CN209100198U - 一种风力发电组Crowbar测试装置 - Google Patents
一种风力发电组Crowbar测试装置 Download PDFInfo
- Publication number
- CN209100198U CN209100198U CN201821918320.5U CN201821918320U CN209100198U CN 209100198 U CN209100198 U CN 209100198U CN 201821918320 U CN201821918320 U CN 201821918320U CN 209100198 U CN209100198 U CN 209100198U
- Authority
- CN
- China
- Prior art keywords
- crowbar
- lifting
- resistance
- wind
- baffle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)
Abstract
本实用新型公开了一种风力发电组Crowbar测试装置,包括测试框架,Crowbar电阻,所述的测试框架上设有升降支架,所述的升降支架右端设有升降平台,所述的升降平台右端设有挡板,所述的挡板下端设有丝杠,所述的丝杠下端设有升降螺母,所述的升降螺母下端设有手轮,所述的手轮右上端设有Crowbar电阻,本实用新型结构简单、使用方便、设计合理、可拆卸,便于设备的安装、维护,所述测试框架侧面设置有沿着高度方向安装的高度标尺,便于直观的读数,设有升降平台便于测试Crowbar电阻,能够有效降低Crowbar保护装置的成本。
Description
技术领域
本实用新型涉及测试装置领域,特别是一种风力发电组Crowbar测试装置。
背景技术
目前,国内风电正处于一个快速增长的阶段,随着风电装机容量的增加,风电接入对电网安全、稳定运行影响日益凸显。作为风电接入关键技术之一的风电机组低电压穿越技术(LVRT),对于风电场接入的电网暂态稳定性、电压稳定性具有直接影响。风力发电机组Crowbar装置是一种保护设备,当发电机组,电网出现异常的情况下,该装置动作,来吸收能量的一种装置,保证发电机组的安全。该测试装置能模拟风机在异常情况下触发Crowbar装置的异常通道,通过模拟各类数据量,直接实现该装置的全部功能测试,每年风力发电场损坏Crowbar装置大约15套左右,通过该装置测试后基本都可以维修成功每年为企业节省很多资金。
现有的风力发电组Crowbar测试装置结构复杂,功能单一且不能多个高度测量影响测试效率。
发明内容
本实用新型的目的是提供一种风力发电组Crowbar测试装置,包括测试框架,Crowbar电阻,所述的测试框架上设有升降支架,所述的升降支架右端设有升降平台,所述的升降平台右端设有挡板,所述的挡板下端设有丝杠,所述的丝杠下端设有升降螺母,所述的升降螺母下端设有手轮,所述的手轮右上端设有Crowbar电阻,本实用新型结构简单、使用方便、设计合理、可拆卸,便于设备的安装、维护,所述测试框架侧面设置有沿着高度方向安装的高度标尺,便于直观的读数,设有升降平台便于测试Crowbar电阻,能够有效降低Crowbar保护装置的成本。
本实用新型是通过以下技术方案来实现的:一种风力发电组Crowbar测试装置,包括测试框架,Crowbar电阻,所述的测试框架上设有升降支架,所述的升降支架右端设有升降平台,所述的升降平台右端设有挡板,所述的挡板下端设有丝杠,所述的丝杠下端设有升降螺母,所述的升降螺母下端设有手轮,所述的手轮右上端设有Crowbar电阻,所述的Crowbar电阻上设有电阻安装架,所述的电阻安装架下端设有光伏发电组件,所述的光伏发电组件下端设有升降板,所述的升降板通过光伏发电组件与电阻安装架相连接,所述的电阻安装架通过Crowbar电阻与升降螺母相连接,所述的升降螺母与手轮通过挡板相连接,所述的挡板通过升降升平台与升降支架相连接,所述的升降支架固定连接在测试框架上。
所述的升降板上设有水平标尺。
所述的测试框架上设有高度尺
有益效果:本实用新型结构简单、使用方便、设计合理、可拆卸,便于设备的安装、维护,所述测试框架侧面设置有沿着高度方向安装的高度标尺,便于直观的读数,设有升降平台便于测试Crowbar电阻,能够有效降低Crowbar保护装置的成本。
附图说明
图1是本实用新型一种风力发电组Crowbar测试装置的结构示意图。
其中,1-测试框架,2-Crowbar电阻,3-升降支架,4-升降平台,5-升降螺母,6-手轮,7-挡板,8-丝杠,9-电阻安装架,10-光伏发电组件,11-升降板,12高度尺,13-水平标尺。
具体实施方式
下面结合附图和实施例对本实用新型做进一步说明。
实施例1
如图1所示,一种风力发电组Crowbar测试装置,包括测试框架1,Crowbar电阻2,所述的测试框架1上设有升降支架3,所述的升降支架3右端设有升降平台4,所述的升降平台4右端设有挡板7,所述的挡板7下端设有丝杠8,所述的丝杠8下端设有升降螺母5,所述的升降螺母5下端设有手轮6,所述的手轮6右上端设有Crowbar电阻2,所述的Crowbar电阻2上设有电阻安装架9,所述的电阻安装架9下端设有光伏发电组件10,所述的光伏发电组件10下端设有升降板11,所述的升降板11通过光伏发电组件10与电阻安装架9相连接,所述的电阻安装架9通过Crowbar电阻2与升降螺母5相连接,所述的升降螺母5与手轮6通过挡板7相连接,所述的挡板7通过升降升平台4与升降支架3相连接,所述的升降支架3固定连接在测试框架1上。
实施例2
所述的升降板11上设有水平标尺13。
实施例3
所述的测试框架1上设有高度尺12。
Claims (3)
1.一种风力发电组Crowbar测试装置,包括测试框架,Crowbar电阻,其特征在于:所述的测试框架上设有升降支架,所述的升降支架右端设有升降平台,所述的升降平台右端设有挡板,所述的挡板下端设有丝杠,所述的丝杠下端设有升降螺母,所述的升降螺母下端设有手轮,所述的手轮右上端设有Crowbar电阻,所述的Crowbar电阻上设有电阻安装架,所述的电阻安装架下端设有光伏发电组件,所述的光伏发电组件下端设有升降板,所述的升降板通过光伏发电组件与电阻安装架相连接,所述的电阻安装架通过Crowbar电阻与升降螺母相连接,所述的升降螺母与手轮通过挡板相连接,所述的挡板通过升降升平台与升降支架相连接,所述的升降支架固定连接在测试框架上。
2.根据权利要求1所述的一种风力发电组Crowbar测试装置,其特征在于:所述的升降板上设有水平标尺。
3.根据权利要求1所述的一种风力发电组Crowbar测试装置,其特征在于:所述的测试框架上设有高度尺。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821918320.5U CN209100198U (zh) | 2018-11-21 | 2018-11-21 | 一种风力发电组Crowbar测试装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821918320.5U CN209100198U (zh) | 2018-11-21 | 2018-11-21 | 一种风力发电组Crowbar测试装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209100198U true CN209100198U (zh) | 2019-07-12 |
Family
ID=67160719
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821918320.5U Active CN209100198U (zh) | 2018-11-21 | 2018-11-21 | 一种风力发电组Crowbar测试装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209100198U (zh) |
-
2018
- 2018-11-21 CN CN201821918320.5U patent/CN209100198U/zh active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Haidar et al. | Utilization of pico hydro generation in domestic and commercial loads | |
CN103777097A (zh) | 一种低压用户侧分布式电源并网全过程通用检测平台及方法 | |
CN106523300B (zh) | 基于机舱风速仪的风电机组损失电量评估方法 | |
Liu et al. | Optimal configuration of hybrid solar-wind distributed generation capacity in a grid-connected microgrid | |
CN101277014A (zh) | 风力发电接入系统方案选择方法 | |
Yan et al. | Research on output power fluctuation characteristics of the clustering photovoltaic-wind joint power generation system based on continuous output analysis | |
CN104167767A (zh) | 一种制定风电场发电计划的方法 | |
CN209100198U (zh) | 一种风力发电组Crowbar测试装置 | |
CN103439970B (zh) | 一种风力发电机组仿真测试方法 | |
CN113497443A (zh) | 一种用于变电站站内风光储微电网的效益分析方法及装置 | |
Shi et al. | Reliability assessment of interconnected generation systems based on hourly wind speed probability model | |
Wang et al. | Adequacy assessment of generating systems incorporating wind, PV and energy storage | |
Amato et al. | An Innovative Method to Evaluate the Real Performance of Wind Turbines with Respect to the Manufacturer Power Curve: Case Study from Mauritania | |
Peña-Carro et al. | Small wind turbines study and integration in a peri-urban microgrid | |
El-Metwally et al. | Detailed analyses of the failure and repair rates of wind and solar-PV systems for RAM assessment | |
CN204386818U (zh) | 机舱支撑装置 | |
CN207526639U (zh) | 一种利用风能太阳能抽水蓄能的水力发电设备 | |
Honrubia-Escribano et al. | Simplified wind turbine models for wind energy integration into power systems | |
Liu et al. | Analysis and promotion of power quality and power control capability of wind farms | |
CN205478119U (zh) | 框架结构风力发电平台 | |
Kumar et al. | Numerical and analytical study on telescopic savonius turbine blade | |
CN104459410A (zh) | 基于小容量电网实现大功率低电压穿越试验的装置及方法 | |
CN204287354U (zh) | 基于小容量电网实现大功率低电压穿越试验的装置 | |
Dangar et al. | Site matching of offshore wind turbines-a case study | |
CN213899189U (zh) | 风力发电机避雷装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |