CN209145405U - A kind of construction device - Google Patents

A kind of construction device Download PDF

Info

Publication number
CN209145405U
CN209145405U CN201821695608.0U CN201821695608U CN209145405U CN 209145405 U CN209145405 U CN 209145405U CN 201821695608 U CN201821695608 U CN 201821695608U CN 209145405 U CN209145405 U CN 209145405U
Authority
CN
China
Prior art keywords
sleeve
hole
steel tube
construction device
leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821695608.0U
Other languages
Chinese (zh)
Inventor
胡玉龙
刘帅
魏占雨
范泽明
杨伯辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kaihong Jiabai Technology Co ltd
Original Assignee
Tianjin Zhonghui Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Zhonghui Construction Engineering Group Co Ltd filed Critical Tianjin Zhonghui Construction Engineering Group Co Ltd
Priority to CN201821695608.0U priority Critical patent/CN209145405U/en
Application granted granted Critical
Publication of CN209145405U publication Critical patent/CN209145405U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of construction device, including square frame, square frame is made of upper beam, underbeam and two side beam weldings, and iron plate or guardrail net are provided on square frame;It is provided with L shape plug on a curb girder wherein, is provided with insertion tube on another curb girder;Two sleeves are welded on underbeam, the axial direction and underbeam of two sleeves are perpendicular;It is fitted with first leg in first sleeve, the second supporting leg is fitted in second sleeve, the first sleeve is identical with the structure of second sleeve, all has a pair of through-hole being disposed radially;The first leg is identical with the structure of the second supporting leg, including inserting axis and chassis, chassis is a square steel tube, the center weld of the square steel tube is in slotting axis bottom end, the top for inserting axis is inserted in sleeve, and in the top setting for inserting axis there are two radial through-hole, two radial through-hole are arranged in right-angled intersection, and aperture is equal with the aperture of the through-hole on sleeve.

Description

A kind of construction device
Technical field
The utility model belongs to technical field of buildings, and in particular to a kind of construction device.
Background technique
Construction guardrail is that a kind of common device, existing guardrail generally include guardrail panel and bottom in construction The supporting leg of the supporting leg in portion, bottom is vertical with guardrail panel, therefore guardrail is when needing to transport, supporting leg very occupied space, So that the transport of guardrail is more troublesome.
Or also have plenty of supporting leg and can dismantle, when transport, needs to unload supporting leg, individually transport, but be easy to make in this way At the confusion of supporting leg and guardrail panel, it is not easy to manage.
In addition, according to the requirement of operating condition, it is also different to the requirement for height of guardrail, need a kind of shield that can convert height Column.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, provide a kind of construction device.
The utility model is achieved through the following technical solutions:
A kind of construction device, including square frame, square frame is by upper beam, underbeam and two side beam welding structures At being provided with iron plate or guardrail net on square frame;
It is provided with L shape plug on a curb girder wherein, is provided with insertion tube on another curb girder;
Two sleeves are welded on underbeam, the axial direction and underbeam of two sleeves are perpendicular;
It is fitted with first leg in first sleeve, the second supporting leg, the first set are fitted in second sleeve Cylinder is identical with the structure of second sleeve, all has a pair of through-hole being disposed radially;
The first leg is identical with the structure of the second supporting leg, including inserts axis and chassis, and chassis is a square steel tube, the party The center weld of steel pipe is inserted in sleeve on slotting axis bottom end, the top for inserting axis, and there are two diameters in the top setting for inserting axis To through-hole, two radial through-hole are arranged in right-angled intersection, and aperture is equal with the aperture of the through-hole on sleeve.
In the above-mentioned technical solutions, the use state of this construction device: the square steel tube chassis of the first leg Square steel tube chassis with the second supporting leg penetrates with the first bolt the through-hole and in first sleeve perpendicular to the square frame One supporting leg inserts the radial through-hole on axis, and it is logical that the second bolt penetrates the radial direction that the through-hole in second sleeve and the second supporting leg are inserted on axis Hole.
In the above-mentioned technical solutions, the collapsed state of this construction device: the square steel tube chassis of first leg and The square steel tube chassis and the square frame of two supporting legs are in same plane.
In the above-mentioned technical solutions, two intermediate vertical beams are set on the square frame, further strengthen the entirety of frame Intensity.
In the above-mentioned technical solutions, 4/1 extension position of underbeam is arranged in first sleeve, and second sleeve is arranged in underbeam 4/ 3 extension positions.
In the above-mentioned technical solutions, it is provided on the square steel tube chassis of first leg and on the square steel tube chassis of the second supporting leg Through-hole, through-hole are vertically arranged in the both ends of square steel tube chassis, in use, selling to insertion into through-hole, ground pin is squeezed into ground end, from And it is fixedly secured engagement positions with ground.
In the above-mentioned technical solutions, top guardrail, the frame of top guardrail are also fitted in the top of square frame To be rectangular, it is provided with bolt at two base angles of the square frame of guardrail above, in the square box of this construction device It is provided with jack on two apex angles of frame, is cooperated by bolt and jack, top guardrail is mounted on square frame.
In the above-mentioned technical solutions, and above it is respectively arranged with plug and insertion tube at left and right sides of guardrail, so as to more Connection between a top guardrail.
In the above-mentioned technical solutions, the length of the square steel tube chassis of first leg is less than the 2/1 of the square frame length.
In the above-mentioned technical solutions, the length of the square steel tube chassis of the second supporting leg is less than the 2/1 of the square frame length.
It the advantages of the utility model and has the beneficial effect that
1, the utility model is convenient for assembling and transport, in use, the square steel tube chassis and the second supporting leg of the first leg Square steel tube chassis perpendicular to the square frame, and penetrate through-hole in first sleeve with the first bolt and first leg inserts axis On radial through-hole, the second bolt penetrates the through-hole in second sleeve and the second supporting leg and inserts radial through-hole on axis.
When needing to transport the present apparatus, the first bolt and the first bolt are unloaded first, then by the square steel tube of first leg The square steel tube chassis of chassis and the second supporting leg is adjusted to parallel with the square frame, then installs the first bolt and first again Bolt finally makes the square steel tube chassis of first leg and the square steel tube chassis of the second supporting leg and the square frame same flat Face, since whole device is a flat surface, institute transports in order to be superimposed.First sleeve is arranged in 4/1 extension position of underbeam, and second 4/3 extension position of underbeam is arranged in sleeve;The length of the square steel tube chassis of first leg and the square steel tube chassis of the second supporting leg Length be respectively less than the 2/1 of the square frame length, to guarantee the square steel tube chassis of first leg and the square steel of the second supporting leg When tube bottom frame and square frame are placed in parallel, the outer end of square steel tube chassis does not protrude square frame two sides.
2, the utility model can convert height.
3, it is provided with through-hole on the square steel tube chassis of first leg and on the square steel tube chassis of the second supporting leg, through-hole is set vertically It sets at the both ends of square steel tube chassis, in use, selling to insertion into through-hole, ground pin is squeezed into ground end, to make engagement positions and ground Face is fixedly secured.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the construction device of the utility model embodiment one.
Fig. 2 is the structural schematic diagram of the construction device use state of the utility model embodiment one.
Fig. 3 is the side view of Fig. 2.
Fig. 4 is the A of Fig. 1 to cross-sectional view.
Fig. 5 is that the construction of the utility model combines connection schematic diagram with device.
Fig. 6 is the side view of the construction device of the utility model embodiment two.
Fig. 7 is the structural schematic diagram of the construction device of the utility model embodiment three.
Fig. 8 is the combining structure schematic diagram of the construction device of the utility model embodiment three.
Wherein:
1: upper beam, 2: underbeam, 3: curb girder, 4: intermediate vertical beam, 5:L shape plug, 6: insertion tube, 11: top guardrail, 12: bolt, 13: jack.
It for those of ordinary skill in the art, without creative efforts, can be according to above attached Figure obtains other relevant drawings.
Specific embodiment
In order to make those skilled in the art better understand the scheme of the utility model, combined with specific embodiments below into one Step illustrates the technical solution of the utility model.
Embodiment one
Referring to attached drawing 1-5, a kind of construction device, including square frame, square frame is by upper beam 1, underbeam 2 and two A curb girder 3 is formed by welding, and two intermediate vertical beams 4 can also be arranged on the square frame, further strengthens the whole strong of frame It spends, is provided with iron plate or guardrail net on square frame.
It is provided with L shape plug 5 on a curb girder wherein, insertion tube 6 is provided on another curb girder, by plug and is inserted Multiple present apparatus can be connected in turn by the cooperation between cylinder.
Two sleeves 7-1 and 7-2 are welded on underbeam 2, the axial direction and underbeam of two sleeves are perpendicular, preferably are as follows: the 4/1 extension position of underbeam is arranged in one sleeve 7-1, and 4/3 extension position of underbeam is arranged in second sleeve 7-2.
It is fitted with first leg 8-1 in first sleeve, the second supporting leg 8-2 is fitted in second sleeve, it is described First sleeve is identical with the structure of second sleeve, all has a pair of through-hole 7-a being disposed radially.
The structure of the first leg 8-1 and the second supporting leg 8-2 are identical, including insert axis 8-a and chassis 8-b, chassis one Root square steel tube, in slotting axis bottom end, the top for inserting axis is inserted in sleeve the center weld of the square steel tube, and is inserting axis 8-a's There are two radial through-hole 8-c, two radial through-hole 8-c to be arranged in right-angled intersection for top setting, the logical 7-a on aperture and sleeve The aperture in hole is equal.
When use (Fig. 2), the square steel tube chassis of the first leg and the square steel tube chassis of the second supporting leg are perpendicular to described Square frame, and the radial through-hole on the through-hole in first sleeve and the slotting axis of first leg, the second spiral shell are penetrated with the first bolt 9-1 Bolt 9-2 penetrates the radial through-hole on the through-hole in second sleeve and the slotting axis of the second supporting leg.
When needing to transport the present apparatus (Fig. 1), the first bolt and the first bolt are unloaded first, then by the side of first leg The square steel tube chassis of steel pipe chassis and the second supporting leg is adjusted to parallel with the square frame, then install again the first bolt and First bolt, the square steel tube chassis of the square steel tube chassis and the second supporting leg that finally make first leg is with the square frame same Plane, since whole device is a flat surface, institute transports in order to be superimposed.Further, the square steel tube chassis of first leg The length of the square steel tube chassis of length and the second supporting leg is respectively less than the 2/1 of the square frame length, to guarantee first leg When the square steel tube chassis of square steel tube chassis and the second supporting leg and square frame are placed in parallel, the not prominent side in the outer end of square steel tube chassis Shape frame two sides.
Embodiment two
Referring to attached drawing 6, on the basis of example 1, further, on the square steel tube chassis of first leg and second Through-hole 8-d is provided on the square steel tube chassis of leg, through-hole is vertically arranged in the both ends of square steel tube chassis, in use, into through-hole Insertion ground pin 8-e, squeezes into ground end for ground pin, so that engagement positions be made to be fixedly secured with ground.
Embodiment three
Referring to attached drawing 7-8, on the basis of example 1, further, in the square frame of this construction device Top be also fitted with top guardrail 11, the frame of top guardrail is rectangular, two of the square frame of guardrail above It is provided with bolt 12 at base angle, is provided with jack 13 on two apex angles of the square frame of this construction device, passes through Bolt 12 and jack 13 cooperate, and top guardrail 11 is mounted on square frame, and the left and right sides of guardrail 11 point above It is not provided with plug and insertion tube, so as to the connection between multiple top guardrails 11.
Illustrative description has been done to the utility model above, it should explanation, in the core for not departing from the utility model In the case where the heart, it is any it is simple deformation, modification or other skilled in the art can not spend creative work etc. The protection scope of the utility model is each fallen with replacement.

Claims (10)

1. a kind of construction device, it is characterised in that: including square frame, square frame is by upper beam, underbeam and two sides Beam is formed by welding, and iron plate or guardrail net are provided on square frame;
It is provided with L shape plug on a curb girder wherein, is provided with insertion tube on another curb girder;
Two sleeves are welded on underbeam, the axial direction and underbeam of two sleeves are perpendicular;
Be fitted with first leg in first sleeve, be fitted with the second supporting leg in second sleeve, the first sleeve and The structure of second sleeve is identical, all has a pair of through-hole being disposed radially;
The first leg is identical with the structure of the second supporting leg, including inserts axis and chassis, and chassis is a square steel tube, the square steel tube Center weld in slotting axis bottom end, the top for inserting axis is inserted in sleeve, and there are two radial logical in the top setting for inserting axis Hole, two radial through-hole are arranged in right-angled intersection, and aperture is equal with the aperture of the through-hole on sleeve.
2. a kind of construction device according to claim 1, it is characterised in that: the use of this construction device State: the square steel tube chassis of the first leg and the square steel tube chassis of the second supporting leg are perpendicular to the square frame, and with One bolt penetrates the radial through-hole on the through-hole in first sleeve and the slotting axis of first leg, and the second bolt penetrates in second sleeve Through-hole and the second supporting leg insert the radial through-hole on axis.
3. a kind of construction device according to claim 1, it is characterised in that: this construction device is packed up State: the square steel tube chassis of first leg and the square steel tube chassis of the second supporting leg and the square frame are in same plane.
4. a kind of construction device according to claim 1, it is characterised in that: be arranged in two on square frame Between vertical beam.
5. a kind of construction device according to claim 1, it is characterised in that: the 4/ of underbeam is arranged in first sleeve 1 extension position, second sleeve are arranged in 4/3 extension position of underbeam.
6. a kind of construction device according to claim 1, it is characterised in that: on the square steel tube chassis of first leg With through-hole is provided on the square steel tube chassis of the second supporting leg, through-hole is vertically arranged in the both ends of square steel tube chassis, in use, to logical Insertion ground pin, squeezes into ground end for ground pin, so that engagement positions be made to be fixedly secured with ground in hole.
7. a kind of construction device according to claim 1, it is characterised in that: also cooperate in the top of square frame Top guardrail is installed, bolt is provided at the two of guardrail base angle above, in the square frame of this construction device Two apex angles on be provided with jack, cooperated by bolt and jack, top guardrail be mounted on square frame.
8. a kind of construction device according to claim 7, it is characterised in that: and the left and right two of guardrail above Side is respectively arranged with plug and insertion tube.
9. a kind of construction device according to claim 1, it is characterised in that: the square steel tube chassis of first leg Length is less than the 2/1 of the square frame length.
10. a kind of construction device according to claim 1, it is characterised in that: the square steel tube chassis of the second supporting leg Length be less than the square frame length 2/1.
CN201821695608.0U 2018-10-18 2018-10-18 A kind of construction device Active CN209145405U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821695608.0U CN209145405U (en) 2018-10-18 2018-10-18 A kind of construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821695608.0U CN209145405U (en) 2018-10-18 2018-10-18 A kind of construction device

Publications (1)

Publication Number Publication Date
CN209145405U true CN209145405U (en) 2019-07-23

Family

ID=67270244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821695608.0U Active CN209145405U (en) 2018-10-18 2018-10-18 A kind of construction device

Country Status (1)

Country Link
CN (1) CN209145405U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111188297A (en) * 2020-02-11 2020-05-22 金川集团股份有限公司 Safety fence

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111188297A (en) * 2020-02-11 2020-05-22 金川集团股份有限公司 Safety fence

Similar Documents

Publication Publication Date Title
CN204753817U (en) Steel structure beam column joint
CN208586762U (en) Flashlight cartridge type integration assembling type steel structure column beam contact composite structure
CN209145405U (en) A kind of construction device
CN110158771A (en) A kind of anti-buckling support energy consumption type bean column node for construction steel structure
CN107386463A (en) A kind of lower logical upper link point
CN207518084U (en) A kind of steady type cabinet
CN203487632U (en) Multipurpose frame component
CN206376589U (en) A kind of stage bracket structure
CN202925879U (en) Multidirectional combined connector
CN206752669U (en) A kind of building frame
CN204850040U (en) But assembled truss combination column structure
CN207794304U (en) A kind of reinforced bean column node
CN206495334U (en) A kind of green assembled architecture basis and the attachment means of wind resistance steel column
CN104759085A (en) Folding football door
CN106223613B (en) The installation and positioning structure of mould bases upright bar
CN205513589U (en) Combination concatenation bed device of high -efficient installation
CN204590563U (en) A kind of Novel dismountable scaffold
CN204637489U (en) Collapsible goal football
CN204326523U (en) Building form vertical supporting
CN204980798U (en) There is not staircase of support host computer base additional strengthening
CN215330937U (en) Assembled support column convenient to dismantle
CN203505906U (en) Foldable furniture
CN216304904U (en) Energy-saving steel structure system
CN215443190U (en) Convenient installation system of large-scale round pin axle
CN202274454U (en) Lamp support for performances

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240226

Address after: No. 33 Kunlun Road, Xinbei District, Changzhou City, Jiangsu Province, 213002

Patentee after: Changzhou Xinmiao Construction Engineering Co.,Ltd.

Country or region after: Zhong Guo

Address before: No. 109, 3rd Floor, 2nd Door, Investment Promotion Headquarters Building, Xinli Street, 700 meters west of Bridge 5, Jintang Road, Dongli District, Tianjin, 300000

Patentee before: TIANJIN ZHONGHUI CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Country or region before: Zhong Guo

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240321

Address after: 621000 No.35 Mianan Road, Fucheng District, Mianyang City, Sichuan Province

Patentee after: Kaihong Jiabai Technology Co.,Ltd.

Country or region after: Zhong Guo

Address before: No. 33 Kunlun Road, Xinbei District, Changzhou City, Jiangsu Province, 213002

Patentee before: Changzhou Xinmiao Construction Engineering Co.,Ltd.

Country or region before: Zhong Guo

TR01 Transfer of patent right