CN209099251U - 一种缆索护栏用立柱连接结构 - Google Patents
一种缆索护栏用立柱连接结构 Download PDFInfo
- Publication number
- CN209099251U CN209099251U CN201821764207.6U CN201821764207U CN209099251U CN 209099251 U CN209099251 U CN 209099251U CN 201821764207 U CN201821764207 U CN 201821764207U CN 209099251 U CN209099251 U CN 209099251U
- Authority
- CN
- China
- Prior art keywords
- plate
- cutting
- hole
- column
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821764207.6U CN209099251U (zh) | 2018-10-29 | 2018-10-29 | 一种缆索护栏用立柱连接结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821764207.6U CN209099251U (zh) | 2018-10-29 | 2018-10-29 | 一种缆索护栏用立柱连接结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209099251U true CN209099251U (zh) | 2019-07-12 |
Family
ID=67157077
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821764207.6U Active CN209099251U (zh) | 2018-10-29 | 2018-10-29 | 一种缆索护栏用立柱连接结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209099251U (zh) |
-
2018
- 2018-10-29 CN CN201821764207.6U patent/CN209099251U/zh active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209099251U (zh) | 一种缆索护栏用立柱连接结构 | |
CN205234370U (zh) | 一种组合式浴缸架 | |
CN105080976A (zh) | 立式轧机垫板安装方法及其装置 | |
CN107134630B (zh) | 一种信号天线安装座及构架 | |
CN212182520U (zh) | 一种通信塔用天线可调节装置 | |
CN201421170Y (zh) | 一种折叠式空调安装架 | |
CN204703741U (zh) | 爬梯 | |
CN204675681U (zh) | 一种悬臂吊起重机立柱加固装置 | |
CN210002654U (zh) | 一种瓷板幕墙系统 | |
CN209099890U (zh) | 一种组装式护栏 | |
US8647165B1 (en) | Play panel installation | |
CN209114397U (zh) | 一种缆索护栏用立柱连接结构 | |
CN202827904U (zh) | 一种电喷摩托车辅助继电器安装结构 | |
CN208622339U (zh) | 将标示牌悬挂在铁塔上的安装支架 | |
CN202352246U (zh) | 钢管塔标志牌安装支架 | |
CN204826873U (zh) | 一种新型工程高度可调施工用围挡板 | |
CN211200127U (zh) | 一种用于防眩板的盖板安装结构及道路防护系统 | |
CN211637774U (zh) | 一种不锈钢丝冷却设备安装定位防护结构 | |
CN205187559U (zh) | 一种无机房电梯轿厢绳头板 | |
CN104260630B (zh) | 一种连接件以及包含该连接件的动力电池安装总成 | |
CN217929197U (zh) | 一种无螺钉固定的空调器风口护网及空调器 | |
CN209113281U (zh) | 紧凑型家用电梯机架 | |
CN209964927U (zh) | 畜牧安全隔离栅栏 | |
CN216270375U (zh) | 一种理片笼 | |
CN217607260U (zh) | 一种具有稳定固定支架的eps应急电源 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A column connection structure for cable guardrail Effective date of registration: 20210514 Granted publication date: 20190712 Pledgee: Bank of Communications Co.,Ltd. Hunan Branch Pledgor: HUNAN CEBO TRAFFIC ENGINEERING Co.,Ltd. Registration number: Y2021980003645 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220411 Granted publication date: 20190712 Pledgee: Bank of Communications Co.,Ltd. Hunan Branch Pledgor: HUNAN CEBO TRAFFIC ENGINEERING CO.,LTD. Registration number: Y2021980003645 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A column connection structure for cable guardrail Effective date of registration: 20220426 Granted publication date: 20190712 Pledgee: Bank of Communications Co.,Ltd. Hunan Branch Pledgor: HUNAN CEBO TRAFFIC ENGINEERING CO.,LTD. Registration number: Y2022430000028 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20230602 Granted publication date: 20190712 Pledgee: Bank of Communications Co.,Ltd. Hunan Branch Pledgor: HUNAN CEBO TRAFFIC ENGINEERING CO.,LTD. Registration number: Y2022430000028 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A column connection structure for cable guardrails Effective date of registration: 20230619 Granted publication date: 20190712 Pledgee: Bank of Communications Co.,Ltd. Hunan Branch Pledgor: HUNAN CEBO TRAFFIC ENGINEERING CO.,LTD. Registration number: Y2023980044351 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |