CN209145283U - A kind of concrete-pouring template bracing means and concreting auxiliary tool - Google Patents
A kind of concrete-pouring template bracing means and concreting auxiliary tool Download PDFInfo
- Publication number
- CN209145283U CN209145283U CN201821255509.0U CN201821255509U CN209145283U CN 209145283 U CN209145283 U CN 209145283U CN 201821255509 U CN201821255509 U CN 201821255509U CN 209145283 U CN209145283 U CN 209145283U
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- concrete
- wirerope
- connect
- fastener
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a kind of concrete-pouring template bracing means, it is related to concreting field, it includes multiple fastening assemblies, fastening assembly includes the first fastener, second fastener, it is L-shaped first connector and the second connector, first connector connect to form the rectangle frame for adapting to concrete-pouring template with the second connector, one end of first fastener is connect with the first connector, the other end of first fastener is connect with the second connector, one end of second fastener is connect with the first connector, the other end of second fastener is connect with the second connector, first fastener and the second fastener both sides that be located at rectangle frame opposite, and first fastener and the second fastener for making the first connector and the second connector clamping concrete-pouring template.The utility model additionally provides a kind of concreting auxiliary tool comprising concrete-pouring template and concrete-pouring template bracing means mentioned above.
Description
Technical field
The utility model relates to concreting fields, and in particular to a kind of concrete-pouring template bracing means and coagulation
Soil pours auxiliary tool.
Background technique
Currently, reinforcing knot of the ruggedized construction of existing concrete-pouring template using the outer anchor ear cooperation split bolt of steel pipe
Structure, the ruggedized construction are easy to be influenced by fashioned iron steel column, cannot effectively reinforce, so that concreting effect is poor, exist and rise
The risk of mould and quick-fried mould.
Inventor has found that the prior art at least has the disadvantage in that under study for action
Strengthening mechanism mould or quick-fried mould it is easier that concrete rises in casting process.
Utility model content
The purpose of this utility model is to provide a kind of concrete-pouring template bracing means, improve the prior art not
Foot, the concrete-pouring template bracing means can effectively reinforce template, prevent concrete from rising in casting process
The case where mould and quick-fried mould, this is reasonable in design, practical.
Another of the utility model has been designed to provide a kind of concreting auxiliary tool comprising mentioned above
Concrete-pouring template bracing means, with the concrete-pouring template bracing means repertoire.
The embodiments of the present invention are achieved in that
The embodiments of the present invention provide a kind of concrete-pouring template bracing means comprising multiple fastening groups
Part;
The fastening assembly includes the first fastener, the second fastener, is L-shaped first connector and the second connection
Part;
First connector connect to form the rectangle frame for adapting to concrete-pouring template with second connector;
One end of first fastener is connect with first connector, the other end of first fastener with it is described
The connection of second connector;
One end of second fastener is connect with first connector, the other end of second fastener with it is described
The connection of second connector;
First fastener and second fastener both sides that be located at the rectangle frame opposite, and described first
Fastener and second fastener are for making first connector and second connector clamp the concreting
Template.
Specifically, the concrete-pouring template bracing means can effectively reinforce template, prevent concrete from pouring
Occur rising in the process mould and quick-fried mould the case where, this is reasonable in design, practical.
Optionally, multiple fastening assemblies are uniformly distributed along the axis direction of the concrete-pouring template.
Optionally, first connector includes the first connecting rod and second connecting rod for being all made of aluminum alloy materials;
Second connector includes the third connecting rod and fourth link for being all made of aluminum alloy materials;
The first connecting rod and the second connecting rod weld, and the length direction of the first connecting rod and the second connecting rod
Length direction it is vertical, the third connecting rod and the fourth link are welded, and the length direction of the third connecting rod with it is described
The length direction of fourth link is vertical;
The first connecting rod is connect with the third connecting rod, and the second connecting rod is connect with the fourth link, and described
First connecting rod, the second connecting rod, the third connecting rod and the fourth link form the rectangle frame;
The first connecting rod, the second connecting rod, the third connecting rod and the fourth link are rectangular steel tube.
Optionally, first fastener includes the first flower basket bolt, the first wirerope and the second wirerope;
One end of first flower basket bolt is connect with one end of first wirerope, first flower basket bolt it is another
One end is connect with one end of second wirerope;
First wirerope is connect far from one end of first flower basket bolt with the first connecting rod;
Second wirerope is connect far from one end of first flower basket bolt with the fourth link.
Optionally, first fastener further includes the first hook and the second hook;
It is described first hook connect with first wirerope, first wirerope pass through it is described first link up with it is described
First connecting rod connection;
It is described second hook connect with second wirerope, second wirerope pass through it is described second link up with it is described
Fourth link connection.
Optionally, second fastener includes the second flower basket bolt, third wirerope and the 4th wirerope;
One end of second flower basket bolt is connect with one end of the third wirerope, second flower basket bolt it is another
One end is connect with one end of the 4th wirerope;
The one end of the third wirerope far from second flower basket bolt is connect with first connector;
The one end of 4th wirerope far from second flower basket bolt is connect with second connector.
Optionally, second fastener further includes third hook and the 4th hook;
Third hook is connect with the third wirerope, the third wirerope by third hook with it is described
First connecting rod connection;
It is described 4th hook connect with the 4th wirerope, the 4th wirerope pass through it is described 4th link up with it is described
Fourth link connection.
Optionally, the fastening assembly further includes the first bolt and the second bolt;
The first connecting rod is provided with first through hole far from one end of the second connecting rod, and the third connecting rod is far from described
One end of fourth link is provided with the first slotted hole;
First bolt pass through the first through hole and first slotted hole with connect the first connecting rod with it is described
Third connecting rod;
The fourth link is provided with the second through-hole far from one end of the third connecting rod, and the second connecting rod is far from described
One end of first connecting rod is provided with the second slotted hole;
Second bolt pass through second through-hole connect with second slotted hole second connecting rod with it is described
Fourth link.
The embodiments of the present invention additionally provide a kind of concreting auxiliary tool comprising concrete-pouring template
With concrete-pouring template bracing means mentioned above, the concrete-pouring template bracing means and the concreting
Template squeezes contact.
Optionally, the concrete-pouring template includes steel form and the permeable template for adapting to the steel form, described
Permeable template is set to the inner surface of the steel form;
The permeable template includes adhesion layer and pervious bed;
The adhesion layer side is adhered to the outer surface of the steel form, the other side of the adhesion layer and the pervious bed
Connection, the pervious bed are provided with multiple holes.
Compared with prior art, the beneficial effect of the utility model embodiment includes, for example:
In conclusion the embodiments of the present invention provide a kind of concrete-pouring template bracing means, the concrete
Formwork for placing bracing means can effectively reinforce template, prevent concrete from occurring rising in casting process the feelings of mould and quick-fried mould
Condition.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment
Attached drawing be briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore should not be by
Regard the restriction to range as, for those of ordinary skill in the art, without creative efforts, may be used also
To obtain other relevant attached drawings according to these attached drawings.
Fig. 1 is that structure of the concrete-pouring template bracing means provided by the embodiment of the utility model under the first visual angle is shown
It is intended to;
Fig. 2 is that structure of the concrete-pouring template bracing means provided by the embodiment of the utility model under the second visual angle is shown
It is intended to;
Fig. 3 is the structural schematic diagram of the first fastener provided by the embodiment of the utility model;
Fig. 4 is the structural schematic diagram of the first connector and the second connector provided by the embodiment of the utility model;
Fig. 5 is the structural schematic diagram of concrete-pouring template provided by the embodiment of the utility model.
Icon: 100- concrete-pouring template bracing means;The first fastener of 111-;The first flower basket bolt of 1111-;
The first wirerope of 1112-;The second wirerope of 1113-;1114- first is linked up with;1115- second is linked up with;The second fastener of 112-;
The second flower basket bolt of 1121-;1122- third wirerope;The 4th wirerope of 1123-;The first connector of 113-;1131- first connects
Bar;1132- second connecting rod;1133- first through hole;The second slotted hole of 1134-;1135- protrusion;The second connector of 114-;
1141- third connecting rod;1142- fourth link;The first slotted hole of 1143-;The second through-hole of 1144-;200- concrete-pouring template;
21- steel form;22- permeable template;221- adhesion layer;222- pervious bed.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer
Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched
The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Usually here in attached drawing description and
The component of the utility model embodiment shown can be arranged and be designed with a variety of different configurations.
Therefore, requirement is not intended to limit to the detailed description of the embodiments of the present invention provided in the accompanying drawings below
The scope of the utility model of protection, but it is merely representative of the selected embodiment of the utility model.Based in the utility model
Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all
Belong to the range of the utility model protection.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that the orientation or position of the instructions such as term " on ", "inner", "outside"
Set relationship be based on the orientation or positional relationship shown in the drawings or the utility model product using when the orientation usually put
Or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than the device of indication or suggestion meaning or
Element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as the limit to the utility model
System.
In addition, term " first ", " second ", " third " etc. are only used for distinguishing description, it is not understood to indicate or imply
Relative importance.
In the description of the present invention, it should also be noted that, unless otherwise clearly defined and limited, term " is set
Set ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can
To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary
Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition
Concrete meaning in utility model.
Embodiment 1
Referring to Fig.1 and 2, present embodiments providing a kind of concrete-pouring template bracing means 100 comprising multiple
Fastening assembly;
Fastening assembly includes the first fastener 111, the second fastener 112, is L-shaped first connector 113 and second
Connector 114;
First connector 113 connect the rectangle frame for being formed and adapting to concrete-pouring template 200 with the second connector 114;
One end of first fastener 111 is connect with the first connector 113, and the other end of the first fastener 111 and second connects
Fitting 114 connects;
One end of second fastener 112 is connect with the first connector 113, and the other end of the second fastener 112 and second connects
Fitting 114 connects;
First fastener 111 and the second fastener 112 both sides that be located at rectangle frame opposite, and the first fastener 111
With the second fastener 112 for making the first connector 113 and the second connector 114 clamp concrete-pouring template 200.
Fig. 1 is please referred to, the shape of concrete-pouring template 200 is cuboid in Fig. 1, and multiple fastening assemblies are poured along concrete
The short transverse of building mould 200 is distributed, and be can be and is uniformly distributed and irregular can also be distributed.
Referring to figure 2., the first connector 113 and the second connector 114 are L shape, and the first connector 113 and second connects
Fitting 114 mutually overlaps, and forms rectangle frame, which can be set in the outer surface of concrete-pouring template 200.
First fastener 111 and the second fastener 112 can be rope, steel wire etc., and the first connector 113 and second connects
Fitting 114 is connected with each other by the first fastener 111 and the second fastener 112, and the first fastener 111 and the second fastener
112 can make rectangle frame extruded concrete formwork for placing 200, to realize the function of clamping to concrete-pouring template 200, improve
Good consolidation effect.
Referring to figure 2., it should be noted that in order to avoid the first connector 113 and the second connector 114 were squeezing
It rotates or tilts in journey, so it is opposite that the first fastener 111 and the second fastener 112 are separately positioned on rectangle frame
Both sides.
Specifically, the utility model provides a kind of concrete-pouring template bracing means 100, the concrete-pouring template
Bracing means 100 can effectively reinforce template, prevent concrete occur rising in casting process mould and quick-fried mould the case where.
Fig. 1 is please referred to, in the present embodiment, multiple fastening assemblies are uniform along the axis direction of concrete-pouring template 200
Distribution.
Fastening assembly is uniformly distributed along the axis direction of concrete-pouring template 200, please refers to Fig. 1, each fastening assembly
The rectangle frame of formation is parallel to each other, which can allow the uniform stress of concrete-pouring template 200, preferably prevents
Concrete-pouring template 200 occur rising when pouring mould and quick-fried mould the case where.
Referring to Fig.1 and 2, in the present embodiment, the first connector 113 includes being all made of the first of aluminum alloy materials to connect
Bar 1131 and second connecting rod 1132;
Second connector 114 includes the third connecting rod 1141 and fourth link 1142 for being all made of aluminum alloy materials;
First connecting rod 1131 and second connecting rod 1132 weld, and the length direction of first connecting rod 1131 and second connecting rod 1132
Length direction it is vertical, third connecting rod 1141 and fourth link 1142 are welded, and the length direction of third connecting rod 1141 and the 4th
The length direction of connecting rod 1142 is vertical;
First connecting rod 1131 is connect with third connecting rod 1141, and second connecting rod 1132 is connect with fourth link 1142, and first
Connecting rod 1131, second connecting rod 1132, third connecting rod 1141 and fourth link 1142 form rectangle frame;
First connecting rod 1131, second connecting rod 1132, third connecting rod 1141 and fourth link 1142 are rectangular steel tube.
First connecting rod 1131 and second connecting rod 1132 use aluminum alloy materials, and the cost of aluminium alloy is low, light-weight and structure
Intensity is high, staff's convenience and high-efficiency in use.Referring to Fig.1 and 2, the first connector 113 includes first connecting rod
1131 and second connecting rod 1132, first connecting rod 1131 and second connecting rod 1132 weld, and guarantee its bonding strength, first connecting rod 1131
It is mutually perpendicular to second connecting rod 1132.Referring to figure 2., it should be noted that first connecting rod 1131 and second connecting rod 1132 weld
Afterwards, first connecting rod 1131 extends a protrusion 1135 along the length direction of itself, is convenient for and first fastener 111 connects
It connects.
In the present embodiment, the second connector 114 uses structure identical with the first connector 113, and which is not described herein again.
It is understood that first connecting rod 1131, second connecting rod 1132, third connecting rod 1141 and fourth link 1142 are distinguished
As four sides of rectangle frame, concrete-pouring template 200 is clamped by the first fastener 111 and the second fastener 112.It needs
It is noted that during practice, first connecting rod 1131, second connecting rod 1132, third connecting rod 1141 and fourth link
1142 can be according to the specific size of concrete-pouring template 200, using different length, to adapt to concrete-pouring template
200 size.
It should be noted that in the present embodiment, first connecting rod 1131, second connecting rod 1132, third connecting rod 1141 and
Double leval jib 1142 is rectangular steel tube, and the contact that rectangular steel tube can be closer with concrete-pouring template 200 is conducive to more preferable
Clamping concrete-pouring template 200, effectively prevent concrete-pouring template 200 from occurring the mould that rises in concreting process
The phenomenon that with quick-fried mould.
Referring to Fig.1 and 2, in the present embodiment, the first fastener 111 includes the first flower basket bolt 1111, the first steel
Cord 1112 and the second wirerope 1113;
One end of first flower basket bolt 1111 is connect with one end of the first wirerope 1112, the first flower basket bolt 1111 it is another
One end is connect with one end of the second wirerope 1113;
First wirerope 1112 is connect far from one end of the first flower basket bolt 1111 with first connecting rod 1131;
Second wirerope 1113 is connect far from one end of the first flower basket bolt 1111 with fourth link 1142.
First fastener 111 further includes the first hook 1114 and the second hook 1115;
First hook 1114 is connect with the first wirerope 1112, and the first wirerope 1112 passes through the first hook 1114 and first
Connecting rod 1131 connects;
Second hook 1115 is connect with the second wirerope 1113, and the second wirerope 1113 passes through the second hook 1115 and the 4th
Connecting rod 1142 connects.
Second fastener 112 includes the second flower basket bolt 1121, third wirerope 1122 and the 4th wirerope 1123;
One end of second flower basket bolt 1121 is connect with one end of third wirerope 1122, the second flower basket bolt 1121 it is another
One end is connect with one end of the 4th wirerope 1123;
The one end of third wirerope 1122 far from the second flower basket bolt 1121 is connect with the first connector 113;
The one end of 4th wirerope 1123 far from the second flower basket bolt 1121 is connect with the second connector 114.
Second fastener 112 further includes third hook and the 4th hook;
Third hook is connect with third wirerope 1122, and third wirerope 1122 passes through third hook and first connecting rod 1131
Connection;
4th hook is connect with the 4th wirerope 1123, and the 4th wirerope 1123 passes through the 4th hook and fourth link 1142
Connection.
In the present embodiment, fastener can be more using this fastener using the combination of flower basket bolt and wirerope
The convenient rectangle frame that adjusts is to the tightness of concrete-pouring template 200.Specifically, the first fastener 111 includes the first flower
Basket bolt 1111, the first wirerope 1112 and the second wirerope 1113, the second fastener 112 include the second flower basket bolt 1121,
Third wirerope 1122 and the 4th wirerope 1123.
One end of first flower basket bolt 1111 and the first wirerope 1112 weld, the other end of the first flower basket bolt 1111
It is welded with the second wirerope 1113, guarantees the first flower basket bolt 1111 and the first wirerope 1112 and the second wirerope 1113
Bonding strength.
Referring to figure 2. and Fig. 3, the first wirerope 1112 are provided with the first hook far from one end of the first flower basket bolt 1111
1114,1114 welding of the first wirerope 1112 and the first hook, between the first wirerope of enhancing 1112 and the first hook 1114
Bonding strength, the first wirerope 1112 are articulated on first connecting rod 1131 by the first hook 1114.Second wirerope 1113 is remote
One end from the first flower basket bolt 1111 is provided with the second hook 1115, and the second wirerope 1113 and the second hook 1115 weld,
Enhance the bonding strength between the second wirerope 1113 and the second hook 1115, the second wirerope 1113 passes through the second hook 1115
It is articulated in fourth link 1142.
It should be noted that in the present embodiment, the second fastener 112 and the first fastener 111 use identical structure,
Which is not described herein again.It is worth noting that, the third wirerope 1122 in the second fastener 112 is articulated in by third
On one connecting rod 1131, the 4th wirerope 1123 is articulated in fourth link 1142 by the 4th.Also, referring to figure 2.,
One fastener 111 and the second fastener 112 are located at the opposite both sides of rectangle frame, are conducive to the fastening assembly and preferably press from both sides
Tight concrete-pouring template 200.
Referring to figure 4., in the present embodiment, fastening assembly further includes the first bolt and the second bolt;
First connecting rod 1131 is provided with first through hole 1133 far from one end of second connecting rod 1132, and third connecting rod 1141 is separate
One end of fourth link 1142 is provided with the first slotted hole 1143;
First bolt passes through first through hole 1133 and the first slotted hole 1143 to connect first connecting rod 1131 and third connecting rod
1141;
Fourth link 1142 is provided with the second through-hole 1144 far from one end of third connecting rod 1141, and second connecting rod 1132 is separate
One end of first connecting rod 1131 is provided with the second slotted hole 1134;
Second bolt passes through the second through-hole 1144 with the second slotted hole 1134 to connect second connecting rod 1132 and fourth link
1142。
Referring to figure 4., first connecting rod 1131 is provided with first through hole 1133, third far from one end of second connecting rod 1132
Connecting rod 1141 is provided with the first slotted hole 1143 far from one end of fourth link 1142, and the first bolt passes through 1133 He of first through hole
First slotted hole 1143 can be relatively fixed by first connecting rod 1131 and third connecting rod 1141, and then by 113 He of the first connector
Second connector 114 is relatively fixed.It should be noted that opposite with third connecting rod 1141 when needing to adjust first connecting rod 1131
When position, staff can unclamp the first bolt, first connecting rod 1131 can be moved along the first slotted hole 1143 appropriate
Distance, then fastened the first connector 113 and the second connector 114 with the first bolt.
Referring to figure 4., fourth link 1142 is provided with the second through-hole 1144 far from one end of third connecting rod 1141, and second
Connecting rod 1132 is provided with the second slotted hole 1134 far from one end of first connecting rod 1131, and the second bolt passes through 1144 He of the second through-hole
Second slotted hole 1134 can be relatively fixed by second connecting rod 1132 and fourth link 1142, and then by 113 He of the first connector
Second connector 114 is relatively fixed.It should be noted that opposite with fourth link 1142 when needing to adjust second connecting rod 1132
When position, staff can unclamp the second bolt, fourth link 1142 can be moved along the second slotted hole 1134 appropriate
Distance, then fastened the first connector 113 and the second connector 114 with the second bolt.
First through hole 1133, the second through-hole 1144, the first slotted hole 1143 and the setting of the second slotted hole 1134 are in order to suitable
For more application scenarios, when the first fastener 111 and the second fastener 112 are also not enough to rectangle frame being clamped in coagulation
When on native formwork for placing 200, the first bolt can be used and the second bolt improves the connection that the first connector 113 is connect with second
Intensity, while rectangle frame is improved to the clamping force of concrete-pouring template 200.
Embodiment 2
Present embodiments provide a kind of concreting auxiliary tool comprising concrete-pouring template 200 and above-mentioned mention
The concrete-pouring template bracing means 100 arrived, concrete-pouring template bracing means 100 and concrete-pouring template 200 squeeze
Press contacts.
Referring to figure 4., in the present embodiment, concrete-pouring template 200 includes steel form 21 and adapts to steel form 21
Permeable template 22, permeable template 22 is set to the inner surface of steel form 21;
Permeable template 22 includes adhesion layer 221 and pervious bed 222;
221 side of adhesion layer is adhered to the outer surface of steel form 21, and the other side of adhesion layer 221 is connect with pervious bed 222,
Pervious bed 222 is provided with multiple holes.
In the casting process of concrete, vapor generation is usually had, vapor encounters concrete-pouring template 200
Inner wall just will form droplet, the quality after influencing concrete formation.In the present embodiment, concrete blinding includes steel form 21
With permeable template 22, which is adapted to the rigid template, and the inner wall of steel form 21 is arranged in the permeable template 22.
Specifically, permeable template 22 includes adhesion layer 221 and pervious bed 222, adhesion layer 221 is bonded in the interior of steel form 21
On wall, pervious bed 222 is bonded on adhesion layer 221, and the surface of pervious bed 222 is provided with multiple holes, and aperture is very small, can only be for
Gas passes through.The vapor generated in concreting process passes through multiple apertures of pervious bed 222, and vapor touches adherency
Layer 221 is condensed into droplet, and droplet is directly bonded on adhesion layer 221, will not be had an impact to the casting process of concrete.
To sum up, which can effectively reinforce template, prevent concrete from pouring
Occur rising in the process mould and quick-fried mould the case where, this is reasonable in design, practical.
It should be noted that in the absence of conflict, the feature in the embodiments of the present invention can be tied mutually
It closes.
The above is only the preferred embodiments of the utility model, are not intended to limit the utility model, for this field
Technical staff for, various modifications and changes may be made to the present invention.Within the spirit and principle of the utility model,
Any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.
Claims (10)
1. a kind of concrete-pouring template bracing means, which is characterized in that including multiple fastening assemblies;
The fastening assembly includes the first fastener, the second fastener, is L-shaped first connector and the second connector;
First connector connect to form the rectangle frame for adapting to concrete-pouring template with second connector;
One end of first fastener is connect with first connector, the other end of first fastener and described second
Connector connection;
One end of second fastener is connect with first connector, the other end of second fastener and described second
Connector connection;
First fastener and second fastener both sides that be located at the rectangle frame opposite, and first fastening
Part and second fastener are for making first connector and second connector clamp the concrete-pouring template.
2. concrete-pouring template bracing means according to claim 1, it is characterised in that: multiple fastening assembly edges
The axis direction of the concrete-pouring template is uniformly distributed.
3. concrete-pouring template bracing means according to claim 1, it is characterised in that: first connector includes
It is all made of the first connecting rod and second connecting rod of aluminum alloy materials;
Second connector includes the third connecting rod and fourth link for being all made of aluminum alloy materials;
The first connecting rod and the second connecting rod weld, and the length of the length direction of the first connecting rod and the second connecting rod
It is vertical to spend direction, the third connecting rod and the fourth link are welded, and the length direction of the third connecting rod and the described 4th
The length direction of connecting rod is vertical;
The first connecting rod is connect with the third connecting rod, and the second connecting rod is connect with the fourth link, and described first
Connecting rod, the second connecting rod, the third connecting rod and the fourth link form the rectangle frame;
The first connecting rod, the second connecting rod, the third connecting rod and the fourth link are rectangular steel tube.
4. concrete-pouring template bracing means according to claim 3, it is characterised in that: first fastener includes
First flower basket bolt, the first wirerope and the second wirerope;
One end of first flower basket bolt is connect with one end of first wirerope, the other end of first flower basket bolt
It is connect with one end of second wirerope;
First wirerope is connect far from one end of first flower basket bolt with the first connecting rod;
Second wirerope is connect far from one end of first flower basket bolt with the fourth link.
5. concrete-pouring template bracing means according to claim 4, it is characterised in that: first fastener also wraps
Include the first hook and the second hook;
First hook is connect with first wirerope, and first wirerope passes through first hook and described first
Connecting rod connection;
Second hook is connect with second wirerope, and second wirerope passes through second hook and the described 4th
Connecting rod connection.
6. concrete-pouring template bracing means according to claim 3, it is characterised in that: second fastener includes
Second flower basket bolt, third wirerope and the 4th wirerope;
One end of second flower basket bolt is connect with one end of the third wirerope, the other end of second flower basket bolt
It is connect with one end of the 4th wirerope;
The one end of the third wirerope far from second flower basket bolt is connect with first connector;
The one end of 4th wirerope far from second flower basket bolt is connect with second connector.
7. concrete-pouring template bracing means according to claim 6, it is characterised in that: second fastener also wraps
Include third hook and the 4th hook;
The third hook is connect with the third wirerope, and the third wirerope passes through third hook and described first
Connecting rod connection;
4th hook is connect with the 4th wirerope, and the 4th wirerope passes through the 4th hook and the described 4th
Connecting rod connection.
8. concrete-pouring template bracing means according to claim 3, it is characterised in that: the fastening assembly further includes
First bolt and the second bolt;
The first connecting rod is provided with first through hole far from one end of the second connecting rod, and the third connecting rod is far from the described 4th
One end of connecting rod is provided with the first slotted hole;
First bolt passes through the first through hole and first slotted hole to connect the first connecting rod and the third
Connecting rod;
The fourth link is provided with the second through-hole far from one end of the third connecting rod, and the second connecting rod is far from described first
One end of connecting rod is provided with the second slotted hole;
Second bolt passes through second through-hole with second slotted hole to connect the second connecting rod and the described 4th
Connecting rod.
9. a kind of concreting auxiliary tool, which is characterized in that including any one of concrete-pouring template and claim 1-8
The concrete-pouring template bracing means, the concrete-pouring template bracing means and the concrete-pouring template squeeze
Press contacts.
10. concreting auxiliary tool according to claim 9, it is characterised in that: the concrete-pouring template packet
It includes steel form and adapts to the permeable template of the steel form, the permeable template is set to the inner surface of the steel form;
The permeable template includes adhesion layer and pervious bed;
The adhesion layer side is adhered to the outer surface of the steel form, and the other side of the adhesion layer and the pervious bed connect
It connects, the pervious bed is provided with multiple holes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821255509.0U CN209145283U (en) | 2018-08-03 | 2018-08-03 | A kind of concrete-pouring template bracing means and concreting auxiliary tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821255509.0U CN209145283U (en) | 2018-08-03 | 2018-08-03 | A kind of concrete-pouring template bracing means and concreting auxiliary tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209145283U true CN209145283U (en) | 2019-07-23 |
Family
ID=67265528
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821255509.0U Active CN209145283U (en) | 2018-08-03 | 2018-08-03 | A kind of concrete-pouring template bracing means and concreting auxiliary tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209145283U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113846832A (en) * | 2021-09-22 | 2021-12-28 | 云贤富 | Cement pouring fixing part |
CN114737783A (en) * | 2022-04-20 | 2022-07-12 | 武汉大学 | Method and equipment for reinforcing concrete column by adopting sandwich structure |
CN116084692A (en) * | 2023-03-27 | 2023-05-09 | 中国十七冶集团有限公司 | Concrete template reinforcing device and application method thereof |
-
2018
- 2018-08-03 CN CN201821255509.0U patent/CN209145283U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113846832A (en) * | 2021-09-22 | 2021-12-28 | 云贤富 | Cement pouring fixing part |
CN114737783A (en) * | 2022-04-20 | 2022-07-12 | 武汉大学 | Method and equipment for reinforcing concrete column by adopting sandwich structure |
CN114737783B (en) * | 2022-04-20 | 2023-03-03 | 武汉大学 | Method and equipment for reinforcing concrete column by adopting sandwich structure |
CN116084692A (en) * | 2023-03-27 | 2023-05-09 | 中国十七冶集团有限公司 | Concrete template reinforcing device and application method thereof |
CN116084692B (en) * | 2023-03-27 | 2023-11-10 | 中国十七冶集团有限公司 | Concrete template reinforcing device and application method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209145283U (en) | A kind of concrete-pouring template bracing means and concreting auxiliary tool | |
CN205531343U (en) | Wall post external corner template reinforcing apparatus | |
CN208251132U (en) | Cup-shaped foundation internal model formwork and cup foundation build device | |
CN107931928A (en) | A kind of Portable clamp for aiding in transverse and longitudinal beam welding equipment | |
CN202953152U (en) | Snap-in scaffold | |
CN104196023B (en) | A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device | |
CN206859684U (en) | A kind of support frame structure of reinforcing template connection | |
CN211817362U (en) | Solid net wall fixed knot of engineering building assembly constructs | |
CN105113776B (en) | The support meanss and building method of pole inner top platform on a kind of spherical tank | |
CN211736338U (en) | Take perforation template of strengthening rib | |
CN207597852U (en) | Lower suspension centre structure | |
CN107476559A (en) | A kind of spigot-and-socket builder's jack and installation method | |
CN211079916U (en) | Anchoring system for suspender of tied-rod arch bridge | |
CN209653442U (en) | Bracket for service sleeve | |
CN208748898U (en) | A kind of concrete walls cavity of truss support | |
CN208472986U (en) | A kind of integrated fashioned iron Building block constructing structure | |
CN207712729U (en) | A kind of PC prefabricated components container | |
CN208310300U (en) | Hoisting structure and hanging device | |
CN207211732U (en) | A kind of cylinder mold fixing device | |
CN214828212U (en) | Elevator well piecing devices | |
CN208266853U (en) | A kind of high intensity purlin | |
CN205134923U (en) | Adjustable distance of encorbelmenting hang mechanism | |
CN205634646U (en) | Building cableway bucket | |
CN209293802U (en) | A kind of constructing tunnel falsework | |
CN209599521U (en) | A kind of concreting molding machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province Patentee after: China Construction Engineering Group Co.,Ltd. Address before: 518000 Guangdong city of Shenzhen province Nanshan District Guangdong streets Center Road No. 3331 steel built in 27 storey building room 2701 Patentee before: China Construction Steel Structure Corp.,Ltd. |
|
CP03 | Change of name, title or address |