CN209145283U - A kind of concrete-pouring template bracing means and concreting auxiliary tool - Google Patents

A kind of concrete-pouring template bracing means and concreting auxiliary tool Download PDF

Info

Publication number
CN209145283U
CN209145283U CN201821255509.0U CN201821255509U CN209145283U CN 209145283 U CN209145283 U CN 209145283U CN 201821255509 U CN201821255509 U CN 201821255509U CN 209145283 U CN209145283 U CN 209145283U
Authority
CN
China
Prior art keywords
connecting rod
concrete
wirerope
connect
fastener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821255509.0U
Other languages
Chinese (zh)
Inventor
赵海旗
冯路路
黄梅坤
吴亮
甘霖
白剑
王聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201821255509.0U priority Critical patent/CN209145283U/en
Application granted granted Critical
Publication of CN209145283U publication Critical patent/CN209145283U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model provides a kind of concrete-pouring template bracing means, it is related to concreting field, it includes multiple fastening assemblies, fastening assembly includes the first fastener, second fastener, it is L-shaped first connector and the second connector, first connector connect to form the rectangle frame for adapting to concrete-pouring template with the second connector, one end of first fastener is connect with the first connector, the other end of first fastener is connect with the second connector, one end of second fastener is connect with the first connector, the other end of second fastener is connect with the second connector, first fastener and the second fastener both sides that be located at rectangle frame opposite, and first fastener and the second fastener for making the first connector and the second connector clamping concrete-pouring template.The utility model additionally provides a kind of concreting auxiliary tool comprising concrete-pouring template and concrete-pouring template bracing means mentioned above.

Description

A kind of concrete-pouring template bracing means and concreting auxiliary tool
Technical field
The utility model relates to concreting fields, and in particular to a kind of concrete-pouring template bracing means and coagulation Soil pours auxiliary tool.
Background technique
Currently, reinforcing knot of the ruggedized construction of existing concrete-pouring template using the outer anchor ear cooperation split bolt of steel pipe Structure, the ruggedized construction are easy to be influenced by fashioned iron steel column, cannot effectively reinforce, so that concreting effect is poor, exist and rise The risk of mould and quick-fried mould.
Inventor has found that the prior art at least has the disadvantage in that under study for action
Strengthening mechanism mould or quick-fried mould it is easier that concrete rises in casting process.
Utility model content
The purpose of this utility model is to provide a kind of concrete-pouring template bracing means, improve the prior art not Foot, the concrete-pouring template bracing means can effectively reinforce template, prevent concrete from rising in casting process The case where mould and quick-fried mould, this is reasonable in design, practical.
Another of the utility model has been designed to provide a kind of concreting auxiliary tool comprising mentioned above Concrete-pouring template bracing means, with the concrete-pouring template bracing means repertoire.
The embodiments of the present invention are achieved in that
The embodiments of the present invention provide a kind of concrete-pouring template bracing means comprising multiple fastening groups Part;
The fastening assembly includes the first fastener, the second fastener, is L-shaped first connector and the second connection Part;
First connector connect to form the rectangle frame for adapting to concrete-pouring template with second connector;
One end of first fastener is connect with first connector, the other end of first fastener with it is described The connection of second connector;
One end of second fastener is connect with first connector, the other end of second fastener with it is described The connection of second connector;
First fastener and second fastener both sides that be located at the rectangle frame opposite, and described first Fastener and second fastener are for making first connector and second connector clamp the concreting Template.
Specifically, the concrete-pouring template bracing means can effectively reinforce template, prevent concrete from pouring Occur rising in the process mould and quick-fried mould the case where, this is reasonable in design, practical.
Optionally, multiple fastening assemblies are uniformly distributed along the axis direction of the concrete-pouring template.
Optionally, first connector includes the first connecting rod and second connecting rod for being all made of aluminum alloy materials;
Second connector includes the third connecting rod and fourth link for being all made of aluminum alloy materials;
The first connecting rod and the second connecting rod weld, and the length direction of the first connecting rod and the second connecting rod Length direction it is vertical, the third connecting rod and the fourth link are welded, and the length direction of the third connecting rod with it is described The length direction of fourth link is vertical;
The first connecting rod is connect with the third connecting rod, and the second connecting rod is connect with the fourth link, and described First connecting rod, the second connecting rod, the third connecting rod and the fourth link form the rectangle frame;
The first connecting rod, the second connecting rod, the third connecting rod and the fourth link are rectangular steel tube.
Optionally, first fastener includes the first flower basket bolt, the first wirerope and the second wirerope;
One end of first flower basket bolt is connect with one end of first wirerope, first flower basket bolt it is another One end is connect with one end of second wirerope;
First wirerope is connect far from one end of first flower basket bolt with the first connecting rod;
Second wirerope is connect far from one end of first flower basket bolt with the fourth link.
Optionally, first fastener further includes the first hook and the second hook;
It is described first hook connect with first wirerope, first wirerope pass through it is described first link up with it is described First connecting rod connection;
It is described second hook connect with second wirerope, second wirerope pass through it is described second link up with it is described Fourth link connection.
Optionally, second fastener includes the second flower basket bolt, third wirerope and the 4th wirerope;
One end of second flower basket bolt is connect with one end of the third wirerope, second flower basket bolt it is another One end is connect with one end of the 4th wirerope;
The one end of the third wirerope far from second flower basket bolt is connect with first connector;
The one end of 4th wirerope far from second flower basket bolt is connect with second connector.
Optionally, second fastener further includes third hook and the 4th hook;
Third hook is connect with the third wirerope, the third wirerope by third hook with it is described First connecting rod connection;
It is described 4th hook connect with the 4th wirerope, the 4th wirerope pass through it is described 4th link up with it is described Fourth link connection.
Optionally, the fastening assembly further includes the first bolt and the second bolt;
The first connecting rod is provided with first through hole far from one end of the second connecting rod, and the third connecting rod is far from described One end of fourth link is provided with the first slotted hole;
First bolt pass through the first through hole and first slotted hole with connect the first connecting rod with it is described Third connecting rod;
The fourth link is provided with the second through-hole far from one end of the third connecting rod, and the second connecting rod is far from described One end of first connecting rod is provided with the second slotted hole;
Second bolt pass through second through-hole connect with second slotted hole second connecting rod with it is described Fourth link.
The embodiments of the present invention additionally provide a kind of concreting auxiliary tool comprising concrete-pouring template With concrete-pouring template bracing means mentioned above, the concrete-pouring template bracing means and the concreting Template squeezes contact.
Optionally, the concrete-pouring template includes steel form and the permeable template for adapting to the steel form, described Permeable template is set to the inner surface of the steel form;
The permeable template includes adhesion layer and pervious bed;
The adhesion layer side is adhered to the outer surface of the steel form, the other side of the adhesion layer and the pervious bed Connection, the pervious bed are provided with multiple holes.
Compared with prior art, the beneficial effect of the utility model embodiment includes, for example:
In conclusion the embodiments of the present invention provide a kind of concrete-pouring template bracing means, the concrete Formwork for placing bracing means can effectively reinforce template, prevent concrete from occurring rising in casting process the feelings of mould and quick-fried mould Condition.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment Attached drawing be briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore should not be by Regard the restriction to range as, for those of ordinary skill in the art, without creative efforts, may be used also To obtain other relevant attached drawings according to these attached drawings.
Fig. 1 is that structure of the concrete-pouring template bracing means provided by the embodiment of the utility model under the first visual angle is shown It is intended to;
Fig. 2 is that structure of the concrete-pouring template bracing means provided by the embodiment of the utility model under the second visual angle is shown It is intended to;
Fig. 3 is the structural schematic diagram of the first fastener provided by the embodiment of the utility model;
Fig. 4 is the structural schematic diagram of the first connector and the second connector provided by the embodiment of the utility model;
Fig. 5 is the structural schematic diagram of concrete-pouring template provided by the embodiment of the utility model.
Icon: 100- concrete-pouring template bracing means;The first fastener of 111-;The first flower basket bolt of 1111-; The first wirerope of 1112-;The second wirerope of 1113-;1114- first is linked up with;1115- second is linked up with;The second fastener of 112-; The second flower basket bolt of 1121-;1122- third wirerope;The 4th wirerope of 1123-;The first connector of 113-;1131- first connects Bar;1132- second connecting rod;1133- first through hole;The second slotted hole of 1134-;1135- protrusion;The second connector of 114-; 1141- third connecting rod;1142- fourth link;The first slotted hole of 1143-;The second through-hole of 1144-;200- concrete-pouring template; 21- steel form;22- permeable template;221- adhesion layer;222- pervious bed.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Usually here in attached drawing description and The component of the utility model embodiment shown can be arranged and be designed with a variety of different configurations.
Therefore, requirement is not intended to limit to the detailed description of the embodiments of the present invention provided in the accompanying drawings below The scope of the utility model of protection, but it is merely representative of the selected embodiment of the utility model.Based in the utility model Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all Belong to the range of the utility model protection.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that the orientation or position of the instructions such as term " on ", "inner", "outside" Set relationship be based on the orientation or positional relationship shown in the drawings or the utility model product using when the orientation usually put Or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than the device of indication or suggestion meaning or Element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as the limit to the utility model System.
In addition, term " first ", " second ", " third " etc. are only used for distinguishing description, it is not understood to indicate or imply Relative importance.
In the description of the present invention, it should also be noted that, unless otherwise clearly defined and limited, term " is set Set ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in utility model.
Embodiment 1
Referring to Fig.1 and 2, present embodiments providing a kind of concrete-pouring template bracing means 100 comprising multiple Fastening assembly;
Fastening assembly includes the first fastener 111, the second fastener 112, is L-shaped first connector 113 and second Connector 114;
First connector 113 connect the rectangle frame for being formed and adapting to concrete-pouring template 200 with the second connector 114;
One end of first fastener 111 is connect with the first connector 113, and the other end of the first fastener 111 and second connects Fitting 114 connects;
One end of second fastener 112 is connect with the first connector 113, and the other end of the second fastener 112 and second connects Fitting 114 connects;
First fastener 111 and the second fastener 112 both sides that be located at rectangle frame opposite, and the first fastener 111 With the second fastener 112 for making the first connector 113 and the second connector 114 clamp concrete-pouring template 200.
Fig. 1 is please referred to, the shape of concrete-pouring template 200 is cuboid in Fig. 1, and multiple fastening assemblies are poured along concrete The short transverse of building mould 200 is distributed, and be can be and is uniformly distributed and irregular can also be distributed.
Referring to figure 2., the first connector 113 and the second connector 114 are L shape, and the first connector 113 and second connects Fitting 114 mutually overlaps, and forms rectangle frame, which can be set in the outer surface of concrete-pouring template 200.
First fastener 111 and the second fastener 112 can be rope, steel wire etc., and the first connector 113 and second connects Fitting 114 is connected with each other by the first fastener 111 and the second fastener 112, and the first fastener 111 and the second fastener 112 can make rectangle frame extruded concrete formwork for placing 200, to realize the function of clamping to concrete-pouring template 200, improve Good consolidation effect.
Referring to figure 2., it should be noted that in order to avoid the first connector 113 and the second connector 114 were squeezing It rotates or tilts in journey, so it is opposite that the first fastener 111 and the second fastener 112 are separately positioned on rectangle frame Both sides.
Specifically, the utility model provides a kind of concrete-pouring template bracing means 100, the concrete-pouring template Bracing means 100 can effectively reinforce template, prevent concrete occur rising in casting process mould and quick-fried mould the case where.
Fig. 1 is please referred to, in the present embodiment, multiple fastening assemblies are uniform along the axis direction of concrete-pouring template 200 Distribution.
Fastening assembly is uniformly distributed along the axis direction of concrete-pouring template 200, please refers to Fig. 1, each fastening assembly The rectangle frame of formation is parallel to each other, which can allow the uniform stress of concrete-pouring template 200, preferably prevents Concrete-pouring template 200 occur rising when pouring mould and quick-fried mould the case where.
Referring to Fig.1 and 2, in the present embodiment, the first connector 113 includes being all made of the first of aluminum alloy materials to connect Bar 1131 and second connecting rod 1132;
Second connector 114 includes the third connecting rod 1141 and fourth link 1142 for being all made of aluminum alloy materials;
First connecting rod 1131 and second connecting rod 1132 weld, and the length direction of first connecting rod 1131 and second connecting rod 1132 Length direction it is vertical, third connecting rod 1141 and fourth link 1142 are welded, and the length direction of third connecting rod 1141 and the 4th The length direction of connecting rod 1142 is vertical;
First connecting rod 1131 is connect with third connecting rod 1141, and second connecting rod 1132 is connect with fourth link 1142, and first Connecting rod 1131, second connecting rod 1132, third connecting rod 1141 and fourth link 1142 form rectangle frame;
First connecting rod 1131, second connecting rod 1132, third connecting rod 1141 and fourth link 1142 are rectangular steel tube.
First connecting rod 1131 and second connecting rod 1132 use aluminum alloy materials, and the cost of aluminium alloy is low, light-weight and structure Intensity is high, staff's convenience and high-efficiency in use.Referring to Fig.1 and 2, the first connector 113 includes first connecting rod 1131 and second connecting rod 1132, first connecting rod 1131 and second connecting rod 1132 weld, and guarantee its bonding strength, first connecting rod 1131 It is mutually perpendicular to second connecting rod 1132.Referring to figure 2., it should be noted that first connecting rod 1131 and second connecting rod 1132 weld Afterwards, first connecting rod 1131 extends a protrusion 1135 along the length direction of itself, is convenient for and first fastener 111 connects It connects.
In the present embodiment, the second connector 114 uses structure identical with the first connector 113, and which is not described herein again.
It is understood that first connecting rod 1131, second connecting rod 1132, third connecting rod 1141 and fourth link 1142 are distinguished As four sides of rectangle frame, concrete-pouring template 200 is clamped by the first fastener 111 and the second fastener 112.It needs It is noted that during practice, first connecting rod 1131, second connecting rod 1132, third connecting rod 1141 and fourth link 1142 can be according to the specific size of concrete-pouring template 200, using different length, to adapt to concrete-pouring template 200 size.
It should be noted that in the present embodiment, first connecting rod 1131, second connecting rod 1132, third connecting rod 1141 and Double leval jib 1142 is rectangular steel tube, and the contact that rectangular steel tube can be closer with concrete-pouring template 200 is conducive to more preferable Clamping concrete-pouring template 200, effectively prevent concrete-pouring template 200 from occurring the mould that rises in concreting process The phenomenon that with quick-fried mould.
Referring to Fig.1 and 2, in the present embodiment, the first fastener 111 includes the first flower basket bolt 1111, the first steel Cord 1112 and the second wirerope 1113;
One end of first flower basket bolt 1111 is connect with one end of the first wirerope 1112, the first flower basket bolt 1111 it is another One end is connect with one end of the second wirerope 1113;
First wirerope 1112 is connect far from one end of the first flower basket bolt 1111 with first connecting rod 1131;
Second wirerope 1113 is connect far from one end of the first flower basket bolt 1111 with fourth link 1142.
First fastener 111 further includes the first hook 1114 and the second hook 1115;
First hook 1114 is connect with the first wirerope 1112, and the first wirerope 1112 passes through the first hook 1114 and first Connecting rod 1131 connects;
Second hook 1115 is connect with the second wirerope 1113, and the second wirerope 1113 passes through the second hook 1115 and the 4th Connecting rod 1142 connects.
Second fastener 112 includes the second flower basket bolt 1121, third wirerope 1122 and the 4th wirerope 1123;
One end of second flower basket bolt 1121 is connect with one end of third wirerope 1122, the second flower basket bolt 1121 it is another One end is connect with one end of the 4th wirerope 1123;
The one end of third wirerope 1122 far from the second flower basket bolt 1121 is connect with the first connector 113;
The one end of 4th wirerope 1123 far from the second flower basket bolt 1121 is connect with the second connector 114.
Second fastener 112 further includes third hook and the 4th hook;
Third hook is connect with third wirerope 1122, and third wirerope 1122 passes through third hook and first connecting rod 1131 Connection;
4th hook is connect with the 4th wirerope 1123, and the 4th wirerope 1123 passes through the 4th hook and fourth link 1142 Connection.
In the present embodiment, fastener can be more using this fastener using the combination of flower basket bolt and wirerope The convenient rectangle frame that adjusts is to the tightness of concrete-pouring template 200.Specifically, the first fastener 111 includes the first flower Basket bolt 1111, the first wirerope 1112 and the second wirerope 1113, the second fastener 112 include the second flower basket bolt 1121, Third wirerope 1122 and the 4th wirerope 1123.
One end of first flower basket bolt 1111 and the first wirerope 1112 weld, the other end of the first flower basket bolt 1111 It is welded with the second wirerope 1113, guarantees the first flower basket bolt 1111 and the first wirerope 1112 and the second wirerope 1113 Bonding strength.
Referring to figure 2. and Fig. 3, the first wirerope 1112 are provided with the first hook far from one end of the first flower basket bolt 1111 1114,1114 welding of the first wirerope 1112 and the first hook, between the first wirerope of enhancing 1112 and the first hook 1114 Bonding strength, the first wirerope 1112 are articulated on first connecting rod 1131 by the first hook 1114.Second wirerope 1113 is remote One end from the first flower basket bolt 1111 is provided with the second hook 1115, and the second wirerope 1113 and the second hook 1115 weld, Enhance the bonding strength between the second wirerope 1113 and the second hook 1115, the second wirerope 1113 passes through the second hook 1115 It is articulated in fourth link 1142.
It should be noted that in the present embodiment, the second fastener 112 and the first fastener 111 use identical structure, Which is not described herein again.It is worth noting that, the third wirerope 1122 in the second fastener 112 is articulated in by third On one connecting rod 1131, the 4th wirerope 1123 is articulated in fourth link 1142 by the 4th.Also, referring to figure 2., One fastener 111 and the second fastener 112 are located at the opposite both sides of rectangle frame, are conducive to the fastening assembly and preferably press from both sides Tight concrete-pouring template 200.
Referring to figure 4., in the present embodiment, fastening assembly further includes the first bolt and the second bolt;
First connecting rod 1131 is provided with first through hole 1133 far from one end of second connecting rod 1132, and third connecting rod 1141 is separate One end of fourth link 1142 is provided with the first slotted hole 1143;
First bolt passes through first through hole 1133 and the first slotted hole 1143 to connect first connecting rod 1131 and third connecting rod 1141;
Fourth link 1142 is provided with the second through-hole 1144 far from one end of third connecting rod 1141, and second connecting rod 1132 is separate One end of first connecting rod 1131 is provided with the second slotted hole 1134;
Second bolt passes through the second through-hole 1144 with the second slotted hole 1134 to connect second connecting rod 1132 and fourth link 1142。
Referring to figure 4., first connecting rod 1131 is provided with first through hole 1133, third far from one end of second connecting rod 1132 Connecting rod 1141 is provided with the first slotted hole 1143 far from one end of fourth link 1142, and the first bolt passes through 1133 He of first through hole First slotted hole 1143 can be relatively fixed by first connecting rod 1131 and third connecting rod 1141, and then by 113 He of the first connector Second connector 114 is relatively fixed.It should be noted that opposite with third connecting rod 1141 when needing to adjust first connecting rod 1131 When position, staff can unclamp the first bolt, first connecting rod 1131 can be moved along the first slotted hole 1143 appropriate Distance, then fastened the first connector 113 and the second connector 114 with the first bolt.
Referring to figure 4., fourth link 1142 is provided with the second through-hole 1144 far from one end of third connecting rod 1141, and second Connecting rod 1132 is provided with the second slotted hole 1134 far from one end of first connecting rod 1131, and the second bolt passes through 1144 He of the second through-hole Second slotted hole 1134 can be relatively fixed by second connecting rod 1132 and fourth link 1142, and then by 113 He of the first connector Second connector 114 is relatively fixed.It should be noted that opposite with fourth link 1142 when needing to adjust second connecting rod 1132 When position, staff can unclamp the second bolt, fourth link 1142 can be moved along the second slotted hole 1134 appropriate Distance, then fastened the first connector 113 and the second connector 114 with the second bolt.
First through hole 1133, the second through-hole 1144, the first slotted hole 1143 and the setting of the second slotted hole 1134 are in order to suitable For more application scenarios, when the first fastener 111 and the second fastener 112 are also not enough to rectangle frame being clamped in coagulation When on native formwork for placing 200, the first bolt can be used and the second bolt improves the connection that the first connector 113 is connect with second Intensity, while rectangle frame is improved to the clamping force of concrete-pouring template 200.
Embodiment 2
Present embodiments provide a kind of concreting auxiliary tool comprising concrete-pouring template 200 and above-mentioned mention The concrete-pouring template bracing means 100 arrived, concrete-pouring template bracing means 100 and concrete-pouring template 200 squeeze Press contacts.
Referring to figure 4., in the present embodiment, concrete-pouring template 200 includes steel form 21 and adapts to steel form 21 Permeable template 22, permeable template 22 is set to the inner surface of steel form 21;
Permeable template 22 includes adhesion layer 221 and pervious bed 222;
221 side of adhesion layer is adhered to the outer surface of steel form 21, and the other side of adhesion layer 221 is connect with pervious bed 222, Pervious bed 222 is provided with multiple holes.
In the casting process of concrete, vapor generation is usually had, vapor encounters concrete-pouring template 200 Inner wall just will form droplet, the quality after influencing concrete formation.In the present embodiment, concrete blinding includes steel form 21 With permeable template 22, which is adapted to the rigid template, and the inner wall of steel form 21 is arranged in the permeable template 22.
Specifically, permeable template 22 includes adhesion layer 221 and pervious bed 222, adhesion layer 221 is bonded in the interior of steel form 21 On wall, pervious bed 222 is bonded on adhesion layer 221, and the surface of pervious bed 222 is provided with multiple holes, and aperture is very small, can only be for Gas passes through.The vapor generated in concreting process passes through multiple apertures of pervious bed 222, and vapor touches adherency Layer 221 is condensed into droplet, and droplet is directly bonded on adhesion layer 221, will not be had an impact to the casting process of concrete.
To sum up, which can effectively reinforce template, prevent concrete from pouring Occur rising in the process mould and quick-fried mould the case where, this is reasonable in design, practical.
It should be noted that in the absence of conflict, the feature in the embodiments of the present invention can be tied mutually It closes.
The above is only the preferred embodiments of the utility model, are not intended to limit the utility model, for this field Technical staff for, various modifications and changes may be made to the present invention.Within the spirit and principle of the utility model, Any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (10)

1. a kind of concrete-pouring template bracing means, which is characterized in that including multiple fastening assemblies;
The fastening assembly includes the first fastener, the second fastener, is L-shaped first connector and the second connector;
First connector connect to form the rectangle frame for adapting to concrete-pouring template with second connector;
One end of first fastener is connect with first connector, the other end of first fastener and described second Connector connection;
One end of second fastener is connect with first connector, the other end of second fastener and described second Connector connection;
First fastener and second fastener both sides that be located at the rectangle frame opposite, and first fastening Part and second fastener are for making first connector and second connector clamp the concrete-pouring template.
2. concrete-pouring template bracing means according to claim 1, it is characterised in that: multiple fastening assembly edges The axis direction of the concrete-pouring template is uniformly distributed.
3. concrete-pouring template bracing means according to claim 1, it is characterised in that: first connector includes It is all made of the first connecting rod and second connecting rod of aluminum alloy materials;
Second connector includes the third connecting rod and fourth link for being all made of aluminum alloy materials;
The first connecting rod and the second connecting rod weld, and the length of the length direction of the first connecting rod and the second connecting rod It is vertical to spend direction, the third connecting rod and the fourth link are welded, and the length direction of the third connecting rod and the described 4th The length direction of connecting rod is vertical;
The first connecting rod is connect with the third connecting rod, and the second connecting rod is connect with the fourth link, and described first Connecting rod, the second connecting rod, the third connecting rod and the fourth link form the rectangle frame;
The first connecting rod, the second connecting rod, the third connecting rod and the fourth link are rectangular steel tube.
4. concrete-pouring template bracing means according to claim 3, it is characterised in that: first fastener includes First flower basket bolt, the first wirerope and the second wirerope;
One end of first flower basket bolt is connect with one end of first wirerope, the other end of first flower basket bolt It is connect with one end of second wirerope;
First wirerope is connect far from one end of first flower basket bolt with the first connecting rod;
Second wirerope is connect far from one end of first flower basket bolt with the fourth link.
5. concrete-pouring template bracing means according to claim 4, it is characterised in that: first fastener also wraps Include the first hook and the second hook;
First hook is connect with first wirerope, and first wirerope passes through first hook and described first Connecting rod connection;
Second hook is connect with second wirerope, and second wirerope passes through second hook and the described 4th Connecting rod connection.
6. concrete-pouring template bracing means according to claim 3, it is characterised in that: second fastener includes Second flower basket bolt, third wirerope and the 4th wirerope;
One end of second flower basket bolt is connect with one end of the third wirerope, the other end of second flower basket bolt It is connect with one end of the 4th wirerope;
The one end of the third wirerope far from second flower basket bolt is connect with first connector;
The one end of 4th wirerope far from second flower basket bolt is connect with second connector.
7. concrete-pouring template bracing means according to claim 6, it is characterised in that: second fastener also wraps Include third hook and the 4th hook;
The third hook is connect with the third wirerope, and the third wirerope passes through third hook and described first Connecting rod connection;
4th hook is connect with the 4th wirerope, and the 4th wirerope passes through the 4th hook and the described 4th Connecting rod connection.
8. concrete-pouring template bracing means according to claim 3, it is characterised in that: the fastening assembly further includes First bolt and the second bolt;
The first connecting rod is provided with first through hole far from one end of the second connecting rod, and the third connecting rod is far from the described 4th One end of connecting rod is provided with the first slotted hole;
First bolt passes through the first through hole and first slotted hole to connect the first connecting rod and the third Connecting rod;
The fourth link is provided with the second through-hole far from one end of the third connecting rod, and the second connecting rod is far from described first One end of connecting rod is provided with the second slotted hole;
Second bolt passes through second through-hole with second slotted hole to connect the second connecting rod and the described 4th Connecting rod.
9. a kind of concreting auxiliary tool, which is characterized in that including any one of concrete-pouring template and claim 1-8 The concrete-pouring template bracing means, the concrete-pouring template bracing means and the concrete-pouring template squeeze Press contacts.
10. concreting auxiliary tool according to claim 9, it is characterised in that: the concrete-pouring template packet It includes steel form and adapts to the permeable template of the steel form, the permeable template is set to the inner surface of the steel form;
The permeable template includes adhesion layer and pervious bed;
The adhesion layer side is adhered to the outer surface of the steel form, and the other side of the adhesion layer and the pervious bed connect It connects, the pervious bed is provided with multiple holes.
CN201821255509.0U 2018-08-03 2018-08-03 A kind of concrete-pouring template bracing means and concreting auxiliary tool Active CN209145283U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821255509.0U CN209145283U (en) 2018-08-03 2018-08-03 A kind of concrete-pouring template bracing means and concreting auxiliary tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821255509.0U CN209145283U (en) 2018-08-03 2018-08-03 A kind of concrete-pouring template bracing means and concreting auxiliary tool

Publications (1)

Publication Number Publication Date
CN209145283U true CN209145283U (en) 2019-07-23

Family

ID=67265528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821255509.0U Active CN209145283U (en) 2018-08-03 2018-08-03 A kind of concrete-pouring template bracing means and concreting auxiliary tool

Country Status (1)

Country Link
CN (1) CN209145283U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113846832A (en) * 2021-09-22 2021-12-28 云贤富 Cement pouring fixing part
CN114737783A (en) * 2022-04-20 2022-07-12 武汉大学 Method and equipment for reinforcing concrete column by adopting sandwich structure
CN116084692A (en) * 2023-03-27 2023-05-09 中国十七冶集团有限公司 Concrete template reinforcing device and application method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113846832A (en) * 2021-09-22 2021-12-28 云贤富 Cement pouring fixing part
CN114737783A (en) * 2022-04-20 2022-07-12 武汉大学 Method and equipment for reinforcing concrete column by adopting sandwich structure
CN114737783B (en) * 2022-04-20 2023-03-03 武汉大学 Method and equipment for reinforcing concrete column by adopting sandwich structure
CN116084692A (en) * 2023-03-27 2023-05-09 中国十七冶集团有限公司 Concrete template reinforcing device and application method thereof
CN116084692B (en) * 2023-03-27 2023-11-10 中国十七冶集团有限公司 Concrete template reinforcing device and application method thereof

Similar Documents

Publication Publication Date Title
CN209145283U (en) A kind of concrete-pouring template bracing means and concreting auxiliary tool
CN205531343U (en) Wall post external corner template reinforcing apparatus
CN208251132U (en) Cup-shaped foundation internal model formwork and cup foundation build device
CN107931928A (en) A kind of Portable clamp for aiding in transverse and longitudinal beam welding equipment
CN202953152U (en) Snap-in scaffold
CN104196023B (en) A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device
CN206859684U (en) A kind of support frame structure of reinforcing template connection
CN211817362U (en) Solid net wall fixed knot of engineering building assembly constructs
CN105113776B (en) The support meanss and building method of pole inner top platform on a kind of spherical tank
CN211736338U (en) Take perforation template of strengthening rib
CN207597852U (en) Lower suspension centre structure
CN107476559A (en) A kind of spigot-and-socket builder's jack and installation method
CN211079916U (en) Anchoring system for suspender of tied-rod arch bridge
CN209653442U (en) Bracket for service sleeve
CN208748898U (en) A kind of concrete walls cavity of truss support
CN208472986U (en) A kind of integrated fashioned iron Building block constructing structure
CN207712729U (en) A kind of PC prefabricated components container
CN208310300U (en) Hoisting structure and hanging device
CN207211732U (en) A kind of cylinder mold fixing device
CN214828212U (en) Elevator well piecing devices
CN208266853U (en) A kind of high intensity purlin
CN205134923U (en) Adjustable distance of encorbelmenting hang mechanism
CN205634646U (en) Building cableway bucket
CN209293802U (en) A kind of constructing tunnel falsework
CN209599521U (en) A kind of concreting molding machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Engineering Group Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Nanshan District Guangdong streets Center Road No. 3331 steel built in 27 storey building room 2701

Patentee before: China Construction Steel Structure Corp.,Ltd.

CP03 Change of name, title or address