CN209147844U - Large diameter deep-hole blasting charge constitution - Google Patents
Large diameter deep-hole blasting charge constitution Download PDFInfo
- Publication number
- CN209147844U CN209147844U CN201821656086.3U CN201821656086U CN209147844U CN 209147844 U CN209147844 U CN 209147844U CN 201821656086 U CN201821656086 U CN 201821656086U CN 209147844 U CN209147844 U CN 209147844U
- Authority
- CN
- China
- Prior art keywords
- blasthole
- pack
- detonator
- fine sand
- sand layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses Large diameter deep-hole blasting charge constitutions, it includes blasthole (9), pack (4), primacord (6), detonator (7) and detonator (8), hole plug (1) compatible with blasthole internal diameter is connected with by connector (2) in the blasthole, the hole plug is close to the bottom of blasthole, bottom fine sand layer (3) are filled in blasthole above the hole plug, pack and bamboo (5) are intervally distributed with to blasthole top-direction at the top of the bottom fine sand layer, top fine sand layer (10) is filled at the top of the blasthole, detonator (7) are laid in blasthole above the top fine sand layer, the blasthole top is externally provided with detonator (8), the detonator is connect with detonator, the detonator is connected with the primacord (6) for extending downwardly across top fine sand layer and connecting with each pack.The utility model has the beneficial effects that relatively simple for structure, loading rate is relatively high.
Description
Technical field
The utility model designs blast charging field more particularly to Large diameter deep-hole blasting charge constitution.
Background technique
Large diameter deep-hole blasting mining codes have many advantages, such as that safety coefficient is high, mechanization degree is high, back production is high-efficient, because
This, Large diameter deep-hole blasting mining codes are widely popularized and are used;Equally, Large diameter deep-hole blasting can be arranged because of blasting parameter
It is improper and lead to problems such as to overbreak or adopt less, highwall control is bad, ore boulder yield is high.Ore boulder yield height is always at this stage
The problem of Large diameter deep-hole blasting mining codes development is influenced, and charge constitution is one of the principal element for influencing demolition effect;Together
When modernization large-scale mine have the characteristics that Employee population is few, mechanization degree is high, yield is big, every separate explosion dosage is big, because
This requires live powder charge to have higher efficiency, and charge constitution is equally the principal element for influencing loading rate.It is big at this stage
Diameter deep hole blast charging structure generally use detonator be layered primer, the structure have process is tedious, detonation stability it is poor,
The disadvantages of easily causing detonator to block blasthole after charging quality requirement height, detonation, therefore good charge constitution can not only improve
Working efficiency, and ore boulder yield can be reduced, improve detonation stability.
Chinese invention patent notification number CN101749987B discloses a kind of long borehole blast charging method, explosion therein
Means for loading structure is as follows: guide head is connect with coupling tube, and coupling tube is connect with multiple explosive-feeding processing device stems, multiple explosive-feeding processing devices
It is sequentially connected end to end in turn, in coyote hole sealing pipe collar, multiple sealing of hole attachment device stems are mounted in coyote hole for multiple explosive-feeding processing device tail portions
It seals in pipe collar, multiple sealing of hole attachment devices are sequentially connected end to end in turn, and the tail portion of multiple sealing of hole attachment devices is hole sealing tube, Duo Gefeng
Hole pipe connection is provided with Grouting Pipe, is placed with explosive between two guide pins.For another example Chinese invention patent publication number
CN108444352A discloses a kind of novel deep hole blasting charge constitution, including there are loading layers in blasthole, the aperture of the blasthole;Edge
The depth direction from top to bottom of the blasthole, successively further include explosion water bag, the first powder charge layer, the second powder charge layer and bottom hole
Energy-gathering ring, the first powder charge layer include the first powder column, and multidirectional M type CUMULATIVE BLASTING powder charge dress is arranged with outside first powder column
It sets, the second powder charge layer is the second explosive column;Carbon dioxide is filled in the explosion water bag.Both blast chargings dress
The structure set is more complicated, and loading rate is relatively low.
Utility model content
The technical problems to be solved in the utility model is that existing blast charging apparatus structure is complicated, and loading rate is low, is
This provides a kind of Large diameter deep-hole blasting charge constitution.
The technical solution of the utility model is: Large diameter deep-hole blasting charge constitution, it include blasthole, pack, primacord,
Detonator and detonator, the blasthole is interior to be connected with hole plug compatible with blasthole internal diameter by connector, and the hole plug leans on
The bottom of nearly blasthole, is filled with bottom fine sand layer in the blasthole above the hole plug, to blasthole at the top of the bottom fine sand layer
Top-direction is intervally distributed with pack and bamboo, and top fine sand layer, the top fine sand layer top are filled at the top of the blasthole
Blasthole in be laid with detonator, the blasthole top is externally provided with detonator, and the detonator is connect with detonator, and the detonator connects
It is connected to the primacord for extending downwardly across top fine sand layer and connecting with each pack.
The mode that is spaced apart of pack described in above scheme and bamboo is alternating floor bamboo between every two layers of pack, the bamboo
The length of son is 0.7m, and the pack near top fine sand layer is apart from 2m at the top of blasthole.The blasthole of this kind of structure can be referred to as to expand
Slot.
The pack that mode is proximate to bottom fine sand layer that is spaced apart of pack described in above scheme and bamboo has two layers,
Remaining pack is one layer, and the length of the bamboo is 0.7m, and the pack near top fine sand layer is apart from 1.5m at the top of blasthole.It should
The blasthole of kind structure can be referred to as interstitial hole.
The pack that mode is proximate to bottom fine sand layer that is spaced apart of pack described in above scheme and bamboo has two layers,
Remaining pack is one layer, and the length of the bamboo is 1m, and the pack near top fine sand layer is apart from 2m at the top of blasthole.This kind knot
The blasthole of structure can be referred to as periphery hole.
Primacord described in above scheme and detonator have 2.
Connector described in above scheme is steel wire.
Pack described in above scheme is oil emulsion pack.
Had the utility model has the beneficial effects that advantageously accounting for detonator layering using double primacord primers and igniting
Detonator blocking blasthole etc. is easily caused after having process is tedious, detonation stability is poor, charging quality requirement is high, expands slot to be layered explosion
Disadvantage, to be conducive to improve working efficiency;Under the premise of guaranteeing that explosive specific charge is rational, cut spreader hole and interstitial hole are used
Drug separated layer between the bamboo of 0.7m can more guarantee the uniformity of explosive distribution, and Energy distribution is more uniform in blast process, is conducive to
Reduce ore boulder yield.Stope periphery hole can be reduced explosive specific charge and preferably be guaranteed using drug separated layer between the bamboo of 1m
The uniformity of explosive distribution protects the stability of stope pillar to further decrease blasting impact power.
Detailed description of the invention
Fig. 1 is the schematic diagram that blasthole is cut spreader hole in the utility model;
Fig. 2 is the schematic diagram that blasthole is interstitial hole in the utility model;
Fig. 3 is the schematic diagram that blasthole is periphery hole in the utility model;
In figure, 1, hole plug, 2, connector, 3, bottom fine sand layer, 4, pack, 5, bamboo, 6, primacord, 7, detonator, 8,
Detonator, 9, blasthole, 10, top fine sand layer.
Specific embodiment
With reference to the accompanying drawing, the technical scheme in the utility model embodiment is clearly and completely described.Obviously,
The described embodiments are only a part of the embodiments of the utility model, instead of all the embodiments.Based on the utility model
In embodiment, those of ordinary skill in the art's every other embodiment without making creative work belongs to
The protection scope of the utility model.
Large diameter deep-hole blasting charge constitution, it includes blasthole 9, pack 4, primacord 6, detonator 7 and detonator 8, described
Hole plug 1 compatible with blasthole internal diameter is connected with by connector 2 in blasthole, the hole plug is close to the bottom of blasthole, institute
It states filled with bottom fine sand layer 3 in the blasthole above hole plug, the bottom fine sand layer top is divided to blasthole top-direction interval
It is furnished with pack and bamboo 5, top fine sand layer 10, laying in the blasthole above the top fine sand layer are filled at the top of the blasthole
There is detonator 7, the blasthole top is externally provided with detonator 8, and the detonator is connect with detonator, and the detonator is connected with across top
The primacord 6 that portion's fine sand layer is extended downwardly and connect with each pack.
As shown in Figure 1, embodiment 1: Large diameter deep-hole blasting charge constitution, it include blasthole 9, oil emulsion pack 4, lead it is quick-fried
Rope 6, detonator 7 and detonator 8, the blasthole is interior to be connected with hole plug 1 compatible with blasthole internal diameter by steel wire 2, described stifled
Bottom fine sand layer 3, the bottom fine sand layer top are filled in blasthole of the stopple above the bottom of blasthole, the hole plug
Pack and bamboo 5 are intervally distributed with to blasthole top-direction, and the mode that is spaced apart of pack and bamboo is every two layers of pack interval
One layer of bamboo, the length of bamboo are 0.7m.Top fine sand layer 10 is filled at the top of the blasthole, above the top fine sand layer
Detonator 7 is laid in blasthole, the blasthole top is externally provided with detonator 8, and the detonator is connect with detonator, and the detonator connects
It is connected to the primacord 6 for extending downwardly across top fine sand layer and connecting with each pack, one end of primacord 6 is tied up into a medicine
It is a big gun head on packet 4.Primacord has two, is passed down through top fine sand layer from detonator extraction and connects with every pack,
Pack above the fine sand layer of bottom can be referred to as bottom pack, which has two layers, be located under the fine sand layer of top
The pack of side can be referred to as top pack, remaining pack can be referred to as middle part pack, and top pack has two layers, middle part medicine
Packet is two layers, and top pack can be referred to as cut spreader hole from 2m at the top of blasthole, the blasthole of this structure.
As shown in Fig. 2, embodiment 2: the difference from embodiment 1 is that the mode that is spaced apart of pack and bamboo is bottom medicine
It is surrounded by two layers, top pack and middle part pack are one layer, and the length of the bamboo is 0.7m, near the pack of top fine sand layer
Apart from 1.5m at the top of blasthole, the blasthole of this structure can be referred to as interstitial hole.As shown in figure 3, embodiment 3: with embodiment 1
Difference is that the mode that is spaced apart of pack and bamboo is that bottom pack has two layers, and top pack and middle part pack are one layer, institute
The length for stating bamboo is 1m, and apart from 2m at the top of blasthole, the blasthole of this structure can be referred to as the pack near top fine sand layer
For periphery hole.
The medicine layer in blasthole 9 in the utility model is ignited by double primacords 6 and double detonator 7.With intermediate pore structure
For blasthole, the installation process of the utility model is as follows: first transferring at away from bottom hole 0.5m hole plug 1 with iron wire 2, is used in combination
Iron wire 2 is fixed by hole plug 1, and bottom fine sand layer 0.5m is then filled out in blasthole 9;One end of primacord 6 is tied up into a pack 4
Upper is a big gun head, two big gun heads is continuously transferred in hole to bottom hole, at aperture that primacord 6 is fixed, primacord 6 has
The effect of primer 4 is avoided that the defect that every layer of pack 4 is ignited with detonator 7, such as powder charge using 6 primer 4 of primacord
Structure is cumbersome, charging quality requires high, detonation stability difference etc.;The bamboo 5 of a 0.7m long is transferred with the rope with hook,
Drug separated layer reduces explosive specific charge between the bamboo 5 of 0.7m long has the function of, while can be protected using 5 drug separated layers of bamboo of 0.7m
Card explosive distribution is relatively more uniform, and Energy distribution is more uniform in blast process, and then advantageously reduces ore boulder yield;Then big gun
It according to a pack 4 is one layer in hole, the progress powder charge of the bamboo 5 of piece 0.7m long in medicine interlayer interval is filled to away from aperture 2m or so
When stop powder charge, top fine sand layer 1.5m finally ties up two hair 7 systems of detonator on aperture primacord 6, and detonator 7, which has to ignite, leads
The effect of quick-fried rope 6.Cut spreader hole charge constitution is similar to interstitial hole charge constitution, and difference is the charge constitution above two big gun heads
It is one layer for two packs 4, the bamboo 5 of piece 0.7m long in medicine interlayer interval, to away from aperture 2m or so, remaining structure is homogeneous for powder charge
Together, because compensation space is smaller when expanding slot explosion, increase dose and be conducive to demolition effect, same cut spreader hole charge constitution is led using double
Quick-fried 6 primer 4 of rope can be avoided the problem of detonator 8 easily blocks blasthole 9 after igniting using the layering of detonator 7;Periphery hole powder charge
Structure is similar to interstitial hole charge constitution, and it is one layer that the charge constitution that difference is above two big gun heads, which is a pack 4, medicine layer
Between be spaced 1m long bamboo, powder charge extremely away from aperture 2m or so, remaining structure is all the same, and the bamboo of 1m long suitably increases medicine layer
Spacing reduces explosive specific charge, reduces blasting impact power, to be conducive to the stability of stope pillar.
Claims (7)
1. Large diameter deep-hole blasting charge constitution, it includes blasthole (9), pack (4), primacord (6), detonator (7) and detonator
(8), described stifled it is characterized in that: being connected with hole plug (1) compatible with blasthole internal diameter by connector (2) in the blasthole
Bottom fine sand layer (3) are filled in blasthole of the stopple above the bottom of blasthole, the hole plug, bottom fine sand layer top
Portion is intervally distributed with pack and bamboo (5) to blasthole top-direction, and top fine sand layer (10) is filled at the top of the blasthole, described
It is laid in blasthole above the fine sand layer of top detonator (7), the blasthole top is externally provided with detonator (8), the detonator
It is connect with detonator, the detonator is connected with the primacord (6) for extending downwardly across top fine sand layer and connecting with each pack.
2. Large diameter deep-hole blasting charge constitution as described in claim 1, it is characterized in that: the interval of the pack and bamboo
Distribution mode is alternating floor bamboo between every two layers of pack, and the length of the bamboo is 0.7m, near the pack of top fine sand layer
Apart from 2m at the top of blasthole.
3. Large diameter deep-hole blasting charge constitution as described in claim 1, it is characterized in that: the interval of the pack and bamboo
The pack that distribution mode is proximate to bottom fine sand layer has two layers, remaining pack is one layer, and the length of the bamboo is 0.7m, most
Pack close to top fine sand layer is apart from 1.5m at the top of blasthole.
4. Large diameter deep-hole blasting charge constitution as described in claim 1, it is characterized in that: the interval of the pack and bamboo
The pack that distribution mode is proximate to bottom fine sand layer has two layers, remaining pack is one layer, and the length of the bamboo is 1m, near
The pack of nearly top fine sand layer is apart from 2m at the top of blasthole.
5. the Large diameter deep-hole blasting charge constitution as described in claim 1-4 is any, it is characterized in that: the primacord and thunder
Guan Jun has 2.
6. the Large diameter deep-hole blasting charge constitution as described in claim 1-4 is any, it is characterized in that: the connector is steel
Silk.
7. the Large diameter deep-hole blasting charge constitution as described in claim 1-4 is any, it is characterized in that: the pack is emulsification
Oily pack.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821656086.3U CN209147844U (en) | 2018-10-12 | 2018-10-12 | Large diameter deep-hole blasting charge constitution |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821656086.3U CN209147844U (en) | 2018-10-12 | 2018-10-12 | Large diameter deep-hole blasting charge constitution |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209147844U true CN209147844U (en) | 2019-07-23 |
Family
ID=67269177
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821656086.3U Active CN209147844U (en) | 2018-10-12 | 2018-10-12 | Large diameter deep-hole blasting charge constitution |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209147844U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111207640A (en) * | 2020-03-30 | 2020-05-29 | 南阳市神威爆破工程有限公司 | Ultra-deep hole blasting method |
CN111649633A (en) * | 2020-06-18 | 2020-09-11 | 长沙矿山研究院有限责任公司 | Device with blast hole measurement and hole plugging functions and application method thereof |
CN115493467A (en) * | 2022-10-14 | 2022-12-20 | 中铁二十三局集团第四工程有限公司 | Underwater loosening blasting construction method for cast-in-situ bored pile |
-
2018
- 2018-10-12 CN CN201821656086.3U patent/CN209147844U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111207640A (en) * | 2020-03-30 | 2020-05-29 | 南阳市神威爆破工程有限公司 | Ultra-deep hole blasting method |
CN111649633A (en) * | 2020-06-18 | 2020-09-11 | 长沙矿山研究院有限责任公司 | Device with blast hole measurement and hole plugging functions and application method thereof |
CN111649633B (en) * | 2020-06-18 | 2023-05-23 | 长沙矿山研究院有限责任公司 | Device with functions of blast hole measurement and hole blocking and application method thereof |
CN115493467A (en) * | 2022-10-14 | 2022-12-20 | 中铁二十三局集团第四工程有限公司 | Underwater loosening blasting construction method for cast-in-situ bored pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209147844U (en) | Large diameter deep-hole blasting charge constitution | |
CN101738148B (en) | Tunnel medium-length hole smooth blasting method | |
CN104154830B (en) | Medium-length hole blasting method for underground mining | |
CN108007285A (en) | A kind of stone head deep hole sublevel is segmented efficient Cut Blasting method | |
CN106091848B (en) | It is a kind of to realize overlength, the method for high inclination-angle tunnel anchorage top bar explosion | |
CN105627846B (en) | A kind of method that deephole bench blasting prevents and treats bump | |
CN107957222A (en) | Reduce blasthole spaced loading and the method for ignition of methods of blasting toes in open generation rate | |
CN114166082B (en) | Tunnel advanced drilling hole combination accurate control blasting structure and construction process | |
CN102494571A (en) | Construction method for damped blasting of tunnels | |
CN102155890A (en) | Filling method used in deep hole loosening blasting pressure release | |
CN107339920B (en) | The method of superdeep holes presplit blasting | |
CN102494572A (en) | Blasting method for undermining and tunnelling in mode of distributing hollow holes at periphery and solid hole in center | |
CN109870084A (en) | A kind of VCR mining codes exempt from cleaning bottom of hole blast charging structure and its construction method | |
CN110440649A (en) | Hydraulic drill ring drilling large cross-section tunnel steel for shot structure and blasting method | |
CN207066255U (en) | A kind of coal seam Deephole pre-splitting blasting charge constitution | |
CN110260731A (en) | A kind of simultaneous shaft sin king construction method for drop shaft, cutting well | |
CN107503726A (en) | Orientation hydraulic pressure for improving gas permeability of coal seam concentrates demolition set | |
CN109612357A (en) | One kind covering object explosion Pass blocks dredging method and device | |
CN114183138B (en) | Coal bed non-mining drilling pre-splitting blasting method | |
CN201159620Y (en) | Deep borehole blasting cartridge | |
CN107288606A (en) | A kind of method of artificial construction hot dry rock heat reservori | |
CN106352749B (en) | A kind of method of tunnelling periphery hole homogeneous energy explosion | |
CN111595213A (en) | Application of non-cutting raise grooving method in blasting stope | |
CN104879128B (en) | Severe inclined thick coal seam coal winning technology based on the advanced pre- quick-fried reduction of top coal | |
CN209623525U (en) | The steel for shot structure of roadway development blasting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |