CN209079884U - A kind of subway dispersing platform - Google Patents
A kind of subway dispersing platform Download PDFInfo
- Publication number
- CN209079884U CN209079884U CN201821967420.7U CN201821967420U CN209079884U CN 209079884 U CN209079884 U CN 209079884U CN 201821967420 U CN201821967420 U CN 201821967420U CN 209079884 U CN209079884 U CN 209079884U
- Authority
- CN
- China
- Prior art keywords
- threaded hole
- vertical beam
- support rod
- connecting plate
- crossbeam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model relates to metro safety facility technology fields, specifically a kind of subway dispersing platform, including platform support, pedal and support rod, platform support includes vertical beam and crossbeam, pedal is set to the upside of crossbeam, the side of vertical beam is connected with the side wall of subway tunnel, the upper end of the vertical beam other side is connected with one end of crossbeam, support rod is obliquely installed, the upper end of support rod is connected with the downside of the crossbeam other end, the lower end of support rod is connected with the lower end of vertical beam, forms triangular structure between vertical beam, crossbeam and support rod.
Description
Technical field
The utility model relates to metro safety facility technology field, specifically a kind of subway dispersing platforms.
Background technique
With the continuous development in city, the flow of the people in city is gradually increased, and is needed to better meet the trip of people
It asks, more and more cities start to build subway, and subway also plays the important and pivotal role in the development in city.And on ground
In the operation of iron, for the sake of security, need to be arranged on tunnel subway dispersing platform, passenger can be escaped by subway dispersing platform
From danger zone, but current subway dispersing platform the problem of there is also structural instabilities, there can be security risk in this way.
Utility model content
The purpose of this utility model is to provide a kind of subway dispersing platforms, are also deposited with solving current subway dispersing platform
The structural instability the problem of.
In order to solve the above technical problems, the utility model uses following technical scheme:
A kind of subway dispersing platform, including platform support, pedal and support rod, platform support include vertical beam and crossbeam,
Pedal is set to the upside of crossbeam, and the side of vertical beam is connected with the side wall of subway tunnel, the upper end of the vertical beam other side and crossbeam
One end be connected, support rod is obliquely installed, and the upper end of support rod is connected with the downside of the crossbeam other end, the lower end of support rod with erect
The lower end of beam is connected, and forms triangular structure between vertical beam, crossbeam and support rod.
Preferably, further technical solution is that the upper end of support rod is transversely provided with the first connecting plate, the first connecting plate
Upside be connected with the downside of crossbeam, the middle section of the downside of the first connecting plate is connected with the upper end of support rod, on the first connecting plate
Equipped with the first transparent threaded hole, crossbeam is equipped with the second threaded hole, and the first threaded hole is adapted with the second threaded hole, has
First bolt is successively screwed into the first threaded hole and the second threaded hole.
Further technical solution is that the second threaded hole is transparent, and the downside of pedal is equipped with third threaded hole, the
Three threaded holes are adapted with the second threaded hole, and the first bolt is successively screwed into the first threaded hole, the second threaded hole and third threaded hole
It is interior.
Further technical solution is that the first threaded hole is set as two, and is located on the first connecting plate and supports
The two sides of bar, the first threaded hole and third threaded hole are adapted with the first threaded hole.
Further technical solution is that the lower end of support rod is vertically equipped with the second connecting plate, the second connecting plate side
Middle section is connected with the lower end of support rod, and the other side is connected with vertical beam, and the 4th penetrating threaded hole is transversely provided on the second connecting plate,
Vertical beam is equipped with the 5th threaded hole in the side being connected with the second connecting plate, and the 5th threaded hole is adapted with the 4th threaded hole, there is the
Two bolts are successively screwed into the 4th threaded hole and the 5th threaded hole.
Further technical solution be further include the first connector, the first connector is connected with the side wall of subway tunnel,
It is vertically equipped with card on first connector and sets channel, the lower end of vertical beam and the second connecting plate are arranged in card and set in channel.
Further technical solution is, card sets the side wall on the outside of channel and is equipped with the 6th threaded hole, the 6th threaded hole with
4th threaded hole is adapted, and the second bolt is successively screwed into the 6th threaded hole, the 4th threaded hole and the 5th threaded hole.
Further technical solution be further include the second connector, the side of the second connector and the side of subway tunnel
Wall is connected, and the other side is equipped with link slot, and the upper end of vertical beam is fastened in link slot, is equipped with the 7th on the side wall of link slot two sides
Threaded hole, vertical beam are equipped with the 8th penetrating threaded hole, and the 7th threaded hole and the 8th threaded hole are adapted, and have third bolt successively
It is screwed into the 7th threaded hole and the 8th threaded hole.
Compared with prior art, the utility model has the beneficial effects that platform support is used to support pedal, realization is trampled
Stablizing for plate is placed, and platform support is specifically divided into vertical beam and crossbeam, and vertical beam is made to be connected with the side wall of subway tunnel, thus
It realizes the connection between platform support and tunnel-side, pedal is set to the upside of crossbeam, realizes that the stabilization of pedal is put
It sets, recycles the support rod being obliquely installed connection vertical beam and crossbeam, and make to form triangle knot between support rod, vertical beam and crossbeam
Structure, and then keep platform support with good stability using support rod, and then guarantee the stabilization of evacuation platform structure, it avoids out
Existing security risk.
Detailed description of the invention
Fig. 1 is a kind of a kind of structural schematic diagram of embodiment of subway dispersing platform.
Fig. 2 is a kind of structural schematic diagram of subway dispersing platform another embodiment.
Fig. 3 is the structural schematic diagram in Fig. 2 at A.
Fig. 4 is the structural schematic diagram in Fig. 2 at B.
Fig. 5 is the structural schematic diagram of platform support.
Fig. 6 is the structural schematic diagram of the first connector.
Fig. 7 is the structural schematic diagram of the second connector.
In figure: 1, platform support;11, vertical beam;111, the 5th threaded hole;112, the 8th threaded hole;113, the first connecting hole;
12, crossbeam;121, the second threaded hole;2, pedal;21, third threaded hole;3, support rod;31, the first connecting plate;311, first
Threaded hole;32, the second connecting plate;321, the 4th threaded hole;4, the first bolt;5, the second bolt;6, the first connector;61, block
If channel;611, the 6th threaded hole;62, first baffle;63, second baffle;64, first connects wallboard;641, the second connecting hole;7,
Second connector;71, third baffle;72, second connects wallboard;721, third connecting hole;8, link slot;81, the 7th threaded hole.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation
Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain
The utility model is not used to limit the utility model.
Fig. 1-7 shows a kind of embodiment of subway dispersing platform.
Referring to attached drawing 1, the utility model provides a kind of subway dispersing platform, may include platform support 1,2 and of pedal
Support rod 3, platform support 1 may include vertical beam 11 and crossbeam 12, and pedal 2 is set to the upside of crossbeam 12, and the one of vertical beam 11
Side is connected with the side wall of subway tunnel, and the upper end of 11 other side of vertical beam is connected with one end of crossbeam 12, and support rod 3 is obliquely installed,
The upper end of support rod 3 is connected with the downside of 12 other end of crossbeam, and the lower end of support rod 3 is connected with the lower end of vertical beam 11, vertical beam 11,
Triangular structure is formed between crossbeam 12 and support rod 3.
Referring to attached drawing 1, vertical beam 11 and crossbeam 12 can be integrally formed, it is ensured that platform support 1 has good structure
Stability, the side of vertical beam 11 are connected with the side wall of subway tunnel, and then realize the fixation of 1 position of platform support, by pedal 2
It is set to the upside of crossbeam 12, realizes the fixation of 2 position of pedal, the downside of pedal 2 is connected with the upside of crossbeam 12, is stepping on
The upside of pedal 2 is equipped with antislip cog, further promotes security performance, and the support rod 3 being obliquely installed and vertical beam 11 and crossbeam
Triangular structure is formed between 12, triangle has good stability, and then it is good steady to have this subway dispersing platform
It is qualitative.Specifically, downside of the upper end of support rod 3 with crossbeam 12 relative to the other end of vertical beam 11 is connected, the lower end of support rod 3
Lower end with vertical beam 11 relative to the other side of tunnel-side is connected.
Referring to attached drawing 2 and attached drawing 3, further, the upper end of support rod 3 can be horizontally arranged with the first connecting plate 31, the
The upside of one connecting plate 31 is connected with the downside of crossbeam 12, the middle section of the downside of the first connecting plate 31 and the upper end phase of support rod 3
Even, the first transparent threaded hole 311 can be set on the first connecting plate 31, the second screw thread has can be set on crossbeam 12
Hole 121, the first threaded hole 311 are adapted with the second threaded hole 121, have the first bolt 4 to be successively screwed into the first threaded hole 311 and
In two threaded holes 121.
The upper end of support rod 3 is connected by the first connecting plate 31 with crossbeam 12, specifically, the upper end of support rod 3 can be with
The upside in the middle section of the downside of the first connecting plate 31, the first connecting plate 31 is connected with the downside of crossbeam 12, and support rod 3 can be with
One connecting plate 31 is integrally formed, and can also be connected by welding with the first connecting plate 31, to realize the upper of support rod 3
Being stably connected between end and the first connecting plate 31.The first transparent threaded hole 311 is provided on first connecting plate 31, it is horizontal
The second threaded hole 121 can be set on beam 12, made the pore size and interior spiral shell of the first threaded hole 311 and the second threaded hole 121
Line is identical, and position is corresponding, then can successively be screwed into the first threaded hole 311 and the second threaded hole by the first bolt 4
In 121, realizes being stably connected between the first connecting plate 31 and crossbeam 12, be that ensure that connect between support rod 3 and crossbeam 12
The stability connect.
Referring to attached drawing 2 and attached drawing 3, further, the second threaded hole 121 can be transparent, the downside of pedal 2
Third threaded hole 21 can be set, third threaded hole 21 is adapted with the second threaded hole 121, and the first bolt 4 is successively screwed into
In one threaded hole 311, the second threaded hole 121 and third threaded hole 21.
It is the pore size and internal screw thread phase of the first threaded hole 311, the second threaded hole 121 and third threaded hole 21
Together, and the position of three is corresponding, is then successively screwed into the first threaded hole 311, the second threaded hole 121 by the first bolt 4
In third threaded hole 21, to realize the connection between pedal 2, crossbeam 12 and connecting plate 31, guarantee to connect between three
Stability, be the stability that can further guarantee this subway dispersing platform structure.
Referring to attached drawing 2, the first threaded hole 311 can be set to two, and be located at 31 upper support bar 3 of the first connecting plate
The left and right sides, the first threaded hole 311 and third threaded hole 21 are adapted with the first threaded hole 311.It can further protect in this way
The stability connected between card pedal 2, crossbeam 12 and connecting plate 31, and balance the stress of connection more, make this subway
Evacuation platform structure has more stability.
Referring to attached drawing 2, attached drawing 4 and attached drawing 5, further, the lower end of support rod 3 can be vertically provided with the second connecting plate
32, the middle section of 32 side of the second connecting plate is connected with the lower end of support rod 3, and the other side is connected with vertical beam 11, the second connecting plate 32
On can be horizontally arranged with the 4th penetrating threaded hole 321, vertical beam 11 is provided in the side being connected with the second connecting plate 32
Five threaded holes 111, the 5th threaded hole 111 are adapted with the 4th threaded hole 321, have the second bolt 5 to be successively screwed into the 4th threaded hole
321 and the 5th in threaded hole 111.
The lower end of support rod 3 is connected by the second connecting plate 32 with vertical beam 11, specifically, the lower end of support rod 3 can be with
The middle section of the side of second connecting plate 32, the other side phase of the other side of the second connecting plate 32 tunnel-side corresponding with vertical beam 11
Even, support rod 3 can be integrally formed with the second connecting plate 32, can also be connected by welding with the second connecting plate 32,
To realize being stably connected between the lower end of support rod 3 and the second connecting plate 32.Can laterally it be arranged on second connecting plate 32
There is the 4th penetrating threaded hole 321, vertical beam 11 is provided with the 5th threaded hole 111 in the side being connected with the second connecting plate 32, makes
4th threaded hole 321 is identical as the pore size of the 5th threaded hole 111 and internal screw thread, and position is corresponding, then can lead to
The second bolt 5 is crossed successively to be screwed into the 4th threaded hole 321 and the 5th threaded hole 111, realize the second connecting plate 32 and vertical beam 11 it
Between be stably connected with, be the stability that ensure that and connected between support rod 3 and vertical beam 11.
Referring to attached drawing 2 and attached drawing 5, the 4th threaded hole 321 can be set to two, and be located on the first connecting plate 31
The two sides up and down of support rod 3, the 5th threaded hole 111 are adapted with the 4th threaded hole 321.It may further ensure that support rod in this way
The stability connected between 3 and vertical beam 11, and balance the stress of connection more, keep this subway dispersing platform structure more steady
It is qualitative.
Referring to attached drawing 2, attached drawing 4 and attached drawing 6, this subway dispersing platform can also include the first connector 6, the first connection
Part 6 is connected with the side wall of subway tunnel, and card can be vertically provided on the first connector 6 and sets channel 61, the lower end of vertical beam 11 and
Second connecting plate 32 is arranged in card and sets in channel 61.
Vertical beam 11 and the second connecting plate 32 are fastened on card to set in channel 61, may further ensure that vertical beam 11 and second connects
Connection between fishplate bar 32, as shown in fig. 6, the side of the first connector 6 is provided with two pieces of first gear that are parallel and being oppositely arranged
Plate 62, one end of first baffle 62 are connected with the side wall of the first connector 6, and the other end is connected with second baffle 63, and second gear
The both ends of plate 63 are connected with the end of two pieces of first baffles 62 respectively, and then using first baffle 62, second baffle 63 and connect
Fitting 6 forms card and sets channel 61.Can be between first baffle 62, second baffle 63 and the first connector 6 it is integrally formed,
It can be bonded by welding.
Referring to attached drawing 6, further, the 6th threaded hole 611 can be set on the side wall that card sets 61 outside of channel, the
Six threaded holes 611 are adapted with the 4th threaded hole 321, and the second bolt 5 is successively screwed into the 6th threaded hole 611, the 4th threaded hole 321
In the 5th threaded hole 111.6th threaded hole 611 can be set on second baffle 63, by the way that the second bolt 5 to be successively screwed into
In 6th threaded hole 611, the 4th threaded hole 321 and the 5th threaded hole 111, it is further ensured that the first connector 6, vertical beam 11 and
Being stably connected between two connecting plates 32.
As shown in fig. 6, being additionally provided with first company's wallboard 64 on the first connector 6, and it is arranged on first company's wallboard 64
There is the second connecting hole 641, by the way that the first expansion swivel nut is arranged in tunnel-side, recycles the first swell fixture from the second connection
Hole 641 is pierced into, and is screwed into the first expansion swivel nut, to realize that first connects the connection between wallboard 64 and tunnel-side, is
Realize the connection between the first connector 6 and tunnel-side.And first company's wallboard 64 can be set to two and first
It is symmetrical on connector 6, it can preferably realize the fixation of the first connector 6 and the balance of more conducively stress.First connects
Fitting 6 and first connects the integrated molding of wallboard 64.
Referring to attached drawing 2 and attached drawing 7, further, this subway dispersing platform can also include the second connector 7, and second connects
The side of fitting 7 is connected with the side wall of subway tunnel, and the other side is equipped with link slot 8, and the upper end of vertical beam 11 is fastened on link slot 8
It is interior, it is equipped with the 7th threaded hole 81 on the side wall of 8 two sides of link slot, vertical beam 11 is equipped with the 8th penetrating threaded hole 112, and the 7th
Threaded hole 81 and the 8th threaded hole 112 are adapted, and have third bolt to be successively screwed into the 7th threaded hole 81 and the 8th threaded hole 112
It is interior.
The preliminary connection realized between the second connector 7 and vertical beam 11 is set first with card of the link slot 8 to vertical beam 11, then
It is successively screwed into the 7th threaded hole 81 and the 8th threaded hole 112, is realized between the second connector 7 and vertical beam 11 by third bolt
It is further stably connected with, since the second connector 7 is the side wall for being fixed on subway tunnel, can realize vertical beam 11 and ground
Being bonded between iron tunnel-side.
As described in Figure 7, the side of the second connector 7 can be set third baffle 71 that is parallel and being oppositely arranged, and two
Link slot 8 can be formed with the cooperation of the side wall of the second connector 7 between third baffle 71, the 7th threaded hole 81 can be set two
In a third baffle 71.
It is additionally provided with second company's wallboard 72 on second connector 7, and is provided with third connection on second company's wallboard 72
Hole 721, by the way that the second expansion swivel nut is arranged in tunnel-side, the second swell fixture of recycling is pierced into from third connecting hole 721,
And be screwed into the second expansion swivel nut, it is to realize that second connects to realize that second connects the connection between wallboard 72 and tunnel-side
Connection between fitting 7 and tunnel-side.And second company's wallboard 72 can be set to two and right on the second connector 7
Claim distribution, can preferably realize the fixation of the second connector 7 and the balance of more conducively stress.Second connector 7 and second
Even wallboard 72 is integrally formed.
Attached drawing 2, attached drawing 5 and attached drawing 7 is participated in further to be horizontally arranged on the side wall of the upper end of vertical beam 11 penetrating
The first connecting hole 113, the position of the first connecting hole 113 is adapted with the position of the second connector 7, and the second connector 7 is even
The slot bottom of access slot 8 is provided with the 9th threaded hole, can be injected in the first connecting hole 113 by an attachment screw and be screwed into the 9th
In threaded hole, it is further ensured that the stability connected between connector 7 and vertical beam 11.
Although reference be made herein to the utility model is described in multiple explanatory embodiments of the utility model, still,
It should be understood that those skilled in the art can be designed that a lot of other modification and implementations, these modifications and implementations
It will fall within scope and spirit disclosed in the present application.More specifically, it discloses in the application, drawings and claims
In range, can building block to theme combination layout and/or layout carry out a variety of variations and modifications.In addition to building block
And/or outside the modification and improvement of layout progress, to those skilled in the art, other purposes also be will be apparent.
Claims (8)
1. a kind of subway dispersing platform, it is characterised in that: described flat including platform support (1), pedal (2) and support rod (3)
Platform bracket (1) includes vertical beam (11) and crossbeam (12), and the pedal (2) is set to the upside of crossbeam (12), the vertical beam
(11) side is connected with the side wall of subway tunnel, and the upper end of vertical beam (11) other side is connected with one end of crossbeam (12), described
Support rod (3) is obliquely installed, and the upper end of the support rod (3) is connected with the downside of crossbeam (12) other end, under support rod (3)
End is connected with the lower end of vertical beam (11), forms triangular structure between the vertical beam (11), crossbeam (12) and support rod (3).
2. a kind of subway dispersing platform according to claim 1, it is characterised in that: the upper end of the support rod (3) is lateral
Equipped with the first connecting plate (31), the upside of first connecting plate (31) is connected with the downside of crossbeam (12), the first connecting plate
(31) middle section of downside is connected with the upper end of support rod (3), and first connecting plate (31) is equipped with transparent first
Threaded hole (311), the crossbeam (12) are equipped with the second threaded hole (121), first threaded hole (311) and the second threaded hole
(121) it is adapted, there is the first bolt (4) to be successively screwed into the first threaded hole (311) and the second threaded hole (121).
3. a kind of subway dispersing platform according to claim 2, it is characterised in that: second threaded hole (121) is up and down
Penetrating, the downside of the pedal (2) is equipped with third threaded hole (21), the third threaded hole (21) and the second threaded hole
(121) it is adapted, first bolt (4) is successively screwed into the first threaded hole (311), the second threaded hole (121) and third screw thread
In hole (21).
4. a kind of subway dispersing platform according to claim 3, it is characterised in that: the first threaded hole (311) setting
It is two, and is located at the two sides of the first connecting plate (31) upper support bar (3), first threaded hole (311) and third spiral shell
Pit (21) is adapted with the first threaded hole (311).
5. a kind of subway dispersing platform according to claim 1, it is characterised in that: the lower end of the support rod (3) is vertical
Equipped with the second connecting plate (32), the middle section of the second connecting plate (32) side is connected with the lower end of support rod (3), the other side with
Vertical beam (11) is connected, and the 4th penetrating threaded hole (321) is transversely provided on second connecting plate (32), the vertical beam (11) exists
The side being connected with the second connecting plate (32) is equipped with the 5th threaded hole (111), the 5th threaded hole (111) and the 4th threaded hole
(321) it is adapted, there is the second bolt (5) to be successively screwed into the 4th threaded hole (321) and the 5th threaded hole (111).
6. a kind of subway dispersing platform according to claim 5, it is characterised in that: it further include the first connector (6), it is described
First connector (6) is connected with the side wall of subway tunnel, and card is vertically equipped on first connector (6) and sets channel (61), institute
The lower end and the second connecting plate (32) for stating vertical beam (11) are arranged in card and set in channel (61).
7. a kind of subway dispersing platform according to claim 6, it is characterised in that: the card sets the side on the outside of channel (61)
Wall is equipped with the 6th threaded hole (611), and the 6th threaded hole (611) is adapted with the 4th threaded hole (321), second spiral shell
Bolt (5) is successively screwed into the 6th threaded hole (611), the 4th threaded hole (321) and the 5th threaded hole (111).
8. a kind of subway dispersing platform according to claim 1, it is characterised in that: it further include the second connector (7), it is described
The side of second connector (7) is connected with the side wall of subway tunnel, the other side be equipped with link slot (8), the vertical beam (11) it is upper
End is fastened in link slot (8), is equipped with the 7th threaded hole (81), the vertical beam on the side wall of link slot (8) two sides
(11) it is equipped with the 8th penetrating threaded hole (112), the 7th threaded hole (81) and the 8th threaded hole (112) are adapted, have
Third bolt is successively screwed into the 7th threaded hole (81) and the 8th threaded hole (112).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821967420.7U CN209079884U (en) | 2018-11-27 | 2018-11-27 | A kind of subway dispersing platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821967420.7U CN209079884U (en) | 2018-11-27 | 2018-11-27 | A kind of subway dispersing platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209079884U true CN209079884U (en) | 2019-07-09 |
Family
ID=67125743
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821967420.7U Active CN209079884U (en) | 2018-11-27 | 2018-11-27 | A kind of subway dispersing platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209079884U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021243959A1 (en) * | 2020-06-01 | 2021-12-09 | 山东鼎昌复合材料有限公司 | Composite material-based egress platform system |
-
2018
- 2018-11-27 CN CN201821967420.7U patent/CN209079884U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021243959A1 (en) * | 2020-06-01 | 2021-12-09 | 山东鼎昌复合材料有限公司 | Composite material-based egress platform system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209079884U (en) | A kind of subway dispersing platform | |
CN103469735B (en) | The mounting method of curve ultrahigh hollow column plate type pier top solid section template | |
CN209228542U (en) | The tower and wind power generating set of wind power generating set | |
CN207218161U (en) | A kind of cable bridge | |
CN207598285U (en) | A kind of subway dispersing platform bottom plate fixing structure | |
CN203487767U (en) | Cross plate scaffold | |
CN204662501U (en) | A kind of pass in and out immersed tube vertical occasional passage | |
CN201148726Y (en) | Independent hanging scaffold super large operating platform | |
CN207572876U (en) | A kind of erecting cable falsework for having automatic regulating function | |
CN206712336U (en) | Shaft tower cable platform work protective cradle | |
CN107916821A (en) | A kind of four column steel pipe pole terminal tower of high altitude localities 330kV double loops | |
CN206971186U (en) | A kind of independently installed device of two layers of tail water overhauling platform | |
CN207016306U (en) | A kind of outer elevator hoistways and wall body fixing device | |
CN206571492U (en) | Combined shaft shaft equipment is installed with special-shaped hanging scaffold | |
CN206091534U (en) | Cable termination tower | |
CN207538483U (en) | A kind of steel box-girder suspender | |
CN207218165U (en) | A kind of crane span structure | |
CN205617565U (en) | Upper assembling type steel corbel of thermal power factory structure | |
CN207073118U (en) | Dam hangs the concrete prefabricated formwork structure of body by the feet | |
CN205063498U (en) | Increase beam column | |
CN207660532U (en) | A kind of electric power overhaul ladder convenient for adjusting | |
CN218510413U (en) | A tuber pipe side direction antidetonation gallows | |
CN209724355U (en) | A kind of tunnel double-lining trolley door frame support device | |
CN107012796A (en) | A kind of wide, bracket of No. zero block construction of squat pier box beam and construction method | |
CN208401268U (en) | A kind of double-deck outlet structure suitable for GIS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |