CN209085961U CN201821688185.XU CN201821688185U CN209085961U CN 209085961 U CN209085961 U CN 209085961U CN 201821688185 U CN201821688185 U CN 201821688185U CN 209085961 U CN209085961 U CN 209085961U
Authority
CN
China
Prior art keywords
tunnel
model
train
temperature
thermostat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821688185.XU
Other languages
Chinese (zh)
Inventor
郑波
吴剑
刘志强
王刚
郭瑞
史宪明
刘玉勇
杜俊
师亚龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Southwest Research Institute Co Ltd
Original Assignee
China Railway Southwest Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Southwest Research Institute Co Ltd filed Critical China Railway Southwest Research Institute Co Ltd
Priority to CN201821688185.XU priority Critical patent/CN209085961U/en
Application granted granted Critical
Publication of CN209085961U publication Critical patent/CN209085961U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)

Abstract

The utility model discloses be related to the tunnel in cold area longitudinal temperature experimental provision of train Piston Action Wind factor, including constant temperature storehouse, air speed control device, tunnel model, train model device, thermostat, air velocity transducer, temperature sensor, data collection system, constant temperature storehouse is to provide cold source, air speed control device is to provide wind energy, tunnel model is formed by tunnel model unit spliced, thermostat is made of thermostat unit and is arranged independently of each other between thermostat unit, thermostat unit is wrapped in tunnel model unit outer surface, air velocity transducer, temperature sensor be arranged in tunnel model and with data collection system Electricity Federation.The experimental provision tested using the tunnel in cold area longitudinal temperature regularity of distribution under one-way or bi-directional ventilation condition provided by the utility model, the regularity of distribution that long tunnel longitudinal temperature under the conditions of different length of tunnel, different tunnel portal temperature, different tunnel portal wind speed, different surrounding rock initial temperature etc. can be simulated, can provide accurate parameter for head of district's tunneling insulating layer laying length of trembling with fear.

Description

It is related to the tunnel in cold area longitudinal temperature experimental provision of train Piston Action Wind factor
Technical field
The utility model relates to tunnel in cold area experimental provision, the tunnel in cold area for being specifically related to train Piston Action Wind factor is longitudinal Temperature experimental provision.
Background technique
With China's the Belt and Road national strategy implementation and infrastructure construction rapid development, northwest China, The high latitude areas such as northeast and China's High Altitude in West China area, the tunnel built is more and more, and length of tunnel is also increasingly It is long.With the refined amp- Linzhi's section of Sichuan-Tibet railway, tunnel accounting is even more than 90%, and length is more than that the tunnel of 30km has 7 according to a preliminary estimate Or more, there is tunnel height above sea level in part in 4200m or more.
Currently, the short tunnel in cold area in, usually uses identical anti-freeze thawing measure in full tunnel, and insulating layer is laid with thickness Spend it is identical, although as long tunnel is increasing, it is also considered that long tunnel both ends be laid with insulating layer mode, this be laid with length Degree is substantially according to the methods of external experience formula or engineering analogy, is not met with China's actual conditions, tunnel in cold area is antifreeze Melt the technical specification and data that design parameter not can refer to.
In addition, there are some new problems relevant to Temperature Distribution in tunnel, such as with the operation of opening of cold area's high-speed rail The Harbin-to-Dalian high-speed rail that is open to traffic is runed, occurs bullet train operation in winter bring cold energy in tunnel into cause asking for temperature redistribution Topic causes original positive warm area section in major long tunnel to be responsible for, icing phenomenon is caused to occur, comes to the safety belt of bullet train hidden Suffer from.
It is obtaining the result is that most really, also can most meet practical feelings using the method for carrying out field test to live tunnel Condition can provide accurate parameter for insulating layer laying length, but there are problems that two, first is that test result can only represent a certain seat tool The influence factor of the body tunnel longitudinal temperature regularity of distribution, the tunnel longitudinal temperature regularity of distribution is numerous, such as: the most cold monthly average temperature in hole Degree, natural wind speed, wind direction, length of tunnel etc., popularization and application have certain limitation, in addition carry out on-the-spot test in Han Qu and need to consume Take a large amount of human and material resources and financial resources, project amount is big, and economic and practical is general, and long highway tunnel can also be used The method of on-the-spot test, and it is almost impossible for high-speed rail operation line in carry out temperature test;Second is that only tunnel completion is logical Data test result after vehicle could represent the actual tunnel longitudinal temperature regularity of distribution, and on-the-spot test has serious full rear property, It is difficult to meet the actual demand of design.Theory analysis then excessively idealizes, it is assumed that condition is too many, it is also difficult to meet requirement of engineering, It even can satisfy needs, also need to be verified.Therefore, on the whole, a kind of research Han Qu is lacked to cold area's major long tunnel The effective means of the tunnel longitudinal temperature regularity of distribution, especially for high-speed railway, tunnel temperature distribution is advised under the conditions of Piston Action Wind Rule, lacks effective research means.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, provides and be related to cold area's tunnel of train Piston Action Wind factor Road longitudinal temperature experimental provision can simulate different length of tunnel, different tunnel portal temperature, different tunnels by the device and enter The regularity of distribution of long tunnel longitudinal temperature under the conditions of one's intention as revealed in what one says speed, different surrounding rock initial temperature etc., thus for cold head of district's tunnel insulation Layer laying length design provides foundation.
The purpose of this utility model is achieved through the following technical solutions: being related to cold area's tunnel of train Piston Action Wind factor Road longitudinal temperature experimental provision, including constant temperature storehouse, air speed control device, Train Simulators, tunnel model, thermostat, wind Fast sensor, temperature sensor, data collection system, the constant temperature storehouse are set to provide cold source, the air speed control device It sets in constant temperature storehouse and to provide wind energy, the tunnel model is formed by tunnel model unit spliced and connected with constant temperature storehouse Logical, the thermostat is made of thermostat unit and is arranged independently of each other between thermostat unit, and thermostat unit is wrapped in tunnel Road model unit outer surface, the air velocity transducer, temperature sensor are arranged in tunnel model and and data collection system Electricity Federation.
Preferably, the constant temperature storehouse includes storehouse and to control temperature in storehouse, and the storehouse side is equipped with With the consistent circular hole of tunnel model internal diameter;The air speed control device includes axial flow blower, the central axis of the axial flow blower with Tunnel model center overlapping of axles, axial flow blower outer dimension are greater than circular hole size.
Preferably, the constant temperature storehouse is equipped with and one and be connected to tunnel model one end, or equipped with 2 and respectively with tunnel The connection of model both ends.
Preferably, the tunnel model uses pvc pipe, is connected between the tunnel model unit by pin and box sub, and Junction is sealed by sealant.
Preferably, the thermostat unit is in cylindrical type, and the inner sidewall of thermostat unit selects the aluminium of 0.2-0.5mm thickness Material, thermostat unit include catch basin, and the catch basin is equipped with inlet and outlet pipes, and the inlet and outlet pipes are erected by horizontal tube and two Straight tube composition, the both ends of the horizontal tube are connect with two vertical pipes respectively.
Preferably, thermostat unit one end is equipped with several connecting rods, and the other end is equipped with company corresponding with connecting rod Hole is connect, the length of the connecting rod is not less than the half of thermostat element length.
Preferably, the pin and box sub between the tunnel model unit is arranged in thermostat unit.
Preferably, the air velocity transducer, temperature sensor are equipped with several, and are uniformly arranged, the temperature sensor It is provided in the upper and lower sides of tunnel model, one of them described air velocity transducer is arranged in one end of tunnel model and to examine Survey the wind speed size of air speed control device.
Preferably, the Train Simulators include train simulation, wire, train model train controller, baffle And the control plug that slows down, the wire are mounted at the positive central axes of tunnel model, the train model is movably arranged on wire On, the deceleration control plug is connect with baffle side, and is all disposed within tunnel model one end.
Preferably, the cross dimensions of the tunnel model is 1:50, and each tunnel model element length is 3m
The beneficial effects of the utility model are: utilizing the area one-way or bi-directional ventilation condition Xia Han provided by the utility model tunnel The experimental provision of road longitudinal temperature regularity of distribution test can simulate different length of tunnel, different tunnel portal temperature, different tunnels The regularity of distribution of long tunnel longitudinal temperature under the conditions of road inlet velocity, different surrounding rock initial temperature etc. can be cold head of district tunnel Insulating layer laying length provides accurate parameter, on the one hand can effectively prevent tunnel-liner freeze injury appearance, guarantee driving safety;It is another Construction cost can be effectively reduced in aspect, improve business efficiency, provide foundation for the construction and design in head of district tunnel of trembling with fear.
Detailed description of the invention
Fig. 1 is bidirectional ventilated experimental provision;
Fig. 2 is longitudinal cross-section diagram in Fig. 3;
Train operation schematic diagram in Fig. 3 the utility model;
Experimental provision longitudinal direction cross-sectional view in Fig. 4 the utility model;
Fig. 5 is thermostat model;
Fig. 6 is the structural schematic diagram of thermostat model unit;
Fig. 7 is tunnel model.
Specific embodiment
The technical solution of the utility model, but the protection scope of the utility model are described in further detail with reference to the accompanying drawing It is not limited to as described below.
Embodiment 2
As shown in figures 1 to 6, the tunnel in cold area longitudinal temperature experimental provision for being related to train Piston Action Wind factor includes constant temperature storehouse 1, it is made of refrigeration system, storehouse, between setting 2 altogether, one main one is auxiliary, and main constant temperature storehouse 1 is using fixed, auxiliary constant temperature storehouse 1, using movable type, can move freely.The temperature in storehouse can be accurately controlled by refrigeration system, opened in the side of storehouse There are a circle (in order to test the hole for more meeting reality and can also being split into tunnel-shaped), 11 size of circular hole and tunnel model Internal diameter is consistent.Pulley is installed in the quadrangle of auxiliary 1 lower part of constant temperature storehouse, can move freely, so as to be provided more for experiment Convenient and fast cold source.
Air speed control device is equipped with axial flow blower 12, axial flow blower 12 in storehouse at circular hole 1110-20cm Central axis and tunnel center overlapping of axles, for 12 outer dimension of axial flow blower than circular hole 11 on storehouse wall than big, guarantee can give tunnel The uniform Parallel airflow beam of input in road model simulates gravity-flow ventilation by axial flow blower 12.Axial flow blower 12 has different shelf grades, Cold air in storehouse, is fed forward by the wind that varying strength can be formed by adjusting using axial flow blower 12 with certain speed, And then the wind of different wind speed is formed, cold wind blows to tunnel by circular hole 11 on storehouse wall, and wind speed biography is equipped at tunnel entrance Sensor 3 and temperature sensor 4 can be tested into air speed value in tunnel by anemobiagraph, can be learnt by temperature sensor 4 The temperature value of cold air in into tunnel.Tunnel face wind speed can be adjusted by axial flow blower 12, and tunnel face temperature can pass through It adjusts refrigeration system to adjust, refrigeration system temperature range is 0 ~ -35 DEG C, can cover any high latitude in China and high altitude localities Most cold monthly mean temperature value.
61 device of train simulation includes train simulation 61, wire 62, train model train controller 63, baffle 64 and slow down control plug 65, the wire 62 is mounted at the positive central axes of tunnel model, and the train model is movably arranged on On wire 62, the deceleration control plug 65 is connect with 64 side of baffle, and is all disposed within tunnel model one end.According to practical column Vehicle and tunnel section area ratio relationship, make train model, and train model is equivalent at round train mould using area equivalent method Type.Using breakdown trailer mode, one finer wire is installed in the positive central axes of tunnel model when experiment, is fixed with train mould on steel wire Type.Train control is installed on the outside, by controller, can control train model speed, when 65 contact of control plug of slowing down Be automatically stopped when baffle 64, train can tunnel both ends move back and forth.
Tunnel model is simulated using round heavy wall pvc pipe, and 1:50 considers cross dimensions in proportion, by multistage tunnel model Unit 2 is assemblied to form tunnel model, and each model unit is the long 3m of every section, and model both ends are provided with male and female interface, Ke Yitong Assembling combination is crossed into the tunnel model of random length, connector is sealed using sealant, is arranged with temperature above and below in tunnel inner wall Sensor 4 is spent, the fore-and-aft distance of temperature sensor 4 is considered by 3m, and air velocity transducer 3, Suo Youwen is arranged at same position The lead of degree sensor 4 and anemobiagraph is connected to data acquisition device.Tunnel model is placed on bracket, and model height is with tunnel axis Being open with storehouse, centre-height is consistent to be advisable.
Thermostat, using thermostated cooling bath temperature control, each constant temperature slot length 3m.The thermostat unit 5 is in cylindrical type, and permanent The inner sidewall of warm slot unit 5 selects the aluminium material of 0.3mm thickness, and thermostat unit 5 includes catch basin, the catch basin equipped with into Outlet pipe, the inlet and outlet pipes are made of horizontal tube and two vertical pipes, and the both ends of the horizontal tube are connect with two vertical pipes respectively. Inlet and outlet pipes are made of horizontal tube and two vertical pipes, can increase thermostat inside water pressure, enable thermostat close to tunnel mould Type guarantees thermostat simulation.
More specifically, described 5 one end of thermostat unit is equipped with several connecting rods 51, and the other end is equipped with and connecting rod 51 corresponding connecting holes 52, the length of the connecting rod 51 are not less than the half of 5 length of thermostat unit.Thermostat unit 5 it Between connecting component use the good material of thermal conductivity, realize and transmit heat between the thermostat unit 5 being in contact, make to measure and Data be more bonded reality.
Country rock temperature on the outside of tunnel can be simulated by thermostat, by controlling the temperature of thermostat, can be simulated true Tunnel surrounding initial temperature.Each thermostat can independent temperature control, and then tunnel longitudinal direction different surrounding rock can be simulated initially Tender feeling condition reaches the different edpth of tunnel conditions of simulation.
Data collection system, in model air velocity transducer 3 and temperature sensor 4 connect, mainly acquire experimentation The air speed data of middle tunnel temperature data along longitudinal direction and different depth, can automatic data collection, it is whole-process automatic in experimentation Acquisition, frequency acquisition can determine according to actual needs.
Whole experiment process is:
1, cold storage at constant temperature is equipped with to be installed in place air speed control device in freezer in cold abutment wall side aperture as required, And debugged, it is ensured that can achieve the subzero temperature of requirement of experiment.
2, processing and fabricating pin-connected panel tunnel model as required, tunnel model length is based on the every section of 3m, convenient transportation and peace Dress.
3, constant temperature cold trap is installed, it is spare.
4, the assembled tunnel model in thermostat, installs temperature, wind speed measuring point as required in an assembling process.
5, Train Simulators are installed.
6, thermostatic bath system and data acquisition test system are opened, reaches requirement of experiment and steady to tunnel model peripheral temperature After fixed, prepare cold storage at constant temperature.
7, it according to tunnel both ends temperature simulation value, opens cold storage at constant temperature and sets relevant temperature value, dropped to cold storehouse temperature To requirement of experiment value, air speed control device is separately turned on according to requirement of experiment, takes out the partition in freezer abutment wall hole, cold wind enters Model tunnel, is tested, and wind speed size is adjusted step by step by ascending sequence.
8, testing after temperature is basicly stable in tunnel model, under the conditions of this terminates, and then adjusts wind-force size, carries out Next stage wind velocity test stops this time testing after the completion of desired all rank wind speed are tested.
9, it by requirement of experiment adjustment thermostat and cold storage at constant temperature temperature, is tested next time.
10, it by assembling different tunnel growth devices, is accordingly tested.
The above is only the preferred embodiment of the utility model, it should be understood that the utility model is not limited to herein Disclosed form, should not be regarded as an exclusion of other examples, and can be used for other combinations, modifications, and environments, and Can be in contemplated scope described herein, modifications can be made through the above teachings or related fields of technology or knowledge.And this field The modifications and changes that personnel are carried out do not depart from the spirit and scope of the utility model, then all should be in right appended by the utility model It is required that protection scope in.

Claims (10)

1. being related to the tunnel in cold area longitudinal temperature experimental provision of train Piston Action Wind factor, which is characterized in that including constant temperature storehouse, wind Velocity control device, tunnel model, Train Simulators, thermostat, air velocity transducer, temperature sensor, data collection system, institute It states constant temperature storehouse and is arranged to provide cold source, the air speed control device in constant temperature storehouse and to provide wind energy, the tunnel Road model is formed by tunnel model unit spliced and is connected to constant temperature storehouse, and the Train Simulators are arranged in tunnel model Interior, the thermostat is made of thermostat unit and is arranged independently of each other between thermostat unit, and thermostat unit is wrapped in tunnel Road model unit outer surface, the air velocity transducer, temperature sensor are arranged in tunnel model and and data collection system Electricity Federation.
2. the tunnel in cold area longitudinal temperature experimental provision according to claim 1 for being related to train Piston Action Wind factor, feature Be: the constant temperature storehouse includes storehouse and to control temperature in storehouse, and the storehouse side is equipped with and tunnel model The consistent circular hole of internal diameter;The air speed control device includes axial flow blower, in the central axis and tunnel model of the axial flow blower Mandrel is overlapped, and axial flow blower outer dimension is greater than circular hole size.
3. the tunnel in cold area longitudinal temperature experimental provision according to claim 2 for being related to train Piston Action Wind factor, feature Be: the constant temperature storehouse is equipped with one and is connected to tunnel model one end, or is equipped with 2 and connects respectively with tunnel model both ends It is logical.
4. the tunnel in cold area longitudinal temperature experimental provision according to claim 1 for being related to train Piston Action Wind factor, feature Be: the tunnel model uses pvc pipe, is connected between the tunnel model unit by pin and box sub, and junction passes through Sealant sealing.
5. the tunnel in cold area longitudinal temperature experimental provision according to claim 1 for being related to train Piston Action Wind factor, feature Be: the thermostat unit is in cylindrical type, and the inner sidewall of thermostat unit selects the aluminium material of 0.2-0.5mm thickness, constant temperature Slot unit includes catch basin, and the catch basin is equipped with inlet and outlet pipes, and the inlet and outlet pipes are made of horizontal tube and two vertical pipes, The both ends of the horizontal tube are connect with two vertical pipes respectively.
6. the tunnel in cold area longitudinal temperature experimental provision according to claim 5 for being related to train Piston Action Wind factor, feature Be: thermostat unit one end is equipped with several connecting rods, and the other end is equipped with connecting hole corresponding with connecting rod, the company The length of extension bar is not less than the half of thermostat element length.
7. the tunnel in cold area longitudinal temperature experimental provision according to claim 5 for being related to train Piston Action Wind factor, feature Be: the pin and box sub between the tunnel model unit is arranged in thermostat unit.
8. the tunnel in cold area longitudinal temperature experimental provision according to claim 1 for being related to train Piston Action Wind factor, feature Be: the air velocity transducer, temperature sensor are equipped with several, and are uniformly arranged, and the temperature sensor is in tunnel model Upper and lower sides be provided with, one of them described air velocity transducer is arranged in one end of tunnel model and to detect blast velocity control The wind speed size of device.
9. the tunnel in cold area longitudinal temperature experimental provision according to claim 1 for being related to train Piston Action Wind factor, feature Be: the Train Simulators include train simulation, wire, train model train controller, baffle and control of slowing down Plug, the wire are mounted at the positive central axes of tunnel model, and the train model is movably arranged on wire, the deceleration Control plug is connect with baffle side, and is all disposed within tunnel model one end.
10. the tunnel in cold area longitudinal temperature experimental provision according to claim 1 for being related to train Piston Action Wind factor, feature Be: the cross dimensions of the tunnel model is 1:50, and each tunnel model element length is 3m.
CN201821688185.XU 2018-10-18 2018-10-18 It is related to the tunnel in cold area longitudinal temperature experimental provision of train Piston Action Wind factor Active CN209085961U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821688185.XU CN209085961U (en) 2018-10-18 2018-10-18 It is related to the tunnel in cold area longitudinal temperature experimental provision of train Piston Action Wind factor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821688185.XU CN209085961U (en) 2018-10-18 2018-10-18 It is related to the tunnel in cold area longitudinal temperature experimental provision of train Piston Action Wind factor

Publications (1)

Publication Number Publication Date
CN209085961U true CN209085961U (en) 2019-07-09

Family

ID=67119635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821688185.XU Active CN209085961U (en) 2018-10-18 2018-10-18 It is related to the tunnel in cold area longitudinal temperature experimental provision of train Piston Action Wind factor

Country Status (1)

Country Link
CN (1) CN209085961U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115824576A (en) * 2022-11-07 2023-03-21 中国科学院西北生态环境资源研究院 Cold region tunnel train piston wind quality-thermal coupling monitoring device and monitoring method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115824576A (en) * 2022-11-07 2023-03-21 中国科学院西北生态环境资源研究院 Cold region tunnel train piston wind quality-thermal coupling monitoring device and monitoring method
CN115824576B (en) * 2022-11-07 2023-11-28 中国科学院西北生态环境资源研究院 Device and method for monitoring wind-thermal coupling of piston of tunnel train in cold region

Similar Documents

Publication Publication Date Title
Zha et al. Experimental and numerical studies of solar chimney for ventilation in low energy buildings
CN102692309B (en) Power transmission line wind tunnel test system and method applied to typhoon wind field
CN108535314B (en) Cold region high-speed railway tunnel air curtain test device and test method
CN106485975B (en) A kind of tunnel in cold area temperature field laboratory experiment system
CN105181730B (en) A kind of tunnel in cold area frost-heave force laboratory test model and its method of testing
CN109443809A (en) It is related to the tunnel in cold area longitudinal temperature experimental provision of train Piston Action Wind factor
WO2021082506A1 (en) Hot-humid climatic wind tunnel and multi-field coupling control system therefor
CN110118666B (en) Experimental method of environment-friendly cold region tunnel freezing injury simulation indoor experimental system
CN105954316B (en) A kind of indoor experimental apparatus and method of detection icy on road
CN104374427B (en) The soil body hot moisture migration effect test system and method in a kind of earth source heat pump operation
CN209085961U (en) It is related to the tunnel in cold area longitudinal temperature experimental provision of train Piston Action Wind factor
CN204405287U (en) A kind of opening single flow icing tunnel of economical and efficient
CN106706697A (en) Model test device for simulating pre-cooling freezing method construction under flowing effect of underground water
CN205317708U (en) Test device of han qu tunnel country rock and distinguished and admirable heat transfer
CN102879552A (en) Freeze thawing and frost heaving model test device and testing method thereof
CN103439357A (en) Method for testing moisture-heat transfer performance of exterior wall and dedicated climate simulation test chamber therefor
CN104749059A (en) Flowing water flushing numerical experiment method for asphalt pavement
CN110361522A (en) A kind of moisturizing freeze thawing device and method for frozen soil experiment
CN209343642U (en) A kind of aeration type tunnel in cold area longitudinal temperature distribution experiments device
CN106228823A (en) A kind of urban storm flood road surface running vehicle safety early warning device and method
CN109448536A (en) A kind of aeration type tunnel in cold area longitudinal temperature distribution experiments device
CN103499518A (en) Method of simulating heavy gas diffusing among urban streets
CN211061548U (en) A frozen swelling volume and frozen power test device for determining single tube freezes
CN208763655U (en) Construction freezing method refrigerating plant
CN204807550U (en) Concrete shrinkage test device under cold execution conditions

Legal Events