the ADE are cumulative are equal to C building block The length of through-hole, the width of the C building block through-hole are equal to the width of two building blocks of AE.
One embodiment according to the present utility model, the first D building block through slot are arranged in D building block in length direction Middle part, for being connected to the inside and outside of the D building block through-hole, the first D building block through slot and the D building block are logical Hole forms T font;The length and width of the 2nd D building block through slot is equal to the thickness of the C building block.
The thickness of one embodiment according to the present utility model, five building blocks of the ABCDE 10,20,30,40,50 is equal For a, wherein the length 5a, width 3a of two building blocks of AE 10,50;The length of B building block 20 is 7a, width 3a;C product The length and width of wooden unit 30 is 5a;The length of D building block 40 is 7a, the equal 5a of width.
One embodiment according to the present utility model, five building blocks of the ABCDE are base by the square of a length of a of rib This unit composition.
Compared with prior art, the utility model has the beneficial effects that:
The utility model master craftsman of the Spring and Autumn period lock is made of five building blocks of ABCDE, by specific structure on each building block, so that Five building blocks of ABCDE are connected with each other support, present one kind and seem simply, but condense marvellous wisdom, and the Shandong Class's lock has the characteristics that structure is reasonable, attractive appearance, is unlikely to deform, is firm reliable, scientific and reasonable.
Detailed description of the invention
In order to illustrate more clearly of the utility model embodiment technical solution, will make below to required in embodiment description Attached drawing is briefly described, it should be apparent that, the accompanying drawings in the following description is some embodiments of the utility model, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is the structural schematic diagram for master craftsman of the Spring and Autumn period's lock that an embodiment of the present invention provides;
Fig. 2 is the decomposition diagram that master craftsman of the Spring and Autumn period locks in the utility model;
Fig. 3 is the structural schematic diagram of A building block in the utility model;
Fig. 4 is the structural schematic diagram of B building block in the utility model;
Fig. 5 is the structural schematic diagram of C building block in the utility model;
Fig. 6 is the structural schematic diagram of D building block in the utility model;
Fig. 7-17 is the assembling process schematic diagram of master craftsman of the Spring and Autumn period's lock in the utility model.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model It clearly and completely describes, it is clear that the embodiments are a part of the embodiments of the present invention, rather than whole implementation Example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work The every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present application, it is to be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", " up time The orientation or positional relationship of the instructions such as needle ", " counterclockwise " is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of It describes the application and simplifies description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with spy Fixed orientation construction and operation, therefore should not be understood as the limitation to the application.In addition, term " first ", " second " are only used for Purpose is described, relative importance is not understood to indicate or imply or implicitly indicates the quantity of indicated technical characteristic. " first " is defined as a result, the feature of " second " can explicitly or implicitly include one or more feature.? In the description of the present application, the meaning of " plurality " is two or more, unless otherwise specifically defined.
With reference to the accompanying drawing, it elaborates to some embodiments of the utility model.In the absence of conflict, under The feature in embodiment and embodiment stated can be combined with each other.
Fig. 1-17, a kind of master craftsman of the Spring and Autumn period's lock provided by the embodiment of the utility model are please referred to, which locks by five products of ABCDE Wooden unit 10,20,30,40,50 forms, wherein and the form and dimension of two building blocks of AE 10,50 is identical, in the present embodiment, AE Two building blocks 10,50, which are equipped with, offers the through-hole mobile for B building block 20, and B building block 20 is equipped with for C building block 30 Mobile B building block through-hole 21 and B building block through slot 22, C building block 30 enter B building block through-hole by B building block through slot 22 In 21;C building block 30 is equipped with for accommodating the C building block through-hole 31 of tri- building blocks of ADE 10,40,50 and for B building block 20 mobile C building block through slots 32, D building block 40 are equipped with for the mobile D building block through-hole 41 of B building block 20, the first D building blocks Block through slot 42 and the 2nd D building block through slot 43, the first D building block through slot 42 and the 2nd D building block through slot 43 are located at D product The two sides of wooden unit through-hole 41, D building block 40 are logical by D building block through-hole 41, the first D building block through slot 42 and the 2nd D building block Slot 43 is put into the C building block 40;Five building blocks of ABCED 10,20,30,40,50 are according to unique sequence in through-hole, B Building block through-hole 21, B building block through slot 22, C building block through-hole 31, C building block through slot 32, D building block through-hole 41, the first D product It moves and is formed self-locking on wooden unit through slot 42 and the 2nd D building block through slot 43.
Specifically, through-hole is the A building block through-hole 11 being arranged on A building block 10 or the E being arranged on E building block 50 product Wooden unit through-hole 51, so that B building block 20 is moved by A building block through-hole 11 and E building block through-hole 51, so that Five building blocks of ABCDE 10,20,30,40,50 form self-locking structure.
After the above technical solution is adopted, since each building block is equipped with specific structure, so that assembled suitable with disassembly Sequence is fixed, if easily grasping when referring to assembled precedence diagram, is suitble to children;If when without reference to assembled precedence diagram, needing relatively strong Spatial imagination, be suitble to take exercise teenager, adult thinking ability, so widely applicable;Can be self-locking after assembly is good, it is not easy It dissipates or loses, while can arbitrarily furnish, ornamental value is stronger, further, since the size shape of two building blocks of AE 10,50 is equal Unanimously, the spending cost of mold can be reduced in this way, as long as i.e. design one set of die can mold two building blocks of AE 10,50 Shape, to save a large amount of manufacturing cost.
In an alternative embodiment, the length of through-hole is matched with the width of B building block 20, width and the B product of through-hole The thickness matching of wooden unit 20.Specifically, the width of the length of A building block through-hole 11 and E building block through-hole 51 and B building block 20 Match, the width of A building block through-hole 11 and E building block through-hole 51 and the thickness matching of B building block 20.
In an alternative embodiment, the length of through-hole is equal to the width of B building block 20, and the width of the through-hole is equal to The thickness of B building block 20.Specifically, the length of A building block through-hole 11 and E building block through-hole 51 is equal to the width of B building block 20, The width of A building block through-hole 11 and E building block through-hole 51 is equal to the thickness of B building block 20.
In an alternative embodiment, thickness and B building block through-hole after tri- building blocks of ADE 10,40,50 are cumulative 21 length matching, the width of B building block through-hole 21 and the thickness matching of C building block 30.Specifically, tri- building blocks 10 of ADE, 40,50 it is cumulative after thickness be equal to the length of B building block through-hole 21, the width of B building block through-hole 21 is equal to the thickness of C building block 30 Degree.
In an alternative embodiment, the thickness matching of the width of B building block through slot 22 and length and C building block 30. Specifically, the width of B building block through slot 22 and length are equal to the thickness of C building block 30.
In an alternative embodiment, thickness and C building block through-hole after tri- building blocks of ADE 10,40,50 are cumulative 31 length matching, the width of C building block through-hole 31 are matched with the width of two building blocks of AE 10,50.Specifically, ADE tri- Thickness after building block 10,40,50 is cumulative is equal to the length of C building block through-hole 31, and the width of C building block through-hole 31 is equal to AE two The width of a building block 10,50.
In an alternative embodiment, D building block 40 is arranged in length direction in the first D building block through slot 42 Portion, for being connected to the inside and outside of D building block through-hole 41, and the first D building block through slot 42 forms T with D building block through-hole 41 Font;2nd D building block through slot 43 is arranged on the opposite side of the first D building block through slot 42, and length and width is equal to C product The thickness of wooden unit 30.
In an alternative embodiment, the thickness of five building blocks of ABCDE 10,20,30,40,50 is a, wherein AE The length 5a of two building blocks 10,50, width 3a;The length of B building block 20 is 7a, width 3a;The length of C building block 30 It is 5a with width;The length of D building block 40 is 7a, the equal 5a of width.
In an alternative embodiment, the middle part of two building blocks of AE 10,50, B building block through-hole 21 is arranged in through-hole The middle part of B building block 20 in the direction of the width is set, the end face of B building block through-hole 21 in the direction of the width and B building blocks The distance of 20 corresponding end surface of block is a, the other end B of B building block through-hole 21 in the direction of the width and 20 corresponding end surface of building block Distance be 2a, B building block through slot 22 be arranged in B building block through-hole 21 along its length on one side middle part on.
In an alternative embodiment, the middle part of C building block 30, C building block through slot is arranged in C building block through-hole 31 32 are arranged on the middle part of 30 any side of C building block;The middle part of D building block, the first D building block is arranged in D building block through-hole 41 Through slot 42 be arranged in D building block 40 along its length on one side middle part on, width a is highly 2a;2nd D building blocks Block through slot 43 be arranged in D building block 40 along its length on another side middle part on.
After the above technical solution is adopted, not only the fastening of product can be made more compact, also ensure that product it is assembled or The uniqueness of disassembly sequence, and be also ensured when being opened using module, convenient for the manufacture and assembly of mold insert.
In an alternative embodiment, five building blocks of ABCDE 10,20,30,40,50 by a length of a of rib square For basic unit composition, to reduce the manufacturing cost of processing, and it is also convenient for the design of product, in addition, the basic unit can The small square composition for thinking a length of a of multiple ribs, can also be integrally formed by modes such as moldings.
In an alternative embodiment, five building blocks of ABCDE 10,20,30,40,50 are that wooden material is fabricated Building block, the class of product not only can be improved, increase the scope of application of product, collected convenient for some elder persons, example Such as process this product with redwood, furthermore, it is possible to carve different shapes in wooden building block, thus improve product class and Entertaining.
In an alternative embodiment, five building blocks of ABCDE 10,20,30,40,50 are plastic material injection molding Building block save a large amount of manufacturing cost to be produced in batches.
In an alternative embodiment, five building blocks of ABCDE 10,20,30,40,50 are that metal material is processed to be formed Building block, not only can ensure the quality of product, and but also product has weight sense.
In an alternative embodiment, the corner of five building blocks of ABCDE 10,20,30,40,50 is equipped with circular arc and falls Angle, is not only convenient for the processing of product, also avoid five building blocks of ABCDE 10,20,30,40,50 break in an assembling process or Person hurts the accidents such as hand, and circular arc chamfering can increase the area of building block and contactant.
After the above technical solution is adopted, as shown in Fig. 7-17, B building block 20 is put into A building block through-hole 11, so that B One end face of building block 20 and an end face of A building block 10 are concordant, and wherein B building block through slot 22 is located at the left side of A building block 10 C building block 30 is then put into B building block through-hole 21 by B building block through slot 22, so that C building block 30 by (such as Fig. 7-8) An end face and B building block through-hole 21 one end face contact (such as Fig. 9-10).
Moving C building block 20 along B building block through-hole 21 is connected to C building block 20 on B building block through-hole 21 (as schemed 11) it, connects and D building block 40 is put into C building block through-hole 31 by C building block through slot 32, wherein the 2nd D building block through slot 43 move along the upside of C building block through slot 32, and the first D building block through slot 42 moves (such as along the downside of C building block through slot 32 Figure 12-13).
D building block is up moved so that the position of D building block through-hole 41 is corresponding with the position of B building block 20 (as schemed 13-14), then moving B building block 20 makes one end of B building block 20 concordant with one end of D building block 40 (such as Figure 14-15).
E building block 50 is put into C building block through-hole 31, and makes position and the B building block 20 of E building block through-hole 51 Position it is corresponding (such as Figure 16-17), finally move B building block 20 and B building block 20 made to sequentially pass through 51 He of E building block through-hole C building block through slot 32, to complete the assembly (such as Fig. 1) of entire master craftsman of the Spring and Autumn period's lock.
Master craftsman of the Spring and Autumn period's lock, is the traditional civil construction fixed knot clutch of ancient Chinese, originating from pioneering in ancient times Han nationality building Joinery and its construction, entire body does not have to nail, rope, supports completely by the connection of self structure, just as a piece of paper doubling once energy Enough so vertical that get up, outer viewing is the cross cube to fit together perfectly, but the concavo-convex portion of interpolation appliance internal engages, and locks master craftsman of the Spring and Autumn period Readily removable difficult dress, and its design is more hard, conforms to the principle of simplicity into depth, makes its assembly and demounting procedure by attempting the different button bit of addition Uniqueness.
After the above technical solution is adopted, not only make the structure of the utility model product more simple, but also easily fabricated, Different materials be can choose as production raw material, in addition, the principle of the product can be used for various ornaments or furniture design, The characteristics of building blocks furniture being made into using different shape mutually pieces together fitting obtains the stability of the global shape after assembling It ensures, not only increases the playability of furniture, emotion can also be increased by splicing furniture together between parent-offspring, but also can be with The imagination and manipulative ability of people are tempered, meanwhile, it does not need to need to make in use, can also be fitted together in furniture Used time takes apart, and reduces the occupancy in space, convenient for the storage of furniture.
In the description of the present application, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected.It can To be mechanical connection, it is also possible to be electrically connected.It can be directly connected, can also can be indirectly connected through an intermediary The interaction relationship of connection or two elements inside two elements.It for the ordinary skill in the art, can be with The concrete meaning of above-mentioned term in this application is understood as the case may be.
In this application unless specifically defined or limited otherwise, fisrt feature second feature "upper" or "lower" It may include that the first and second features directly contact, also may include that the first and second features are not direct contacts but pass through it Between other characterisation contact.Moreover, fisrt feature includes the first spy above the second feature " above ", " above " and " above " Sign is right above second feature and oblique upper, or is merely representative of first feature horizontal height higher than second feature.Fisrt feature exists Second feature " under ", " lower section " and " following " include that fisrt feature is directly below and diagonally below the second feature, or is merely representative of First feature horizontal height is less than second feature.
Above disclosure provides many different embodiments or example is used to realize the different structure of the application.In order to Simplify disclosure herein, above the component of specific examples and setting are described.Certainly, they are merely examples, and And purpose does not lie in limitation the application.In addition, the application can in different examples repeat reference numerals and/or reference letter, This repetition is for purposes of simplicity and clarity, itself not indicate between discussed various embodiments and/or setting Relationship.In addition, this application provides various specific techniques and material example, but those of ordinary skill in the art can be with Recognize the application of other techniques and/or the use of other materials.
In the description of this specification, reference term " embodiment ", " some embodiments ", " schematically implementation The description of mode ", " example ", " specific example " or " some examples " etc. means embodiment or example is combined to describe specific Feature, structure, material or feature are contained at least one embodiment or example of the application.In the present specification, right The schematic representation of above-mentioned term is not necessarily referring to identical embodiment or example.Moreover, the specific features of description, knot Structure, material or feature can be combined in any suitable manner in any one or more embodiments or example.
While there has been shown and described that presently filed embodiment, it will be understood by those skilled in the art that: These embodiments can be carried out with a variety of variations, modification, replacement in the case where not departing from the principle and objective of the application and become Type, scope of the present application are defined by the claims and their equivalents.

Claims (10)

1. a kind of master craftsman of the Spring and Autumn period's lock, which is characterized in that master craftsman of the Spring and Autumn period's lock is made of five building blocks of ABCDE, wherein two products of the AE The form and dimension of wooden unit is identical, and two building blocks of the AE, which are equipped with, offers the through-hole mobile for the B building block, described B building block is equipped with the B building block through-hole and B building block through slot mobile for C building block, and the C building block passes through the B building blocks Block through slot enters in the B building block through-hole, and it is logical that the C building block is equipped with the C building block for accommodating tri- building blocks of ADE Hole and the C building block through slot mobile for the B building block, the D building block are equipped with the D building blocks mobile for the B building block Block through-hole, the first D building block through slot and the 2nd D building block through slot, the first D building block through slot and the 2nd D building block through slot difference Positioned at the two sides of D building block through-hole, the D building block passes through the D building block through-hole, the first D building block through slot and the 2nd D product Wooden unit through slot is put into the C building block;Five building blocks of the ABCED are according to unique sequence in the through-hole, B building block Through-hole, B building block through slot, C building block through-hole, C building block through slot, D building block through-hole, the first D building block through slot and the 2nd D product It moves and is formed self-locking on wooden unit through slot.
2. master craftsman of the Spring and Autumn period's lock according to claim 1, which is characterized in that the length of the through-hole is matched with the width of B building block, The width of the through-hole and the thickness matching of B building block.
3. master craftsman of the Spring and Autumn period's lock according to claim 2, which is characterized in that the length of the through-hole is equal to the width of B building block, institute The width for stating through-hole is equal to the thickness of B building block.
4. master craftsman of the Spring and Autumn period's lock according to claim 1, which is characterized in that thickness and B product after tri- building blocks of the ADE are cumulative The length of wooden unit through-hole matches, the width of the B building block through-hole and the thickness matching of C building block.
5. master craftsman of the Spring and Autumn period's lock according to claim 4, which is characterized in that the thickness after tri- building blocks of the ADE are cumulative is equal to B The length of building block through-hole, the width of the B building block through-hole are equal to the thickness of C building block.
6. master craftsman of the Spring and Autumn period's lock according to claim 5, which is characterized in that the width and length and the C of the B building block through slot The thickness matching of building block.
7. master craftsman of the Spring and Autumn period's lock according to claim 1, which is characterized in that the thickness after tri- building blocks of the ADE are cumulative is equal to C The length of building block through-hole, the width of the C building block through-hole are equal to the width of two building blocks of AE.
8. master craftsman of the Spring and Autumn period's lock according to claim 1, which is characterized in that the first D building block through slot setting exists in D building block The middle part of length direction, for being connected to the inside and outside of the D building block through-hole, the first D building block through slot and the D Building block through-hole forms T font;The 2nd D building block through slot is arranged on the opposite side of the first D building block through slot, length Degree and width are equal to the thickness equal to the C building block.
9. master craftsman of the Spring and Autumn period's lock according to claim 1, which is characterized in that the thickness of five building blocks of ABCDE is a, In, the length 5a, width 3a of two building blocks of AE;The length of B building block is 7a, width 3a;The length and width of C building block Degree is 5a;The length of D building block is 7a, the equal 5a of width.
10. -9 described in any item master craftsman of the Spring and Autumn period's locks according to claim 1, which is characterized in that five building blocks of the ABCDE are by rib The square of a length of a is basic unit composition.
CN201822024962.7U 2018-12-04 2018-12-04 A kind of master craftsman of the Spring and Autumn period's lock Expired - Fee Related CN209204670U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822024962.7U CN209204670U (en) 2018-12-04 2018-12-04 A kind of master craftsman of the Spring and Autumn period's lock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822024962.7U CN209204670U (en) 2018-12-04 2018-12-04 A kind of master craftsman of the Spring and Autumn period's lock

Publications (1)

Publication Number Publication Date
CN209204670U true CN209204670U (en) 2019-08-06

Family

ID=67462973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822024962.7U Expired - Fee Related CN209204670U (en) 2018-12-04 2018-12-04 A kind of master craftsman of the Spring and Autumn period's lock

Country Status (1)

Country Link
CN (1) CN209204670U (en)

Similar Documents

Publication Publication Date Title
CN109304044A (en) A kind of master craftsman of the Spring and Autumn period's lock
CN109568986A (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204670U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204666U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN109513226A (en) A kind of master craftsman of the Spring and Autumn period's lock
CN109260726A (en) A kind of master craftsman of the Spring and Autumn period's lock
CN109173290A (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209317023U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN208711035U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204667U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204659U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204663U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204662U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204674U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204660U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN109224478A (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204669U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204672U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204671U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204664U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204658U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209317025U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204661U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209204665U (en) A kind of master craftsman of the Spring and Autumn period's lock
CN209317027U (en) A kind of master craftsman of the Spring and Autumn period's lock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190806

Termination date: 20201204

CF01 Termination of patent right due to non-payment of annual fee