Utility model content
The utility model is intended to solve one of above-mentioned technical problem in the prior art at least to a certain extent.In view of
This, the utility model need to provide a kind of dust-proof, thermal insulation property it is all good and with high-strength abrasion-proof performance for mushroom room
Dustproof construction.
The utility model provides a kind of dustproof construction for mushroom room, is arranged on plain soil layer, the dustproof construction packet
It includes the grey soil layer being successively set on the plain soil layer from bottom to top, the first waterproof coating, insulating layer, the second waterproof coating, mix
Solidifying soil layer, dust-proof layer and wear-resistant coat are equipped with concrete cushion and levelling between the ash soil layer and first waterproof coating
Layer, the concrete cushion are arranged close to the grey soil layer;The insulating layer is that the multi-layer heat preserving plate fissure of displacement is laid on described first
Between waterproof coating and second waterproof coating;The dust-proof layer is multiple layers of cured oxidant layer.
One embodiment according to the present utility model, first waterproof coating and second waterproof coating are poly- ammonia
Ester waterproof coating layer.
One embodiment according to the present utility model, the oxidant layer that solidifies are consolidated for the sealing of two layers of 0.32~0.55Kg/m2
Agent.
One embodiment according to the present utility model, the wear-resistant coat push away light for the concrete magma of 4.8~5.5Kg/m2 and mix
The surface layer of diamond dust.
One embodiment according to the present utility model, the polyurethane water-proof paint layer with a thickness of 1~2mm.
One embodiment according to the present utility model, the insulation board are the extruded sheet of thickness 50mm.
One embodiment according to the present utility model, the concrete layer with a thickness of 200~240mm C25 concrete, and
The skeleton of two-way reinforcement is equipped with inside the concrete layer.
One embodiment according to the present utility model, the concrete cushion are the C15 concrete mats of 50~70mm of thickness
Layer.
One embodiment according to the present utility model, the screed-coat are the cement mortar screeding layer of 20~25mm of thickness.
One embodiment according to the present utility model, the ash soil thickness is 250~350mm.
A kind of dustproof construction for mushroom room of the utility model, by setting gradually multilayer knot on natural soils layer
Structure, and dust-proof layer is provided on concrete layer, insulating layer is equipped with inside dustproof construction, so that the dust-proof effect of the dustproof construction
It improves, while the dustproof construction also being made to have good heat insulating ability, on the other hand, be equipped on dust-proof layer mixed with the resistance to of diamond dust
Wear layer substantially increases the wear-resisting property on dustproof construction surface, extends the service life in mushroom room.
Specific embodiment
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning
Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng
The embodiment for examining attached drawing description is exemplary, it is intended to for explaining the utility model, and should not be understood as to the utility model
Limitation.
As shown in Figure 1, embodiment according to the present utility model, a kind of dustproof construction 100 for mushroom room are arranged in element
On soil layer 1, dustproof construction 100 includes the grey soil layer 2 being successively set on plain soil layer 1 from bottom to top, the first waterproof coating 3, protects
Warm layer 4, the second waterproof coating 5, concrete layer 6, dust-proof layer 7 and wear-resistant coat 8, set between grey soil layer 2 and the first waterproof coating 3
There are concrete cushion 9 and screed-coat 10, concrete cushion 9 is arranged close to grey soil layer 2;Insulating layer 4 is multi-layer heat preserving plate fissure of displacement paving
It is located between the first waterproof coating 3 and the second waterproof coating 5;Dust-proof layer 7 is multiple layers of cured oxidant layer.
A kind of dustproof construction 100 for mushroom room of the utility model, by by compacting plain soil layer 1 on successively
Multilayered structure is set, and is provided with dust-proof layer 7 on concrete layer 6, insulating layer 4 is equipped with inside dustproof construction 100, so that this is anti-
The dust-proof effect of dirt structure 100 improves, while the dustproof construction 100 also being made to have good heat insulating ability, on the other hand, dust-proof
Layer 7 is equipped with the wear-resistant coat 8 mixed with diamond dust, substantially increases the wear-resisting property on 100 surface of dustproof construction, extends mushroom room
Service life.
As shown in Figure 1, the first waterproof coating 3 and the second waterproof coating 5 are polyurethane water-proof paint layer, polyurethane water-proof
Dope layer with a thickness of 1~2mm, it is preferable that optimum thickness 1.5mm, polyurethane water-proof paint and basal plane cohesive force are strong, can be
It directly constructs on moist or dry various basal planes, weatherability is strong and construction is simple.
As shown in Figure 1, solidifying the curing sealing agent that oxidant layer 7 is two layers of 0.32~0.55Kg/m2, curing agent is by infiltrating through
Part chemical substance in inside concrete, with concrete chemically reacts, and forms gel, has envelope to the micropore in concrete
Stifled effect, makes concrete become a fine and close entirety, to greatly improve the performances such as impervious, wear-resisting of concrete, prevents bacterium
Dirt is played in mushroom house, to reach clear production, and surface the more can grind the more smooth in use, effectively extend the use of dust-proof layer
Period.
As shown in Figure 1, wear-resistant coat 8 is that the concrete magma of 4.8~5.5Kg/m2 pushes away the surface layer of light gold doping emery, this quality model
The wearability that concrete magma in enclosing pushes away light gold doping emery surface layer is high, and intensity is big, can effectively extend the service life of dustproof construction.
As shown in Figure 1, insulation board 4 is the extruded sheet of thickness 50mm, extruded sheet has excellent thermal and insulating performance, resistance to compression
Property, and be environmental protection building material.
As shown in Figure 1, C25 concrete of the concrete layer 6 with a thickness of 200~240mm, and be equipped with inside concrete layer 6 double
To the skeleton (not pointing out in figure) of arrangement of reinforcement, skeleton can increase the whole design strength of dustproof construction 100, extend mushroom room
Service life.
As shown in Figure 1, concrete cushion 9 be 50~70mm of thickness C15 concrete cushion, screed-coat 10 be thickness 20~
The cement mortar screeding layer of 25mm.
As shown in Figure 1, grey soil layer 2 is with a thickness of 250~350mm, it is preferable that the thickness of grey soil layer 2 is selected as 300mm, this is thick
The grey soil layer 2 of degree intensity and water-resistance with higher after compacting, while increasing the adhesive strength between soil particle, for ash
The multilayered structure of 2 top of soil layer provides solid foundation.
Although the embodiments of the present invention have been shown and described above, it is to be understood that above-described embodiment is
Illustratively, it should not be understood as limiting the present invention, those skilled in the art are in the scope of the utility model
Inside it can make changes, modifications, alterations, and variations to the above described embodiments.