CN209163061U - A kind of large span increases the connection structure of cantilever steel girder and former beams of concrete newly - Google Patents

A kind of large span increases the connection structure of cantilever steel girder and former beams of concrete newly Download PDF

Info

Publication number
CN209163061U
CN209163061U CN201821755290.0U CN201821755290U CN209163061U CN 209163061 U CN209163061 U CN 209163061U CN 201821755290 U CN201821755290 U CN 201821755290U CN 209163061 U CN209163061 U CN 209163061U
Authority
CN
China
Prior art keywords
concrete
beams
former
steel
secondary section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821755290.0U
Other languages
Chinese (zh)
Inventor
陈磊
叶伟平
陈立文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central Engineering Technology (shanghai) Co Ltd
Original Assignee
Central Engineering Technology (shanghai) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Engineering Technology (shanghai) Co Ltd filed Critical Central Engineering Technology (shanghai) Co Ltd
Priority to CN201821755290.0U priority Critical patent/CN209163061U/en
Application granted granted Critical
Publication of CN209163061U publication Critical patent/CN209163061U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses the connection structures that a kind of large span increases cantilever steel girder and former beams of concrete newly, former beams of concrete have continuous three it is associated with newly-increased cantilever steel girder, former beams of concrete sets U-shaped Baogang using anchor bolt, and newly-increased cantilever steel girder is the welded H section steel structure for including principal piece and more secondary sections;Principal piece is Cantilever Beams, is welded with the first secondary section, and the web of the first pair section and lower flange and the U-shaped Baogang of first former beams of concrete weld, and the top flange edge of the first secondary section extends to above the former flooring of last root original beams of concrete;Each pair section is connected by the former beams of concrete of the fixed plate blending bolt and both ends that are welded in U-shaped Baogang;Last secondary section has one end and last root original beams of concrete to be connected by fixed plate hinged on junction steel plate;The top flange of the first secondary section H profile steel and the top flange of all secondary section H profile steels are connected to drawing anchor bolt to pass through floor;Newly-increased cantilever steel girder and former beams of concrete are linked to be an entirety by above-mentioned each connection structure.

Description

A kind of large span increases the connection structure of cantilever steel girder and former beams of concrete newly
Technical field
The utility model belongs to technical field of buildings, and in particular to a kind of connection of newly-increased cantilever steel girder and former beams of concrete Technology.
Background technique
In the prior art, often have it is certain building need Rebuilding, extend new outrigger platform, this will involve with it is original Reinforced beam connection.For Long-span Cantilever structure, if newly-increased beam uses armored concrete, beam section size compared with Greatly, headroom is influenced, while Cantilever Beams upper reinforcement bar planting depth needs to amplify 1.5 times, bar planting constructional difficulties and quality are difficult to protect Card;If newly-increased beam uses steel construction, overhanging depth of beam can control, but its top flange is held with node plate welding seams and top anchor bolt By very big pulling force, design and construction are difficult.And for increasing joist steel structure newly, this is the emphasis of design.Former beams of concrete simultaneously Bear high torque, it is also necessary to well solve.
Summary of the invention
The purpose of this utility model is to provide a kind of pair of existing building and needs to add cantilever steel girder to extend new overhanging and put down A kind of solid and reliable and easy simple process organization plan of original reinforced beam connection is involved when platform.
The purpose of this utility model is achieved through the following technical solutions.
A kind of large span increases the connection structure of cantilever steel girder and former beams of concrete newly, characterized in that former beams of concrete is at least There are continuous three, from first piece former beams of concrete every piece side and bottom surface setting U-shaped packets associated with newly-increased cantilever steel girder Steel, the side of last root original beams of concrete and bottom surface are arranged U-shaped Baogang or junction steel plate, U-shaped Baogang only are arranged in medial surface And the junction steel plate is connected using anchor bolt and former beams of concrete;Newly-increased cantilever steel girder is welded H section steel structure, and H profile steel includes Setting one secondary section between principal piece and every adjacent two former beams of concretes;Principal piece H profile steel is overhanging Cantilever Beams, principal piece H profile steel With each corresponding welding in the top flange of the first secondary section H profile steel immediately, web and lower flange, and the web of the two is by enhancing steel Plate and using being bolted;The web of first secondary section H profile steel and lower flange and the U-shaped Baogang of first former beams of concrete weld, The top flange of first secondary section H profile steel along extend to first, second until last root original beams of concrete former flooring above simultaneously It is developed with former flooring;A second secondary section H profile steel is connected between first and second former beams of concrete, the second secondary section H profile steel Both ends are respectively connected by the fixed plate and utilization bolt and the former beams of concrete at both ends that are welded in U-shaped Baogang;Remaining secondary section The rest may be inferred for connection;Last secondary section H profile steel has one end to pass through the fixed plate in the U-shaped Baogang of former beams of concrete that is welded on before it And be connected using bolt, the other end is consolidated with last root original beams of concrete by hinged on the junction steel plate or U-shaped Baogang Fixed board is simultaneously connected using bolt;Floor is passed through by the top flange of the first secondary section H profile steel and all secondary section H profile steels to drawing anchor bolt Top flange is connected;Newly-increased cantilever steel girder and former beams of concrete are linked to be an entirety by above-mentioned each connection structure.
Preferred embodiment, the fixed plate in U-shaped Baogang are to be symmetrical arranged about the web of H profile steel, and web is clipped in the middle Recycle bolt tightening.
The top flange of preferred embodiment, the first secondary section H profile steel is made of thickening steel plate.
Preferred embodiment, original beams of concrete associated with newly-increased cantilever steel girder is continuous three.
The beneficial effects of the utility model are:
1, this structure is combined by multispan beam and converts reasonable stress, solves asking for newly-increased Cantilever Beams top tension difficulty Topic;
2, the torque to former beams of concrete is reduced by extension steel beam simultaneously, making it only needs to carry out Flexural strength;
3, being reinforced by torsion for constructional difficulties is avoided;
4, it is structurally reasonable it is simple, manufacturing cost is lower.
Detailed description of the invention
Attached drawing 1 is an embodiment of the present invention structural schematic diagram;
Attached drawing 2 is the schematic top plan view of Fig. 1.
In figure, first former beams of concrete 1;Former flooring 11;Second former beams of concrete 2;U-shaped Baogang 3;Fixed plate 31; Third root original beams of concrete 4;Junction steel plate 5;Anchor bolt 61;Bolt 62;Principal piece H profile steel 7;First secondary section H profile steel 71;Top flange 711;Web 712;Lower flange 713;Enhance steel plate 714;To drawing anchor bolt 8.
Specific embodiment
Elaborate with reference to the accompanying drawing to the embodiments of the present invention: the present embodiment is with the utility model technology Implemented under premised on scheme, the detailed implementation method and specific operation process are given, but the protection of the utility model Range is not limited to the following embodiments.
Embodiment: as shown in Figure 1, a kind of large span increases the connection structure of cantilever steel girder and former beams of concrete, former coagulation newly Tu Liang at least continuous three associated with newly-increased cantilever steel girder, and the present embodiment is described for three, and the rest may be inferred by analogy;First The side and bottom surface of the former beams of concrete 2 of former beams of concrete 1 and second are arranged U-shaped Baogang 3, third root original beams of concrete 4 it is interior Side is arranged junction steel plate 5, U-shaped Baogang 3 and the junction steel plate 5 and is connected using anchor bolt 61 and former beams of concrete;Newly-increased overhanging Girder steel is welded H section steel structure, and H profile steel includes principal piece and first, second, and third totally three secondary sections;Principal piece H profile steel 7 is outer Stretch Cantilever Beams, principal piece H profile steel 7 and the top flange 711 of the first secondary section H profile steel 71, web 712 and lower flange 713 it is each it is corresponding weld, And the web 712 of the two is connected by enhancing steel plate 714 and using bolt 62;The web 712 of first secondary section H profile steel 71 and under The U-shaped Baogang 3 of the former beams of concrete 1 of the edge of a wing 713 and first welds, and the top flange 711 of the first secondary section H profile steel 71 is along extending to first Root, second and third root original beams of concrete former flooring 11 develop above and with former flooring 11, the first secondary section H profile steel 71 it is upper The edge of a wing 711 is made of thickening steel plate.A second secondary section H profile steel is connected between first and second former beams of concrete 2, the first He Second secondary section H profile steel and the cooperation mechanism of adjacent two former beams of concretes are deployment and conjugation, and registration property is slightly interference Preload fiting property, referring in particular to JB/Z144-79 provide.Third pair section H profile steel is connected to second and third root original coagulation Between native beam 4;The both ends of second secondary section H profile steel respectively pass through the fixed plate 31 being welded in U-shaped Baogang 3 and utilization bolt 62 and two The former beams of concrete at end is connected, and the fixed plate 31 in U-shaped Baogang 3 is to be symmetrical arranged about the web 712 of H profile steel, and by web 712, which are clipped in the middle, recycles bolt 62 to fasten.Third pair section H profile steel has one end by being welded on the U of second former beams of concrete 2 Fixed plate 31 and utilization bolt 62 in type Baogang 3 are connected, and the other end and third root original beams of concrete pass through the junction steel plate 5 Or hinged fixed plate 31 and utilization bolt 62 is connected in U-shaped Baogang 3;Floor is passed through by the first secondary section H profile steel to drawing anchor bolt 8 Top flange 711 and the top flange of second, third secondary section H profile steel are connected;Above-mentioned each connection structure is by newly-increased cantilever steel girder and raw steel Concrete Beam Reinforced is linked to be an entirety.Referring to fig. 2.
The utility model is dexterously combined using the top flange of multistage auxiliary girder and the first auxiliary girder, by newly-increased cantilever steel girder for The torque of raw steel Concrete Beam Reinforced is reasonably converted to the pulling force to more raw steel Concrete Beam Reinforceds, moment of flexure and pressure greatly The bearing capacity of original structure is improved, the top flange of the therein first secondary section H profile steel is by an independent monolith and the steel plate structure of thickening At, which assumes responsibility for the pulling force converted, due to without welding, avoiding the defect for defending the intensity for connecing steel decline, and And be to thicken, so the top flange has especially powerful tensile strength.
The utility model solves the problems, such as that newly-increased Cantilever Beams connect difficulty with former concrete-steel beams, has easy to operate knot The advantage that structure is simple, manufacturing cost is low.The basic principles and main features and this reality of the utility model have been shown and described above With novel advantage.It should be understood by those skilled in the art that the present utility model is not limited to the above embodiments, above-mentioned implementation Only illustrate the principles of the present invention described in example and specification, in the premise for not departing from the spirit and scope of the utility model Under, the utility model also has various changes and improvements, these changes and improvements both fall within claimed invention model In enclosing.The protection scope of the present invention is defined by the appended claims and their equivalents.

Claims (4)

1. the connection structure that a kind of large span increases cantilever steel girder and former beams of concrete newly, characterized in that former beams of concrete is at least Continuous three are associated with newly-increased cantilever steel girder, and U-shaped Baogang is arranged in every side and bottom surface from first former beams of concrete, The side of last root original beams of concrete and bottom surface are arranged U-shaped Baogang or junction steel plate, U-shaped Baogang and institute only are arranged in medial surface Junction steel plate is stated to be connected using anchor bolt and former beams of concrete;Newly-increased cantilever steel girder is welded H section steel structure, and H profile steel includes principal piece And a secondary section is set between former beams of concrete per adjacent two;Principal piece H profile steel is overhanging Cantilever Beams, principal piece H profile steel and tight The top flange of the secondary section H profile steel of first connect, each corresponding welding of web and lower flange, and the web of the two is by enhancing steel plate simultaneously Using being bolted;The web of first secondary section H profile steel and lower flange and the U-shaped Baogang of first former beams of concrete weld, and first The top flange of secondary section H profile steel along extend to first, second until last root original beams of concrete former flooring above and with original Flooring develops;A second secondary section H profile steel is connected between first and second former beams of concrete, the both ends of the second secondary section H profile steel Respectively it is connected by the fixed plate and utilization bolt and the former beams of concrete at both ends that are welded in U-shaped Baogang;The connection of remaining secondary section The rest may be inferred;Last secondary section H profile steel has one end to pass through the fixed plate and benefit in the U-shaped Baogang of former beams of concrete that is welded on before it It is connected with bolt, the other end and last root original beams of concrete pass through fixed plate hinged on the junction steel plate or U-shaped Baogang And it is connected using bolt;Floor is passed through by the upper limb of the top flange of the first secondary section H profile steel and all secondary section H profile steels to drawing anchor bolt Edge is connected.
2. a kind of large span according to claim 1 increases the connection structure of cantilever steel girder and former beams of concrete, feature newly It is that web is clipped in the middle to be symmetrical arranged about the web of H profile steel and recycles bolt tightening by the fixed plate in U-shaped Baogang.
3. a kind of large span according to claim 1 or 2 increases the connection structure of cantilever steel girder and former beams of concrete newly, special Sign is that the top flange of the first secondary section H profile steel is made of thickening steel plate.
4. a kind of large span according to claim 3 increases the connection structure of cantilever steel girder and former beams of concrete, feature newly It is that original beams of concrete associated with newly-increased cantilever steel girder is continuous three.
CN201821755290.0U 2018-10-29 2018-10-29 A kind of large span increases the connection structure of cantilever steel girder and former beams of concrete newly Active CN209163061U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821755290.0U CN209163061U (en) 2018-10-29 2018-10-29 A kind of large span increases the connection structure of cantilever steel girder and former beams of concrete newly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821755290.0U CN209163061U (en) 2018-10-29 2018-10-29 A kind of large span increases the connection structure of cantilever steel girder and former beams of concrete newly

Publications (1)

Publication Number Publication Date
CN209163061U true CN209163061U (en) 2019-07-26

Family

ID=67335508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821755290.0U Active CN209163061U (en) 2018-10-29 2018-10-29 A kind of large span increases the connection structure of cantilever steel girder and former beams of concrete newly

Country Status (1)

Country Link
CN (1) CN209163061U (en)

Similar Documents

Publication Publication Date Title
CN106049255B (en) The light-duty combination beam Simply supported non-uniform structure construction of steel and ultra-high performance concrete and its construction method
CN106758856B (en) The construction method of the pretensioned prestressing corrugated steel web plate composite box girder of precast block
CN108193607B (en) Fabricated prestressed truss for reinforcement and construction method thereof
CN106906748B (en) Based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder
KR101229472B1 (en) Steel pipe girder for bridge
CN101280546A (en) Lower chord opening beam type corrugated steel web combination beam
CN101122159A (en) Steel pipe integral girders for constructing prestressing force and construction method thereof
CN209323367U (en) Steel reinforced concrete composite beam bridge panel assembly seam construction based on early strong high performance concrete
CN105735560A (en) Ultrahigh-tenacity concrete-steel component combined type replaceable connecting beam
CN108316125A (en) Assembled combination folding web grider bridge
CN103061243A (en) Prestressed steel tube concrete combination trussed beam and construction method thereof
CN101793002B (en) Overall composite towing beam arching structure for railway steel truss girder cable-stayed bridge
CN106906736A (en) A kind of clad steel case performance of concrete column confined and girder steel are rigidly connected structural form and construction method
CN110230268A (en) The steel truss composite beam bridge construction method of freely-supported after first continuous
CN104631318A (en) Bridge deck slab transverse unequal-strength steel-concrete combined bridge deck system and construction method thereof
CN209163061U (en) A kind of large span increases the connection structure of cantilever steel girder and former beams of concrete newly
CN108086478A (en) Quadrate steel pipe column and I-beam flat push type dovetail assembling frame Joint design method
CN106906749A (en) The construction method of full assembled steel-concrete combined structure box beam
CN116044020A (en) Construction structure for connecting square steel column with concrete beam
CN109629418A (en) A kind of close stringer system segmentation prestressing force overlapping concrete slab and construction method
CN205617580U (en) Assembled primary and secondary roof beam connection structure
CN214245330U (en) Novel large-tonnage tension swing pier structure of cable-stayed bridge auxiliary pier
CN114704029A (en) Steel-wood combined roof truss structure
CN209066725U (en) A kind of concrete-filled steel tube truss-armored concrete board combining structure
CN107142830A (en) Steel pipe web prestressing force steel reinforced concrete combines main beam structure and construction method

Legal Events

Date Code Title Description
GR01 Patent grant