CN209117848U - A kind of single-phase electric energy meter module ageing rack - Google Patents
A kind of single-phase electric energy meter module ageing rack Download PDFInfo
- Publication number
- CN209117848U CN209117848U CN201821766391.8U CN201821766391U CN209117848U CN 209117848 U CN209117848 U CN 209117848U CN 201821766391 U CN201821766391 U CN 201821766391U CN 209117848 U CN209117848 U CN 209117848U
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy meter
- meter module
- parcel shelf
- pressing plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000032683 aging Effects 0.000 title claims abstract description 23
- 238000012360 testing method Methods 0.000 claims abstract description 38
- 230000011664 signaling Effects 0.000 claims abstract description 9
- 238000003825 pressing Methods 0.000 claims description 38
- 230000007246 mechanism Effects 0.000 claims description 35
- 230000006835 compression Effects 0.000 claims description 23
- 238000007906 compression Methods 0.000 claims description 23
- 239000000523 sample Substances 0.000 claims description 23
- 239000007787 solid Substances 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 7
- 238000009434 installation Methods 0.000 abstract description 6
- 230000008569 process Effects 0.000 abstract description 5
- 230000007547 defect Effects 0.000 abstract description 4
- 238000003466 welding Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 238000001514 detection method Methods 0.000 description 3
- 238000000105 evaporative light scattering detection Methods 0.000 description 3
- 239000004973 liquid crystal related substance Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 230000015556 catabolic process Effects 0.000 description 1
- 238000002788 crimping Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000002431 foraging effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
The utility model relates to a kind of single-phase electric energy meter module ageing racks, including frame body, frame body includes symmetrically arranged two support columns, at least one parcel shelf is movably equipped between two support columns, connecting groove is provided among parcel shelf, multiple electric energy meter module fixtures are fixed on the parcel shelf of connecting groove two sides, installation electric energy meter module and signaling module of having good luck on electric energy meter module fixture, the two sides of parcel shelf are equipped with the clamp clamping device of clamp that multiple pairs of electric energy meter module fixtures are clamped.The utility model setting module welding after, before assembly process, ahead of time expose electronic device mass defect, solve the problems, such as in the prior art due to bad finished product cause to reprocess it is excessively cumbersome;The number of parcel shelf can flexible setting according to demand, using two-sided setting electric energy meter module fixture, enough stations are provided and are tested for epitope, and driven simultaneously by a clamp clamping device of clamp using multiple groups electric energy meter module fixture, it is time saving and energy saving to operate, and testing efficiency is high.
Description
Technical field
The utility model relates to a kind of single-phase electric energy meter module ageing racks.
Background technique
Demand with the increasingly developed and people of smart grid to high power supply quality and service level, intelligent electric meter
The market demand is increasing.As the measurement instrument of electric energy trade settlement, intelligent electric energy meter requires have higher quality stability
And reliability, and quality stability and reliability are influenced by the quality life-span of manufacturing process and electronic component.
Carrying out degradation to finished product electric energy meter may be implemented the mass defect and stabilizing device that expose electronic device ahead of time
The purpose of performance, but this requires for aging process to be arranged before electric energy meter assembly process, if occurred not after aging process
When non-defective unit needs to reprocess, then electric energy meter is disassembled, repair then return assembly shop, so that rework process is excessively cumbersome, shadow
Ring production efficiency.Traditional electric energy meter aging is all to establish burn-in chamber, electric energy meter aging area is arranged in burn-in chamber, to electric energy meter
Aging is carried out, such method takes up a large area, the electric energy meter limited amount that can be accommodated every time, and ageing efficiency is low.
Utility model content
The utility model provides a kind of single-phase electric energy meter module ageing rack, carries out aging to the electronic device finished product of production
Test exposes the mass defect of electronic device ahead of time, solve in the prior art due to occur bad finished product cause to reprocess it is excessively numerous
Trivial problem.
In order to solve the above-mentioned technical problem, the utility model is achieved through the following technical solutions:
A kind of single-phase electric energy meter module ageing rack, including frame body, the frame body include symmetrically arranged two support columns, and two
It is movably equipped at least one parcel shelf between a support column, connecting groove, the connecting groove two are provided among the parcel shelf
Be fixed with multiple electric energy meter module fixtures on the parcel shelf of side, on the electric energy meter module fixture installation electric energy meter module and
It has good luck signaling module, the two sides of the parcel shelf are equipped with the clamp dress that multiple pairs of electric energy meter module fixtures are clamped
It sets.
By using above-mentioned technical proposal, the number of parcel shelf can flexible setting according to demand, open up among parcel shelf
Connecting groove, connecting groove are convenient for the traction and placement of conducting wire, keep conducting wire exposed, have hidden effect to conducting wire, improve parcel shelf
Trimness;Multiple groups electric energy meter module fixture is respectively provided on the parcel shelf of connecting groove two sides, using two-sided setting electric energy meter module
Fixture is provided enough test stations as epitope test, and is pressed from both sides simultaneously by a fixture using multiple groups electric energy meter module fixture
Tight device driving, does not need to drive electric energy meter module fixture one by one, and it is time saving and energy saving to operate, and substantially increases testing efficiency, economical
High efficiency.
Preferably, the vertical direction of two support columns is provided with strip groove, and the parcel shelf is slidably installed in strip groove.
By using above-mentioned technical proposal, parcel shelf installation and removal are convenient, and the spacing between parcel shelf and parcel shelf can
With flexible modulation, meet the detection work of different specification size module to be detected, is suitble to mass detection work.
Preferably, the electric energy meter module fixture includes that the first pressing plate and the second pressing plate disposed in parallel and activity are set
The guiding mechanism between the first pressing plate and the second pressing plate is set, the first pressing plate is equipped with the first mounting groove, peace in the first mounting groove
Electric energy meter module is filled, the second pressing plate is equipped with the second mounting groove, installs signaling module of having good luck, signal mode of having good luck in the second mounting groove
Test probe is fixed on block, first pressing plate is equipped with the test probe aperture walked for test probe.
By using above-mentioned technical proposal, test probe is squeezed by clamp clamping device of clamp, bullet is replied in test probe cooperation
Spring crimps mode and applies signal to electric energy meter module, while so that test probe is withstood electric energy meter module, applies to electric energy meter module
Add signal of having good luck, test probe is connected with electric energy meter module, effectively avoids maloperation, test safety coefficient is high, test effect
It is good;To electric energy meter module right angle setting on electric energy meter module fixture, employee is facilitated to check liquid crystal display, while being also conducive to heat
It is uniformly distributed.
Preferably, the guiding mechanism includes guide rod and the returning spring that is set on guide rod, and guide rod is fixed on the
On one pressing plate, the guide rod other end is set on the second pressing plate, and returning spring limits between the first pressing plate and the second pressing plate.
By using above-mentioned technical proposal, guiding mechanism is set between the first pressing plate and the second pressing plate, when electric energy meter mould
When block fixture is driven compression by clamp clamping device of clamp, effective guarantee accuracy of action improves the accuracy of test.
Preferably, the clamp clamping device of clamp includes the compression bar being movably arranged on parcel shelf, is arranged in compression bar and glove
Multiple first connecting rod mechanisms between plate, and the second connecting rod mechanism of driving first connecting rod mechanism and compression bar movement.
By using above-mentioned technical proposal, compression bar, first connecting rod mechanism and second connecting rod mechanism collectively form crank rocker
Mechanism, structure is simple, easy to operate.
Preferably, the first connecting rod mechanism includes being fixedly mounted on the first mounting seat of parcel shelf side, and fixation is set
Set the first fixing axle in the first mounting seat, one end turns the first connecting rod being located in the first fixing axle, first connecting rod it is another
One end turns to be located on the first pin shaft, and the first pin shaft is fixedly mounted on compression bar.
By using above-mentioned technical proposal, link mechanism is low counter gear, and large carrying capacity is wear-resistant, and structure is simple, system
Facilitate, flexible operation.
Preferably, the second connecting rod mechanism include the second mounting seat for being fixedly mounted on parcel shelf side, fixation set
It sets the second fixing axle in the second mounting seat, the shaft joint being movably arranged in the second fixing axle, be fixed at connecting shaft
Rocking bar and second connecting rod on device, and turn the second pin shaft for being located at the second connecting rod other end, the second pin shaft is fixedly mounted on pressure
On bar.
By using above-mentioned technical proposal, have a wide range of application, it is compact-sized, it is easy to make, it is easy to operate.
Preferably, it is provided with several through slots on the compression bar, pulley is installed in the through slot.
By using above-mentioned technical proposal, compression bar and electric energy meter module fixture contact portion increase pulley, when reducing operation
To the frictional force of electric energy meter module fixture, electric energy meter module fixture is less likely to be damaged, good in economic efficiency.
Preferably, the frame body bottom is equipped with idler wheel, and the idler wheel is equipped with retainer.
By using above-mentioned technical proposal, the setting of idler wheel facilitates the carrying of frame body, and retainer is then convenient for the fixation of idler wheel
And positioning, it carries flexibly, it is time saving and energy saving to operate, and use is safe.
In conclusion the advantages of the utility model:
1. the setting of single-phase electric energy meter module ageing rack is exposed electronics device after module welding, before assembly process ahead of time
The mass defect of part, solve the problems, such as in the prior art due to occur bad finished product cause to reprocess it is excessively cumbersome;
2. parcel shelf installation and removal are convenient, the number of parcel shelf can flexible setting according to demand, parcel shelf and glove
Spacing between plate with flexible modulation, can meet the detection work of different specification size module, be suitble to mass detection work;It sets
Connecting groove is opened up among object plate, connecting groove is convenient for the traction and placement of conducting wire, keeps conducting wire exposed, have hidden effect to conducting wire
Fruit improves the trimness of parcel shelf;
3. using two-sided setting electric energy meter module fixture, enough detection stations are provided as epitope test, and using more
Group electric energy meter module fixture is driven by a clamp clamping device of clamp simultaneously, does not need to drive electric energy meter module fixture one by one, is operated
It is time saving and energy saving, substantially increase testing efficiency, high financial profit;
4. squeezing test probe by clamp clamping device of clamp, test probe cooperation returning spring crimping mode is to electric energy meter mould
Block applies signal, while so that test probe is withstood electric energy meter module, applies signal of having good luck to electric energy meter module, makes to test probe
It is connected with electric energy meter module, effectively avoids maloperation, test safety coefficient is high, good test effect;
5. facilitate employee to check liquid crystal display electric energy meter module right angle setting on electric energy meter module fixture, while
Conducive to even heat distribution;
6. frame body bottom is equipped with idler wheel, the setting of idler wheel facilitates the carrying of frame body, and retainer, stop are equipped on idler wheel
Part is then convenient for the fixation and positioning of idler wheel, carries flexibly, time saving and energy saving.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the left view of the utility model;
Fig. 3 is the structural schematic diagram of parcel shelf in the utility model;
Fig. 4 is the structural schematic diagram of electric energy meter module fixture in the utility model;
Fig. 5 is the side view of electric energy meter module fixture in the utility model;
Fig. 6 is the structural schematic diagram of clamp clamping device of clamp in the utility model;
Fig. 7 is the structural schematic diagram of first connecting rod mechanism in the utility model;
Fig. 8 is the structural schematic diagram of second connecting rod mechanism in the utility model.
Appended drawing reference:
1, support column;2, parcel shelf;3, connecting groove;4, electric energy meter module fixture;41, the first pressing plate;411, the first installation
Slot;42, the second pressing plate;421, the second mounting groove;43, guiding mechanism;431, guide rod;432, returning spring;44, probe is tested;
45, probe aperture is tested;5, clamp clamping device of clamp;51, compression bar;511, through slot;52, first connecting rod mechanism;521, the first installation bottom
Seat;522, the first fixing axle;523, first connecting rod;524, the first pin shaft;53, second connecting rod mechanism;531, the second mounting seat;
532, the second fixing axle;533, shaft joint;534, rocking bar;535, second connecting rod;536, the second pin shaft;54, pulley;6, bar shaped
Slot;7, idler wheel;8, retainer;9, electric energy meter module;10, it has good luck signaling module.
Specific embodiment
Embodiment:
A kind of single-phase electric energy meter module ageing rack, shown in as shown in Figure 1, Figure 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, including frame
Body, frame body include symmetrically arranged two support columns 1, are movably equipped at least one parcel shelf 2, glove between two support columns 1
It is provided with connecting groove 3 among plate 2, multiple electric energy meter module fixtures 4, electric energy meter are fixed on the parcel shelf 2 of 3 two sides of connecting groove
Electric energy meter module 9 and signaling module 10 of having good luck are installed, the two sides of parcel shelf 2 are equipped with multiple pairs of electric energy meter moulds on Modular jig 4
The clamp clamping device of clamp 5 that block fixture 4 is clamped.
The number of parcel shelf 2 can flexible setting according to demand, open up connecting groove 3 among parcel shelf 2, connecting groove 3 is convenient for
The connection and placement of conducting wire, keep conducting wire exposed, have hidden effect to conducting wire, improve the trimness of parcel shelf 2, connecting groove 3
It is respectively provided with multiple groups electric energy meter module fixture 4 on the parcel shelf 2 of two sides, using two-sided setting electric energy meter module fixture 4, provides enough
More test stations are tested for epitope, and are driven simultaneously by a clamp clamping device of clamp 5 using multiple groups electric energy meter module fixture 4, no
It needs to drive electric energy meter module fixture 4 one by one, it is time saving and energy saving to operate, and substantially increases testing efficiency, high financial profit.
The vertical direction of two support columns 1 is provided with strip groove 6, and parcel shelf 2 is slidably installed in strip groove 6, pacifies parcel shelf 2
Assembly and disassembly are convenient, and the spacing between parcel shelf 2 and parcel shelf 2 can meet the inspection of different specification size module with flexible modulation
Work is surveyed, mass detection work is suitble to.
Electric energy meter module fixture 4 includes the first pressing plate 41 disposed in parallel and the second pressing plate 42, and is movably arranged on the
Guiding mechanism 43 between one pressing plate 41 and the second pressing plate 42, the first pressing plate 41 are equipped with the first mounting groove 411, the first mounting groove
Electric energy meter module 9 is installed, the second pressing plate 42 is equipped with the second mounting groove 421, installs letter of having good luck in the second mounting groove 421 in 411
Number module 10 is fixed with test probe 44 on signaling module 10 of having good luck, and the first pressing plate 41 is equipped with walks for test probe 44
Test probe aperture 45.
Test probe 44 is squeezed by clamp clamping device of clamp 5, test probe 44 cooperates returning spring 432 to crimp mode to electricity
Energy table module 9 applies signal, while so that test probe 44 is withstood electric energy meter module 9, applies letter of having good luck to electric energy meter module 9
Number, make to test probe 44 and electric energy meter module 9 is connected, effectively avoids maloperation, test safety coefficient is high, good test effect;Electricity
To 9 right angle setting of electric energy meter module on energy table Modular jig 4, employee is facilitated to check liquid crystal display, while it is equal to be also conducive to heat
Even distribution.
Guiding mechanism 43 includes guide rod 431 and the returning spring 432 being set on guide rod 431, and 431 one end of guide rod is fixed on
On first pressing plate 41,431 other end of guide rod is set on the second pressing plate 42, and the limit of returning spring 432 is in the first pressing plate 41 and the
Between two pressing plates 42;Guiding mechanism 43 is set between the first pressing plate 41 and the second pressing plate 42, when electric energy meter module fixture 4 is pressed from both sides
When having the driving compression of clamping device 5, effective guarantee accuracy of action improves the accuracy of test.
Clamp clamping device of clamp 5 include the compression bar 51 being movably arranged on parcel shelf 2, setting compression bar 51 and parcel shelf 2 it
Between multiple first connecting rod mechanisms 52, and driving first connecting rod mechanism 52 and compression bar 51 act second connecting rod mechanism 53;Pressure
Bar 51, first connecting rod mechanism 52 and second connecting rod mechanism 53 collectively form crank and rocker mechanism, and structure is simple, easy to operate.
First connecting rod mechanism 52 includes being fixedly mounted on the first mounting seat 521 of 2 side of parcel shelf, is fixed at the
The first fixing axle 522 in one mounting seat 521, one end turn the first connecting rod 523 being located in the first fixing axle 522, and first connects
The other end of bar 523 turns to be located on the first pin shaft 524, and the first pin shaft 524 is fixedly mounted on compression bar 51.
Second connecting rod mechanism 53 includes the second mounting seat 531 for being fixedly mounted on 2 side of parcel shelf, is fixed at the
The second fixing axle 532 in two mounting seats 531, the shaft joint 533 being movably arranged in the second fixing axle 532, fixed setting
Rocking bar 534 and second connecting rod 535 on shaft joint 533, and turn the second pin shaft 536 for being located at 535 other end of second connecting rod,
Second pin shaft 536 is fixedly mounted on compression bar 51.
It is provided with several through slots 511 on compression bar 51, pulley 54 is installed in through slot 511, compression bar 51 connects with electric energy meter module fixture 4
Contact portion point increases pulley 54, reduces frictional force when operating to electric energy meter module fixture 4, is not easy electric energy meter module fixture 4
Damage.
Frame body bottom is equipped with idler wheel 7, and idler wheel 7 is equipped with retainer 8, and the setting of idler wheel 7 facilitates the carrying of frame body, retainer
8 are convenient for the fixation and positioning of idler wheel 7, carry flexibly, it is time saving and energy saving to operate.
In addition to above preferred embodiment, for the utility model there are also other embodiments, those skilled in the art can root
It is made various changes and modifications according to the utility model, without departing from the spirit of the utility model, should belong to the utility model
Range defined in appended claims.
Claims (9)
1. a kind of single-phase electric energy meter module ageing rack, including frame body, it is characterised in that: the frame body includes symmetrically arranged two
Support column is movably equipped at least one parcel shelf between two support columns, connecting groove is provided among the parcel shelf, described
It is fixed with multiple electric energy meter module fixtures on the parcel shelf of connecting groove two sides, electric energy is installed on the electric energy meter module fixture
Table module and signaling module of having good luck, the two sides of the parcel shelf are equipped with the fixture that multiple pairs of electric energy meter module fixtures are clamped
Clamping device.
2. a kind of single-phase electric energy meter module ageing rack according to claim 1, it is characterised in that: two support columns
Vertical direction is provided with strip groove, and the parcel shelf is slidably installed in strip groove.
3. a kind of single-phase electric energy meter module ageing rack according to claim 1, it is characterised in that: the electric energy meter module folder
Tool includes the first pressing plate disposed in parallel and the second pressing plate, and the guiding being movably arranged between the first pressing plate and the second pressing plate
Mechanism, the first pressing plate are equipped with the first mounting groove, and electric energy meter module is installed in the first mounting groove, and the second pressing plate is equipped with the second peace
Tankage, the second mounting groove is interior to install signaling module of having good luck, and test probe, first pressing plate are fixed on signaling module of having good luck
It is equipped with the test probe aperture walked for test probe.
4. a kind of single-phase electric energy meter module ageing rack according to claim 3, it is characterised in that: the guiding mechanism includes
Guide rod and the returning spring being set on guide rod, guide rod are fixed on the first pressing plate, and the guide rod other end is set in the second pressure
On plate, returning spring is limited between the first pressing plate and the second pressing plate.
5. a kind of single-phase electric energy meter module ageing rack according to claim 1, it is characterised in that: the clamp clamping device of clamp
Including the compression bar being movably arranged on parcel shelf, the multiple first connecting rod mechanisms being arranged between compression bar and parcel shelf, and drive
The second connecting rod mechanism of dynamic first connecting rod mechanism and compression bar movement.
6. a kind of single-phase electric energy meter module ageing rack according to claim 5, it is characterised in that: the first connecting rod mechanism
The first mounting seat including being fixedly mounted on parcel shelf side, the first fixing axle being fixed in the first mounting seat,
One end turns the first connecting rod being located in the first fixing axle, and the other end of first connecting rod turns to be located on the first pin shaft, and the first pin shaft is solid
Dingan County is on compression bar.
7. a kind of single-phase electric energy meter module ageing rack according to claim 5, it is characterised in that: the second connecting rod mechanism
Including the second mounting seat for being fixedly mounted on parcel shelf side, the second fixing axle being fixed in the second mounting seat,
The shaft joint being movably arranged in the second fixing axle, the rocking bar and second connecting rod that are fixed on shaft joint, and turn to be located at
Second pin shaft of the second connecting rod other end, the second pin shaft are fixedly mounted on compression bar.
8. a kind of single-phase electric energy meter module ageing rack according to claim 5, it is characterised in that: if being provided on the compression bar
Dry through slot, the through slot is interior to install pulley.
9. a kind of single-phase electric energy meter module ageing rack according to claim 1, it is characterised in that: the frame body bottom is equipped with
Idler wheel, the idler wheel are equipped with retainer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821766391.8U CN209117848U (en) | 2018-10-30 | 2018-10-30 | A kind of single-phase electric energy meter module ageing rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821766391.8U CN209117848U (en) | 2018-10-30 | 2018-10-30 | A kind of single-phase electric energy meter module ageing rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209117848U true CN209117848U (en) | 2019-07-16 |
Family
ID=67202846
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821766391.8U Active CN209117848U (en) | 2018-10-30 | 2018-10-30 | A kind of single-phase electric energy meter module ageing rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209117848U (en) |
-
2018
- 2018-10-30 CN CN201821766391.8U patent/CN209117848U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202057777U (en) | Vertical aging test production for bracket lamps | |
CN218647017U (en) | Automatic testing jig for timing | |
CN110116103A (en) | Integral type vibrates cloth rice and sweeps a meter recovering mechanism | |
CN209117848U (en) | A kind of single-phase electric energy meter module ageing rack | |
CN108776243A (en) | The electric energy meter mounting base of electric energy meter calibrating apparatus | |
CN211698110U (en) | Battery stress testing device | |
CN210893867U (en) | Tool checking fixture for quick inspection of automobile mounting bracket | |
CN210401469U (en) | Multi-channel test clip | |
CN107290621A (en) | A kind of measurement jig for detachable connectors adjacent modules | |
CN113625002B (en) | Automatic plugging testing device for network port | |
CN110658470A (en) | Jig for testing probe | |
CN206848346U (en) | It is a kind of for the voltage of Switching Power Supply and/or the test device of testing current | |
CN201909841U (en) | Circling-type device for automatically connecting and disconnecting terminal of electric energy meter | |
CN204731405U (en) | Direct access electric energy meter calibrating frock | |
CN204964742U (en) | Guide tracked electric energy meter single -point error detection tool of DIN | |
CN208224326U (en) | A kind of connector test fixture | |
CN209460043U (en) | A kind of steel strength verifying attachment based on municipal road and bridge construction | |
CN209416559U (en) | A kind of car door clamping force measuring device | |
CN207779679U (en) | Intelligent measurement clamp spring mechanism | |
CN208238671U (en) | A kind of auto parts and components cubing | |
CN202471954U (en) | Bidirectional multiple-pass docking detecting device of electric energy meter terminal | |
CN211791438U (en) | Clamp for photovoltaic module field detection | |
CN207007981U (en) | A kind of measurement jig for detachable connectors adjacent modules | |
CN211348345U (en) | Novel power supply test board performance test clamp | |
CN210464820U (en) | Pipe fitting side leakage testing machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |