CN209163611U - Guardrail structure of gate maintenance platform - Google Patents

Guardrail structure of gate maintenance platform Download PDF

Info

Publication number
CN209163611U
CN209163611U CN201821804940.6U CN201821804940U CN209163611U CN 209163611 U CN209163611 U CN 209163611U CN 201821804940 U CN201821804940 U CN 201821804940U CN 209163611 U CN209163611 U CN 209163611U
Authority
CN
China
Prior art keywords
gate
inspection platform
guardrail
vertical
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821804940.6U
Other languages
Chinese (zh)
Inventor
王兴恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201821804940.6U priority Critical patent/CN209163611U/en
Application granted granted Critical
Publication of CN209163611U publication Critical patent/CN209163611U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a guardrail structure of a gate maintenance platform, which comprises a gate maintenance platform (1), wherein two gantry crane tracks (2) are arranged on the gate maintenance platform (1), and a group of gate holes (3) are arranged between the two gantry crane tracks (2); guard rails are arranged around the gate holes (3). The guardrail is in a long and narrow rectangular shape; the guardrail comprises a group of fixed guardrails (4) and a group of movable guardrails (5); the fixed guardrails (4) are positioned at two sides of the wider gate pier (6) between the gate hole (3) and at two ends of the gate overhaul platform (1), and guardrail doors (7) are arranged on the fixed guardrails (4); the movable guardrails (5) are positioned at two sides of the gate hole (3). The utility model discloses when carrying out the door leaf overhaul, can realize dismantling the requirement of movable guardrail through dismantling bolt assembly, can not damage the rail guard structure, after the door leaf overhaul, still can go back movable guardrail installation again.

Description

A kind of guard bar structure of gate inspection platform
Technical field
The utility model relates to a kind of guard bar structures of gate inspection platform, belong to hydraulic and hydroelectric engineering metal structure technology neck Domain.
Background technique
General to require setting protective fence for gate inspection platform, existing protective fence is all using being welded and fixed mode It is welded and fixed with the pre-embedded steel slab at the top of gate inspection platform.Existing protective fence normal service general for gate is safeguarded Meet requirement, but when needing to set up scaffold progress gate flap overhaul, some need to remove protective fence protective fence in the way, It needs to root out welding line structure when removing protective fence, causes protective fence to damage, can not continue to use, therefore the prior art or inadequate It is perfect, it needs to be further improved.
Utility model content
The purpose of this utility model is to provide a kind of guard bar structures of gate inspection platform, and protective fence is divided into fixed shield Column and movable rail two parts, to some protective fences of scaffold in the way of setting up using movable rail, movable rail passes through bolt Component at the top of inspection platform pre-embedded steel slab and nonfloating rail both ends connect.When carrying out gate flap overhaul, by removing bolt The requirement for removing railing can be realized, rail structure, effective overcome the deficiencies in the prior art will not be damaged.
To achieve the above objectives, the present invention adopts the following technical solutions:
A kind of guard bar structure of gate inspection platform of the utility model, including gate inspection platform, gate inspection platform Two wharf portal crane tracks are equipped with, are equipped with one group of lock hole between two wharf portal crane tracks;Lock hole is surrounded by guardrail;The shape of guardrail is Narrow and long rectangular;Guardrail includes one group of nonfloating rail and one group of movable rail;Nonfloating rail wider lock between lock hole and lock hole Pier two sides and gate inspection platform both ends, nonfloating rail are equipped with divider gate;Movable rail is located at lock hole two sides.
In aforementioned device, the nonfloating rail and movable rail include one group of column;Through crossbeam between column and column Connection;The column lower end of nonfloating rail is directly welded with the pre-embedded steel slab of gate inspection platform top surface;The cross at nonfloating rail both ends Beam is connect through transversal connecting assembly with the crossbeam at movable rail both ends;The column bottom end of movable rail is through vertical connecting assembly and in advance Bury steel plate flexible connection.
In aforementioned device, the transversal connecting assembly includes the circle for being welded on the one end of the beam of nonfloating rail and movable rail Plate, plectane are welded with horizontal auricle, connect between two horizontal auricles through a pair of bolts component.Guardrail is located at wharf portal crane track and one One group of lock hole is trapped among in narrow and long rectangular by group between lock hole.
In aforementioned device, the horizontal auricle at the nonfloating rail both ends is located at below the horizontal auricle at movable rail both ends.
In aforementioned device, the vertical connecting assembly includes being welded on the vertical monaural piece of pre-embedded steel slab top surface and being welded on The end plate of column bottom end, end plate bottom surface are welded with vertical ears piece;Vertical ears piece is connect through bolt assembly with vertical monaural piece.
In aforementioned device, the plane of the vertical monaural piece and vertical ears piece and the length direction of gate inspection platform are flat Row.
In aforementioned device, the gap between two auricles of the vertical ears piece is slightly larger than the thickness of vertical monaural piece.
In aforementioned device, the divider gate be opened in symmetrical it is two-door;Wherein Yishanmen is equipped with plug, on another Yishanmen Equipped with jack.
By adopting the above-described technical solution, the utility model is compared with prior art, the utility model has and has as follows Beneficial effect: in the wharf portal crane track of gate inspection platform, protective fence is arranged in the two sides in lock hole and two ends.Protective fence is divided into fixation Guardrail and movable rail.Movable rail is located at lock hole two sides, remaining is nonfloating rail, and nonfloating rail is equipped with protective door.Activity Guardrail is connect using bolt assembly with the pre-embedded steel slab of gate inspection platform and nonfloating rail both ends.When carrying out gate flap overhaul, The requirement of dismounting movable rail can be realized by removing bolt assembly, guardrail structure will not be damaged, when gate flap overhaul terminates Afterwards, also movable rail installation can be gone back again.The setting of lock hole two sides is using horizontal direction and vertically to the bolt for being mutually perpendicular to arrangement Component fixes movable rail, and the both direction to movable rail in gate inspection platform plane is constrained, effectively prevented Shaking when movable rail stress.The horizontal auricle at movable rail both ends is located at the horizontal auricle top at nonfloating rail both ends, just In removal and disassembly movable rail.Divider gate can have warning function to lock hole direction, can prevent people using opening in two fans Member falls the generation of lock hole accident.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the partial enlarged view in Fig. 1 at wider gate pier.
In the figure, it is marked as 1- gate inspection platform, 2- wharf portal crane track, 3- lock hole, 4- nonfloating rail, 5- movable rail, 6- Wider gate pier, 7- divider gate, 8- column, 9- crossbeam, 10- pre-embedded steel slab, 11- transversal connecting assembly, 12- vertical connecting assembly, The vertical monaural piece of the horizontal auricle of 13- plectane, 14-, 15- bolt assembly, 16-, 17- end plate, the vertical ears piece of 18-.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples.
The guard bar structure of a kind of gate inspection platform of the utility model, as shown in Figure 1, including gate inspection platform 1, lock Door inspection platform 1 is equipped with two wharf portal crane tracks 2, is equipped with one group of lock hole 3 between two wharf portal crane tracks 2;Lock hole 3 is surrounded by shield Column.The shape of guardrail is narrow and long rectangular;Guardrail includes one group of nonfloating rail 4 and one group of movable rail 5;Nonfloating rail 4 is located at lock Wider 6 two sides of gate pier and 1 both ends of gate inspection platform between hole 3 and lock hole 3, nonfloating rail 4 are equipped with divider gate 7;Activity shield Column 5 is located at 3 two sides of lock hole.
As shown in Fig. 2, nonfloating rail 4 and movable rail 5 include one group of column 8;Through crossbeam 9 between column 8 and column 8 Connection;It is directly welded with the pre-embedded steel slab 10 of 1 top surface of gate inspection platform 8 lower end of column of nonfloating rail 4;4 liang of nonfloating rail The crossbeam 9 at end is connect through transversal connecting assembly 11 with the crossbeam 9 at 5 both ends of movable rail;8 bottom end of column of movable rail 5 is through vertical It is flexibly connected to connection component 12 with pre-embedded steel slab 10.Transversal connecting assembly 11 includes being welded on nonfloating rail 4 and movable rail 5 9 one end of crossbeam plectane 13, plectane 13 is welded with horizontal auricle 14, through a pair of bolts component 15 between two horizontal auricles 14 Connection.Guardrail, which is located between wharf portal crane track 2 and one group of lock hole 3, is trapped among in one group of lock hole 3 in narrow and long rectangular.4 both ends of nonfloating rail Horizontal auricle 14 be located at the lower section of horizontal auricle 14 at 5 both ends of movable rail.Vertical connecting assembly 12 includes being welded on pre-buried steel The vertical monaural piece 16 of 10 top surface of plate and the end plate 17 for being welded on 8 bottom end of column, 17 bottom surface of end plate is welded with vertical ears piece 18; Vertical ears piece 18 is connect through bolt assembly 15 with vertical monaural piece 16.The plane of vertical monaural piece 16 and vertical ears piece 18 with The length direction of gate inspection platform 1 is parallel.Gap between two auricles of vertical ears piece 18 is slightly larger than vertical monaural piece 16 Thickness.Divider gate 7 be opened in symmetrical it is two-door;Wherein Yishanmen is equipped with plug, and another Yishanmen is equipped with jack.
Embodiment
This example is as depicted in figs. 1 and 2, in the wharf portal crane track 2 of gate inspection platform 1, the two sides in lock hole 3 and two is equipped with Protective fence.Protective fence includes being located at two lock holes 3 at wider gate pier 6 and nonfloating rail 4 and the position at 1 both ends of gate inspection platform Movable rail 5 in 3 two sides of lock hole.Nonfloating rail 4 is equipped with the interior guardrail 7 opened.3 upstream and downstream two sides of lock hole are all made of horizontal direction The gate inspection platform 1 for being vertically fixed on movable rail 5 to the bolt assembly 15 for being mutually perpendicular to arrangement;Nonfloating rail 4 is logical Column 8 is crossed to be directly welded on the pre-embedded steel slab 10 of 1 top surface of gate inspection platform;It is welded on the crossbeam 8 at 4 both ends of nonfloating rail Symmetrical plectane 13 and horizontal auricle 14;The horizontal auricle 14 at 4 both ends of nonfloating rail is through bolt assembly 15 and 5 both ends of movable rail Horizontal auricle 14 connect.When connection, the horizontal auricle 14 at 5 both ends of movable rail is located at the horizontal auricle at 4 both ends of nonfloating rail 14 tops are removed with can above lift movable rail 5 easily after bolt assembly 15 easy to dismantle.8 lower end of column of movable rail 5 Equipped with vertical ears piece 18, movable rail 5 passes through vertical ears piece 18 and the pre-embedded steel slab for being welded on 1 top surface of gate inspection platform Vertical monaural piece 16 on 10 is bolted;Gap between two auricles of vertical ears piece 18 is slightly larger than vertical monaural piece 16 Thickness, to facilitate connection.

Claims (8)

1. a kind of guard bar structure of gate inspection platform, including gate inspection platform (1), gate inspection platform (1) is equipped with two Wharf portal crane track (2) is equipped with one group of lock hole (3) between two wharf portal crane tracks (2);Lock hole (3) is surrounded by guardrail, and feature exists In: the shape of guardrail is narrow and long rectangular;Guardrail includes one group of nonfloating rail (4) and one group of movable rail (5);Nonfloating rail (4) Wider gate pier (6) two sides and gate inspection platform (1) both ends, nonfloating rail are set on (4) between lock hole (3) and lock hole (3) There are divider gate (7);Movable rail (5) is located at lock hole (3) two sides.
2. the guard bar structure of gate inspection platform according to claim 1, it is characterised in that: the nonfloating rail (4) and work Dynamic guardrail (5) include one group of column (8);It is connect between column (8) and column (8) through crossbeam (9);Nonfloating rail (4) is stood It is directly welded with the pre-embedded steel slab (10) of gate inspection platform (1) top surface column (8) lower end;The crossbeam (9) at nonfloating rail (4) both ends It is connect through transversal connecting assembly (11) with the crossbeam (9) at movable rail (5) both ends;Column (8) bottom end of movable rail (5) is through vertical It is flexibly connected to connection component (12) with pre-embedded steel slab (10).
3. the guard bar structure of gate inspection platform according to claim 2, it is characterised in that: the transversal connecting assembly (11) Plectane (13) including being welded on crossbeam (9) one end of nonfloating rail (4) and movable rail (5), plectane (13) are welded with level Auricle (14), connects through a pair of bolts component (15) between two horizontal auricles (14), and guardrail is located at wharf portal crane track (2) and one group One group of lock hole (3) is trapped among in narrow and long rectangular between lock hole (3).
4. the guard bar structure of gate inspection platform according to claim 3, it is characterised in that: nonfloating rail (4) both ends Horizontal auricle (14) be located at below the horizontal auricle (14) at movable rail (5) both ends.
5. the guard bar structure of gate inspection platform according to claim 2, it is characterised in that: the vertical connecting assembly (12) Including the vertical monaural piece (16) for being welded on pre-embedded steel slab (10) top surface and the end plate (17) for being welded on column (8) bottom end, end plate (17) bottom surface is welded with vertical ears piece (18);Vertical ears piece (18) connects through bolt assembly (15) with vertical monaural piece (16) It connects.
6. the guard bar structure of gate inspection platform according to claim 5, it is characterised in that: the vertical monaural piece (16) and The plane of vertical ears piece (18) is parallel with the length direction of gate inspection platform (1).
7. the guard bar structure of gate inspection platform according to claim 6, it is characterised in that: the vertical ears piece (18) Gap between two auricles is slightly larger than the thickness of vertical monaural piece (16).
8. the guard bar structure of gate inspection platform according to claim 1, it is characterised in that: the divider gate (7) is symmetrical In open it is two-door;Wherein Yishanmen is equipped with plug, and another Yishanmen is equipped with jack.
CN201821804940.6U 2018-11-02 2018-11-02 Guardrail structure of gate maintenance platform Active CN209163611U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821804940.6U CN209163611U (en) 2018-11-02 2018-11-02 Guardrail structure of gate maintenance platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821804940.6U CN209163611U (en) 2018-11-02 2018-11-02 Guardrail structure of gate maintenance platform

Publications (1)

Publication Number Publication Date
CN209163611U true CN209163611U (en) 2019-07-26

Family

ID=67336440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821804940.6U Active CN209163611U (en) 2018-11-02 2018-11-02 Guardrail structure of gate maintenance platform

Country Status (1)

Country Link
CN (1) CN209163611U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109209014A (en) * 2018-11-02 2019-01-15 中国电建集团贵阳勘测设计研究院有限公司 Guardrail structure of gate maintenance platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109209014A (en) * 2018-11-02 2019-01-15 中国电建集团贵阳勘测设计研究院有限公司 Guardrail structure of gate maintenance platform
CN109209014B (en) * 2018-11-02 2024-01-26 中国电建集团贵阳勘测设计研究院有限公司 Guardrail structure of gate maintenance platform

Similar Documents

Publication Publication Date Title
CN204782041U (en) Elevartor shaft entrance to a cave rail guard with adjustable
CN209163611U (en) Guardrail structure of gate maintenance platform
CN201605536U (en) Opening anti-collision guard rail
CN109209014B (en) Guardrail structure of gate maintenance platform
CN203320496U (en) Protection device of tail water maintenance platform for power station
CN203283979U (en) Retractable car top guard
CN109610301B (en) Damping energy consumption three-way limiting metal damping device for near-fault bridge and installation method
CN202881854U (en) Support bracket for bridge construction
CN216039673U (en) Converter stove lower track bottom plate mounting structure
CN205444739U (en) Fixed railing structure of detachable
CN211498508U (en) Assembled pocket bottom protection device
CN212742228U (en) Integrated safety protection platform for bent cap construction
CN204959604U (en) A board -like ballastless track bridge floor for rushing to repair girder steel
CN110616687B (en) Anti-tidal bore arc gate door top structure
CN203961296U (en) A kind of device that improves discharging platform safety
CN203904889U (en) Movable guardrail for separation zone opening of highway
CN209212069U (en) A kind of construction guard fender
CN203497900U (en) Rail type elevator shaft protecting door
CN207159944U (en) Channel side slopes steel construction operating platform
CN211715488U (en) Construction elevator guardrail connecting device
CN208586514U (en) A kind of simply supported girder bridge expansion gap device
CN204983708U (en) Elevartor shaft door opening self -closing rail guard
CN220035192U (en) Bridge overhauls workstation
CN204223651U (en) Automobile conveying plate chain
CN204959505U (en) Single line roof beam security platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant