CN209166874U CN201821966451.0U CN201821966451U CN209166874U CN 209166874 U CN209166874 U CN 209166874U CN 201821966451 U CN201821966451 U CN 201821966451U CN 209166874 U CN209166874 U CN 209166874U
Authority
CN
China
Prior art keywords
axis
screw rod
guide rail
slide
workbench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821966451.0U
Other languages
Chinese (zh)
Inventor
周维彬
孙建禹
曹洪建
陈坤
石念
胡光强
陈后勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiao Yuan And Rui Engineering Testing Technology Co Ltd
Original Assignee
Chongqing Jiao Yuan And Rui Engineering Testing Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiao Yuan And Rui Engineering Testing Technology Co Ltd filed Critical Chongqing Jiao Yuan And Rui Engineering Testing Technology Co Ltd
Priority to CN201821966451.0U priority Critical patent/CN209166874U/en
Application granted granted Critical
Publication of CN209166874U publication Critical patent/CN209166874U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of workbench, including plate (6-1), it is characterised in that: plate (6-1) upper side is equipped with multiple T-slots (6-11), and each T-slot (6-11) parallel interval is distributed;Plate (6-1) upper side is equipped with draining annular groove (6-12), the draining annular groove (6-12) is connected to each T-slot (6-11), and is equipped with discharge outlet (6-13) in the draining annular groove (6-12);Plate (6-1) upper side is installed with multiple bearing raised lines (6-3), and each bearing raised line (6-3) parallel interval distribution.The utility model, which can facilitate, fixes the rock block to coring, and can be by coring when the sewage that generates can be discharged in time, while being able to achieve the rock block through safe coring.In addition the invention also discloses a kind of rock corning machines.

Description

A kind of workbench and rock corning machine
Technical field
The utility model belongs to a kind of rock detection technique field more particularly to a kind of workbench and rock corning machine.
Background technique
Rock corning machine (reference can be made to Fig. 1) includes drilling machine, cylinder knife and workbench at present, and this tin knife is mounted on drill spindle On, and this tin knife upper end be equipped with standard knife handle, the drill spindle be equipped with standard knife handle cooperation connection structure, this tin knife with Realization cylinder knife quick change between drill spindle, but discovery has the following disadvantages and is analyzed as follows when in use:
First, current workbench is equipped with threaded hole, since screw thread hole site is fixed, when to the big rocklet of different shapes When block is fixed, there are inconveniences, and the practicability is poor;
Second, it on current workbench in coring, needs plus water cooling and lubrication, there are large amount of sewage, and deposit at present In sewage crossfire everywhere, there is the problems such as pollution environment;
Third, current workbench is that a level faces to support to the rock block of coring greatly, when cylinder knife is being drilled wait take When the rock block of core, when this tin knife lower end cutter tooth downlink, can encounter the plate, be easy damage cutter and workbench, while depositing not The problem of coring capable of being run through to the rock block completely;
4th, since cylinder knife is when boring dynamic coring, drill bit can generate heat, and need the effects of adding water cooling, depositing dust, use at present One water pipe is directed at cylinder knife bore position, to water is added on the outside of cylinder knife, both there is the splashes of water on the outside of cylinder knife, while this tin knife Inside and rock dry friction, reduce and lubricant effect is weak, and resistance is big, there are problems that coring low efficiency;
5th, since the drilling machine cannot be displaced, exist to the rock block different location placed on pedestal in coring, need Mobile rock, due to rock heaviness, be displaced it is dangerous, exist simultaneously it is time-consuming and laborious, it is troublesome in poeration;
6th, since the workbench cannot be displaced and height adjustment, it can not achieve low level placement, there are feeding troubles, together When mobile rock is not easy in different location coring, be displaced it is dangerous, exist simultaneously it is time-consuming and laborious, it is troublesome in poeration;
7th, current rock corning machine exists due to having a single function and is only used for outdoor coring, and needs to design one Rock corning machine of the kind for indoor coring, meets more requirements.
Utility model content
In order to which in view of the one or more defects existed in the prior art in above-mentioned, the utility model provides a kind of work Platform.
To achieve the above object, the utility model provides a kind of workbench, including plate (6-1), it is characterised in that: should Plate (6-1) upper side is equipped with multiple T-slots (6-11), and each T-slot (6-11) parallel interval is distributed;The plate (6- 1) upper side is equipped with draining annular groove (6-12), which is connected to each T-slot (6-11), and should It drains in annular groove (6-12) and is equipped with discharge outlet (6-13);Plate (6-1) upper side is installed with multiple bearing raised lines (6-3), and Each bearing raised line (6-3) parallel interval distribution.
Using the above scheme, it has the characteristics that and is analyzed as follows at work: first, it is spaced apart due to being provided with Multiple T-slots (6-11), can facilitate will be fixed on this work by multiple groups tommyhead bolt component multiposition to the rock block of coring Make on platform;Second, since the draining annular groove (6-12) is connected to each T type groove (6-11), in the draining annular groove (6-12) Equipped with discharge outlet (6-13), the sewage generated in coring can be discharged in time, while also reduce pollution;Third, due to multiple The contour horizontal supporting of raised line (6-3) for the rock block to coring is held, waits for this on the upside of rock block of coring and plate (6-1) There is certain interval height between face, be both conducive to sewage and be discharged in time, while when cylinder knife is drilling when the rock block of coring, it should It will not encounter the plate (6-1) when cylinder knife (1) lower end downlink, therefore play a protective role to this tin knife (1) sword end, simultaneously It can be achieved to run through coring safely to the rock block.
It further, further include an enclosing (6-2), which is set to the plate (6-1) upper side edge.It should Enclosing (6-2) is used to circumferentially go along with sb. to guard him to the working region of the plate (6-1) upper side, can prevent from preventing dirt in coring Powder-refining with water is splashed, and protective action is played.
Further, draining annular groove (6-12) depth is greater than the T-slot (6-11) depth.The T-slot (6- in this way 11) waste liquid in etc. can automatically flow into the draining annular groove (6-12) of low level, while can be discharged in time, and subtract It is few to be detained, and the later period is facilitated to clean out, conducive to being inserted and removed from for tommyhead bolt, prevent stuck.
Another purpose of the utility model is to provide a kind of rock corning machine, includes drilling machine (5), drilling machine (5) main shaft On toolbox is installed, it is characterised in that: further include workbench as claimed in any one of claims 1-3 (6).
Preferably, the toolbox includes cylinder knife (1), cylinder tool apron (2), water ring (3) and two sealing rings (4);The cylinder Knife (1) includes cylinder (1-1), which is equipped with cutter tooth (1-2), which is equipped with the first connection Head (1-3), first connector (1-3)) in be equipped with connecting hole (1-31), have in the connecting hole (1-31) and to be distributed up and down Taper hole section (1-311) and inner bolt hole section (1-312);This tin tool apron (2) lower end is equipped with the second connector (2-1), second connection There is the outer cone section (2-11) that is distributed up and down and external thread section (2-12) on head (2-1), the outer cone section (2-11) for it is described Taper hole section (1-311) cooperation positioning, the external thread section (2-12) with the inner bolt hole section (1-312) for being threadedly engaged;The water Ring (3) is set on cylinder tool apron (2) middle part and cooperates through described two sealing rings (4) and seals, on two sealing rings (4) Under be spaced apart;Water ring (3) lateral wall is equipped with inlet opening (3-1), the inlet opening (3-1) be passed through in the water ring (3) and Between two sealing rings (4);Aquaporin (2-3) is equipped in this tin tool apron (2), described aquaporin one end (2-3) be used for Inlet opening (3-1) inner end communicates and the aquaporin (2-3) other end is used for and communicates in the cylinder (1-1);The cylinder Tool apron (2) upper end is equipped with standard knife handle (2-4).
Using the above scheme, the course of work and feature are as follows: first, the first connector (1-3) on this tin knife (1) with The second connector (2-1) on cylinder tool apron (2) is fixedly connected, since the outer cone section (2-11) and the taper hole section (1-311) are bored Face cooperates and concentric locating, the external thread section (2-12) are threadedly engaged with the inner bolt hole section (1-312) and are fixedly connected, therefore The cylinder (1-1) and cylinder tool apron (2) are fixed with one heart, improve assembly precision, influence to take to prevent a knife (1) eccentric rotary Core dimensional accuracy, while convenient disassembly make this tin knife (1) can be achieved quickly and precisely to replace;Second, due to this tin tool apron (2) Upper end is equipped with standard knife handle (2-4), and the standard knife handle (2-4) is used to connect with the main shaft matching standard on rock corning machine, Therefore it can guarantee cylinder tool apron (2) assembly precision, prevent this tin knife (1) eccentric rotary and influence coring dimensional accuracy;Third, due to Water ring (3) is set on cylinder tool apron (2) middle part, which is equipped with inlet opening (3-1), and this tin tool apron (2) it is equipped with aquaporin (2-3) in, described aquaporin one end (2-3) is used to communicate with the inner end the inlet opening (3-1) and the water Channel (2-3) other end is used for and communicates in the cylinder (1-1), when in use, inlet opening (3-1) the external water supply pipe, In coring, water can successively enter in the cylinder knife (1) after inlet opening (3-1), aquaporin (2-3), since water is to be located at institute It states in a knife (1), water splashes when can prevent coring first improve processing environment;Secondly because water is interior in cylinder knife (1), it can Realization sufficiently cools down to cylinder knife (1) inner wall and sufficient lubrication, and cooling and lubricant effect are best, keeps coring resistance small, can mention significantly High coring efficiency;In addition, the minim gap stream due to water in cylinder knife (1) between cylinder knife (1) inner wall and sample outer core Out, water application efficiency is greatly improved, is greatly reduced with water, while also greatly reducing sewage generation;4th, due to the water ring (3) It is set on cylinder tool apron (2) middle part and cooperates through described two sealing rings (4) and seal, and the inner end inlet opening (3-1) position Between two sealing rings (4);Therefore in the inlet opening (3-1) after water inlet will not the water ring (3) and the cylinder tool apron (2) it Between let out from two sides, job stability and reliability when water supply can be improved.
Preferably, the standard knife handle (2-4) uses Mohs knife handle.It can guarantee concentricity, fast and easy positioning and installation.
Further, water ring (3) inner sidewall sets two sealing ring card slots (3-2), which blocks respectively In described two sealing ring card slots (3-2).It can prevent two sealing rings (4) from loosening along water ring (3) axial displacement, The stability and reliability of two sealing rings (4) after sealing can be further improved, is conducive to be suitable for higher hydraulic condition Lower work.
It further, further include having worktable displacement driving mechanism (7);The worktable displacement driving mechanism (7) with it is described Workbench (6) connects and for adjusting to the workbench (6) position.The worktable displacement driving mechanism (7) and the work Platform (6) connects and for adjusting to the workbench (6) position.When being placed when the rock of coring on the workbench (6), can lead to Workbench (6) position adjusting is crossed, and then drilling machine (5) is made to treat the rock different location coring of coring, can avoid carrying and position Bulky rock is moved, coring is safer, can be time-consuming and laborious, it operates more convenient.
Preferably, the worktable displacement driving mechanism (7) includes pedestal (7-1), Z axis guide rail (7-2), Z axis slide (7-3), Z axis screw rod (7-4), Y-axis guide rail (7-6), Y-axis slide (7-7), Y-axis screw rod (7-8), X-axis guide rail (7-10), X-axis are sliding Seat (7-11) and X-axis screw rod (7-12);The Z axis slide (7-3) is slidably connected by Z axis guide rail (7-2) with pedestal (7-1), should Z axis screw rod (7-4) is parallel with Z axis guide rail (7-2) and is threadedly engaged with the Z axis slide (7-3), the Z axis screw rod (7-4) one End is connect with Z axis driving motor (7-5) or Z axis rocking handle;The Y-axis slide (7-7) passes through Y-axis guide rail (7-6) and Z axis slide (7-3) is slidably connected, and the Y-axis screw rod (7-8) is parallel with the Y-axis guide rail (7-6) and matches with Y-axis slide (7-7) screw thread It closes, which connect with Y axis driving motor (7-9) or Y-axis rocking handle;The X-axis slide (7-11) passes through X-axis Guide rail (7-10) is slidably connected with Y-axis slide (7-7), the X-axis screw rod (7-12) it is parallel with the X-axis guide rail (7-10) and with The X-axis slide (7-11) is threadedly engaged, and the X-axis screw rod one end (7-12) and X-axis driving motor (7-13) or X-axis rocking handle connect It connects;The workbench (6) is fixedly mounted on the X-axis slide (7-11).
Wherein, the first regulative mode: Z axis silk can be driven by operation Z axis driving motor (7-5) or Z axis rocking handle Bar (7-4) rotation, and the Z axis screw rod (7-4) will drive the Z axis slide (7-3) and go up and down displacement along Z axis guide rail (7-2) Z axis, with Realize to the Z axis slide (7-3) along Z axis height adjustment, while can on workbench (6) place to coring rock along Z axis height Degree is adjusted;
Wherein, second of regulative mode: Y-axis screw rod can be driven by operation Y-axis driving motor (7-9) or Y-axis rocking handle (7-8) rotation, and the Y-axis screw rod (7-8) will drive the Y-axis slide (7-7) along Y-axis guide rail (7-6) Y-axis horizontal displacement, with reality Now to the Y-axis slide (7-7) along Y axis coordinate be displaced adjust, while can on workbench (6) place to coring rock along Y-axis Coordinate displacement is adjusted;
Wherein, the third regulative mode: X-axis silk can be driven by operation X-axis driving motor (7-13) or X-axis rocking handle Bar (7-12) rotation, and the X-axis screw rod (7-12) will drive the X-axis slide (7-11) along X-axis guide rail (7-10) X-axis horizontal position It moves, is adjusted with realizing to be displaced the X-axis slide (7-11) along X axis coordinate, while can be to the rock placed on workbench (6) to coring Stone is displaced along X axis coordinate and adjusts;
In addition, above-mentioned various regulative modes one or more can carry out simultaneously, with realize to placement on workbench (6) to Any X-axis, Y-axis and the Z axis coordinate displacement of the rock of coring are adjusted, it can be achieved that treating different location coring on the rock of coring.
It further, further include drilling machine displacement drive mechanism (8);The drilling machine displacement drive mechanism (8) and the drilling machine (5) it connects and for being adjusted to the drilling machine (5) position;Drilling machine displacement drive mechanism (8) includes fixed beam (8-1), One guide rail (8-2), first slide (8-3), the first screw rod (8-4) and first motor (8-5), the first slide (8-3) pass through the The connection of one guide rail (8-2) fixed beam (8-1) top slide, first screw rod (8-4) is parallel with the first guide rail (8-2), this first Motor (8-5) output end connect with the one end the first screw rod (8-4) and for driving first screw rod (8-4) to rotate, the drilling machine (5) it is fixedly mounted on the first slide (8-3).When placing when the rock of coring on the workbench (6), drilling machine can be passed through Displacement drive mechanism (8) work, and then drilling machine (5) position is adjusted, it, can to realize the rock different location coring for treating coring It avoiding carrying and being displaced bulky rock, coring is safer, can be time-consuming and laborious, it operates more convenient.To drilling machine (5) position tune When section, which drives the first screw rod (8-4) rotation, which drives the edge first slide (8-3) The sliding of the first guide rail direction (8-2), the drilling machine (5) with first slide (8-3) mass motion, and then realize to this first Slide (8-3) drilling machine (5) displacement automatic adjustment, therefore can realize different location coring on the rock for treat coring.
The beneficial effects of the utility model are:
First, the utility model can facilitate due to being provided with the multiple T-slots being spaced apart by the rock to coring Block is fixed on this workbench by multiple groups tommyhead bolt component multiposition;
Second, the utility model is equipped with draining since the draining annular groove is connected to each T-slot in the draining annular groove Mouthful, the sewage generated in coring can be discharged in time, while also reduce pollution;
Third, the utility model are used for the contour horizontal supporting of the rock block to coring due to multiple bearing raised lines, make this To have certain interval height between the rock block and plate upper side of coring, sewage both it had been conducive to and had been discharged in time, while having worked as cylinder knife It is drilling when the rock block of coring, when this tin knife lower end cutter tooth downlink will not encounter the plate, therefore to the knife of this tin knife Tooth plays a protective role, while can realize to the rock block through coring;
4th, the utility model circumferentially go along with sb. to guard him to the working region of the plate upper side due to passing through the enclosing, It can prevent from preventing sewage from splashing in coring, play protective action;
5th, the utility model can automatically flow into the draining annular groove positioned at low level due to the waste liquid etc. in the T-slot It is interior, while can be discharged in time, and reduce delay, and the later period is facilitated to clean out, conducive to tommyhead bolt insertion and take Out, it prevents stuck;
6th, the utility model improves assembly precision since cylinder and cylinder tool apron are detachably fixed with one heart, to prevent Cylinder knife eccentric rotary and influence coring dimensional accuracy, while convenient disassembly makes this tin knife that can realize quick and accurate replacement;
7th, the utility model is since this tin tool apron upper end is equipped with standard knife handle, and the standard knife handle with rock for taking Main shaft matching standard connection on core machine, therefore can guarantee cylinder tool apron assembly precision, it prevents this tin knife eccentric rotary and influences to take Core dimensional accuracy;
8th, the utility model is since in the middle part of water ring the is set in cylinder tool apron, which is equipped with water inlet Hole, and aquaporin is equipped in this tin tool apron, described aquaporin one end is communicated with the inlet opening inner end and the aquaporin is another It holds and is communicated in the cylinder, in coring, water can successively enter in the cylinder knife after inlet opening, aquaporin, can prevent from taking Water splashes when core improve processing environment, can be achieved sufficiently cool down to cylinder knife inner wall and sufficient lubrication, cool down and lubricant effect Preferably, make coring resistance small, be greatly improved coring efficiency, greatly improve water application efficiency, greatly reduce with water, while is also big The big sewage that reduces generates;
9th, the utility model water ring is set in upper in the middle part of the cylinder tool apron and cooperates through described two sealing rings close Envelope, and the inlet opening inner end is located between two sealing rings;It therefore will not be in the water ring and the cylinder after intaking in the inlet opening It lets out between tool apron from two sides, job stability and reliability when water supply can be improved.
Tenth, the utility model passes through worktable displacement driving mechanism, it can be achieved that the rock placed on workbench to coring Any X-axis, Y-axis and the Z axis coordinate displacement of stone are adjusted, it can be achieved that treating different location coring on the rock of coring, while can bore Driving mechanism is moved in seat in the plane, realizes the adjusting to drilling machine coring position, the workbench and drilling machine position adjust and can cooperate, and energy Meet different characteristics and personalized coring requirement simultaneously, wide adaptability, versatility are good, are highly suitable for coring indoors.
Detailed description of the invention
Fig. 1 is a kind of main view of existing rock corning machine.
Fig. 2 is a kind of cross-sectional view of workbench in the utility model.
Fig. 3 is a kind of top view of workbench in the utility model.
Fig. 4 is a kind of perspective view of workbench in the utility model.
Fig. 5 is a kind of main view of rock corning machine in the utility model.
Fig. 6 is a kind of perspective view of rock corning machine in the utility model.
Fig. 7 is the perspective view of worktable displacement driving mechanism and drilling machine displacement drive mechanism assembly relation.
Fig. 8 is a kind of cross-sectional view of toolbox in the utility model.
Fig. 9 is a kind of perspective view of toolbox in the utility model.
Figure 10 is a kind of explosive view of toolbox in the utility model.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples:
Embodiment one: referring to fig. 2-4, a kind of workbench, including plate 6-1, plate 6-1 upper side are equipped with multiple T-types Slot 6-11, and each T-slot 6-11 parallel interval distribution;Plate 6-1 upper side is equipped with draining annular groove 6-12, the draining Annular groove 6-12 is connected to each T-slot 6-11, and discharge outlet 6-13 is equipped in draining annular groove 6-12;On plate 6-1 Side is installed with multiple bearing raised line 6-3, and each bearing raised line 6-3 parallel interval distribution.
In the present embodiment, the plate 6-1 is rectangular slab, which is rectangle annular groove.
In addition, further including an enclosing 6-2, enclosing 6-2 is set to the plate 6-1 upper side edge.Enclosing 6-2 is used for The working region of the plate 6-1 upper side circumferentially go along with sb. to guard him, can prevent from preventing sewage from splashing in coring, play protection Effect.In the present embodiment, the enclosing 6-2 is rectangle coaming plate.The straight-flanked ring slot position is in the rectangle coaming plate and close to setting It sets.
Preferably, enclosing 6-2 is removably attached on plate 6-1.
Further, the draining annular groove 6-12 depth is greater than the T-slot 6-11 depth.In T type groove 6-11 in this way Waste liquid etc. can automatically flow into the draining annular groove 6-12 of low level, while can be discharged in time, and reduce delay, and And also the later period is facilitated to clean out, conducive to being inserted and removed from for tommyhead bolt, prevent stuck.
The present embodiment has the characteristics that and is analyzed as follows at work:
First, due to being provided with the multiple T-slot 6-11 being spaced apart, it can facilitate and pass through the rock block to coring Multiple groups tommyhead bolt component multiposition is fixed on this workbench;
Second, since the draining annular groove 6-12 is connected to each T-slot 6-11, it is equipped in draining annular groove 6-12 Discharge outlet 6-13, the sewage generated in coring can be discharged in time, while also reduce pollution;
Third makes this wait for coring since multiple bearing raised line 6-3 are used for the contour horizontal supporting of the rock block to coring There is certain interval height between rock block and plate 6-1 upper side, be both conducive to sewage and be discharged in time, while when cylinder knife is drilling When the rock block of coring, when 1 lower end downlink of this tin knife, will not meet the plate 6-1, therefore play guarantor to 1 sword end of this tin knife Shield effect, while can realize to the rock block through coring.
Embodiment two: referring to Fig. 5-10, a kind of rock corning machine includes workbench 6 described in drilling machine 5 and embodiment one.
Toolbox is installed on 5 main shaft of drilling machine.Existing structure design can be used in the drilling machine 5, so do not repeat.
In the present embodiment, the toolbox includes cylinder knife 1, cylinder tool apron 2, water ring 3 and two sealing rings 4.
This tin knife 1 includes cylinder 1-1, and the lower end cylinder 1-1 is equipped with cutter tooth 1-2, and the upper end cylinder 1-1 is equipped with the first connection It is equipped with connecting hole 1-31 in head 1-3, first connector 1-3, there is the taper hole section 1-311 being distributed up and down in connecting hole 1-31 With inner bolt hole section 1-312.
2 lower end of this tin tool apron is equipped with the second connector 2-1, has the outer cone section being distributed up and down on second connector 2-1 2-11 and external thread section 2-12, the outer cone section 2-11 are used to cooperate with the taper hole section 1-311 and position, and external thread section 2-12 is used It is threadedly engaged in the inner bolt hole section 1-312.
The water ring 3 is set on the 2 middle part 2-2 of cylinder tool apron and cooperates through described two sealing rings 4 and seals, this two close About 4 seal is spaced apart;3 lateral wall of water ring is equipped with inlet opening 3-1, and inlet opening 3-1 is passed through in the water ring 3 and position Between two sealing rings 4.
In addition, this tin tool apron 2 in be equipped with aquaporin 2-3, the one end the aquaporin 2-3 be used for in the inlet opening 3-1 End communicates and the aquaporin 2-3 other end is used for and communicates in the cylinder 1-1;2 upper end of this tin tool apron is equipped with standard knife handle 2-4。
The course of work and characteristic analysis of this toolbox are as follows: first, the first connector 1-3 and cylinder on this tin knife 1 The second connector 2-1 on tool apron 2 is fixedly connected, due to the outer cone section 2-11 and the taper hole section 1-311 cone match and it is same Heart positioning, external thread section 2-12 is threadedly engaged with the inner bolt hole section 1-312 and is fixedly connected, therefore cylinder 1-1 and cylinder Tool apron 2 is fixed with one heart, improves assembly precision, influences coring dimensional accuracy to prevent 1 eccentric rotary of a knife, dismantle simultaneously It is convenient, make this tin knife 1 that can realize quick and accurate replacement;
Second, since 2 upper end of this tin tool apron is equipped with standard knife handle 2-4, and the standard knife handle 2-4 is used for and rock corning machine On main shaft matching standard connection, therefore can guarantee 2 assembly precision of cylinder tool apron, prevent 1 eccentric rotary of this tin knife and influence coring Dimensional accuracy;
Third, since water ring 3 is set on 2 middle part of cylinder tool apron, which is equipped with inlet opening 3-1, and Aquaporin 2-3 is equipped in this tin tool apron 2, the one end the aquaporin 2-3 is used to communicate with the inner end the inlet opening 3-1 and the water The channel 2-3 other end is used for and communicates in the cylinder 1-1, when in use, the external water supply pipe of inlet opening 3-1, in coring When, water can successively enter in the cylinder knife 1 after inlet opening 3-1, aquaporin 2-3, first since water is located in the cylinder knife 1 Water splashes when can first prevent coring improve processing environment;Secondly because water is in cylinder knife 1, it can be achieved that filling to 1 inner wall of cylinder knife Divide cooling and sufficient lubrication, cooling and lubricant effect are best, keep coring resistance small, are greatly improved coring efficiency;In addition, due to Water greatly improves water application efficiency, greatly in the minim gap outflow in cylinder knife 1 between 1 inner wall of cylinder knife and sample outer core Big reduce uses water, while also greatly reducing sewage generation;
4th, since the water ring 3 is set in the middle part of the cylinder tool apron 2 upper and cooperates sealing through described two sealing rings 4, And the inlet opening inner end 3-1 is located between two sealing rings 4;It therefore will not be in the water ring 3 and institute after water inlet in the 3-1 of the inlet opening It states and lets out between a tool apron 2 from two sides, job stability and reliability when water supply can be improved.
In addition, the water ring 3 is equipped with mounting hole 3-3, which is fixedly connected with the main shaft box enclosure of drilling machine, this tin knife Seat 2 rotates in water ring 3, but due to two sealing ring card slot 3-2 both sides sealings, will not there is leakage problem.
Preferably, the standard knife handle 2-4 uses Mohs knife handle.It can guarantee concentricity, fast and easy positioning and installation.
In addition, in other embodiments, standard knife handle 2-4 can be used and national standard, American Standard, Europe superscript or day mark drill press spindle The connection structure to match.Due to belonging to existing design, so do not repeat.
Further, 3 inner sidewall of water ring sets two sealing ring card slot 3-2, which is installed on institute respectively It states in two sealing ring card slot 3-2.It can prevent two sealing rings 4 from loosening along 3 axial displacement of water ring, can further improve The stability and reliability of two sealing rings 4 after sealing, conducive to being suitable for working under higher hydraulic condition.
It further, further include having worktable displacement driving mechanism 7;The worktable displacement driving mechanism 7 and the work Platform 6 connects and for adjusting to 6 position of workbench.The worktable displacement driving mechanism 7 connect with the workbench 6 and For being adjusted to 6 position of workbench.When placing when the rock of coring on the workbench 6,6 position of workbench can be passed through It adjusts, and then drilling machine 5 is made to treat the rock different location coring of coring, can avoid carrying and be displaced bulky rock, coring is more Safety, can be time-consuming and laborious, operates more convenient.
Preferably, the worktable displacement driving mechanism 7 includes pedestal 7-1, Z axis guide rail 7-2, Z axis slide 7-3, Z axis silk Bar 7-4, Y-axis guide rail 7-6, Y-axis slide 7-7, Y-axis screw rod 7-8, X-axis guide rail 7-10, X-axis slide 7-11 and X-axis screw rod 7-12; The Z axis slide 7-3 is slidably connected by Z axis guide rail 7-2 and pedestal 7-1, the Z axis screw rod 7-4 it is parallel with Z axis guide rail 7-2 and with The Z axis slide 7-3 is threadedly engaged, which connect with Z axis driving motor 7-5 or Z axis rocking handle;The Y Axis slide 7-7 is slidably connected by Y-axis guide rail 7-6 and Z axis slide 7-3, and the Y-axis screw rod 7-8 is parallel with the Y-axis guide rail 7-6 And be threadedly engaged with the Y-axis slide 7-7, which connect with Y axis driving motor 7-9 or Y-axis rocking handle;The X Axis slide 7-11 is slidably connected by X-axis guide rail 7-10 and Y-axis slide 7-7, the X-axis screw rod 7-12 and the X-axis guide rail 7-10 It is threadedly engaged in parallel and with the X-axis slide 7-11, the X-axis one end screw rod 7-12 and X-axis driving motor 7-13 or X-axis rocking handle connect It connects;The workbench 6 is fixedly mounted on the X-axis slide 7-11.
Wherein, the first regulative mode: Z axis screw rod can be driven by operation Z axis driving motor 7-5 or Z axis rocking handle 7-4 rotation, and Z axis screw rod 7-4 will drive the Z axis slide 7-3 and go up and down displacement along Z axis guide rail 7-2Z axis, to realize to the Z axis Slide 7-3 along Z axis height adjustment, while can on workbench 6 place to coring rock along Z axis height adjustment;
Wherein, second of regulative mode: Y-axis screw rod 7- can be driven by operation Y-axis driving motor 7-9 or Y-axis rocking handle 8 rotations, and Y-axis screw rod 7-8 will drive the Y-axis slide 7-7 along Y-axis guide rail 7-6Y axis horizontal displacement, to realize to the Y-axis Slide 7-7 is displaced along Y axis coordinate and adjusts, while can adjust to placing to be displaced to the rock of coring along Y axis coordinate on workbench 6;
Wherein, the third regulative mode: X-axis screw rod can be driven by operation X-axis driving motor 7-13 or X-axis rocking handle 7-12 rotation, and X-axis screw rod 7-12 will drive the X-axis slide 7-11 along X-axis guide rail 7-10X axis horizontal displacement, with realization pair The X-axis slide 7-11 is displaced along X axis coordinate and adjusts, while can be displaced to the rock of coring along X axis coordinate to placing on workbench 6 It adjusts;
In addition, above-mentioned various regulative modes one or more can carry out simultaneously, placed on workbench 6 to coring with realizing Any X-axis of rock, Y-axis and Z axis coordinate displacement adjust, it can be achieved that treating different location coring on the rock of coring.
It further, further include drilling machine displacement drive mechanism 8;The drilling machine displacement drive mechanism 8 connect with the drilling machine 5 and For being adjusted to 5 position of drilling machine;Drilling machine displacement drive mechanism 8 includes fixed beam 8-1, the first guide rail 8-2, first Slide 8-3, the first screw rod 8-4 and first motor 8-5, first slide 8-3 pass through sliding at the top of the first guide rail 8-2 fixed beam 8-1 Dynamic connection, the first screw rod 8-4 is parallel with the first guide rail 8-2, and first motor 8-5 output end and first one end screw rod 8-4 connect It connects and is used to that the first screw rod 8-4 to be driven to rotate, which is fixedly mounted on the first slide 8-3.When the workbench It places when the rock of coring, can be worked on 6 by drilling machine displacement drive mechanism 8, and then adjust 5 position of drilling machine, to realize The rock different location coring of coring to be treated, can avoid carrying and is displaced bulky rock, coring is safer, can be time-consuming and laborious, It operates more convenient.When adjusting to 5 position of drilling machine, first motor 8-5 drives the first screw rod 8-4 rotation, first screw rod 8-4 drives first slide 8-3 to slide along the first direction guide rail 8-2, the drilling machine 5 with first slide 8-3 mass motion, into And it realizes to be displaced first slide 8-3 drilling machine 5 and automatically adjust, therefore can realize that different location takes on the rock for treat coring Core.
In the present embodiment, first guide rail 8-2 is arranged along the y axis.
In other embodiments, first guide rail 8-2 can be arranged along the y axis or other directions are arranged.
The preferred embodiments of the present invention have been described in detail above.It should be appreciated that the ordinary skill people of this field Member according to the present utility model can conceive without creative work makes many modifications and variations.Therefore, all this technology necks Technical staff passes through logic analysis, reasoning or limited reality according to the design of the utility model on the basis of existing technology in domain Available technical solution is tested, it all should be within the scope of protection determined by the claims.

Claims (10)

1. a kind of workbench, including plate (6-1), it is characterised in that:
Plate (6-1) upper side is equipped with multiple T-slots (6-11), and each T-slot (6-11) parallel interval is distributed;
Plate (6-1) upper side is equipped with draining annular groove (6-12), the draining annular groove (6-12) and each T-slot (6-11) It is connected to, and is equipped with discharge outlet (6-13) in the draining annular groove (6-12);
Plate (6-1) upper side is installed with multiple bearing raised lines (6-3), and each bearing raised line (6-3) parallel interval point Cloth.
2. a kind of workbench as described in claim 1, it is characterised in that: further include an enclosing (6-2), which sets In the plate (6-1) upper side edge.
3. a kind of workbench as claimed in claim 1 or 2, it is characterised in that: draining annular groove (6-12) depth is greater than institute State T-slot (6-11) depth.
4. a kind of rock corning machine, including drilling machine (5), toolbox is installed on drilling machine (5) main shaft, it is characterised in that: It further include workbench as claimed in any one of claims 1-3 (6).
5. a kind of rock corning machine as claimed in claim 4, it is characterised in that: the toolbox includes cylinder knife (1), cylinder knife Seat (2), water ring (3) and two sealing rings (4);
This tin knife (1) includes cylinder (1-1), which is equipped with cutter tooth (1-2), which is equipped with the One connector (1-3), first connector (1-3) is interior to be equipped with connecting hole (1-31), has in the connecting hole (1-31) and divides up and down The taper hole section (1-311) and inner bolt hole section (1-312) of cloth;
This tin tool apron (2) lower end is equipped with the second connector (2-1), has the outer cone being distributed up and down on second connector (2-1) Section (2-11) and external thread section (2-12), the outer cone section (2-11) are used to cooperate with the taper hole section (1-311) and position, the outer spiral shell Line section (2-12) with the inner bolt hole section (1-312) for being threadedly engaged;
The water ring (3) is set on cylinder tool apron (2) middle part and cooperates through described two sealing rings (4) and seals, this two close Seal (4) is spaced apart up and down;
Water ring (3) lateral wall is equipped with inlet opening (3-1), which is passed through in the water ring (3) and is located at two Between sealing ring (4);
It is equipped with aquaporin (2-3) in this tin tool apron (2), described aquaporin one end (2-3) is used for and the inner end the inlet opening (3-1) It communicates and the aquaporin (2-3) other end is used for and communicates in the cylinder (1-1);
This tin tool apron (2) upper end is equipped with standard knife handle (2-4).
6. a kind of rock corning machine as claimed in claim 5, it is characterised in that: the standard knife handle (2-4) uses Mohs knife Handle.
7. a kind of rock corning machine as claimed in claim 5, it is characterised in that: water ring (3) inner sidewall sets two sealings It encloses card slot (3-2), which is installed on respectively in described two sealing ring card slots (3-2).
8. a kind of rock corning machine as described in any one of claim 4-7, it is characterised in that: further include having worktable displacement Driving mechanism (7);The worktable displacement driving mechanism (7) connect with the workbench (6) and for the workbench (6) position Set adjusting.
9. a kind of rock corning machine as claimed in claim 8, it is characterised in that: worktable displacement driving mechanism (7) packet Include pedestal (7-1), Z axis guide rail (7-2), Z axis slide (7-3), Z axis screw rod (7-4), Y-axis guide rail (7-6), Y-axis slide (7-7), Y-axis screw rod (7-8), X-axis guide rail (7-10), X-axis slide (7-11) and X-axis screw rod (7-12);
The Z axis slide (7-3) is slidably connected by Z axis guide rail (7-2) with pedestal (7-1), the Z axis screw rod (7-4) and Z axis guide rail (7-2) is parallel and is threadedly engaged with the Z axis slide (7-3), the Z axis screw rod one end (7-4) and Z axis driving motor (7-5) or The connection of person's Z axis rocking handle;
The Y-axis slide (7-7) is slidably connected by Y-axis guide rail (7-6) with Z axis slide (7-3), the Y-axis screw rod (7-8) with it is described Y-axis guide rail (7-6) is parallel and is threadedly engaged with the Y-axis slide (7-7), the Y-axis screw rod one end (7-8) and Y-axis driving motor The connection of (7-9) or Y-axis rocking handle;
The X-axis slide (7-11) is slidably connected by X-axis guide rail (7-10) with Y-axis slide (7-7), the X-axis screw rod (7-12) and The X-axis guide rail (7-10) is parallel and is threadedly engaged with the X-axis slide (7-11), and the X-axis screw rod one end (7-12) and X-axis are driven Dynamic motor (7-13) or X-axis rocking handle connection;
The workbench (6) is fixedly mounted on the X-axis slide (7-11).
10. a kind of rock corning machine as described in any one of claim 4-7 or 9, it is characterised in that: further include drilling machine displacement Driving mechanism (8);
The drilling machine displacement drive mechanism (8) connect with the drilling machine (5) and for adjusting to the drilling machine (5) position;
Drilling machine displacement drive mechanism (8) includes fixed beam (8-1), the first guide rail (8-2), first slide (8-3), first Bar (8-4) and first motor (8-5), the first slide (8-3) are connected by the first guide rail (8-2) fixed beam (8-1) top slide It connects, first screw rod (8-4) is parallel with the first guide rail (8-2), first motor (8-5) output end and the first screw rod (8-4) one End connects and for driving first screw rod (8-4) to rotate, which is fixedly mounted on the first slide (8-3).
CN201821966451.0U 2018-11-27 2018-11-27 A kind of workbench and rock corning machine Expired - Fee Related CN209166874U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821966451.0U CN209166874U (en) 2018-11-27 2018-11-27 A kind of workbench and rock corning machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821966451.0U CN209166874U (en) 2018-11-27 2018-11-27 A kind of workbench and rock corning machine

Publications (1)

Publication Number Publication Date
CN209166874U true CN209166874U (en) 2019-07-26

Family

ID=67340516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821966451.0U Expired - Fee Related CN209166874U (en) 2018-11-27 2018-11-27 A kind of workbench and rock corning machine

Country Status (1)

Country Link
CN (1) CN209166874U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109283012A (en) * 2018-11-27 2019-01-29 重庆交院和瑞工程检测技术有限公司 A kind of workbench and rock corning machine
CN113216887A (en) * 2021-03-31 2021-08-06 深圳大学 Magnetic closing simulation device for flap valve
CN113579999A (en) * 2021-08-12 2021-11-02 江苏万阳轮毂有限公司 New energy automobile wheel hub system of processing

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109283012A (en) * 2018-11-27 2019-01-29 重庆交院和瑞工程检测技术有限公司 A kind of workbench and rock corning machine
CN113216887A (en) * 2021-03-31 2021-08-06 深圳大学 Magnetic closing simulation device for flap valve
CN113216887B (en) * 2021-03-31 2022-04-01 深圳大学 Magnetic closing simulation device for flap valve
CN113579999A (en) * 2021-08-12 2021-11-02 江苏万阳轮毂有限公司 New energy automobile wheel hub system of processing
CN113579999B (en) * 2021-08-12 2022-05-13 江苏万阳轮毂有限公司 New energy automobile wheel hub system of processing

Similar Documents

Publication Publication Date Title
CN209166874U (en) A kind of workbench and rock corning machine
CN106914640B (en) Intelligent steel pipe drilling equipment
CN208214778U (en) A kind of Novel drilling beveler
CN209166873U (en) A kind of toolbox and rock corning machine
CN206952526U (en) A kind of digital control rotating disc type multistation bores and attacks building-block machine
CN208303929U (en) Upright drill with positioning component
CN109283012A (en) A kind of workbench and rock corning machine
CN107962197A (en) A kind of work pieces process drilling equipment
ES351959A1 (en) Milling and drilling tool
CN105033303B (en) One kind can process big workpiece radial drilling machine
CN107186497A (en) A kind of hand Mobile Slide
CN109283011A (en) A kind of toolbox and rock corning machine
CN109283011B (en) Cutter assembly and rock core taking machine
CN207997003U (en) A kind of efficient drilling machine
CN207189885U (en) A kind of hole making drill for being convenient to clean scrap and positioning
CN207155371U (en) A kind of device for being used to stop that drilling machine waste material splashes
CN108188587A (en) A kind of carving machine and its application method of band CCD
CN205363415U (en) Eager processing smear metal protector is rolled to gear dry -type
CN208584241U (en) Drilling tool is used in axial support
CN208342376U (en) A kind of lathe for Hardware fitting cut forming
CN108723397B (en) Double-spindle double-tool-tower lathe
CN208230901U (en) A kind of high efficiency lamp base part drilling equipment
CN207431270U (en) Knife lathe is arranged in a kind of miniature precision numerical control
CN208342272U (en) A kind of automatic drilling and milling machine of pump case base
CN207464211U (en) A kind of machine tool chief axis with annular spray formula cooling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190726