CN209134942U - A kind of novel agricultural planting greenhouse - Google Patents
A kind of novel agricultural planting greenhouse Download PDFInfo
- Publication number
- CN209134942U CN209134942U CN201821774900.1U CN201821774900U CN209134942U CN 209134942 U CN209134942 U CN 209134942U CN 201821774900 U CN201821774900 U CN 201821774900U CN 209134942 U CN209134942 U CN 209134942U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- connector sleeve
- fixed
- pipe connector
- fastening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/25—Greenhouse technology, e.g. cooling systems therefor
Landscapes
- Greenhouses (AREA)
Abstract
A kind of novel agricultural planting greenhouse, including steel pipe, steel pipe connector sleeve, fasten plate, fixing insertion, fixed operating sleeve, pre-buried fixed plate, be located by connecting set, it is fastenedly connected block, multiple steel pipes are connected on the outside of the steel pipe connector sleeve, it is fastenedly connected block side and passes through fastening screw joint steel pipe connector sleeve, it is fastenedly connected block other side joint steel pipe, block is fastenedly connected to be meshed with steel pipe, multiple fastening plates are connected on the outside of steel pipe connector sleeve, the fastening plate passes through steel pipe connector sleeve, steel pipe connects fixing insertion, the fixing insertion passes through fixing screws joint steel pipe connector sleeve, steel pipe lower part connects ground, the set that is located by connecting is connected by fastening bolt on the outside of steel pipe, described be located by connecting covers lower part and connects ground by positioning screw, fixed operating sleeve top connects the set that is located by connecting by positioning screw, fixed operating sleeve lower part passes through expansion It is bolted ground.
Description
Technical field
The utility model relates to agriculture field more particularly to a kind of novel agricultural planting greenhouses.
Background technique
In agricultural planting greenhouse in use, most of agricultural planting greenhouses are all to connect with steel tube made of, however by
Unreasonable in agricultural planting greenhouse overall structure, steel pipe and steel pipe junction often will appear loosely, to cause agricultural planting big
Canopy tilts and collapses, and brings economic loss to user.
Utility model content
The utility model In view of the above shortcomings of the prior art, provides a kind of a kind of structurally reasonable novel agricultural kind
Plant greenhouse.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of novel agricultural planting greenhouse, including steel pipe, steel pipe connector sleeve, fastening plate, fixing insertion, be fixedly connected
Set, the set that is located by connecting, is fastenedly connected block at pre-buried fixed plate, connects multiple steel pipes on the outside of the steel pipe connector sleeve, is fastenedly connected block
Side is fastenedly connected block other side joint steel pipe, is fastenedly connected block and mutually nibbled with steel pipe by fastening screw joint steel pipe connector sleeve
It closes, multiple fastening plates is connected on the outside of steel pipe connector sleeve, the fastening plate is connected and fixed slotting across steel pipe connector sleeve, steel pipe
Plate, for the fixing insertion by fixing screws joint steel pipe connector sleeve, steel pipe lower part connects ground, passes through fastening spiral shell on the outside of steel pipe
It tethers and connects the set that is located by connecting, described be located by connecting covers lower part by positioning screw connection ground, and it is fixed that fixed operating sleeve top passes through
Position screw rod connects the set that is located by connecting, and fixed operating sleeve lower part connects ground by expansion bolt, has inside ground multiple pre-buried
Fixed plate.
The pre-buried fixed plate top has multiple fixed lobes, and the pre-buried fixed plate lower part connects two fixed steel
Muscle, the fixed steel bars are symmetrical arranged, positioning screw sequentially passes through fixed operating sleeve, the set that is located by connecting, ground be connected and fixed it is convex
It rises, plastic film is connected on the outside of steel pipe.
The utility model has the advantages that
In the case where fastening plate, fixing insertion, being fastenedly connected the collective effect of block, it connect steel pipe more with steel pipe connector sleeve
It is firm, keep overall structure more reasonable, while fixed operating sleeve, pre-buried fixed plate, the set that is located by connecting, fixed steel bars phase interworking
Under conjunction, the stability that steel pipe is connect with ground is improved, connect steel pipe with ground more firm, keeps overall structure more reasonable.
Detailed description of the invention
Fig. 1 is a kind of novel agricultural planting greenhouse structural schematic diagram described in the utility model.
Fig. 2 is a kind of novel agricultural planting greenhouse partial sectional view described in the utility model.
Fig. 3 is a kind of novel agricultural planting greenhouse partial enlarged view described in the utility model.
Specific embodiment
The utility model is described in further detail below according to drawings and examples:
A kind of novel agricultural planting greenhouse, including it is steel pipe 01, steel pipe connector sleeve 02, fastening plate 03, fixing insertion 04, solid
Determine connector sleeve 05, pre-buried fixed plate 06, the set 07 that is located by connecting, be fastenedly connected block 08, is connected on the outside of the steel pipe connector sleeve 02 more
A steel pipe 01 is fastenedly connected 08 side of block by 09 joint steel pipe connector sleeve 02 of fastening screw, is fastenedly connected 08 other side of block company
Steel pipe 01 is connect, block 08 is fastenedly connected and is meshed with steel pipe 01, multiple fastening plates 03 are connected on the outside of steel pipe connector sleeve 02, it is described tight
Gu plate 03 passes through steel pipe connector sleeve 02, steel pipe 01 is connected and fixed plate 04, the fixing insertion 04 is connected by fixing screws 10
Steel pipe connector sleeve 02 is connect, 01 lower part of steel pipe connects ground, passes through fastening bolt 12 on the outside of steel pipe 01 and connect the set 07 that is located by connecting, institute
It states 07 lower part of set that is located by connecting and ground is connected by positioning screw 13,05 top of fixed operating sleeve is fixed by the connection of positioning screw 13
Position connector sleeve 07,05 lower part of fixed operating sleeve connect ground by expansion bolt 14, have multiple pre-buried fixed plates inside ground
06。
06 top of pre-buried fixed plate has multiple fixed lobes 15, and pre-buried 06 lower part of fixed plate connects two admittedly
Determine reinforcing bar 11, the fixed steel bars 11 are symmetrical arranged, positioning screw 13 sequentially pass through fixed operating sleeve 05, the set 07 that is located by connecting,
Ground is connected and fixed protrusion 15, connects plastic film on the outside of steel pipe 01.
In the case where fastening plate 03, fixing insertion 04, being fastenedly connected the collective effect of block 08, make steel pipe 01 and steel pipe connector sleeve
02 connection it is more firm, keep overall structure more reasonable, at the same fixed operating sleeve 05, pre-buried fixed plate 06, the set 07 that is located by connecting,
Under the mutual cooperation of fixed steel bars 11, the stability that steel pipe 01 is connect with ground is improved, connect steel pipe 01 more with ground
It is firm, keep overall structure more reasonable.
Claims (2)
1. a kind of novel agricultural planting greenhouse, it is characterized in that: including steel pipe, steel pipe connector sleeve, fastening plate, fixing insertion, consolidating
Determine connector sleeve, pre-buried fixed plate, the set that is located by connecting, be fastenedly connected block, multiple steel pipes, fastening are connected on the outside of the steel pipe connector sleeve
Link block side is fastenedly connected block other side joint steel pipe, is fastenedly connected block and steel by fastening screw joint steel pipe connector sleeve
Pipe is meshed, and multiple fastening plates are connected on the outside of steel pipe connector sleeve, and the fastening plate passes through steel pipe connector sleeve, steel pipe connection admittedly
Determine plate, for the fixing insertion by fixing screws joint steel pipe connector sleeve, steel pipe lower part connects ground, passes through on the outside of steel pipe tight
Fixing bolt connects the set that is located by connecting, and described be located by connecting covers lower part by positioning screw connection ground, and fixed operating sleeve top is logical
It crosses positioning screw and connects the set that is located by connecting, fixed operating sleeve lower part connects ground by expansion bolt, has inside ground multiple
Pre-buried fixed plate.
2. a kind of novel agricultural planting greenhouse according to claim 1, it is characterized in that: the pre-buried fixed plate top tool
There are multiple fixed lobes, the pre-buried fixed plate lower part connects two fixed steel bars, and the fixed steel bars are symmetrical arranged, and positions spiral shell
Bar sequentially passes through fixed operating sleeve, the set that is located by connecting, ground are connected and fixed protrusion, and plastic film is connected on the outside of steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821774900.1U CN209134942U (en) | 2018-10-31 | 2018-10-31 | A kind of novel agricultural planting greenhouse |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821774900.1U CN209134942U (en) | 2018-10-31 | 2018-10-31 | A kind of novel agricultural planting greenhouse |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209134942U true CN209134942U (en) | 2019-07-23 |
Family
ID=67271665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821774900.1U Expired - Fee Related CN209134942U (en) | 2018-10-31 | 2018-10-31 | A kind of novel agricultural planting greenhouse |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209134942U (en) |
-
2018
- 2018-10-31 CN CN201821774900.1U patent/CN209134942U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103039301B (en) | Agricultural greenhouse frame structure and L type, E type and T type connecting devices thereof | |
CN206879334U (en) | A kind of function garden shovel for being easy to assembling | |
CN209134942U (en) | A kind of novel agricultural planting greenhouse | |
CN208227897U (en) | It is a kind of to have both beautiful tree anti-tilting bracket for garden seedling tree | |
CN203015543U (en) | Arc-shaped bracket connecting device of agricultural greenhouse | |
CN207305533U (en) | A kind of Simple detachable nursery Small plastic shed | |
CN208724532U (en) | The detachable fruit tree shelter from rain of Y type | |
KR101222611B1 (en) | United assembling blocks for frame connection of small-sized connecting greenhouse | |
CN204742031U (en) | Modular removal canopy of growing seedlings | |
CN201278716Y (en) | Combined greenhouse frame | |
CN206274710U (en) | Water injection type rake | |
CN204401807U (en) | Agricultural greenhouse L-type frame connecting apparatus | |
KR20130057183A (en) | Structure for frame of tent house | |
CN202969577U (en) | Reticulated casing rigid-hinge transformation node capable of adapting to rigidity requirements at different stages | |
CN208860377U (en) | Integral intelligent weather monitoring station | |
CN208748831U (en) | A kind of bamboo bar spreading structure of ring fastening type | |
CN208064771U (en) | Stainless steel table lower layer table linker | |
CN207587256U (en) | Steel construction often uses node display model | |
CN209171008U (en) | Novel rice seeding balance covering device | |
CN203735176U (en) | Fruit and vegetable greenhouse support capable of being assembled and disassembled quickly | |
CN213867522U (en) | Isolating device for municipal road greening | |
CN208708275U (en) | Detachable Simple heating temperature canopy | |
CN215301848U (en) | Novel detachable big-arch shelter of light letter | |
CN207235362U (en) | A kind of agricultural use can sow irrigation spade | |
CN102027865A (en) | Environmental protection energy-saving type combined greenhouse |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190723 Termination date: 20211031 |
|
CF01 | Termination of patent right due to non-payment of annual fee |