CN209163183U - A kind of novel house construction engineering construction ceiling structure - Google Patents
A kind of novel house construction engineering construction ceiling structure Download PDFInfo
- Publication number
- CN209163183U CN209163183U CN201821897379.0U CN201821897379U CN209163183U CN 209163183 U CN209163183 U CN 209163183U CN 201821897379 U CN201821897379 U CN 201821897379U CN 209163183 U CN209163183 U CN 209163183U
- Authority
- CN
- China
- Prior art keywords
- keel
- side arm
- hanging piece
- frame
- stull
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model provides a kind of novel house construction engineering construction ceiling structure, belong to the realm of building construction, including side arm, keel, after-frame and stull keel, keel are arranged between side arm and after-frame, after-frame is fixedly connected on one end of stull keel, and stull keel are horizontally installed on the top of keel, and both ends are fixedly connected with side arm and after-frame, the surface of side arm is socketed with hanging piece, and the top of hanging piece is fixedly embedded protruding block.By setting hanging piece, protruding block, extension blocks and extension chassis, achieve the effect that each component stable connection in structure when in use, effectively prevents sagging and the problem of fall off.
Description
Technical field
The utility model relates to the realm of building construction, specially a kind of ceiling structure.
Background technique
When existing roof furred ceiling, the mode that frame-type ties up connection is generallyd use, although simple and practical in structure, when long
Between after use, sagging gravity influence and tie up when position is tied up it is firmly uneven due to, cause sagging to show with what is fallen off
As causing connective stability between each component poor.How the above problem to be solved by a kind of novel structure, is also become
One hot topic of the ornament materials production unit of roof lifting now.
For this purpose, the ceiling structure it is proposed that a kind of novel house construction engineering is constructed.
Utility model content
(1) the technical issues of solving
For the technical issues of connection is not sufficiently stable between each component of ceiling structure of the prior art, the utility model is provided
A kind of novel house construction engineering is constructed ceiling structure, and by setting hanging piece, protruding block, extension blocks and extension chassis, to reach make
The effect of each component stable connection in used time structure effectively prevents sagging and the problem of fall off.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs: a kind of novel house construction engineering is applied
Work ceiling structure, including side arm, keel, after-frame and stull keel, it is characterised in that: keel are arranged between side arm and after-frame,
After-frame is fixedly connected on one end of stull keel, and stull keel are horizontally installed on the top of keel, and both ends and side arm and after-frame
It is fixedly connected, the surface of side arm is socketed with hanging piece, and the top of hanging piece is fixedly embedded protruding block, and the centre of keel is fixedly connected with
Extension blocks, the bottom end of keel are fixedly connected with extension chassis.
Preferably, the junction of side arm Yu stull keel is arranged in hanging piece, and hanging piece is set as inverted " convex " shape.
Preferably, the bottom end of hanging piece and stull keel are socketed, and top and side arm are socketed, and the top two sides of hanging piece are fixed
Equipped with fixation hole.
Preferably, protruding block is provided with several, and two are arranged among the top two sides of hanging piece for one group, and protruding block is set
It is set to rubber block.
Preferably, it is one group that extension blocks, which are set as two, and the middle opening two sides of keel are arranged in, and extension blocks are two pieces of phases
The link block to connect, and compression of metals spring is connected between connection fastly interconnected, extension blocks are embedded in stull dragon
The surface of bone.
Preferably, the both ends for extending chassis are set as the shape that curves inwardly, and are metal plate.
(3) beneficial effect
(1) the utility model lies in that hanging piece is set as inverted " convex " shape, so that the cross-point of stull keel and side arm obtains
To stabilization, achieve the effect that rock-steady structure.
(2) simultaneously, when structure is fixed in hanging piece, reached by protruding block and increased between hanging piece and side arm
The effect of frictional force achievees the effect that fixed side arm.
(3) it secondly, extension blocks are the two pieces of link blocks connected by compressed spring, and is embedded in stull keel, thus
Achieved the effect that by extension blocks it is fixed to stull keel, since the both ends of extension chassis are set as bending, to reach pair
The effect that external plate is fixed.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of utility model device entirety.
Fig. 2 is the utility model hanging piece structure top view.
Fig. 3 is the utility model keel structure side view.
In Fig. 1-3: 1 side arm, 2 keel, 3 after-frames, 4 stull keel, 5 hanging pieces, 6 protruding blocks, 7 extension blocks, 8 extension chassis.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Embodiment:
As shown in Figs. 1-3;
The present embodiment provides a kind of novel house construction engineering construction ceiling structures, including side arm 1, keel 2, after-frame 3 and stull
Keel 4, keel 2 are arranged between side arm 1 and after-frame 3, and after-frame 3 is fixedly connected on one end of stull keel 4, and stull keel 4 are horizontal
To the top that keel 2 are arranged in, and both ends are fixedly connected with side arm 1 and after-frame 3, and the surface of side arm 1 is socketed with hanging piece 5, hanging piece 5
The junction of side arm 1 Yu stull keel 4 is set, and hanging piece 5 is set as inverted " convex " shape, the bottom end of hanging piece 5 and stull keel 4
Socket, top and side arm 1 are socketed, and the top two sides of hanging piece 5 are fixed with fixation hole, since hanging piece 5 is set as inverted
" convex " shape, while being connect with stull keel 4 and side arm 1, so that the cross-point of stull keel 4 and side arm 1 is stablized, to reach
To the effect of rock-steady structure, the top of hanging piece 5 is fixedly embedded protruding block 6, and protruding block 6 is provided with several, and two are one group
It is arranged among the top two sides of hanging piece 5, protruding block 6 is set as rubber block, when structure is fixed in hanging piece 5, by
It is set as rubber block in protruding block 6, to reach increase when side arm 1 is fixed in hanging piece 5 by protruding block 6 and hang
The effect of frictional force between part 5 and side arm 1, to achieve the effect that fixed side arm 1, the centre of keel 2 is fixedly connected with expansion
Block 7 is opened up, it is one group that extension blocks 7, which are set as two, and the middle opening two sides of keel 2 are arranged in, and extension blocks 7 are two pieces of interconnections
Link block, and connection interconnected it is fast between be connected with compression of metals spring, extension blocks 7 are embedded in stull keel 4
Surface, since extension blocks 7 are the two pieces of link blocks connected by compressed spring so that extension blocks 7 be under pressure when
Time can carry out activity, and be embedded in stull keel 4, thus achieve the effect that fix stull keel 4 by extension blocks 7,
The bottom end of keel 2 is fixedly connected with extension chassis 8, and it is metal plate that the both ends of extension chassis 8, which are set as the shape that curves inwardly, due to
The both ends of extension chassis 8 are set as bending, to achieve the effect that external plate is fixed.
Concrete principle: this structure carry out using when, the connection between side arm 1 and keel 2 is fixed by hanging piece 5, by
It is connect respectively with one end of side arm 1 and keel 2 in the top of hanging piece 5 and low side, and by the cross-point between side arm 1 and keel 2
It being fixed, increases stability, while side arm 1 is fixed in hanging piece 5, protruding block 6 increases the frictional force of side arm 1, from
And it is fixed, and in the connection between keel 2 and stull keel 4, pressure is applied to stull keel 4 by extension blocks 7,
It is fixed, stability between keel 2 and stull keel 4 is increased.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
- Ceiling structure, including side arm (1), keel (2), after-frame (3) and stull keel (4) 1. a kind of novel house construction engineering is constructed, It is characterized by: keel (2) are arranged between side arm (1) and after-frame (3), after-frame (3) is fixedly connected on the one of stull keel (4) End, stull keel (4) are horizontally installed on the top of keel (2), and both ends are fixedly connected with side arm (1) and after-frame (3), side arm (1) surface is socketed with hanging piece (5), and the top of hanging piece (5) is fixedly embedded to be had protruding block (6), and the centre of keel (2) is fixedly connected Have extension blocks (7), the bottom end of keel (2) be fixedly connected with extension chassis (8), it is described extension chassis (8) both ends be set as to Interior bending is metal plate.
- The ceiling structure 2. novel house construction engineering according to claim 1 is constructed, it is characterised in that: hanging piece (5) setting In the junction of side arm (1) and stull keel (4), hanging piece (5) is set as inverted " convex " shape.
- The ceiling structure 3. novel house construction engineering according to claim 2 is constructed, it is characterised in that: the bottom of the hanging piece (5) End is socketed with stull keel (4), and top and side arm (1) are socketed, and the top two sides of hanging piece (5) are fixed with fixation hole.
- The ceiling structure 4. novel house construction engineering according to claim 1 is constructed, it is characterised in that: the protruding block (6) sets Several are equipped with, two are one group of setting among the top two sides of hanging piece (5), and protruding block (6) is set as rubber block.
- The ceiling structure 5. novel house construction engineering according to claim 1 is constructed, it is characterised in that: the extension blocks (7) set Being set to two is one group, and in the middle opening two sides of keel (2), extension blocks (7) are two pieces of link blocks interconnected for setting, and Compression of metals spring, the surface for being embedded in stull keel (4) of extension blocks (7) are connected between connection interconnected is fast.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821897379.0U CN209163183U (en) | 2018-11-16 | 2018-11-16 | A kind of novel house construction engineering construction ceiling structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821897379.0U CN209163183U (en) | 2018-11-16 | 2018-11-16 | A kind of novel house construction engineering construction ceiling structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209163183U true CN209163183U (en) | 2019-07-26 |
Family
ID=67338558
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821897379.0U Expired - Fee Related CN209163183U (en) | 2018-11-16 | 2018-11-16 | A kind of novel house construction engineering construction ceiling structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209163183U (en) |
-
2018
- 2018-11-16 CN CN201821897379.0U patent/CN209163183U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204919961U (en) | Straw insulating brick | |
CN204456575U (en) | Split module plaster tablet suspended ceiling | |
CN208072858U (en) | A kind of stone panel hanger structure | |
CN209163183U (en) | A kind of novel house construction engineering construction ceiling structure | |
CN203617636U (en) | Vertical face connecting piece of cable ladder | |
CN204343521U (en) | A kind of decoration panel connector of dark keel furred ceiling | |
CN108240089B (en) | Metope component and metope installation method | |
CN205509388U (en) | Three cascades climbing crane span structure | |
CN205883119U (en) | Dual -glass photovoltaic assembly's installation pendant and fixed knot construct | |
CN204715603U (en) | A kind of parallel wide keel smallpox | |
CN209429343U (en) | A kind of plate-jointing structure of concealed frame glass curtain wall | |
CN207144277U (en) | A kind of lightgage steel joist joint for being easily installed and dismantling | |
CN208473142U (en) | The T-type fixture of novel color steel tile | |
CN206903192U (en) | Plastic cement fastener | |
CN203856117U (en) | Reverse supporting installation structure | |
CN211817324U (en) | Indoor corrugated suspended ceiling external corner installation node structure | |
CN214034930U (en) | Sunshine room with anti-shear structure | |
CN205476371U (en) | Ceramic tile suspended structure | |
CN204510930U (en) | Be convenient to the preassembled transformer station assembled | |
CN205296475U (en) | Aerated concrete window wrap panel fixed establishment's last structure | |
CN210563165U (en) | Dry-hanging wall brick connecting sleeve | |
CN210563164U (en) | Integrated stone hanging structure | |
CN209494109U (en) | Large-scale public space top surface aluminium profiles rack moulding mounting structure | |
CN216973836U (en) | Prefabricated wall structure is built in room of high strength assembled | |
CN204081370U (en) | Building heat preservation decorative panel connects securing member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190726 Termination date: 20201116 |
|
CF01 | Termination of patent right due to non-payment of annual fee |