CN209071995U - It is a kind of to cross line door frame across exit passageway suitable for workshop erection temporary cable - Google Patents
It is a kind of to cross line door frame across exit passageway suitable for workshop erection temporary cable Download PDFInfo
- Publication number
- CN209071995U CN209071995U CN201822182134.6U CN201822182134U CN209071995U CN 209071995 U CN209071995 U CN 209071995U CN 201822182134 U CN201822182134 U CN 201822182134U CN 209071995 U CN209071995 U CN 209071995U
- Authority
- CN
- China
- Prior art keywords
- arch
- door frame
- baffle
- exit passageway
- workshop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Insulating Bodies (AREA)
Abstract
The utility model provides a kind of line door frame excessively for setting up temporary cable across exit passageway suitable for workshop, including two bottom plates disposed in parallel, the top surface both ends of each bottom plate are equipped with column, column bottom is fixedly connected with bottom plate, column on two bottom plates corresponds to each other, the top of column is equipped with arch, and the axis of arch is arranged along the length direction of bottom plate, and the both ends of arch are corresponding with two bottom plates and the bottom sidewall of arch is fixedly connected with column top sidewall;Arch includes the arch sheet in semicircle shape and the baffle for being fixed at arch sheet two sides, baffle is arranged along arch sheet sidewall edge, baffle is adapted with arch plate shape, and the top surface of baffle extends upward, forms crossed beam trunking between the top surface of arch sheet and the medial surface of two baffles;Its structure is simple, and the erecting cable that will can temporarily pull does not influence vehicle and the normal pass of staff, while also can guarantee the safety of temporary electricity route, removes a hidden danger.
Description
Technical field
The utility model relates to workshops to cross line safeguard construction field, more particularly to a kind of set up suitable for workshop is faced
When cable across exit passageway cross line door frame.
Background technique
In workshop, the demand that interim drawing cable crosses workshop is inevitably had, the cable that these are temporarily pulled is big
Mostly arbitrarily be placed on bottom surface, be not easy to vehicle and the walking of staff, in addition will appear and artificially trample, vehicle rolls electricity
The situation of cable be easy to cause the damage of cable, Danger Electric shock risk even occurs, therefore being badly in need of one kind can be to interim drawing cable progress
Specification places and does not influence the structure of vehicle and staff's normal walking.
Utility model content
In order to overcome the drawbacks of the prior art, the technical problem to be solved by the utility model is to propose that one kind is suitable for
Workshop sets up temporary cable and crosses line door frame across exit passageway, and structure is simple, the erecting cable that will can temporarily pull,
Vehicle and the normal pass of staff are not influenced, while can guarantee the safety of temporary electricity route yet, are removed a hidden danger.
For this purpose, the following technical solution is employed for the utility model:
The utility model provides a kind of line door frame excessively for setting up temporary cable across exit passageway suitable for workshop, including
Two bottom plates disposed in parallel, the top surface both ends of each bottom plate are equipped with column, the column bottom and the fixed company of the bottom plate
It connects, the column on two bottom plates corresponds to each other, and the top of the column is equipped with arch, the axis edge of the arch
The length direction of the bottom plate is arranged, the bottom sidewall of the both ends of the arch arch corresponding and described with two bottom plates
It is fixedly connected with the column top sidewall;The arch includes the arch sheet in semicircle shape and is fixed at the arch sheet
The baffle of two sides, the baffle are arranged along the arch sheet sidewall edge, and the baffle is adapted with the arch plate shape, and
The top surface of the baffle extends upward, forms crossed beam trunking between the top surface of the arch sheet and the medial surface of two baffles.
In the preferable technical solution of the utility model, the arch sheet is in tabular along axial section.
In the preferable technical solution of the utility model, the arch sheet arc recessed in middle part along axial section
Shape.
In the preferable technical solution of the utility model, be equipped with groove in the middle part of the top surface of the arch sheet, the groove with
The arch plate shape is adapted, the arc-shaped shape in the bottom surface of the groove.
In the preferable technical solution of the utility model, the medial surface of the top surface of the arch sheet and two baffles is viscous
It connects and is fixed with electro-insulating rubber pad, the electro-insulating rubber pad is adapted with the shape of the crossed beam trunking.
In the preferable technical solution of the utility model, the bottom surface both ends of the bottom plate are fixedly installed with band self-locking function
Universal wheel.
In the preferable technical solution of the utility model, the top surface of each baffle is fixed with two hanging rings, is located at
Center line symmetrical setting of two hanging rings about the arch on the same baffle, on two baffles described in
Hanging ring corresponds to each other.
In the preferable technical solution of the utility model, the bottom surface of the arch sheet is fixed with muti-piece along the arch
The stiffening plate of axis direction setting, axis circumferentially array distribution of the stiffening plate described in muti-piece around the arch.
In the preferable technical solution of the utility model, the lateral surface of the baffle is equipped with the warning strip for anticollision
Line.
In the preferable technical solution of the utility model, the distance between two described bottom plates are greater than 3m, the arch bottom surface
Height of the middle part apart from bottom surface is greater than 3m.
The utility model has the following beneficial effects:
It is provided by the utility model it is a kind of suitable for workshop set up temporary cable across exit passageway cross line door frame, knot
Structure is simple, and the erecting cable that the design of arch will can temporarily pull passes through cable from crossed beam trunking, is vehicle and work people
The normal pass of member provides enough spaces, while also can guarantee the safety of temporary electricity route, removes a hidden danger;And baffle
Design can effectively prevent cable from sliding from the two sides of arch, can preferably be stopped cable, easy to use.
Detailed description of the invention
Fig. 1 is that one kind disclosed in specific embodiment of the utility model is suitable for workshop erection temporary cable across safety
The front view for crossing line door frame in channel;
Fig. 2 is that one kind disclosed in specific embodiment of the utility model is suitable for workshop erection temporary cable across safety
The side view for crossing line door frame in channel;
Fig. 3 is arch schematic cross-section disclosed in specific embodiment of the utility model.
In figure:
100, bottom plate;200, column;300, arch;310, arch sheet;320, baffle;321, striped is warned;330, line is crossed
Slot;340, rubber-covered pad;350, hanging ring;360, stiffening plate;400, universal wheel.
Specific embodiment
Further illustrate the technical solution of the utility model below with reference to the accompanying drawings and specific embodiments.
As shown in Figure 1 and Figure 2, it is disclosed in specific embodiment of the utility model a kind of suitable for the interim electricity of workshop erection
Cable crosses line door frame across exit passageway, including two bottom plates 100 disposed in parallel, the top surface both ends of each bottom plate 100 are all provided with
There is column 200,200 bottom of column is fixedly connected with the bottom plate 100, the column on two bottom plates 100
200 correspond to each other, and the top of the column 200 is equipped with arch 300, the length of the axis of the arch 300 along the bottom plate 100
Direction setting, the bottom sidewall of the both ends of the arch 300 arch 300 corresponding and described with two bottom plates 100 with it is described
200 top sidewall of column is fixedly connected;The arch 300 includes the arch sheet 310 in semicircle shape and is fixed at the arch
The baffle 320 of 310 two sides of plate, the baffle 320 are arranged along 310 sidewall edge of arch sheet, the baffle 320 and the arch
310 shape of shape plate is adapted, and the top surface of the baffle 320 extends upward, the top surface of the arch sheet 310 and two baffles
Crossed beam trunking 330 is formed between 320 medial surface.
It is above-mentioned it is a kind of set up temporary cable suitable for workshop and cross line door frame across exit passageway, structure is simple, institute
State the erecting cable that the design of arch 300 will can temporarily pull, pass through cable from the crossed beam trunking 330, be vehicle and
The normal pass of staff provides enough spaces, while also can guarantee the safety of temporary electricity route, removes a hidden danger;And
The design of the baffle 320 can effectively prevent cable from sliding from the two sides of arch, can preferably be stopped cable, use
It is convenient.
Further, as shown in a figure of Fig. 3, the arch sheet 310 is in tabular along axial section;The arch sheet
310 is simple using this kind of structure fabrication, can reduce cost of manufacture in the case where guaranteeing normal use.
Further, the arch sheet 310 arc shape recessed in middle part along axial section;The arch sheet 310 is adopted
It may make the space of lines excessively of the crossed beam trunking 330 larger with this kind of structure, facilitate and place more cables.
Further, groove, the groove and 310 shape of arch sheet are equipped in the middle part of the top surface of the arch sheet 310
It is adapted, the arc-shaped shape in the bottom surface of the groove;The arch sheet 310 is seen using this kind of structure can distinguish placement cable, such as straight
The lesser cable of diameter can be passed through from the groove part, and what is be relatively large in diameter then passes through from the groove two sides, facilitated differentiation, prevented
Only coiling.
Further, the medial surface of the top surface of the arch sheet 310 and two baffles 320 is adhesively fixed with insulation rubber
Rubber mat 340, the electro-insulating rubber pad 340 are adapted with the shape of the crossed beam trunking 330;The design of the electro-insulating rubber pad can be prevented
Only the arch 300 is directly contacted with cable, avoids cable failure and electric leakage accident occurs, and improves safety in utilization.
Further, the bottom surface both ends of the bottom plate 100 are fixedly installed with the universal wheel 400 with self-locking function;It is described
The design of universal wheel 400 can facilitate the movement of the utility model entirety, need temporarily to be led to cross line door frame and to be moved to
The region of cable is drawn, flexibly and easily;And the universal wheel 400 has self-locking function, needs after it determines position to described universal
Wheel 400 is locked, and prevents from moving in use process, it should be noted that the universal wheel with self-locking function can be in market
It is upper directly to purchase.
Further, the top surface of each baffle 320 is fixed with two hanging rings 350, is located at the same baffle 320
On center line symmetrical setting of two hanging rings 350 about the arch 300, on two baffles 320 described in hang
Ring 350 corresponds to each other;The design of the hanging ring 350 can facilitate the carrying to the utility model.
Further, the bottom surface of the arch sheet 310 is fixed with what muti-piece was arranged along the axis direction of the arch 300
Stiffening plate 360, axis circumferentially array distribution of the stiffening plate 360 described in muti-piece around the arch 300;The stiffening plate 360
Design can enhance the load-bearing capacity of the arch sheet 310, reinforce integrally-built structural strength.
Further, the lateral surface of the baffle 320 is equipped with the warning striped 321 for anticollision;The warning strip
The design of line 321 can warn vehicle and personnel note that the further safety of support personnel, vehicle and route.
Further, the distance between two described bottom plates 100 are greater than 3m, and 300 bottom surface of the arch middle part is apart from bottom surface
Height is greater than 3m.
The utility model is described with reference to the preferred embodiments, and those skilled in the art know, is not departing from this reality
In the case where with novel spirit and scope, various changes or equivalence replacement can be carried out to these features and embodiment.This reality
It is not limited to the particular embodiment disclosed with novel, other embodiments fallen into claims hereof all belong to
In the range of the utility model protection.
Claims (10)
1. a kind of cross line door frame across exit passageway suitable for workshop erection temporary cable, it is characterised in that:
Including two bottom plates (100) disposed in parallel, the top surface both ends of each bottom plate (100) are equipped with column (200), described vertical
Column (200) bottom is fixedly connected with the bottom plate (100), and the column (200) being located on two bottom plates (100) is mutually right
It answers, the top of the column (200) is equipped with arch (300), the length of the axis of the arch (300) along the bottom plate (100)
Direction setting, the bottom sidewall of the both ends of the arch (300) arch (300) corresponding and described with two bottom plate (100)
It is fixedly connected with the column (200) top sidewall;The arch (300) includes the arch sheet (310) in semicircle shape and fixes
Baffle (320) set on the arch sheet (310) two sides, the baffle (320) set along the arch sheet (310) sidewall edge
It sets, the baffle (320) is adapted with the arch sheet (310) shape, and the top surface of the baffle (320) extends upward, institute
State formation crossed beam trunking (330) between the top surface of arch sheet (310) and the medial surface of two baffles (320).
2. it is according to claim 1 it is a kind of suitable for workshop set up temporary cable across exit passageway cross line door frame,
It is characterized in that:
The arch sheet (310) is in tabular along axial section.
3. it is according to claim 1 it is a kind of suitable for workshop set up temporary cable across exit passageway cross line door frame,
It is characterized in that:
The arch sheet (310) arc shape recessed in middle part along axial section.
4. it is according to claim 1 it is a kind of suitable for workshop set up temporary cable across exit passageway cross line door frame,
It is characterized in that:
Groove is equipped in the middle part of the top surface of the arch sheet (310), the groove is adapted with the arch sheet (310) shape, institute
State the arc-shaped shape in bottom surface of groove.
5. it is according to claim 1 it is a kind of suitable for workshop set up temporary cable across exit passageway cross line door frame,
It is characterized in that:
The medial surface of the top surface of the arch sheet (310) and two baffles (320) is adhesively fixed with electro-insulating rubber pad
(340), the electro-insulating rubber pad (340) is adapted with the shape of the crossed beam trunking (330).
6. it is according to claim 1 it is a kind of suitable for workshop set up temporary cable across exit passageway cross line door frame,
It is characterized in that:
The bottom surface both ends of the bottom plate (100) are fixedly installed with the universal wheel (400) with self-locking function.
7. it is according to claim 1 it is a kind of suitable for workshop set up temporary cable across exit passageway cross line door frame,
It is characterized in that:
The top surface of each baffle (320) is fixed with two hanging rings (350), two be located on the same baffle (320)
Center line symmetrical setting of the hanging ring (350) about the arch (300), be located on two baffles (320) described hangs
Ring (350) corresponds to each other.
8. it is according to claim 1 it is a kind of suitable for workshop set up temporary cable across exit passageway cross line door frame,
It is characterized in that:
The bottom surface of the arch sheet (310) is fixed with the stiffening plate that muti-piece is arranged along the axis direction of the arch (300)
(360), axis circumferentially array distribution of the stiffening plate described in muti-piece (360) around the arch (300).
9. it is according to claim 1 it is a kind of suitable for workshop set up temporary cable across exit passageway cross line door frame,
It is characterized in that:
The lateral surface of the baffle (320) is equipped with the warning striped (321) for anticollision.
10. it is according to claim 1 it is a kind of suitable for workshop set up temporary cable across exit passageway cross line door frame,
It is characterized in that:
The distance between two described bottom plates (100) are greater than 3m, and height of arch (300) the bottom surface middle part apart from bottom surface is greater than
3m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822182134.6U CN209071995U (en) | 2018-12-24 | 2018-12-24 | It is a kind of to cross line door frame across exit passageway suitable for workshop erection temporary cable |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822182134.6U CN209071995U (en) | 2018-12-24 | 2018-12-24 | It is a kind of to cross line door frame across exit passageway suitable for workshop erection temporary cable |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209071995U true CN209071995U (en) | 2019-07-05 |
Family
ID=67102030
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822182134.6U Active CN209071995U (en) | 2018-12-24 | 2018-12-24 | It is a kind of to cross line door frame across exit passageway suitable for workshop erection temporary cable |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209071995U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11569643B2 (en) | 2020-07-10 | 2023-01-31 | Babylon Consolidated LLC | Adjustable cable support structure |
US12034286B2 (en) | 2022-12-22 | 2024-07-09 | Babylon Consolidated LLC | Adjustable cable support structure |
-
2018
- 2018-12-24 CN CN201822182134.6U patent/CN209071995U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11569643B2 (en) | 2020-07-10 | 2023-01-31 | Babylon Consolidated LLC | Adjustable cable support structure |
US12034286B2 (en) | 2022-12-22 | 2024-07-09 | Babylon Consolidated LLC | Adjustable cable support structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202611578U (en) | Iron tower ladder provided with detachable rest platform | |
CN209071995U (en) | It is a kind of to cross line door frame across exit passageway suitable for workshop erection temporary cable | |
CN204958147U (en) | Half chests formula test bench hoist device | |
CN207774604U (en) | Lift-on/Lift-off System and its hanging apparatus for ground-connecting-wall steel reinforcement cage | |
CN205061336U (en) | Purlin piece stands up frock | |
CN203329226U (en) | Movable safety belt fixing device | |
CN105417271B (en) | Iron tower of power transmission line stake actinobacillus device and its construction method | |
CN203699679U (en) | Lifting appliance for lifting wire coil | |
CN202754699U (en) | Overlong steel plate balance hoisting beam | |
CN204847572U (en) | Support frame that cable laying used | |
CN110735557B (en) | Large-scale tower body weightless dumping method | |
CN206447508U (en) | For both wired template provision for disengagement | |
CN207863437U (en) | Indirect cool tower direct tube section installation platform | |
CN206090309U (en) | A device that is used for outdoor portion of case roof beam case to be under construction | |
CN205953323U (en) | Novel overhead hoist that concrete duct handling was used | |
CN206801442U (en) | A kind of rotatable collapsible hard ladder | |
CN216355684U (en) | Simple power distribution pipe tower transfer operation working platform | |
CN115000907B (en) | Traveling cable protection structure based on crane | |
CN210606334U (en) | Wear-free removable force indicating plate for 220kV cable | |
CN205555889U (en) | Jack -up lifting device | |
CN210238283U (en) | Portable simple and easy basket of hanging | |
CN205087791U (en) | 24 passageway passenger car road hoist device for analogue test | |
CN217079814U (en) | Swift installation type safety work protector that falls | |
CN105390979B (en) | A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device | |
CN218603105U (en) | Wheel arch wire harness protection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |