CN209078982U - A kind of die temperance control water route is switched fast pipeline - Google Patents

A kind of die temperance control water route is switched fast pipeline Download PDF

Info

Publication number
CN209078982U
CN209078982U CN201821747452.6U CN201821747452U CN209078982U CN 209078982 U CN209078982 U CN 209078982U CN 201821747452 U CN201821747452 U CN 201821747452U CN 209078982 U CN209078982 U CN 209078982U
Authority
CN
China
Prior art keywords
switch valve
way switch
cooling tower
hot fluid
cold fluid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821747452.6U
Other languages
Chinese (zh)
Inventor
徐小军
陈俊俊
张思宇
丁安玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Huare Machinery Manufacturing Co Ltd
Original Assignee
Ningbo Huare Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Huare Machinery Manufacturing Co Ltd filed Critical Ningbo Huare Machinery Manufacturing Co Ltd
Priority to CN201821747452.6U priority Critical patent/CN209078982U/en
Application granted granted Critical
Publication of CN209078982U publication Critical patent/CN209078982U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

The utility model relates to a kind of die temperance control water routes to be switched fast pipeline, including cooling tower, cold fluid and hot fluid, cooling tower, cold fluid is respectively connected with outlet pipe with the side of hot fluid and is connected with one end of water inlet pipe, cooling tower, be mounted in cold fluid and the corresponding outlet pipe of hot fluid power output device and one end be mounted on output three-way switch valve, cooling tower, one end of cold fluid and the corresponding water inlet pipe of hot fluid is mounted on input three-way switch valve, cold fluid inputs three-way switch valve and cooling tower inputs three-way switch valve, cooling tower, cold fluid and each self-forming self circular loop of hot fluid, output three-way switch valve is connected by water pipe and four-way connecting tube with clear mould three-way switch valve, clear mould three-way switch valve is also respectively connected with external compressed gas and mold, it inputs three-way switch valve and passes through water pipe and four-way Connecting tube is connected with mold.The utility model control is simple, and integration degree is high, and low energy consumption.

Description

A kind of die temperance control water route is switched fast pipeline
Technical field
The utility model relates to die temperance control fields, are switched fast pipeline more particularly to a kind of die temperance control water route.
Background technique
The structure in present die temperance control water route is all more complicated, and use cost is relatively high, there is no the water route of self-loopa, Keep the energy consumption of heating and the cooling of entire mold all bigger.
Summary of the invention
The technical problem to be solved by the utility model is to provide a kind of die temperance control water routes to be switched fast pipeline, Suo Youshui Road switching and clear mould are controlled by valve station and are completed, achievable to reach certain temperature to the fast-refrigerating of mold, heating and ambient temperature It can be used cooling tower so that fluid is directly discharged to cooling tower when replacing cold fluid refrigeration and the clear mould of mold when spending, stream be not used Body enters self-loopa mode, reduces energy consumption.
It is quickly cut the technical scheme adopted by the utility model to solve the technical problem is as follows: providing a kind of die temperance control water route Pipeline, including cooling tower, cold fluid and hot fluid are changed, the side of the cooling tower, cold fluid and hot fluid is all connected with There is outlet pipe to be connected with one end of water inlet pipe, is respectively mounted on the cooling tower, cold fluid and the corresponding outlet pipe of hot fluid Dynamic output device and one end be separately installed with hot fluid output three-way switch valve, cold fluid output three-way switch valve and cold But water tower exports three-way switch valve, and one end of the cooling tower, cold fluid and the corresponding water inlet pipe of hot fluid is installed respectively There are hot fluid input three-way switch valve, cold fluid input three-way switch valve and cooling tower input three-way switch valve, described is cold But between water tower, cold fluid and hot fluid and respective outlet pipe and water inlet pipe and connection outlet pipe and the short piece of water inlet pipe Form self circular loop, hot fluid output three-way switch valve, cold fluid output three-way switch valve and the cooling tower output Three-way switch valve is connected by water pipe and four-way connecting tube with clear mould three-way switch valve, and the clear mould three-way switch valve is also distinguished Connect external compressed gas and mold, hot fluid input three-way switch valve, cold fluid input three-way switch valve and the cooling Water tower input three-way switch valve is connected by water pipe and four-way connecting tube with mold.
As a kind of supplement to technical solution described in the utility model, the hot fluid output three-way switch valve, Cold fluid exports three-way switch valve, cooling tower output three-way switch valve, hot fluid input three-way switch valve, cold fluid input three Direction changeover valve, cooling tower input three-way switch valve and clear mould three-way switch valve are three-way ball valve.
Further, hot fluid output three-way switch valve, cold fluid output three-way switch valve, cooling tower output Three-way switch valve, hot fluid input three-way switch valve, cold fluid inputs three-way switch valve, cooling tower inputs three-way switch valve, Clear mould three-way switch valve and four-way connecting tube are integrally disposed in valve station.
A kind of die temperance control water route is switched fast the control method of pipeline, specific as follows:
Mold heating:
Hot fluid output three-way switch valve opening state between hot fluid and mold is that entrance is connected to down outlet, upper outlet It is obstructed;It is that upper outlet is connected to entrance that hot fluid, which inputs three-way switch valve opening state, and lower outlet is obstructed;Between cold fluid and mold Cold fluid output three-way switch valve opening state be entrance be connected to upper outlet, it is lower outlet it is obstructed, cold fluid input threeway switching The valve opening state is lower outlet entrance, and upper outlet is obstructed;Cooling tower output threeway between cooling tower and mold is cut Changing the valve opening state is that entrance is connected to upper outlet, and lower outlet is obstructed;Cooling tower input three-way switch valve opening state be it is lower go out Mouth connection entrance, upper outlet are obstructed;Clear mould three-way switch valve opening state is lower outlet entrance, and upper outlet is obstructed, hot-fluid Body is delivered to mold by power output device, realizes the heating to mold, respectively inside recycles for cold fluid and cooling tower;
Mold is cooling:
(I) water in cooling tower is passed through mold, specifically, the cooling tower output three between cooling tower and mold Direction changeover valve opening state is the lower outlet of entrance connection, and upper outlet is obstructed, and cooling tower input three-way switch valve opening state is Upper outlet is connected to entrance, and lower outlet is obstructed;Between hot fluid and mold hot fluid output three-way switch valve opening state be into Mouth connection upper outlet, lower outlet are obstructed;It is lower outlet entrance that hot fluid, which inputs three-way switch valve opening state, and upper outlet is not It is logical;Cold fluid output three-way switch valve opening state between cold fluid and mold is that entrance is connected to upper outlet, and lower outlet is obstructed; It is lower outlet entrance that cold fluid, which inputs three-way switch valve opening state, and upper outlet is obstructed;Clear mould three-way switch valve open shape State is lower outlet entrance, and upper outlet is obstructed, and cooling tower is delivered to mold by corresponding power output device, is realized to mould The refrigeration of tool, hot fluid and cold fluid are respectively internal to be recycled;
(II) cold fluid is flowed into mold, and the cold fluid between cold fluid and mold exports three-way switch valve opening state It is connected to lower outlet for entrance, upper outlet is obstructed;It is that upper outlet is connected to entrance that cold fluid, which inputs three-way switch valve opening state, it is lower go out Mouth is obstructed;Hot fluid output three-way switch valve opening state between hot fluid and mold is that entrance is connected to upper outlet, lower outlet Obstructed, it is lower outlet entrance that hot fluid, which inputs three-way switch valve opening state, and upper outlet is obstructed, cooling tower and mold it Between cooling tower output three-way switch valve opening state be entrance be connected to upper outlet, it is lower outlet it is obstructed, cooling tower input three Direction changeover valve opening state is lower outlet entrance, and upper outlet is obstructed, and clear mould three-way switch valve opening state is lower outlet company It is passed through mouth, upper outlet is obstructed, and cold fluid is delivered to mold by corresponding power output device, realizes the refrigeration to mold, hot-fluid Respectively inside recycles for body and cooling tower;
The clear mould of mold:
When the clear mould of the mold, the hot fluid output three-way switch valve opening state between hot fluid and mold is that entrance connects Logical upper outlet, lower outlet is obstructed, and it is lower outlet entrance that hot fluid, which inputs three-way switch valve opening state, and upper outlet is obstructed, Three-way ball valve opening state between cold fluid and mold is that entrance leads to upper outlet, and lower outlet is obstructed, and cold fluid input threeway is cut Changing the valve opening state is lower outlet entrance, and upper outlet is obstructed, and the cooling tower between cooling tower and mold exports threeway Switching the valve opening state is that entrance is connected to upper outlet, and lower outlet is obstructed, under cooling tower input three-way switch valve opening state is Outlet is passed through mouth, and upper outlet is obstructed, and clear mould three-way switch valve opening state is that upper outlet is passed through mouth, and lower outlet is obstructed, and compression is empty Gas enters mold by clear mould three-way switch valve, and the fluid in mold flows into cooling tower, realizes the clear mould of mold, hot fluid, cold flow Respectively inside recycles for body and cooling tower.
The utility model has the advantages that be switched fast pipeline the utility model relates to a kind of die temperance control water route, all water routes switchings and clear Mould is controlled by valve station and is completed, achievable to can be used when reaching certain temperature to the fast-refrigerating of mold, heating and ambient temperature Cooling tower replaces making fluid be directly discharged to cooling tower when cold fluid refrigeration and the clear mould of mold, and fluid is not used and enters from following Ring mode reduces energy consumption;It can be directly realized by mold hot fluid heats, mold cooling water cooling, mold without union again The multi-functionals such as cooling, the clear mould of mold air blowing of cold fluid.
Detailed description of the invention
Fig. 1 is the system composite structural diagram of the utility model.
Diagram: 1, hot fluid;2, cold fluid;3, cooling tower;4, heating device;5, power output device;6, water inlet pipe; 7, outlet pipe is connected;8, hot fluid exports three-way switch valve;9, hot fluid inputs three-way switch valve;10, cold fluid exports threeway Switching valve;11, cold fluid inputs three-way switch valve;12, cooling tower exports three-way switch valve;13, cooling tower inputs threeway Switching valve;14, clear mould three-way switch valve;15, four-way connecting tube;A, entrance;B, lower outlet;C, upper outlet.
Specific embodiment
The present invention will be further illustrated below in conjunction with specific embodiments.It should be understood that these embodiments are merely to illustrate this Utility model rather than limitation the scope of the utility model.In addition, it should also be understood that, in the content for having read the utility model instruction Later, those skilled in the art can make various changes or modifications the utility model, and such equivalent forms equally fall within this Shen It please the appended claims limited range.
As shown in Figure 1, the embodiments of the present invention, which is related to a kind of die temperance control water route, is switched fast pipeline, including cold But the side of water tower 3, cold fluid 2 and hot fluid 1, the cooling tower 3, cold fluid 2 and hot fluid 1 is respectively connected with outlet pipe 7 are connected with one end of water inlet pipe 6, are mounted on the cooling tower 3, cold fluid 2 and the corresponding outlet pipe 7 of hot fluid 1 Power output device 5 and one end be separately installed with hot fluid output three-way switch valve 8, cold fluid output 10 and of three-way switch valve Cooling tower exports three-way switch valve 12, one end of the cooling tower 3, cold fluid 2 and the corresponding water inlet pipe 6 of hot fluid 1 It is separately installed with hot fluid input three-way switch valve 9, cold fluid input three-way switch valve 11 and cooling tower input threeway switching Valve 13, the cooling tower 3, cold fluid 2 and hot fluid 1 and respective outlet pipe 7 and water inlet pipe 6 and connect outlet pipe 7 Self circular loop, the hot fluid output three-way switch valve 8, cold fluid output are formed between the short piece 16 of water inlet pipe 6 Three-way switch valve 10 and cooling tower output three-way switch valve 12 pass through water pipe and four-way connecting tube 15 and clear mould three-way switch valve 14 are connected, and the clear mould three-way switch valve 14 is also respectively connected with external compressed gas and mold, the hot fluid input three Direction changeover valve 9, cold fluid input three-way switch valve 11 and cooling tower input three-way switch valve 13 are connected by water pipe with four-way Pipe 15 is connected with mold.
As a kind of supplement to technical solution described in the utility model, the hot fluid output three-way switch valve 8, Cold fluid exports three-way switch valve 10, cooling tower output three-way switch valve 12, hot fluid and inputs three-way switch valve 9, cold fluid Inputting three-way switch valve 11, cooling tower input three-way switch valve 13 and clear mould three-way switch valve 14 is three-way ball valve.
Further, hot fluid output three-way switch valve 8, cold fluid export three-way switch valve 10, cooling tower Export three-way switch valve 12, hot fluid input three-way switch valve 9, cold fluid input three-way switch valve 11, cooling tower input three Direction changeover valve 13, clear mould three-way switch valve 14 and four-way connecting tube 15 are integrally disposed in valve station.
Process for using mainly first hot fluid progressive die tool heating, when mold need to freeze, first switch cooling tower water into Die-cooling, rear cold fluid progressive die tool reach refrigeration and require, and reduce the temperature difference between cold and hot exchange, can effectively reduce can consume It loses, by the clear mould of compressed air when mold changing.
Steps are as follows for specific method:
Mold heating:
Hot fluid output 8 opening state of three-way switch valve between hot fluid and mold is that entrance a is connected to down outlet b, on It is obstructed to export c;It is that upper outlet c is connected to entrance a that hot fluid, which inputs 9 opening state of three-way switch valve, and lower outlet b is obstructed;Cold fluid Cold fluid output 10 opening state of three-way switch valve between mold is that entrance a is connected to upper outlet c, and lower outlet b is obstructed, cold flow It is that lower outlet b is connected to entrance a that body, which inputs 11 opening state of three-way switch valve, and upper outlet c is obstructed;Between cooling tower and mold It is that entrance a is connected to upper outlet c that cooling tower, which exports 12 opening state of three-way switch valve, and lower outlet b is obstructed;Cooling tower input three 13 opening state of direction changeover valve is that lower outlet b is connected to entrance a, and upper outlet c is obstructed;Under clear 14 opening state of mould three-way switch valve is It exporting b and is connected to entrance a, upper outlet c is obstructed, and hot fluid is delivered to mold by power output device 5, realize the heating to mold, Respectively inside recycles for cold fluid and cooling tower;
Mold is cooling:
Water in I cooling tower is passed through mold, and specifically, the cooling tower between cooling tower and mold exports threeway 12 opening state of switching valve, which is that entrance a connection is lower, exports b, and upper outlet c is obstructed, and cooling tower inputs 13 open shape of three-way switch valve State is that upper outlet c is connected to entrance a, and lower outlet b is obstructed;Hot fluid output three-way switch valve 8 between hot fluid and mold is opened State is that entrance a is connected to upper outlet c, and lower outlet b is obstructed;Hot fluid inputs 9 opening state of three-way switch valve as lower outlet b connection Entrance a, upper outlet c are obstructed;Cold fluid output 10 opening state of three-way switch valve between cold fluid and mold is that entrance a is connected to Upper outlet c, lower outlet b are obstructed;It is that lower outlet b is connected to entrance a, upper outlet c that cold fluid, which inputs 11 opening state of three-way switch valve, It is obstructed;Clear 14 opening state of mould three-way switch valve is that lower outlet b is connected to entrance a, and upper outlet c is obstructed, and cooling tower is by corresponding Power output device 5 is delivered to mold, realizes the refrigeration to mold, respectively inside recycles for hot fluid and cold fluid;
II cold fluid is flowed into mold, and the cold fluid between cold fluid and mold exports 10 opening state of three-way switch valve It is obstructed that lower outlet b, upper outlet c are connected to for entrance a;Cold fluid input 11 opening state of three-way switch valve be upper outlet c be connected into Mouth a, lower outlet b is obstructed;Hot fluid output 8 opening state of three-way switch valve between hot fluid and mold is that entrance a is connected to C is exported, lower outlet b is obstructed, and it is that lower outlet b is connected to entrance a that hot fluid, which inputs 9 opening state of three-way switch valve, and upper outlet c is not Logical, cooling tower output 12 opening state of three-way switch valve between cooling tower and mold is that entrance a is connected to upper outlet c, under It is obstructed to export b, it is that lower outlet b is connected to entrance a that cooling tower, which inputs 13 opening state of three-way switch valve, and upper outlet c is obstructed, clear mould 14 opening state of three-way switch valve is that lower outlet b is connected to entrance a, and upper outlet c is obstructed, and cold fluid is by corresponding power output device 5 are delivered to mold, realize the refrigeration to mold, respectively inside recycles for hot fluid and cooling tower;
The clear mould of mold:
When the clear mould of the mold, hot fluid output 8 opening state of three-way switch valve between hot fluid and mold is entrance a It is connected to upper outlet c, lower outlet b is obstructed, and it is that lower outlet b is connected to entrance a that hot fluid, which inputs 9 opening state of three-way switch valve, above goes out Mouth c is obstructed, and 10 opening state of three-way ball valve between cold fluid and mold is that entrance a leads to upper outlet c, and lower outlet b is obstructed, cold flow It is that lower outlet b is connected to entrance a that body, which inputs 11 opening state of three-way switch valve, and upper outlet c is obstructed, between cooling tower and mold It is that entrance a is connected to upper outlet c that cooling tower, which exports 12 opening state of three-way switch valve, and lower outlet b is obstructed, cooling tower input three 13 opening state of direction changeover valve be lower outlet b be passed through a mouthful a, upper outlet c is obstructed, clear 14 opening state of mould three-way switch valve be it is upper out Mouth c is passed through a mouthful a, and lower outlet b is obstructed, and compressed air enters mold by clear mould three-way switch valve 14, and the fluid in mold flows into cold But water tower realizes the clear mould of mold, and hot fluid, cold fluid and cooling tower are respectively internal to be recycled.
All water routes of present patent application switch and clear mould is controlled by valve station and completed, the achievable quick system to mold When reaching certain temperature cooling tower can be used to make fluid when replacing cold fluid refrigeration and the clear mould of mold for cold, heating and ambient temperature It is directly discharged to cooling tower, unused fluid enters self-loopa mode, reduces energy consumption.

Claims (3)

1. a kind of die temperance control water route is switched fast pipeline, including cooling tower (3), cold fluid (2) and hot fluid (1), special Sign is that the side of the cooling tower (3), cold fluid (2) and hot fluid (1) is respectively connected with outlet pipe (7) and water inlet pipe (6) one end is connected, and is mounted on the cooling tower (3), cold fluid (2) and the corresponding outlet pipe (7) of hot fluid (1) Power output device (5) and one end be separately installed with hot fluid output three-way switch valve (8), cold fluid output three-way switch valve (10) and cooling tower exports three-way switch valve (12), and the cooling tower (3), cold fluid (2) and hot fluid (1) are corresponding One end of water inlet pipe (6) be separately installed with hot fluid input three-way switch valve (9), cold fluid input it is three-way switch valve (11) and cold But water tower input three-way switch valve (13), the cooling tower (3), cold fluid (2) and hot fluid (1) and respective outlet pipe (7) self circular loop is formed between water inlet pipe (6) and connection outlet pipe (7) and the short piece (16) of water inlet pipe (6), it is described Hot fluid output three-way switch valve (8), cold fluid output three-way switch valve (10) and cooling tower output three-way switch valve (12) it is connected by water pipe and four-way connecting tube (15) with clear mould three-way switch valve (14), the clear mould three-way switch valve (14) It is also respectively connected with external compressed gas and mold, hot fluid input three-way switch valve (9), cold fluid input threeway switching Valve (11) and cooling tower input three-way switch valve (13) are connected by water pipe and four-way connecting tube (15) with mold.
2. die temperance control water route according to claim 1 is switched fast pipeline, it is characterised in that: the hot fluid output Three-way switch valve (8), cold fluid output three-way switch valve (10), cooling tower output three-way switch valve (12), hot fluid input Three-way switch valve (9), cold fluid input three-way switch valve (11), cooling tower input three-way switch valve (13) He Qingmo threeway are cut Changing valve (14) is three-way ball valve.
3. die temperance control water route according to claim 2 is switched fast pipeline, it is characterised in that: the hot fluid output Three-way switch valve (8), cold fluid output three-way switch valve (10), cooling tower output three-way switch valve (12), hot fluid input Three-way switch valve (9), cold fluid input three-way switch valve (11), cooling tower input three-way switch valve (13), clear mould threeway are cut It changes valve (14) and four-way connecting tube (15) is integrally disposed in valve station.
CN201821747452.6U 2018-10-26 2018-10-26 A kind of die temperance control water route is switched fast pipeline Expired - Fee Related CN209078982U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821747452.6U CN209078982U (en) 2018-10-26 2018-10-26 A kind of die temperance control water route is switched fast pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821747452.6U CN209078982U (en) 2018-10-26 2018-10-26 A kind of die temperance control water route is switched fast pipeline

Publications (1)

Publication Number Publication Date
CN209078982U true CN209078982U (en) 2019-07-09

Family

ID=67120880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821747452.6U Expired - Fee Related CN209078982U (en) 2018-10-26 2018-10-26 A kind of die temperance control water route is switched fast pipeline

Country Status (1)

Country Link
CN (1) CN209078982U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109109233A (en) * 2018-10-26 2019-01-01 宁波华热机械制造有限公司 A kind of die temperance control water route is switched fast pipeline and its control method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109109233A (en) * 2018-10-26 2019-01-01 宁波华热机械制造有限公司 A kind of die temperance control water route is switched fast pipeline and its control method
CN109109233B (en) * 2018-10-26 2023-09-22 宁波华热机械制造有限公司 Quick switching pipeline for die temperature control waterway and control method thereof

Similar Documents

Publication Publication Date Title
CN203286821U (en) Two-stage enthalpy-increasing air conditioning system
CN204115293U (en) Air conditioning system
CN109109233A (en) A kind of die temperance control water route is switched fast pipeline and its control method
CN105180304B (en) Air-conditioner outdoor unit, multifuctional air conditioning system and its method of work
CN209078982U (en) A kind of die temperance control water route is switched fast pipeline
CN106016826B (en) With the cooling high/low temperature hot oil control system of second level
CN202382480U (en) Air-injection enthalpy-increasing type heat pump
CN202532776U (en) Compressed air cooling device
CN203443182U (en) Air conditioner
CN203757907U (en) Cold air supply system
CN201876193U (en) Cooling water control system of heat exchanger
CN202133181U (en) Energy-saving cold-hot integral thermostat machine
CN206890904U (en) Air conditioning system
CN107883606A (en) A kind of efficient heat source tower heat pump
CN216661743U (en) Air inlet device for changing material pneumatic conveying state
CN103743102B (en) Double-condenser air energy cold-hot water separating water heater
CN208606458U (en) Water refrigeration system
CN207671904U (en) Individual section machine multistage pressure output device
CN207716677U (en) A kind of interior conversion hysteria water source heat pump units
CN208146891U (en) A kind of water arranging device on die casting
CN206379443U (en) For the battery heating device of electric car and the electric car with it
CN204026992U (en) Air source heat pump hot water device
CN220771434U (en) Fluid flow block and semiconductor refrigeration and heating circulation box structure thereof
CN104819608A (en) Refrigeration system and electromagnetic three-way valve thereof
CN205641678U (en) Heat pump set and stock solution unit thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190709