CN209179138U - A kind of packet drainpipe facility - Google Patents
A kind of packet drainpipe facility Download PDFInfo
- Publication number
- CN209179138U CN209179138U CN201821971307.6U CN201821971307U CN209179138U CN 209179138 U CN209179138 U CN 209179138U CN 201821971307 U CN201821971307 U CN 201821971307U CN 209179138 U CN209179138 U CN 209179138U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- main body
- water pipe
- template
- batten
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of packet drainpipe facilities, including water pipe facility main body, batten, L-type template, crude face and cement slurry, prefabricated board is provided on the right side of newspaper, prefabricated board is fixedly connected with newspaper, prefabricated board improves the convenience of water pipe facility main body well, the bottom of cement slurry is provided with asbestos gauge, asbestos gauge is fixedly connected with cement slurry, asbestos gauge improves the safety of facility facility main body well, the bottom of batten is provided with bamboo slab rubber, bamboo slab rubber is fixedly connected with batten, bamboo slab rubber improves the service life of water pipe facility main body well, the rear portion bottom end of water pipe facility main body is provided with loose-leaf device, loose-leaf device is fixedly connected with water pipe facility main body, loose-leaf device improves the flexibility of water pipe facility main body well, suitable for water pipe facility main body It uses, will be had a wide range of applications in future.
Description
Technical field
The utility model relates to water pipe facility technology field, specially a kind of packet drainpipe facility.
Background technique
Current packet drainpipe facility drains the water of pipeline greatly mostly from the life waste water of resident, among these not only
It is washing one's hands, is washing one's face containing a large amount of people, the hair that the falls when daily cleanings such as hair washing, and containing largely from family or restaurant
The kitchen grease of discharge, the grease drained in pipeline is mostly animal fat, these animal fats are to be very easy to satisfying for solidification
And fat, in winter temperature once reducing and will solidify, solidification while, can connect the rubbish incidentals shape such as other hairs
At the strong design for being similar to armored concrete, this structure is very easy to cause to drain blockage.
But existing packet drainpipe facility, disadvantage is that packet drainpipe facility is at it in use, packet drainpipe is set
The ability easy to use applied is not very well and packet drainpipe facility is poor in safety when used for a long time, and packet drainpipe is set
The service life applied is not grown and the flexibility in use of packet drainpipe facility is not fine.
Utility model content
The purpose of this utility model is to provide a kind of packet drainpipe facilities, convenient to solve to propose in above-mentioned background technique
Ability is poor, and safety is poor, the problem that service life is not grown and flexibility is bad.
To achieve the above object, the utility model provides the following technical solutions: a kind of packet drainpipe facility, including water pipe are set
Apparatus main body, batten, L-type template, crude face and cement slurry are applied, the top of the water pipe facility main body is provided with batten,
The batten is fixedly connected with water pipe facility main body, and the bottom of the batten is provided with L-type template, the L-type template with
Batten is fixedly connected, and the top of the L-type template is provided with crude face, and the crude face is fixedly connected with L-type template, the hair
The bottom of matte is provided with cement slurry, and the cement slurry is fixedly connected with crude face, and the left bottom of the L-type template is provided with
Flitch, the flitch are fixedly connected with L-type template, and newspaper, the newspaper and L-type template are provided in the middle part of the L-type template
It is fixedly connected, right angle plank is provided with before the L-type template, the right angle plank is fixedly connected with L-type template, the L
The bottom end of pattern plate is provided with U-shaped template, and the U-shaped template is flexibly connected with L-type template, the middle part setting of the U-shaped template
There is master module, the master module is fixedly connected with U-shaped template, and the external surrounding of the master module is provided with small crushed stone, described small
Rubble is fixedly connected with master module, and the left and right side of the small crushed stone is provided with plank, the plank and the fixed company of small crushed stone
It connects, the external surrounding of the U-shaped template is provided with shell, and the shell is fixedly connected with U-shaped template, the water pipe facility
The bottom front of main body is provided with fixing glue, and the fixing glue is fixedly connected with water pipe facility main body.
Further, prefabricated board is provided on the right side of the newspaper, the prefabricated board is fixedly connected with newspaper.
Further, the bottom of the cement slurry is provided with asbestos gauge, and the asbestos gauge is fixedly connected with cement slurry.
Further, the bottom of the batten is provided with bamboo slab rubber, and the bamboo slab rubber is fixedly connected with batten.
Further, the rear portion bottom end of the water pipe facility main body is provided with loose-leaf device, the loose-leaf device with
Water pipe facility main body is fixedly connected.
Further, the prefabricated board is provided with a monolith, and right side and the top position of newspaper is arranged in.
Further, the bamboo slab rubber is provided with ten pieces, is separately positioned on the interior location of L-type template and U-shaped template.
Compared with prior art, the utility model has the beneficial effects that this kind of packet drainpipe facility, it is prefabricated to be provided with mold
Plate, prefabricated board can make water pipe facility main body easily be assembled and be manufactured, and the firmness degree of prefabricated board is good, prefabricated
The span of plate is also more practical, and the performance of waterproof is also relatively better, prefabricated board carry out to water pipe facility main body this
The use of human subject is also very universal, in the speed used water pipe facility main body also than very fast, improves well
The convenience of water pipe facility main body, asbestos gauge can bring a fireproof performance, water supply with feed pipe facility main body
Pipe facility main body adds a non-combustible substance, and asbestos gauge can disperse high temperature and fire source, sets water pipe
The temperature for applying apparatus main body obtains a good control, improves the safety of facility facility main body, bamboo glue well
The intensity of plate is high, and the toughness of bamboo slab rubber also can very reduce well the usage quantity of template, and breadth is broader, and formwork is torn open
Mould speed is fast, and water resistance is very effective, can be very good to reach the indeformable effect of dampness, anti-corrosion, and use turnover time
Number is high, bamboo slab rubber can front and back sides carry out using the control of the available bamboo slab rubber in the gap of piece improves water pipe well and sets
The service life of apparatus main body is applied, loose-leaf device can make L-type template and U-shaped template have the function that one is flexibly stirred,
So that L-type template and U-shaped template is closed and is opened, achievees the effect that one flexibly acts on, and improves water pipe facility well
The flexibility of apparatus main body.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the L-type template the schematic diagram of the section structure of the utility model;
Fig. 3 is the U-shaped template the schematic diagram of the section structure of the utility model.
In figure: 1, water pipe facility main body, 2, batten, 3, L-type template, 301, crude face, 302, cement slurry, 303, wood
Side, 304, prefabricated board, 305, newspaper, 306, asbestos gauge, 4, bamboo slab rubber, 5, right angle plank, 6, U-shaped template, 601, master module,
602, small crushed stone, 603, plank, 604, shell, 7, loose-leaf device, 8, fixing glue.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment, based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of packet drainpipe facility, including water pipe facility
The top of apparatus main body 1, batten 2, L-type template 3, crude face 301 and cement slurry 302, water pipe facility main body 1 is provided with wood
Item 2, batten 2 are fixedly connected with water pipe facility main body 1, and the bottom of batten 2 is provided with L-type template 3, L-type template 3 and batten
2 are fixedly connected, and the top of L-type template 3 is provided with crude face 301, and crude face 301 is fixedly connected with L-type template 3, crude face 301
Bottom be provided with cement slurry 302, cement slurry 302 is fixedly connected with crude face 301, and the left bottom of L-type template 3 is provided with wood
Side 303, flitch 303 is fixedly connected with L-type template 3, and the middle part of L-type template 3 is provided with newspaper 305, newspaper 305 and L-type template 3
It is fixedly connected, right angle plank 5 is provided with before L-type template 3, right angle plank 5 is fixedly connected with L-type template 3, L-type template 3
Bottom end is provided with U-shaped template 6, and U-shaped template 6 is flexibly connected with L-type template 3, and the middle part of U-shaped template 6 is provided with master module 601,
Master module 601 is fixedly connected with U-shaped template 6, and the external surrounding of master module 601 is provided with small crushed stone 602, small crushed stone 602 and master
Template 601 is fixedly connected, and the left and right side of small crushed stone 602 is provided with plank 603, plank 603 and the fixed company of small crushed stone 602
It connects, the external surrounding of U-shaped template 6 is provided with shell 604, and shell 604 is fixedly connected with U-shaped template 6, water pipe facility main body
1 bottom front is provided with fixing glue 8, and fixing glue 8 is fixedly connected with water pipe facility main body 1.
Further, the right side of newspaper 305 is provided with prefabricated board 304, and prefabricated board 304 is fixedly connected with newspaper 305, prefabricated
Plate 304 can make water pipe facility main body 1 easily be assembled and be manufactured, and the firmness degree of prefabricated board 304 is good, prefabricated
The span of plate 304 is also more practical, and the performance of waterproof is also relatively better, and prefabricated board 304 is being carried out to water pipe facility
The use of 1 this human subject of main body is also very universal, in the speed used water pipe facility main body 1 also than very fast, very well
The convenience for improving water pipe facility main body 1.
Further, the bottom of cement slurry 302 is provided with asbestos gauge 306, and asbestos gauge 306 is fixedly connected with cement slurry 302,
Asbestos gauge 306 can bring a fireproof performance, feed pipe facility main body 1 additional one with feed pipe facility main body 1
A non-combustible substance, asbestos gauge 306 can disperse high temperature and fire source, and the temperature of water pipe facility main body 1 is made
A good control is obtained, improves the safety of facility facility main body 1 well.
Further, the bottom of batten 2 is provided with bamboo slab rubber 4, and bamboo slab rubber 4 is fixedly connected with batten 2, bamboo slab rubber 4 it is strong
Degree is high, and the toughness of bamboo slab rubber 4 also can very reduce well the usage quantity of template, and breadth is broader, formwork, demoulding speed
Fastly, water resistance is very effective, can be very good to reach the indeformable effect of dampness, anti-corrosion, and, bamboo high using the number of turnover
Offset plate 4 can front and back sides carry out improving water pipe facility dress well using, the control of the available bamboo slab rubber 4 in the gap of piece
Set the service life of main body 1.
Further, the rear portion bottom end of water pipe facility main body 1 is provided with loose-leaf device 7, and loose-leaf device 7 is set with water pipe
It applies apparatus main body 1 to be fixedly connected, loose-leaf device 7 can make L-type template 3 and U-shaped template 6 reach the work flexibly stirred
With making L-type template 3 and U-shaped template 6 are closed and be opened, achieve the effect that one flexibly acts on, and improves water pipe well
The flexibility of facility main body 1.
Further, prefabricated board 304 is provided with a monolith, and right side and the top position of newspaper 305 is arranged in, mentions well
The high convenient ability of whole water pipe facility main body 1.
Further, bamboo slab rubber 4 is provided with ten pieces, is separately positioned on the interior location of L-type template 3 and U-shaped template 6, very
The good leakproofness for making entire water pipe facility main body 1 improves.
Working principle: first that packet drainpipe erection of equipment is good, then prefabricated board 304 can make water pipe facility main body
1 is easily assembled and is manufactured, and the firmness degree of prefabricated board 304 is good, and the span of prefabricated board 304 is also more practical, waterproof
Performance it is also relatively better, prefabricated board 304 carrying out to 1 this human subject of water pipe facility main body use it is also unusual
Generally, water pipe facility main body 1 is improved well also than very fast in the speed used water pipe facility main body 1
Convenience, then asbestos gauge 306 can bring a fireproof performance, feed pipe facility with feed pipe facility main body 1
Main body 1 adds a non-combustible substance, and asbestos gauge 306 can disperse high temperature and fire source, makes water pipe facility
The temperature of main body 1 obtains a good control, improves the safety of facility facility main body 1 well, and then bamboo
The intensity of offset plate 4 is high, and the toughness of bamboo slab rubber 4 also can very reduce well the usage quantity of template, and breadth is broader, branch
Mould, demoulding speed is fast, and water resistance is very effective, can be very good to reach the indeformable effect of dampness, anti-corrosion, and use week
Turn number height, bamboo slab rubber 4 can front and back sides carry out using the control of the available bamboo slab rubber 4 in the gap of piece improves well
The service life of water pipe facility main body 1, last loose-leaf device 7 can make L-type template 3 and U-shaped template 6 reach a spirit
The effect living stirred, makes L-type template 3 and U-shaped template 6 are closed and be opened, achievees the effect that one flexibly acts on, well
The flexibility of water pipe facility main body 1 is improved, here it is the working principles of packet drainpipe facility.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (7)
1. a kind of packet drainpipe facility, including water pipe facility main body (1), batten (2), L-type template (3), crude face (301)
With cement slurry (302), it is characterised in that: the top of the water pipe facility main body (1) is provided with batten (2), the batten
(2) it is fixedly connected with water pipe facility main body (1), the bottom of the batten (2) is provided with L-type template (3), the L-type mould
Plate (3) is fixedly connected with batten (2), and the top of the L-type template (3) is provided with crude face (301), the crude face (301)
Be fixedly connected with L-type template (3), the bottom of the crude face (301) is provided with cement slurry (302), the cement slurry (302) with
Crude face (301) is fixedly connected, and the left bottom of the L-type template (3) is provided with flitch (303), the flitch (303) and L
Pattern plate (3) is fixedly connected, and is provided with newspaper (305) in the middle part of the L-type template (3), the newspaper (305) and L-type template
(3) it is fixedly connected, is provided with right angle plank (5) before the L-type template (3), the right angle plank (5) and L-type template (3)
It is fixedly connected, the bottom end of the L-type template (3) is provided with U-shaped template (6), the U-shaped template (6) and L-type template (3) activity
It connects, is provided with master module (601) in the middle part of the U-shaped template (6), the master module (601) and U-shaped template (6) fixed company
It connects, the external surrounding of the master module (601) is provided with small crushed stone (602), and the small crushed stone (602) and master module (601) are solid
Fixed connection, the left and right side of the small crushed stone (602) are provided with plank (603), the plank (603) and small crushed stone (602)
It is fixedly connected, the external surrounding of the U-shaped template (6) is provided with shell (604), and the shell (604) and U-shaped template (6) are solid
Fixed connection, the bottom front of the water pipe facility main body (1) are provided with fixing glue (8), and the fixing glue (8) sets with water pipe
Apparatus main body (1) is applied to be fixedly connected.
2. a kind of packet drainpipe facility according to claim 1, it is characterised in that: the right side of the newspaper (305) is arranged
Have prefabricated board (304), the prefabricated board (304) is fixedly connected with newspaper (305).
3. a kind of packet drainpipe facility according to claim 1, it is characterised in that: the bottom of the cement slurry (302) is set
It is equipped with asbestos gauge (306), the asbestos gauge (306) is fixedly connected with cement slurry (302).
4. a kind of packet drainpipe facility according to claim 1, it is characterised in that: the bottom of the batten (2) is provided with
Bamboo slab rubber (4), the bamboo slab rubber (4) are fixedly connected with batten (2).
5. a kind of packet drainpipe facility according to claim 1, it is characterised in that: the water pipe facility main body (1)
Rear portion bottom end be provided with loose-leaf device (7), the loose-leaf device (7) is fixedly connected with water pipe facility main body (1).
6. a kind of packet drainpipe facility according to claim 2, it is characterised in that: the prefabricated board (304) is provided with one
The right side in newspaper (305) and top position is arranged in monolith.
7. a kind of packet drainpipe facility according to claim 4, it is characterised in that: the bamboo slab rubber (4) is provided with ten pieces,
It is separately positioned on the interior location of L-type template (3) and U-shaped template (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821971307.6U CN209179138U (en) | 2018-11-28 | 2018-11-28 | A kind of packet drainpipe facility |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821971307.6U CN209179138U (en) | 2018-11-28 | 2018-11-28 | A kind of packet drainpipe facility |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209179138U true CN209179138U (en) | 2019-07-30 |
Family
ID=67374394
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821971307.6U Active CN209179138U (en) | 2018-11-28 | 2018-11-28 | A kind of packet drainpipe facility |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209179138U (en) |
-
2018
- 2018-11-28 CN CN201821971307.6U patent/CN209179138U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ATE208205T1 (en) | LACTOBACILLI TO INCREASE MINERAL ABSORPTION BY INTESTINAL CELLS | |
CN209179138U (en) | A kind of packet drainpipe facility | |
CN208072571U (en) | A kind of villages within the city's separate system | |
CN208220277U (en) | A kind of ecology wheeled lavatory | |
CN207307970U (en) | A kind of energy saving and environment friendly pulverizer in cement plant | |
CN205272320U (en) | Concrete mixer | |
CN208034952U (en) | A kind of PC production lines cement strike-off stick | |
CN207193733U (en) | A kind of floating cover pontoon bridge | |
CN205822721U (en) | A kind of finishing high efficiency processes floor cement plant | |
CN210969337U (en) | Environment-friendly cement curing box | |
CN202354191U (en) | Heat preservation and insulation floor for livestock | |
CN202742499U (en) | Energy-saving curing device for concrete | |
CN204869237U (en) | Blade hybrid mixer | |
CN210210902U (en) | Can regulate and control continuous level and prepare sand device | |
CN208363026U (en) | A kind of urban activity flood protection device | |
CN203840907U (en) | Roof slab of pet house | |
CN207776046U (en) | A kind of multifunctional closestool | |
CN204492184U (en) | Sealing plug water power pre-buried hole sleeve die | |
CN203506921U (en) | Rabbit knee joint clamp type outer fixing device | |
CN2404941Y (en) | Permanent forms with water-proof function | |
CN207700818U (en) | Combined universal steel flag platform | |
CN208040187U (en) | A kind of water blocking waterproof construction | |
CN218091216U (en) | Indoor ultra-thin waterscape pond structure | |
CN202689423U (en) | Ceiling | |
CN208105718U (en) | A kind of environmental protection brick fixed for building decoration splicing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |