CN209143698U - It is a kind of based on anthraquinone hydrogen peroxide manufacture equipment and its extraction process unit - Google Patents

It is a kind of based on anthraquinone hydrogen peroxide manufacture equipment and its extraction process unit Download PDF

Info

Publication number
CN209143698U
CN209143698U CN201821073815.2U CN201821073815U CN209143698U CN 209143698 U CN209143698 U CN 209143698U CN 201821073815 U CN201821073815 U CN 201821073815U CN 209143698 U CN209143698 U CN 209143698U
Authority
CN
China
Prior art keywords
cylinder
tower
draft tube
flow guiding
external flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821073815.2U
Other languages
Chinese (zh)
Inventor
徐杭
潘浩
朱跃庭
江炜
刘江涛
赵卫星
陈斌
骆浩
赖晓敏
冯泽峰
丁丽芳
周佳
张欢欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG ENGINEERING DESIGN Co Ltd
Original Assignee
ZHEJIANG ENGINEERING DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG ENGINEERING DESIGN Co Ltd filed Critical ZHEJIANG ENGINEERING DESIGN Co Ltd
Priority to CN201821073815.2U priority Critical patent/CN209143698U/en
Application granted granted Critical
Publication of CN209143698U publication Critical patent/CN209143698U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Extraction Or Liquid Replacement (AREA)

Abstract

The utility model relates to a kind of based on anthraquinone hydrogen peroxide manufacture equipment and its extraction process unit, belong to chemical equipment technical field.Hydrogen peroxide manufacture equipment includes extraction tower and the tower cap assembly that is mounted at the top of extraction tower;Tower cap assembly includes the separation assembly that top is equipped with the cap shell of exhaust outlet and is mounted in cap shell, which is used to carry out poking processing to the Water-In-Oil in the raffinate after extraction tower extraction processing and also carries out water-oil separating processing to the mixing blended together by water phase and working solution.There is the tower cap assembly of separation assembly by being arranged, the pure water that will be mixed in working solution carries out separating treatment, can reduce manually-operated workload while reducing number of processing devices, can be widely applied in the production field of hydrogen peroxide.

Description

It is a kind of based on anthraquinone hydrogen peroxide manufacture equipment and its extraction process unit
Technical field
The utility model relates to chemical equipment technical fields, specifically, being related to a kind of based on anthraquinone hydrogen peroxide Production equipment and extraction process unit for constructing the production equipment.
Background technique
Currently, anthraquinone technique is most important hydrogen peroxide manufacture technique.In process of production, working solution is walked in hydrogenation Hydrogenated processing obtains hydride in rapid, and hydride is oxidation-treated in oxidation step to obtain the oxidation solution containing hydrogen peroxide, Oxidation solution is used pure water to extract in extraction step, obtains extract liquor and raffinate, the raffinate be containing a small amount of water with The working solution of hydrogen peroxide.
Common extraction tower carries out disclosing one kind in extraction processing, such as the patent document of Publication No. CN103803504A Extract tower structure comprising top is equipped with the tower casing of raffinate outlet.Due in extraction process, it may appear that " Water-In-Oil " phenomenon, In extraction tower, so-called Water-In-Oil refers to that the working solution of light phase is wrapped in heavy phase water and forms bubble, leads to working solution and water It is not readily separated, a large amount of water is carried over extraction tower, has not only aggravated the workload of aftertreatment technology, and aggravated to disappear to pure water Consumption.Therefore it needs to handle raffinate, to recycle pure water and reduce the workload of post-processing.It commonly uses as shown in Figure 1 Equipment raffinate is handled, i.e., the raffinate that extraction tower 01 is discharged isolates the portion that may be carried secretly through extraction raffinate separator 02 Divide water and then is post-processed by entering after-treatment device 05 after working solution measuring tank 03;In this process, it need to manually control Pure water of the system ground through isolating discharges into pure water accumulator tank 04, and not only number of devices is more, and manual operation is complicated.
Due to the process recycled in working solution, moisture therein need to be removed using after-treatment device 05, to prevent existing Explosion danger.Currently, the method removed water in industrial production to working solution has vacuum dehydration method, alkali evaporation and publication number Water-oil separating method disclosed in patent document for CN104370331A.
For alkali evaporation, as shown in Fig. 2, its after-treatment device 05 includes washing tower (for removing CO2) 06, alkali separator 07, caustic settler 08, the top of carclazyte bed 091, alkali collection slot 092 and alkali evaporator 093, washing tower (for removing CO2) 06 is connected to by pipeline with alkali separator 07, alkali Separator 07 is connected to by pipeline with caustic settler 08, and caustic settler 08 is connected to by pipeline with carclazyte bed 091.In the course of work In, the working solution of the top of (1) extraction tower 01 outflow is after extraction raffinate separator 02 separates the part water that may be carried secretly, from 06 bottom of washing tower (for removing CO2) The material mouth in portion enters washing tower (for removing CO2) 06;(2) it is provided with dense solution of potassium carbonate in washing tower (for removing CO2) 06, for removing remaining water in working solution Divide, neutralize acids and decompose remaining hydrogen peroxide;(3) working solution flowed out at the top of washing tower (for removing CO2) 06 followed by alkali separator 07 with Caustic settler 08, after isolating the solution of potassium carbonate that may be carried secretly, working solution enters back into carclazyte bed 091 and is handled, and isolates Solution of potassium carbonate be collected in alkali collection slot 092.Diluted solution of potassium carbonate and alkali collection is collected in washing tower (for removing CO2) 06 Solution of potassium carbonate in slot 092 is recycled by reentering in washing tower (for removing CO2) 01 after 093 inspissation of alkali evaporator.
But for remaining hydrogen peroxide enters washing tower (for removing CO2) 06 with working solution in working solution after extracting after, in washing tower (for removing CO2) 06 Violent decomposition reaction can occur, release bulk gas and heat, if gas has little time to discharge, will cause washing tower (for removing CO2) and 06 surpass Pressure, and gas also occurs that in washing tower (for removing CO2) 06 and is bubbled and generates " Water-In-Oil " phenomenon, so-called " Water-In-Oil " refers to the work of light phase Liquid is wrapped in potassium carbonate and forms bubble, causes working solution and solution of potassium carbonate to be not readily separated, a large amount of solution of potassium carbonate is carried over Washing tower (for removing CO2) 06 not only results in the reduction of solution of potassium carbonate concentration in washing tower (for removing CO2) 06 and reduces the service life of dense potassium carbonate, increases The consumption of potassium carbonate, and aggravated alkali separator 07, caustic settler 08, alkali evaporator 093 and manually-operated load.
Utility model content
The main purpose of the utility model be to provide it is a kind of based on anthraquinone hydrogen peroxide manufacture equipment, to reduce equipment Quantity and simplified manual operation;
The another object of the utility model is to provide a kind of for constructing the extraction process unit of above-mentioned production equipment.
In order to achieve the above-mentioned main objectives, it includes extraction that the utility model, which is provided based on anthraquinone hydrogen peroxide manufacture equipment, Tower is taken, extraction tower includes the tower casing that top is equipped with raffinate outlet;Tower cap assembly is installed in tower casing;Tower cap assembly includes top Cap shell equipped with exhaust outlet and the separation assembly being mounted in cap shell;Separation assembly includes inner draft tube and is sleeved on inner draft tube Gas-liquid separation cylinder and external flow guiding cylinder outer and relatively arranged up and down;The lower port and raffinate outlet of inner draft tube are fixed to being grounded In tower casing;Gas-liquid separation cylinder is fixedly connected with ground connection with external flow guiding cylinder port, and upper end is that end face is higher than the spacious of inner draft tube Mouth end;First packing layer of the upper surface lower than the discharge port of inner draft tube is filled between gas-liquid separation cylinder and inner draft tube;It leads outside The lower end of flow cartridge is equipped with fluid hole;The second packing layer that lower surface is higher than fluid hole is filled between cap shell and external flow guiding cylinder;Cap Shell is located at the partial lumen room below fluid hole and constitutes water expansion chamber;Cap shell is equipped with position and is higher than the second packing layer and lower than spacious The material outlet at mouth end.
During the work time, working solution is in extraction tower after extraction processing, and raffinate stream is through raffinate outlet and along interior Guide shell floats, and portion gas is directly discharged from exhaust outlet, the water of working solution and entrained under the effect of gravity, along inner draft tube Upper nozzle edge disperse decline, and pass through the first packing layer, it would be possible to which existing " Water-In-Oil " is poked, so that gas is due to floating Power is acted on and is discharged from exhaust outlet, and discharges the pure water being wrapped in working solution;Through gas-liquid separation treated working solution and Water under the effect of gravity, continues to decline, and flows through sinking flow-guiding channel, and flow into water-oil separating room from fluid hole;Due to water phase Specific gravity is larger, is settled down to separation chamber bottom and assembles in water expansion chamber, and working solution is lighter, floats and is arranged by material outlet Out.Water-In-Oil is poked by the way that first of packing layer is arranged, setting second packing layer is used for oil water separation process It is adjusted, so that water-oil separating is more thorough;To realize the separation to the gas-liquid separation of Water-In-Oil and water and working solution, and The quantity of equipment is reduced without extraction raffinate separator, while simplifying manual operation.
Specific scheme is that water expansion chamber is communicatively equipped with drainage pipeline, for by the water of sedimentation be transmitted back in extraction tower into Row cycling extraction;Multiple fluid holes are arranged circumferentially along external flow guiding cylinder.
Another specific scheme is that gas-liquid separation cylinder includes major diameter canister portion for loading the first packing layer and to ground connection The back taper canister portion being installed on the lower end of major diameter canister portion, the upper nozzle of external flow guiding cylinder and the path port part pair of back taper canister portion Ground connection is fixedly connected.
It includes after-treatment device that preferred scheme, which is hydrogen peroxide manufacture equipment,;After-treatment device includes for going out to material The withering washing tower (for removing CO2) of working solution, carclazyte bed and the first tower cap assembly being mounted on the top of washing tower (for removing CO2) of mouth discharge, alkali Tower includes the first tower casing that top is equipped with working solution outlet;First tower cap assembly includes the first inner draft tube, is sleeved in first Guide shell is outer and the first gas-liquid separation cylinder relatively arranged up and down and the first external flow guiding cylinder, is sleeved on sinking outside the first external flow guiding cylinder It drops cylinder and top is equipped with the first cap shell of exhaust outlet;The lower port of first inner draft tube is installed in ground connection with working solution outlet In first tower casing;First gas-liquid separation cylinder is fixedly connected with ground connection with the first external flow guiding cylinder port, and upper end is that end face is higher than the The open end of one inner draft tube;Upper surface is filled between first gas-liquid separation cylinder and the first inner draft tube lower than the first inner draft tube Discharge port packing layer;The lower end of first external flow guiding cylinder is equipped with the first fluid hole being connected to the inner cavity chamber of settlement barrel;It is heavy The packing layer that lower surface is higher than the first fluid hole, the portion below the first fluid hole are filled between drop cylinder and the first external flow guiding cylinder Inner cavity chamber is divided to constitute solution of potassium carbonate expansion chamber;Settlement barrel and the first cap shell surround the liquid collecting arranged around settlement barrel The upper port of room, settlement barrel is lower than open end;First cap shell, which is equipped with, to be exported with carclazyte bed by the liquid collecting room that pipeline is connect.
During the work time, working solution flows through working solution outlet and the water conservancy diversion along first in washing tower (for removing CO2) after being dried Cylinder floats, and portion gas is directly discharged from exhaust outlet, the solution of potassium carbonate of working solution and entrained under the effect of gravity, along first The upper nozzle edge of inner draft tube disperses decline, and passes through packing layer, it would be possible to existing " Water-In-Oil " is poked so that gas by It is discharged in buoyancy from exhaust outlet;Under the effect of gravity through gas-liquid separation treated working solution and solution of potassium carbonate, after Continuous decline flows through sinking flow-guiding channel, and flows into water-oil separating room from fluid hole;Since potassium carbonate specific gravity is larger, it is settled down to Separation chamber bottom and assemble in solution of potassium carbonate expansion chamber, working solution is lighter, float enter hydrops room in is collected, finally by Material outlet flows out to carclazyte bed.Water-In-Oil is poked and packing layer is set in the first gas-liquid separation cylinder, in oil Packing layer is set in the upper end of water separation chamber for oil water separation process to be adjusted, so that water-oil separating is more thorough; To realize the separation to the gas-liquid separation of Water-In-Oil and solution of potassium carbonate and working solution, and it is not necessarily to alkali separator and caustic settler And the quantity of equipment is reduced, while simplifying manual operation.
Preferred scheme is that the bottom of solution of potassium carbonate expansion chamber is connected with Pipe for draining alkali road, the potassium carbonate for will settle Solution is delivered to the solution of potassium carbonate locker room at washing tower (for removing CO2) bottom.
Further embodiment is that the upper end of settlement barrel is sleeved on outside the lower end of the first gas-liquid separation cylinder, and the two is in diameter Upward arranged for interval and form overflow port;First cap shell includes the base cylinder that outer diameter is greater than the first tower casing, on the inner wall of base cylinder It is installed with inner cylinder, surrounds liquid collecting room between inner cylinder and base cylinder;Base cylinder is located at barrel and inner cylinder under inner cylinder Body connects and composes settlement barrel;The upper surface of inner cylinder is zigzag spillwag chute, and the tooth socket in zigzag spillwag chute is along inner cylinder It is arranged circumferentially.
It is structured filling material layer that another preferred scheme, which is packing layer,.
In order to achieve the above-mentioned another object, extraction process unit provided by the utility model includes extraction tower, extraction tower packet Include the tower casing that top is equipped with raffinate outlet;Tower cap assembly is installed in tower casing;Tower cap assembly includes that top is equipped with exhaust outlet Cap shell and the separation assembly being mounted in cap shell;Separation assembly includes inner draft tube and to be sleeved on inner draft tube outer and relatively up and down The gas-liquid separation cylinder and external flow guiding cylinder of arrangement;The lower port and raffinate outlet of inner draft tube are installed in tower casing ground connection;Gas Liquid cylinder is fixedly connected with ground connection with external flow guiding cylinder port, and upper end is the open end that end face is higher than inner draft tube;Gas-liquid point From be filled between cylinder and inner draft tube upper surface lower than inner draft tube discharge port the first packing layer;The lower end of external flow guiding cylinder Equipped with fluid hole;The second packing layer that lower surface is higher than fluid hole is filled between cap shell and external flow guiding cylinder;Cap shell is located at fluid hole The partial lumen room of lower section constitutes water expansion chamber;Cap shell is equipped with position and is higher than the second packing layer and goes out lower than the material of open end Mouthful.
Specific scheme is that water expansion chamber is communicatively equipped with drainage pipeline, for by the water of sedimentation be transmitted back in extraction tower into Row cycling extraction.
Preferred scheme is that gas-liquid separation cylinder includes major diameter canister portion for loading the first packing layer and is installed in ground connection Back taper canister portion on the lower end of major diameter canister portion, the upper nozzle of external flow guiding cylinder docked with the path port part of back taper canister portion it is solid Fixed connection;Packing layer is structured filling material layer.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the extraction processing and post-processing section separating device in existing hydrogen peroxide manufacture equipment;
Fig. 2 is the structural schematic diagram of existing after-treatment device;
Fig. 3 is the structural schematic diagram of the utility model production equipment embodiment;
Fig. 4 is the structural schematic diagram of extraction tower and the second tower cap assembly in the utility model production equipment embodiment;
Fig. 5 is the partial structurtes of the second tower cap assembly and extraction tower amplification signal in the utility model production equipment embodiment Figure;
Fig. 6 is the structural schematic diagram of washing tower (for removing CO2) and the first tower cap assembly in the utility model production equipment embodiment;
Fig. 7 is the partial structurtes enlarged diagram of tower cap assembly and washing tower (for removing CO2) in the utility model production equipment embodiment;
Fig. 8 is A partial enlarged view in Fig. 6.
Specific embodiment
With reference to embodiments and its attached drawing the utility model is described in further detail.
Production equipment embodiment
Referring to Fig. 3 to Fig. 8, the utility model includes extraction tower 11, installation based on anthraquinone hydrogen peroxide manufacture equipment 1 The second tower cap assembly 12 on the top of extraction tower 11, the alkali being connected to by pipeline with the material outlet of the second tower cap assembly 12 Tower 13, the first tower cap assembly 14 being mounted on the top of washing tower (for removing CO2) 13, by the material outlet of pipeline and the first tower cap assembly 13 The carclazyte bed 15 of connection and the alkali evaporator 16 being connected to by pipeline with the solution of potassium carbonate locker room of washing tower (for removing CO2) 13.
As shown in Figures 3 to 5, extraction tower 11 includes the second tower casing 110, is equipped in the second tower casing 110 for receiving oxygen Change the material inlet of liquid, to receive working solution to be processed.The top of second tower casing 110 is frustum shell portion 111, frustum shell The path port in portion 111 constitutes raffinate outlet 112, i.e. the working solution after pure water extraction processing is from raffinate outlet 112 Extraction tower 11 is discharged.
Second tower cap assembly 12 is mounted on the top of tower casing 11, including the second inner draft tube 21, the second gas-liquid separation cylinder 3, the second external flow guiding cylinder 22 and the second cap shell 23.
The lower port and raffinate outlet 112 of second inner draft tube 21 are installed in frustum shell portion 111 with being docked and connected In path port part, interior bore, which is constituted, rises flow-guiding channel, and the second inner draft tube 21 is internal diameter and raffinate outlet 112 etc. The straight tube structure of diameter.
Second external flow guiding cylinder 22 is the straight tube structure being sleeved on outside the second inner draft tube 21, and interval is formed by between the two Radial clearance constitutes sinking flow-guiding channel;The lower port of second external flow guiding cylinder 22 is fixedly connected with frustum shell portion 111, and under The barrel of end is equipped with the second fluid hole 220 around one circle arrangement, and in the present embodiment, the second fluid hole 220 is constituted Around the cloth discharge orifice of the second external flow guiding cylinder 22 being arranged circumferentially, so that the liquid in sinking flow-guiding channel is in lower end surrounding It can substantially evenly distribute.
Second gas-liquid separation cylinder 3 includes major diameter canister portion 30 for loading the first structured filling material layer 32 and is installed in ground connection Back taper canister portion 31 on 30 lower end of major diameter canister portion, the upper nozzle of the second external flow guiding cylinder 22 and the miner diameter end of back taper canister portion 31 Oral area is fixedly connected with ground connection, so that the second gas-liquid separation cylinder 3 is located at the top of the second external flow guiding cylinder 22.Back taper canister portion 31 is used Assemble in the liquid after being handled through the first structured filling material layer 32, so that into the fluid in sinking flow-guiding channel along week To generally uniform arrangement.
Second cap shell 23 includes that outer diameter is greater than the base cylinder 230 of the second tower casing 110 and is removably mounted on base cylinder 230 Upper port on end socket 231, end socket 231 is for closing the upper port of base cylinder 230.In the present embodiment, base cylinder Body 230 is the straight tube structure that lower end is throat structure, is sleeved on outside the upper end of the second tower casing 110, and lower necking end with It is water-tightly to be fixedly connected between second tower casing 110.Exhaust outlet 232, i.e. the second cap are equipped on the top central region of end socket 231 The top of shell 23 is equipped with exhaust outlet.
Base cylinder 230 is sleeved on except the second external flow guiding cylinder 22 and the second gas-liquid separation cylinder 3, and between the radial direction between them Gap constitutes water-oil separating room.Lower surface is filled between base cylinder 230 and the second external flow guiding cylinder 22 higher than the second fluid hole 220 Second structured filling material layer 24, the partial lumen room that water-oil separating room is located at 220 lower section of the second fluid hole constitute water expansion chamber 25.? Base cylinder 230 is equipped with the material outlet 26 that position is higher than the second packing layer 24 and the upper surface lower than the second gas-liquid separation cylinder 3, Material outlet 26 is connected to washing tower (for removing CO2) 13 by pipeline.
The upper end of second gas-liquid separation cylinder 3 be end face be higher than the second inner draft tube 21 open end, so as to accept from The working solution that second inner draft tube 21 floats.
It is connected with drainage pipeline 250 in the bottom of water expansion chamber 25, the pure water for collecting sedimentation, which is delivered to, is located at extraction It takes and carries out cycling extraction in tower 11.
As shown in Fig. 3 and Fig. 6 to Fig. 8, washing tower (for removing CO2) 13 includes the first tower casing 130, is equipped in the first tower casing 130 for passing through The material inlet 133 that pipeline is connected to material outlet 26, to receive working solution to be processed.The top of first tower casing 130 is cone Bench-type shell portion 131, the path port in frustum shell portion 131 constitute working solution outlet 132, i.e., are dried it through solution of potassium carbonate Washing tower (for removing CO2) 13 is discharged from working solution outlet 132 in working solution afterwards.
First tower cap assembly 14 is mounted on the top of the second tower casing 130, including the first inner draft tube 4, the first gas-liquid point From cylinder 5, the first external flow guiding cylinder 6, settlement barrel 7 and the first cap shell 8.
The lower port of first inner draft tube 4 is installed in the small of frustum shell portion 131 with working solution outlet 132 with being docked and connected In diameter port part, interior bore, which is constituted, rises flow-guiding channel, and the first external flow guiding cylinder 6 is that internal diameter and working solution outlet 132 are isometrical Straight tube structure.
First external flow guiding cylinder 6 is the straight tube structure being sleeved on outside the first inner draft tube 4, and interval is formed by diameter between the two Sinking flow-guiding channel is constituted to gap;The lower port of first external flow guiding cylinder 6 is fixedly connected with frustum shell portion 131, and in lower end The barrel in portion is equipped with the first fluid hole 60 around one circle arrangement, and in the present embodiment, the first fluid hole 60, which is constituted, to be surround The cloth discharge orifice of first external flow guiding cylinder 6 being arranged circumferentially, so that flow in sinking flow-guiding channel can in lower end surrounding Substantially uniform distribution.
First gas-liquid separation cylinder 5 includes major diameter canister portion 50 for loading third structured filling material layer 52 and is installed in ground connection Back taper canister portion 51 on 50 lower end of major diameter canister portion, the upper nozzle of the first external flow guiding cylinder 6 and the miner diameter end of back taper canister portion 51 Oral area is fixedly connected with ground connection, so that the first gas-liquid separation cylinder 5 is located at the top of the first external flow guiding cylinder 6.Back taper canister portion 51 is used Assemble in the liquid after being handled through structured filling material layer 52, so that circumferentially big into the fluid in sinking flow-guiding channel Cause is evenly arranged.
First cap shell 8 includes that outer diameter is greater than the base cylinder 80 of the second tower casing 130 and is removably mounted on base cylinder 80 End socket 81 in upper port, end socket 81 is for closing the upper port of base cylinder 80.In the present embodiment, base cylinder 80 is Lower end is the straight tube structure of throat structure, is sleeved on outside the upper end of the first tower casing 130, and lower necking end and the first tower casing It is water-tightly to be fixedly connected between 130.Exhaust outlet 82, the i.e. top of the first cap shell 8 are equipped on the top central region of end socket 81 Equipped with exhaust outlet, upper in base cylinder 80 is equipped with material outlet 83, and material outlet 83, which is constituted in the first tower cap assembly 14, passes through pipe The material outlet that road is connected to carclazyte bed 15.
Inner cylinder 71 is installed on the upper end inner wall of base cylinder 80, the lower end of inner cylinder 71 is that bending extends outwardly Flap, to be water-tightly fixedly connected between the flap and the inner wall wall surface of base cylinder 80, thus in inner cylinder 71 and base cylinder A liquid collecting room 70 is surrounded between body 80.
Base cylinder 80 is located at the cylinder under inner cylinder 71 and constitutes the sedimentation connected and composed in the present embodiment with inner cylinder 71 Cylinder 7, i.e., settlement barrel 7 is sleeved on except the first external flow guiding cylinder 6 and the first gas-liquid separation cylinder 5, and the radial clearance structure between them The liquid collecting room 70 around 7 surrounding of settlement barrel arrangement is surrounded at water-oil separating room and settlement barrel 7 and the first cap shell 8, in the present embodiment In, liquid collecting room 70 is to surround inner cylinder 71 circumferentially.Lower surface height is filled between settlement barrel 7 and the first inner draft tube 4 In the 4th structured filling material layer 72 of the first fluid hole 60, water-oil separating room is located at the partial lumen room structure of 60 lower section of the first fluid hole At solution of potassium carbonate expansion chamber 73.
In the present embodiment, the inner port of material outlet 83 is connected to liquid collecting room 70, i.e., it constitutes liquid collecting room outlet, with logical Piping is connected to carclazyte bed 15 and liquid collecting room 70.
The upper end of first gas-liquid separation cylinder 5 is the open end that end face is higher than the first inner draft tube 4, so as to accept from the The working solution that one inner draft tube 4 floats.The upper end of settlement barrel 7 is sleeved on outside the lower end of the first gas-liquid separation cylinder 5, so that heavy The upper port for dropping cylinder 7 is lower than the open end end face of the first gas-liquid separation cylinder 5, and constitutes the overflow port of water-oil separating room;In this reality It applies in example, the upper surface of inner cylinder 71 is arranged to zigzag spillwag chute 710, the tooth socket in the zigzag spillwag chute 710 is in Cylinder 71 is arranged circumferentially.
It is connected with Pipe for draining alkali road 730 in the bottom of solution of potassium carbonate expansion chamber 73, it is molten for the potassium carbonate collected will to be settled Liquid is delivered to the solution of potassium carbonate locker room at 13 bottom of washing tower (for removing CO2), with will be dilute by the pipeline connecting with material outlet 134 The solution of potassium carbonate released is delivered in alkali evaporator 16 after progress inspissation processing, and recycling can be recycled in washing tower (for removing CO2) 13.
During the work time, (1) working solution is in extraction tower 11 after extraction processing, and raffinate stream is through raffinate outlet It 112 and floats along the second inner draft tube 21, portion gas is directly discharged from exhaust outlet, and the water of working solution and entrained with is made in gravity Under, disperse decline along the upper nozzle edge of the second inner draft tube 21, and pass through the first structured filling material layer 32, it would be possible to existing " Water-In-Oil " is poked so that gas due to buoyancy and from exhaust outlet 232 be discharged, and discharge be wrapped in it is pure in working solution Water;(2) under the effect of gravity through gas-liquid separation treated working solution and water, continue to decline, flow through sinking flow-guiding channel, and from Fluid hole flows into water-oil separating room;Since water phase specific gravity is larger, it is settled down to separation chamber bottom and assembles in water expansion chamber 25, Working solution is lighter, floats and is discharged by material outlet 26;(3) working solution of the fire through extraction separator processing is through material inlet 133 enter in washing tower (for removing CO2) 13, and working solution is dried;Treatment fluid flow after being dried exports 132 edges through working solution Inner draft tube 4 floats, and portion gas is directly entered in the chamber of end socket 81 and is discharged through exhaust outlet 82, working solution and possible entrainment Solution of potassium carbonate under the effect of gravity, dispersion decline, by third structured filling material layer 53, it would be possible to existing " Water-In-Oil " stamp It is broken, so that gas is ascended into the chamber of end socket 81 due to buoyancy and is discharged through exhaust outlet 82;(4) through gas-liquid separation Treated working solution and solution of potassium carbonate under the effect of gravity, continue to decline, and flow through sinking flow-guiding channel, and from fluid hole 60 It is evenly distributed with to water-oil separating room;(5) since potassium carbonate specific gravity is larger, bottom is sunk to and in 73 cohesion of solution of potassium carbonate expansion chamber Collection, working solution is lighter, and floating to enter in hydrops room 70 is collected, and finally spills out carclazyte bed 16 by material outlet.And sink to carbon Solution of potassium carbonate in sour potassium solution expansion chamber 73 then passes through the potassium carbonate storage area that automatic Pipe for draining alkali line returns to washing tower (for removing CO2) bottom It is interior.The Water-In-Oil between working solution and pure water is poked by the way that the first structured filling material layer 32 is arranged, setting second is regular to fill out The bed of material 24 is for being adjusted the oil water separation process of working solution and pure water, so that water-oil separating is more thorough;Pass through setting Third structured filling material layer 52 and the Water-In-Oil between working solution and solution of potassium carbonate is poked, be arranged the 4th structured filling material layer 72 It is adjusted for the oil water separation process to working solution and solution of potassium carbonate, so that water-oil separating is more thorough, i.e., first Packing layer and third road packing layer promote gas-liquid separation, and the heavy phase that release is wrapped up by light phase solution for poking Water-In-Oil Solution, it is more smoothly thorough with subsequent water-oil separating;To realize point to the gas-liquid separation of Water-In-Oil, pure water and working solution Equipment is reduced from the separation with solution of potassium carbonate and working solution, and without extraction raffinate separator, alkali separator and caustic settler Quantity, while simplifying manual operation.
In the above-described embodiments, the watertight between each cylinder, which is fixedly connected, can be used welding procedure realization.
Extraction process unit embodiment
In the description of above-mentioned production equipment embodiment, extraction tower and the tower cap assembly being mounted on the extraction tower are constituted In extraction processing in the present embodiment, i.e., the utility model extraction process unit embodiment is described, herein not It repeats again.
The central scope of the utility model, by installing on the top of extraction tower and/or washing tower (for removing CO2) for at through extraction " Water-In-Oil " carries out gas-liquid separation processing and to the pure water and/or carbonic acid in working solution in reason and/or the working solution being dried Potassium solution carries out the tower cap assembly of water-oil separating processing, is subtracted with omitting extraction separator and/or alkali separator and caustic settler The quantity of few equipment, and manually-operated complexity can be simplified.According to this design, extraction tower, washing tower (for removing CO2), carclazyte bed and alkali evaporation The structure that the structure of device can refer to existing product is designed;Conventional fillers, nothing can be selected in filler used in structured filling material layer Particular/special requirement;In addition, can be manufactured using the tube structure of two layers of mutual sheathing for the structure of settlement barrel and cap shell. Furthermore, it is possible to be replaced using water-oil separating method etc. disclosed in the patent document of vacuum dehydration method and Publication No. CN104370331A For the alkali evaporation that washing tower (for removing CO2) employed in previous embodiment carries out, to realize the drying process to raffinate.

Claims (10)

1. a kind of based on anthraquinone hydrogen peroxide manufacture equipment, including extraction tower and after-treatment device, the extraction tower includes Top is equipped with the tower casing of raffinate outlet, it is characterised in that:
Tower cap assembly is installed in the tower casing;The tower cap assembly includes that top is equipped with the cap shell of exhaust outlet and is mounted on described Separation assembly in cap shell;The separation assembly includes inner draft tube and is sleeved on outside the inner draft tube and arranges up and down relatively Gas-liquid separation cylinder and external flow guiding cylinder;
The lower port of the inner draft tube and the raffinate outlet are installed in the tower casing ground connection;The gas-liquid separation cylinder Ground connection is fixedly connected with the external flow guiding cylinder port, and upper end is the open end that end face is higher than the inner draft tube;The gas First packing layer of the upper surface lower than the discharge port of the inner draft tube is filled between liquid cylinder and the inner draft tube;
The lower end of the external flow guiding cylinder is equipped with fluid hole;Lower surface is filled between the cap shell and the external flow guiding cylinder higher than institute State the second packing layer of fluid hole;The cap shell is located at the partial lumen room below the fluid hole and constitutes water expansion chamber;It is described Cap shell is equipped with position and is higher than second packing layer and is lower than the material outlet of the open end.
2. hydrogen peroxide manufacture equipment according to claim 1, it is characterised in that:
The water expansion chamber is communicatively equipped with drainage pipeline, carries out circulation extraction for the water of sedimentation to be transmitted back in the extraction tower It takes;
The multiple fluid hole being arranged circumferentially along the external flow guiding cylinder.
3. hydrogen peroxide manufacture equipment according to claim 1, it is characterised in that:
The gas-liquid separation cylinder includes major diameter canister portion for loading first packing layer and is installed in the major diameter to ground connection Back taper canister portion on the lower end of canister portion, the upper nozzle of the external flow guiding cylinder are docked with the path port part of the back taper canister portion Ground is fixedly connected.
4. according to claim 1 to hydrogen peroxide manufacture equipment described in any one of 3 claims, it is characterised in that:
The after-treatment device includes the withering washing tower (for removing CO2) of working solution, the carclazyte bed for the material outlet to be discharged And it is mounted on the first tower cap assembly on the top of the washing tower (for removing CO2), the washing tower (for removing CO2) includes the first tower that top is equipped with working solution outlet Shell;The first tower cap assembly includes the first inner draft tube, and it is outer and relatively arranged up and down to be sleeved on first inner draft tube First gas-liquid separation cylinder and the first external flow guiding cylinder, the settlement barrel being sleeved on outside first external flow guiding cylinder and top are equipped with exhaust First cap shell of mouth;The lower port of first inner draft tube and working solution outlet are installed in first tower casing to ground connection On;The first gas-liquid separation cylinder is fixedly connected with ground connection with first external flow guiding cylinder port, and upper end is higher than institute for end face State the open end of the first inner draft tube;Upper surface is filled between the first gas-liquid separation cylinder and first inner draft tube to be lower than The packing layer of the discharge port of first inner draft tube;
The lower end of first external flow guiding cylinder is equipped with the first fluid hole being connected to the inner cavity chamber of the settlement barrel;The sedimentation It is filled with the packing layer that lower surface is higher than first fluid hole between cylinder and first external flow guiding cylinder, is located at described first and goes out liquid Partial lumen room below hole constitutes solution of potassium carbonate expansion chamber;The settlement barrel and first cap shell are surrounded around described heavy The upper port of the liquid collecting room arranged around drop cylinder, the settlement barrel is lower than the open end;First cap shell be equipped with The carclazyte bed is exported by the liquid collecting room that pipeline connects.
5. hydrogen peroxide manufacture equipment according to claim 4, it is characterised in that:
The bottom of the solution of potassium carbonate expansion chamber is connected with Pipe for draining alkali road, is located at for the solution of potassium carbonate of sedimentation to be delivered to Solution of potassium carbonate locker room at washing tower (for removing CO2) bottom.
6. hydrogen peroxide manufacture equipment according to claim 4, it is characterised in that:
The upper end of the settlement barrel is sleeved on outside the lower end of the first gas-liquid separation cylinder, and the two is spaced cloth radially It sets and forms overflow port;First cap shell includes the base cylinder that outer diameter is greater than first tower casing, the inner wall of the base cylinder On be installed with inner cylinder, surround the liquid collecting room between the inner cylinder and the base cylinder;The base cylinder is located in described Barrel and the inner cylinder under cylinder connect and compose the settlement barrel;The upper surface of the inner cylinder is zigzag overflow Face, tooth socket being arranged circumferentially along the inner cylinder in the zigzag spillwag chute.
7. according to claim 1 to hydrogen peroxide manufacture equipment described in any one of 3 claims, it is characterised in that:
Packing layer is structured filling material layer.
8. a kind of extraction process unit, including extraction tower, the extraction tower includes the tower casing that top is equipped with raffinate outlet, special Sign is:
Tower cap assembly is installed in the tower casing;The tower cap assembly includes that top is equipped with the cap shell of exhaust outlet and is mounted on described Separation assembly in cap shell;The separation assembly includes inner draft tube and is sleeved on outside the inner draft tube and arranges up and down relatively Gas-liquid separation cylinder and external flow guiding cylinder;
The lower port of the inner draft tube and the raffinate outlet are installed in the tower casing ground connection;The gas-liquid separation cylinder Ground connection is fixedly connected with the external flow guiding cylinder port, and upper end is the open end that end face is higher than the inner draft tube;The gas First packing layer of the upper surface lower than the discharge port of the inner draft tube is filled between liquid cylinder and the inner draft tube;
The lower end of the external flow guiding cylinder is equipped with fluid hole;Lower surface is filled between the cap shell and the external flow guiding cylinder higher than institute State the second packing layer of fluid hole;The cap shell is located at the partial lumen room below the fluid hole and constitutes water expansion chamber;It is described Cap shell is equipped with position and is higher than second packing layer and is lower than the material outlet of the open end.
9. extraction process unit according to claim 8, it is characterised in that:
The water expansion chamber is communicatively equipped with drainage pipeline, carries out circulation extraction for the water of sedimentation to be transmitted back in the extraction tower It takes.
10. extraction process unit according to claim 8 or claim 9, it is characterised in that:
The gas-liquid separation cylinder includes major diameter canister portion for loading first packing layer and is installed in the major diameter to ground connection Back taper canister portion on the lower end of canister portion, the upper nozzle of the external flow guiding cylinder are docked with the path port part of the back taper canister portion Ground is fixedly connected;
Packing layer is structured filling material layer.
CN201821073815.2U 2018-07-06 2018-07-06 It is a kind of based on anthraquinone hydrogen peroxide manufacture equipment and its extraction process unit Expired - Fee Related CN209143698U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821073815.2U CN209143698U (en) 2018-07-06 2018-07-06 It is a kind of based on anthraquinone hydrogen peroxide manufacture equipment and its extraction process unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821073815.2U CN209143698U (en) 2018-07-06 2018-07-06 It is a kind of based on anthraquinone hydrogen peroxide manufacture equipment and its extraction process unit

Publications (1)

Publication Number Publication Date
CN209143698U true CN209143698U (en) 2019-07-23

Family

ID=67264969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821073815.2U Expired - Fee Related CN209143698U (en) 2018-07-06 2018-07-06 It is a kind of based on anthraquinone hydrogen peroxide manufacture equipment and its extraction process unit

Country Status (1)

Country Link
CN (1) CN209143698U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108751135A (en) * 2018-07-06 2018-11-06 浙江工程设计有限公司 It is a kind of based on anthraquinone hydrogen peroxide manufacture equipment and its extraction process unit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108751135A (en) * 2018-07-06 2018-11-06 浙江工程设计有限公司 It is a kind of based on anthraquinone hydrogen peroxide manufacture equipment and its extraction process unit
CN108751135B (en) * 2018-07-06 2023-09-29 浙江工程设计有限公司 Hydrogen peroxide production facility and extraction processing apparatus based on anthraquinone process

Similar Documents

Publication Publication Date Title
AU2006307504B2 (en) A gravity separator, and a method for separating a mixture containing water, oil, and gas
CN201801394U (en) Air flotation processing device for oily waste water
CN206793112U (en) Tub oil water separator
CN115477354A (en) Compact gas flotation separation device
CN110980674B (en) Defluorinated phosphoric acid production process and device
CN101417184A (en) Gas floatation separation device
CN201906485U (en) Gas-liquid separation system
CN209143698U (en) It is a kind of based on anthraquinone hydrogen peroxide manufacture equipment and its extraction process unit
CN208586059U (en) A kind of after-treatment device of process for prepairng hydrogen peroxide by anthraquinone technique
CN103320161B (en) Method and apparatus for improving hydrogen utilization rate of hydrogenation equipment
CN115849489A (en) Hydrodynamic cavitation dissolved air reactor for dissolved air floatation
CN108751135A (en) It is a kind of based on anthraquinone hydrogen peroxide manufacture equipment and its extraction process unit
CN101935081B (en) Pressure type air flotation separation device
CN207498328U (en) A kind of shale gas special horizontal gas-liquid sand three phase separator
CN201454168U (en) Gas-oil-water three-phase separation device
CN105152504A (en) Sludge oil removal system and method
CN206395925U (en) Deliming anaerobic reactor
CN209721702U (en) A kind of high-load anaerobic reactor
CN207169669U (en) A kind of oil-gas-water three-phase separation for esterification
CN103242923B (en) Natural gas desulfurization device and desulfurization process applicable to production platform
CN211198616U (en) Defluorinated phosphoric acid production device
CN209405741U (en) A kind of hydrogen peroxide raffinate water separation device
CN219602142U (en) Chemical saving tank capable of separating greasy dirt
CN201275433Y (en) Bucket type oil and water separator
CN207169112U (en) A kind of liquid phase separating device for esterification

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190723

CF01 Termination of patent right due to non-payment of annual fee