CN209086424U - Singlephase earth fault test platform for electric energy metering device performance detection - Google Patents

Singlephase earth fault test platform for electric energy metering device performance detection Download PDF

Info

Publication number
CN209086424U
CN209086424U CN201821905996.0U CN201821905996U CN209086424U CN 209086424 U CN209086424 U CN 209086424U CN 201821905996 U CN201821905996 U CN 201821905996U CN 209086424 U CN209086424 U CN 209086424U
Authority
CN
China
Prior art keywords
metering device
electric energy
energy metering
earth fault
singlephase earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821905996.0U
Other languages
Chinese (zh)
Inventor
刘刚
艾兵
刘鹍
黄嘉鹏
罗睿希
何娜
张杰夫
叶子阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201821905996.0U priority Critical patent/CN209086424U/en
Application granted granted Critical
Publication of CN209086424U publication Critical patent/CN209086424U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the singlephase earth fault test platforms for electric energy metering device performance detection, ground fault analogue unit can carry out selection adjusting to resistance according to the demand of grounding resistance, under ground-fault condition, to reach the demand for testing different ground fault simulations, facilitate the one-way earth fault under simulation different conditions, guarantee to carry out continuous electrical measurement in the state that circuit connection carries out, so that the time of singlephase earth fault operation is controlled, guarantee the test for carrying out the long period to the metering performance of mutual inductor and electric energy metering device, and obtain reliable test data, pass through metering device at two before and after failure again, it obtains measuring difference caused by failure, to evaluate the variation of electric quantity metering performance under singlephase earth fault;Various emulation modes are automatically controlled by setting control unit, manual wiring is not required to, ensure that the reliability of system, while easy to operate, it is highly-safe.

Description

Singlephase earth fault test platform for electric energy metering device performance detection
Technical field
The utility model relates to a kind of electrical energy measurements to detect test platform, and in particular to one kind is used for electric energy metering device The singlephase earth fault test platform that can be detected.
Background technique
Most methods of operation for using neutral non-effective grounding in the current country 10~35kV power distribution network.In such ground connection Under mode, the failure of generation is mostly singlephase earth fault, accounts for 80% or so of failure sum.A certain phase in systems occurs After failure, since fault current cannot effectively circulate, what is flowed through in the line is the relatively small capacitive earth current of amplitude; And due to after failure three-phase voltage still maintain symmetrically, the power supply of load will not be had an impact.Therefore, when the such failure of generation When, protective relaying device only needs to issue signal and do not need to act, and system can be run 2 hours in this state, from And keep the reliable power supply to user.Therefore, when singlephase earth fault occurs for system with non effectively earth ed neutral, for reduction The purpose of power off time, system can continue charging operation 2 hours in the case where not cutting off failure immediately.
The electric energy metering device in 10~35kV distribution network system is run on by current transformer, voltage transformer, electric energy The composition such as table and secondary circuit, during failure, mutual inductor is practically in damage operation.Single-phase earthing occurs in system After failure, the metering performance that may cause the component parts such as current transformer, voltage transformer is affected to further shadow The metering performance of electric energy metering device is rung, it is inaccurate so as to cause the metering to customer electricity.Mutual inductor metering performance is caused to change The reason of there are two types of: one is causing transformer iron core to be saturated due to fault transient process, mutual inductor primary side induction reactance and system Capacitance to earth forms matching, generates the ferromagnetic resonance of stable state, leads to overvoltage and overcurrent, at present about the research of ferromagnetic resonance It is more;Another situation is that system single-phase earthing moment and singlephase earth fault disappear moment, failure phase and non-faulting are relatively Voltage jump causes direct-to-ground capacitance over the ground in discharge process and current transformer primary side inductance causes the oscillation of magnetic linkage, this feelings Under condition system parameter may off-resonance area and stable ferromagnetic resonance cannot be formed, may cause current transformer primary side production Raw biggish excitation surge current, more seriously in intermittent arc grounding, excitation surge current can also repeated stock.
In order to accurately grasp the electric energy metering device in 10~35kV distribution network system using neutral non-effective grounding Metering performance characteristic under singlephase earth fault needs to carry out its metering performance test under singlephase earth fault, therefore, Singlephase earth fault test platform must be built first.
Utility model content
Problem to be solved in the utility model is: conventional failure simulation experiment platform is mainly used for simulated failure, failure It is powered after generation all in transient high voltage high current, electric current is held time and only must just be carried out in a few seconds after failure occurs Open circuit;When carrying out electrical energy measurement due to electric energy metering device, need the longer ground connection time to carry out the accumulation of electric flux, because This, conventional failure simulation experiment platform, which is not suitable for detecting electrical energy measurement performance detection, requires asking of continuously measuring of long period Topic, the utility model provide the singlephase earth fault test platform for electric energy metering device performance detection.
The utility model is achieved through the following technical solutions:
For the singlephase earth fault test platform of electric energy metering device performance detection, including it is power supply, step-up transformer, disconnected Road device, line length analogue unit, ground fault analogue unit, step-down transformer, large capacity deferrable load, control unit, electricity It can metering device;
Line length analogue unit, for simulating the overhead transmission line or cable run of different length;
Ground fault analogue unit, for simulating singlephase earth fault;Ground fault analogue unit includes three 10kV mono- It is isolated disconnecting link S1, S2, S3;It further include high-pressure vacuum contactor S4, conducting copper;S1, S2, S3 are respectively used to control A, B, C The on-off of three-phase voltage route and conducting copper;Conducting copper connects high-pressure vacuum contactor S4, and high-pressure vacuum contactor S4 connects Connecting resistance adjusts unit, and the resistance value of resistance adjustment unit is controlled by control unit, simulated by different resistance sizes The ground fault of different situations, resistance adjustment unit reconnect grounding copper bar, grounding copper bar ground connection;
Large capacity deferrable load provides continuous primary current for test platform, and payload can be single by control Member automatically adjusts;Control unit, for controlling the simulation length of line length analogue unit, control ground fault simulation is single The resistance value parameter of member, and the load current that control large capacity deferrable load provides;
Electric energy metering device, including source side electric energy metering device and load side electric energy metering device, the source side Electric energy metering device is used to measure the electrical energy measurement of ground fault front end;The load side electric energy metering device is for measuring ground connection The electrical energy measurement of failure rear end.
Conventional failure simulation experiment platform is mainly used for simulated failure, all in transient high voltage high current after failure generation It is powered, electric current is held time after failure occurs must only carry out open circuit, therefore, conventional failure simulation experiment platform in a few seconds The continuous measurement for not being suitable for detecting the electrical energy measurement metering performance testing requirements long period, uses above-mentioned ground fault mould Quasi- platform, ground fault analogue unit can carry out selection adjusting to resistance according to the demand of grounding resistance, in ground-fault condition Under, to reach the demand for testing different ground fault simulations, facilitate the one-way earth fault under simulation different conditions, in use, The resistance value close to simulated failure is selected, guarantees to carry out continuous electrical measurement in the state that circuit connection carries out, so that single-phase The time of ground fault operation is controlled, to guarantee that the metering performance to mutual inductor and electric energy metering device carries out test, and Obtain reliable test data;Again by metering device at two before and after failure, obtain measuring difference caused by failure, to comment The variation of valence mutual inductor and electrical energy measurement the electric quantity metering performance under singlephase earth fault.
Further, the transformer that step-up transformer and step-down transformer are 380V/10kV.
Further, line length analogue unit: every phase is made of multiple capacitor C, and it is long that each capacitor C represents 10 kms The direct-to-ground capacitance for spending overhead transmission line, by carrying out switch series parallel combination to multiple capacitor C, the disconnected conjunction of the switch is single by control Member carries out automatically controlling, and obtains different capacitances, to simulate the overhead transmission line or cable run of different length.
Further, the electric energy metering device includes source side electric energy metering device and load side electrical energy measurement dress It sets, the source side electric energy metering device is used to measure the electrical energy measurement of ground fault front end;The load side electrical energy measurement dress Set the electrical energy measurement for measuring ground fault rear end.
Further, resistance adjustment unit includes the resistance of multiple and different resistance value sizes, and multiple resistance pass through switch series simultaneously Connection combination, to realize the analog quantity of different resistance values, the disconnected conjunction of switch is carried out automatically controlling by control unit.
The utility model has the following advantages and benefits:
1, ground fault analog platform described in the utility model, ground fault analogue unit can be according to the need of grounding resistance It asks and selection adjusting is carried out to resistance, under ground-fault condition, to reach the demand for testing different ground fault simulations, facilitate mould One-way earth fault under quasi- different conditions, in use, resistance value of the selection close to simulated failure, guarantees what circuit connection carried out Continuous electrical measurement is carried out under state so that the time of singlephase earth fault operation is controlled, to guarantee to mutual inductor and The metering performance of electric energy metering device carries out the test of long period, and obtains reliable test data, then by before and after failure Two at metering device, obtain measuring difference caused by failure, to evaluate mutual inductor and electrical energy measurement in singlephase earth fault The variation of lower electric quantity metering performance;
2, the utility model passes through the simulation length of setting control unit automatic control circuit length analogue unit, and control connects The resistance value parameter of earth fault analogue unit, and the load current that control large capacity deferrable load provides, are not required to manual wiring, protect The reliability of system is demonstrate,proved, while easy to operate, it is highly-safe;
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the utility model embodiment, constitutes the one of the application Part does not constitute the restriction to the utility model embodiment.In the accompanying drawings:
Fig. 1 is Tthe utility model system module principle schematic diagram.
Fig. 2 is the utility model ground fault analogue unit schematic illustration.
Specific embodiment
For the purpose of this utility model, technical solution and advantage is more clearly understood, below with reference to embodiment and attached drawing, The utility model is described in further detail, and the exemplary embodiment and its explanation of the utility model are only used for explaining this Utility model is not intended to limit the scope of the present invention.
Embodiment 1
As shown in Figure 1 and Figure 2, for the singlephase earth fault test platform of electric energy metering device performance detection, including electricity Source, step-up transformer, breaker, line length analogue unit, ground fault analogue unit, step-down transformer, large capacity is adjustable Load, control unit, electric energy metering device;
Line length analogue unit, for simulating the overhead transmission line or cable run of different length;
Ground fault analogue unit, for simulating singlephase earth fault;Ground fault analogue unit includes three 10kV mono- It is isolated disconnecting link S1, S2, S3;It further include high-pressure vacuum contactor S4, conducting copper;S1, S2, S3 are respectively used to control A, B, C The on-off of three-phase voltage route and conducting copper;Conducting copper connects high-pressure vacuum contactor S4, and high-pressure vacuum contactor S4 connects Connecting resistance adjusts unit, and the resistance value of resistance adjustment unit is controlled by control unit, simulated by different resistance sizes The ground fault of different situations, resistance adjustment unit reconnect grounding copper bar, grounding copper bar ground connection;Large capacity deferrable load is Test platform provides continuous primary current, and payload can be automatically adjusted by control unit;Control unit is used In the simulation length of control line length analogue unit, the resistance value parameter of ground fault analogue unit, and control great Rong are controlled Measure the load current that deferrable load provides;Control the overhead transmission line or cable of the folding simulation different length of capacitance switch Different grounding resistances are simulated in road, the folding for controlling resistance switch;Electric energy metering device, as object access platform to be detected, root It is detected according to the position access electric energy metering device that platform needs to be arranged electric quantity metering device.Step-up transformer and downconverter The primary voltage of device is 10kV, and the electric distribution network overhead wire and cable run of this test platform main analog 10kV grade occur single The variation of electric energy metering device metering performance when phase ground fault.
When implementation, power supply is that can commonly pass through the 220V/380V power supply of high current;Step-up transformer and step-down transformer are The transformer of 220V/380V/10kV;The every phase of line length analogue unit is made of multiple capacitor C, and each capacitor C represents 10 The direct-to-ground capacitance of km length overhead transmission line, by the carry out switch series parallel combination to multiple capacitor C, the disconnected conjunction of the switch is logical It crosses control unit to carry out automatically controlling, obtains different capacitances, to simulate the overhead transmission line or cable of different length Road;Electric energy metering device includes source side electric energy metering device and load side electric energy metering device, the source side electric energy meter Amount device is used to measure the electrical energy measurement of ground fault front end;The load side electric energy metering device is for after measuring ground fault The electrical energy measurement at end;The operation voltage of the high-pressure vacuum contactor S4 is AC220V.
As shown in Fig. 2, ground fault analogue unit be mainly used for simulate singlephase earth fault, it is mentioned herein it is single-phase can To be any one phase in A, B, C three-phase.By the cabinet body, the true true ground fault of 10kV overhead line may be implemented.Resistance The resistance that unit includes multiple and different resistance value sizes is adjusted, multiple resistance are by switch series parallel combination, to realize different resistance values Analog quantity, the disconnected conjunction of switch carried out automatically controlling by control unit;Wherein, S1, S2, S3 are the single-phase isolation switch of 10kV, Corresponding A, B, C three-phase voltage.S4 is high-pressure vacuum contactor in dotted line frame, operates voltage AC220V.There are 5 power electricity below Resistance, specification: 250 Ω/55KW.
By taking A phase ground fault as an example, B, C are isolated disconnecting link first and are in gate-dividing state, then A phase disconnecting link is in and is closed Lock state, series-parallel by carrying out to following resistance, then the ground resistance calculated connects line, pass through control S4 operates voltage, closes a floodgate to S4, carries out A phase and is grounded experiment.
Above-described specific embodiment, to the purpose of this utility model, technical scheme and beneficial effects carried out into One step is described in detail, it should be understood that being not used to limit the foregoing is merely specific embodiment of the present utility model Determine the protection scope of the utility model, within the spirit and principle of the utility model, any modification for being made equally is replaced It changes, improve, should be included within the scope of protection of this utility model.

Claims (5)

1. being used for the singlephase earth fault test platform of electric energy metering device performance detection, which is characterized in that including power supply, boosting Transformer, breaker, line length analogue unit, ground fault analogue unit, step-down transformer, large capacity deferrable load, control Unit processed, electric energy metering device;
Line length analogue unit, for simulating the overhead transmission line or cable run of different length;
Ground fault analogue unit, for simulating singlephase earth fault;Ground fault analogue unit include three 10kV it is single-phase every From disconnecting link S1, S2, S3;It further include high-pressure vacuum contactor S4, conducting copper;S1, S2, S3 are respectively used to control A, B, C three-phase The on-off of voltage circuit and conducting copper;Conducting copper connects high-pressure vacuum contactor S4, high-pressure vacuum contactor S4 connection electricity Resistance adjusts unit, and the resistance value of resistance adjustment unit is controlled by control unit, is simulated by different resistance sizes different The ground fault of situation, resistance adjustment unit reconnect grounding copper bar, grounding copper bar ground connection;
Large capacity deferrable load provides continuous primary current for test platform, and payload can by control unit into Row automatic adjustment;
Control unit, for controlling the simulation length of line length analogue unit, the resistance value ginseng of control ground fault analogue unit Number, and the load current that control large capacity deferrable load provides;
Electric energy metering device, including source side electric energy metering device and load side electric energy metering device, the source side electric energy Metering device is used to measure the electrical energy measurement of ground fault front end;The load side electric energy metering device is for measuring ground fault The electrical energy measurement of rear end.
2. the singlephase earth fault test platform according to claim 1 for electric energy metering device performance detection, special Sign is, the transformer that the step-up transformer and step-down transformer are 380V/10kV.
3. the singlephase earth fault test platform according to claim 1 for electric energy metering device performance detection, special Sign is that the every phase of line length analogue unit is made of multiple capacitor C, and it is aerial that each capacitor C represents 10 km length The direct-to-ground capacitance of route, by carrying out switch series parallel combination to multiple capacitor C, the disconnected conjunction of the switch is carried out by control unit It automatically controls, different capacitances is obtained, to simulate the overhead transmission line or cable run of different length.
4. the singlephase earth fault test platform according to claim 1 for electric energy metering device performance detection, special Sign is that the resistance adjustment unit includes the resistance of multiple and different resistance value sizes, and multiple resistance pass through switch series parallel combination, To realize the analog quantity of different resistance values, the disconnected conjunction of switch is carried out automatically controlling by control unit.
5. the singlephase earth fault test platform according to claim 1 for electric energy metering device performance detection, special Sign is that the operation voltage of the high-pressure vacuum contactor S4 is AC220V.
CN201821905996.0U 2018-11-19 2018-11-19 Singlephase earth fault test platform for electric energy metering device performance detection Active CN209086424U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821905996.0U CN209086424U (en) 2018-11-19 2018-11-19 Singlephase earth fault test platform for electric energy metering device performance detection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821905996.0U CN209086424U (en) 2018-11-19 2018-11-19 Singlephase earth fault test platform for electric energy metering device performance detection

Publications (1)

Publication Number Publication Date
CN209086424U true CN209086424U (en) 2019-07-09

Family

ID=67124562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821905996.0U Active CN209086424U (en) 2018-11-19 2018-11-19 Singlephase earth fault test platform for electric energy metering device performance detection

Country Status (1)

Country Link
CN (1) CN209086424U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117420493A (en) * 2023-11-09 2024-01-19 国网四川省电力公司营销服务中心 Electrical energy metering device uncertainty testing system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117420493A (en) * 2023-11-09 2024-01-19 国网四川省电力公司营销服务中心 Electrical energy metering device uncertainty testing system

Similar Documents

Publication Publication Date Title
CN101551432B (en) Power distribution network fault positioning method
CN106154116B (en) A kind of distribution net work earthing fault localization method
CN101436776B (en) Grounding and line selection method for low current grounding system
CN100386637C (en) Fault line selection method for single-phase-to-ground fault in small ground current distribution network
CN103454555B (en) Based on the one-phase earthing failure in electric distribution network Section Location of parameter identification
CN103605357B (en) The test macro of power distribution network boundary switch control device
CN104181442A (en) Power distribution network single-phase earth fault section locating method based on correlation analysis
CN101435845B (en) Small grounding current system double-loop wire single-phase ground fault distance measuring method
CN101598761A (en) Fault line selection method for small electric current grounding system of distribution network
CN103293446A (en) Small-current grounding fault line selection method based on arc suppression coil
CN108548986A (en) A kind of high resistance ground detecting system of small current neutral grounding system, device and method
CN2521811Y (en) Shunt resistance type autoamtic tracking arc suppression compensating & select switch
CN102593737B (en) Relay protection vector checkout facility method before putting into operation with the transformer station of capacitance compensation
CN102830287B (en) Circuit power frequency parameter measuring device capable of eliminating power frequency interference
CN103368167A (en) Single-phase earth fault fundamental current full compensation device and method
CN103645410A (en) Dynamic simulation system and method of small current grounding systems in power grid
CN107104420A (en) The segment protection method of circuit distance I accessed suitable for THE UPFC
CN104280664A (en) Online insulation monitoring and line selecting method for resonant grounded system
CN204422692U (en) A kind of small current grounding failure wire selection system
CN110045221A (en) Small current neutral grounding simulated testing system and test method
CN112485717A (en) Power distribution true test load simulation device and method
CN102879710B (en) System and method for detecting single-phase ground fault point of power distribution line
CN209086424U (en) Singlephase earth fault test platform for electric energy metering device performance detection
CN104280663A (en) Online monitoring and line selecting method for single-phase earth faults of small current grounding system
CN205583702U (en) Novel reactive compensation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant