CN105390979B CN201510780915.3A CN201510780915A CN105390979B CN 105390979 B CN105390979 B CN 105390979B CN 201510780915 A CN201510780915 A CN 201510780915A CN 105390979 B CN105390979 B CN 105390979B
Authority
CN
China
Prior art keywords
tube half
transmission line
lower tube
upper tube
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510780915.3A
Other languages
Chinese (zh)
Other versions
CN105390979A (en
Inventor
沈宜勇
魏勇
赵显伦
冯昌斌
王西海
王照玉
王猛
吴玮
许兆涛
王念明
张兵
许晨曦
张夏楠
张帅
吴平
王发军
崔节忠
刁目金
孙诗新
李贵毅
谢赟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shandong Yuncheng Power Supply Co
Heze Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Shandong Yuncheng Power Supply Co
Heze Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shandong Yuncheng Power Supply Co, Heze Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Shandong Yuncheng Power Supply Co
Priority to CN201510780915.3A priority Critical patent/CN105390979B/en
Publication of CN105390979A publication Critical patent/CN105390979A/en
Application granted granted Critical
Publication of CN105390979B publication Critical patent/CN105390979B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The invention discloses a kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device.Including upper tube half, lower tube half, upper tube half forms hollow pipe after being docked with lower tube half, and round tube inside diameter is suitable with high voltage transmission line outside diameter;The upper tube half end symmetric is equipped with disconnecting prevention structure, is arranged with the first fixing device on the outside of the disconnecting prevention structure at the section of upper tube half, circular hole is equipped among the first fixing device;The lower tube half is equipped with gravity balance structure, and positional symmetry corresponding with the first fixing device is equipped with the second fixing device at the section of lower tube half, is equipped with bolt among the second fixing device, bolt outside diameter is suitable with Circularhole diameter, and bolt is provided with supporting nut.The present invention effectively increases the safety coefficient of payingoff construction, and the present apparatus is reusable, after installing, without manually nurse, greatly reduces construction cost.

Description

A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device
Technical field
The invention belongs to ultra-high-tension power transmission line construction field, is concretely a kind of ultra-high-tension power transmission line scissors crossing unwrapping wire Construction antiwear device.
Background technology
During 10KV and the transmission line construction of the above, high-tension line scissors crossing phenomenon is inevitable.And applying During work unwrapping wire, because two bursts of conducting wire horizontal verticals are intersected, phase mutual friction can cause conducting wire to damage.At present, majority is adopted in work progress With raising one conducting wire, or install among two strands of conducting wires the method for interim protective device additional and prevent from rubbing.Led because raising one Line is relatively spent human and material resources, and installed additional among two strands of conducting wires interim protective device in the construction process easily occur high-altitude fall Fall, there are certain construction safety hidden danger, so, safety coefficient is relatively low, and once interim protective device drops, two cross-wires Between inevitably produce friction, conducting wire is caused to damage.
The content of the invention
Present invention aim to solve how to protect conducting wire not because of friction and caused by damage.The present invention proposes one kind The safety coefficient in work progress is greatly improved in immobilization, modular protective device, the present apparatus, strengthens and intersection is led The antifriction protection of line.
The purpose of the present invention is what is realized by following technical scheme:
A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device, including upper tube half, lower tube half, upper tube half with Hollow pipe is formed after lower tube half docking, round tube inside diameter is suitable with high voltage transmission line outside diameter;The upper tube half end symmetric is set There is disconnecting prevention structure, be arranged with the first fixing device on the outside of the disconnecting prevention structure at the section of upper tube half, among the first fixing device Equipped with circular hole;The lower tube half is equipped with gravity balance structure, the position corresponding with the first fixing device at the section of lower tube half The second fixing device is arranged with, bolt is equipped among the second fixing device, bolt outside diameter is suitable with Circularhole diameter, bolt installation There is supporting nut.
The purpose of the present invention can also be realized by following technical scheme:
A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device, the upper tube half and lower tube half are bilayer Structure, internal layer are ambroin, and outer layer is hard wear-resistant material.
A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device, the internal layer are polytetrafluoroethylene material, Outer layer is stainless steel material.
A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device, the upper tube half include at least upper and lower two Point, it is hinged between two parts;The lower tube half includes at least two parts, is hinged between two parts;Upper tube half and lower tube half Hollow pipe is formed after docking, round tube inside diameter can be adjusted according to high voltage transmission line outside diameter difference.
A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device, the disconnecting prevention structure are circle vertically upward Column, cylinder free end are symmetrical opposite curved hook type, are to be laterally hinged between disconnecting prevention structure and upper tube half.
A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device, the height of the disconnecting prevention structure are not less than The distance between 5cm, symmetrical disconnecting prevention structure is not less than 2cm.
A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device, the gravity balance structure is downward vertically Cylinder, be symmetrically mounted on the both ends of lower tube half.
A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device, the gravity balance structure are uniformly distributed in The bottom of lower tube half, the bottom of lower tube half is in part convex.
Present invention also offers a kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device, including upper tube half, Lower tube half, upper tube half form hollow pipe after being docked with lower tube half, round tube inside diameter is suitable with high voltage transmission line outside diameter;Pipe two End is symmetrically installed semi-circular baffle;The upper tube half and lower tube half are double-decker, and internal layer is ambroin, and both ends are symmetrically pacified Glaze sliding block, outer layer are hard wear-resistant material, install corresponding with sliding block glass guide-rail in outer layer relevant position, upper tube half and Lower tube half is docked to form hollow pipe after, can be slided between outer layer and internal layer by the way that sliding block, guide rail are opposite.
Further, a kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device, it is characterised in that in described Layer is polytetrafluoroethylene material, and outer layer is stainless steel material, and the height of baffle is not less than 5cm.
The application method of the present invention
The wire of high-tension line being below is wrapped up with lower tube half with the upper tube half of the present apparatus, is harmonious two-by-two, and use spiral shell Bolt compresses, and prevents conducting wire from sliding.By the new route conducting wire in top ride over above the present apparatus can unwrapping wire, can effectively prevent It is in contact and rubs between two conducting wire.
Beneficial effects of the present invention
1st, upper tube half and lower tube half of the invention can tightly protect the original conducting wire in lower section, prevent it from sliding, weight Heart balanced structure allows disconnecting prevention structure free end vertically upward, to prevent the new route conducting wire in top during payingoff construction Skid off and be in contact and rub with the new route conducting wire being below outside the present apparatus.
2nd, internal layer is ambroin, to be guaranteed at the former conducting wire normal operation of lower section during the construction line-putting;Outer layer is Hard wear-resistant material, during preventing the construction line-putting the new route conducting wire in top too early to present apparatus friction damage so that The present apparatus cannot repeatedly use.
3rd, internal layer is polytetrafluoroethylene material, and outer layer is stainless steel material, can preferably ensure the present apparatus in former conducting wire just Often construct in the case of operation, and the present apparatus can be repeatedly used preferably.
4th, the round tube inside diameter of the present apparatus can be adjusted according to high voltage transmission line outside diameter difference so that the present apparatus can fit when constructing With a variety of different high voltage transmission line outside diameters.
5th, the free end of disconnecting prevention structure is symmetrical opposite curved hook type, can preferably prevent from being in top during payingoff construction New route conducting wire skid off that the present apparatus is outer to be in contact and rub with the new route conducting wire being below.Disconnecting prevention structure with it is upper To be laterally hinged between semicanal, be conducive to payingoff construction and finish, disconnecting prevention structure is folded, be convenient for carrying.
6th, the height of disconnecting prevention structure is not less than the distance between 5cm, symmetrical disconnecting prevention structure and is not less than 2cm.Can be preferably Prevent that the new route conducting wire in top skids off the new route conducting wire generation with being below outside the present apparatus during payingoff construction Contact and friction.
7th, gravity balance structure is cylinder downward vertically, is symmetrically mounted on the both ends of lower tube half, gravity balance structure with To be laterally hinged between lower tube half, be conducive to payingoff construction and finish, gravity balance structure is folded, be convenient for carrying.
8th, the gravity balance structure is uniformly distributed in the bottom of lower tube half, and the bottom of lower tube half is in part convex.Have Finished beneficial to payingoff construction, be more convenient to carry.
9th, slide block guide rail is conducive to reduce friction, is more convenient construction.
10th, the present apparatus reaches maximum area with the wire of high-tension line being below and contacts and fix, and has immobilization, mould The characteristics of block.Install and use simplicity, the new route conducting wire in top will not skid off outside the present apparatus be below it is new Build line conductor to be in contact and rub, effectively increase the safety coefficient of payingoff construction.The present apparatus is reusable, installs Bi Hou, without manually nurse, can charging construction, greatly reduce construction cost.With higher generalization and applicability.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is attached drawing needed in technology description to be briefly described, it should be apparent that, drawings in the following description are this hairs Some bright embodiments, for those of ordinary skill in the art, without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the structure diagram of the present invention.
Fig. 2 is the enlarged drawing of local location A in Fig. 1.
Fig. 3 is the right view of Fig. 1.
Fig. 4 is the structure diagram of upper tube half described in Fig. 1.
Fig. 5 is the structure diagram of lower tube half described in Fig. 1.
Fig. 6 is the structure diagram of second embodiment.
Fig. 7 is the right view of Fig. 6.
Fig. 8 is the structure diagram of the third embodiment.
Fig. 9 is the right view of Fig. 8.
Figure 10 is the structure diagram of upper tube half described in Fig. 8.
Figure 11 is the structure diagram of lower tube half described in Fig. 8.
Figure 12 is the enlarged drawing of local location B in Figure 10.
Figure label:1 is upper tube half, and 11 be the first fixing device, and 12 be circular hole, and 2 be lower tube half, and 21 fix dress for second Put, 22 be bolt, and 23 be nut, and 3 be disconnecting prevention structure, and 4 be gravity balance structure, and 5 be outer layer, and 51 be guide rail, and 6 be internal layer, 61 It is baffle for sliding block, 7.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, the technical solution in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art All other embodiments obtained without creative efforts, belong to the scope of protection of the invention.
Embodiment 1
As Fig. 1~5 show the present invention a kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device, including Upper tube half 1, lower tube half 2, upper tube half 1 form hollow pipe, round tube inside diameter and high voltage transmission line outside diameter after being docked with lower tube half 2 Quite;Upper tube half can tightly protect the original conducting wire in lower section with lower tube half, and 1 end symmetric of upper tube half is equipped with disconnecting prevention structure 3, disconnecting prevention structure 3 can prevent that the new route conducting wire in top is skidded off outside the present apparatus and is below and is newly-built during payingoff construction Line conductor is in contact and rubs.The first fixing device 11 is arranged with the section of 3 outside upper tube half 1 of disconnecting prevention structure, Circular hole 12 is equipped among first fixing device 11;The lower tube half 2 is equipped with gravity balance structure 4 so that disconnecting prevention structure vertically to On, skid off to prevent the new route conducting wire in top during payingoff construction and sent out outside the present apparatus with the new route conducting wire being below Raw contact and friction.At the section of lower tube half 2 the second fixing device is equipped with 11 corresponding positional symmetry of the first fixing device 21, the centre of the second fixing device 21 is equipped with bolt 22, and 22 outside diameter of bolt is suitable with 12 diameter of circular hole, and bolt 22 is provided with supporting Nut 23;Upper tube half 1 forms hollow pipe after being docked with lower tube half 2, hollow circular-tube is connected by fixing device and bolt, nut It is connected together, the wire of high-tension line being below is wrapped up, prevents conducting wire from sliding.
Application method
The wire of high-tension line being below is wrapped up with lower tube half with the upper tube half of the present apparatus, is harmonious two-by-two, and use spiral shell Bolt compresses, and prevents conducting wire from sliding.By the new route conducting wire in top ride over above the present apparatus can unwrapping wire, can effectively prevent It is in contact and rubs between two conducting wire.
Upper tube half 1 and lower tube half 2 are double-decker described in further the present embodiment, and internal layer 6 is ambroin, so as to The former conducting wire normal operation of lower section can be guaranteed at during the construction line-putting;Outer layer 5 is hard wear-resistant material, during preventing the construction line-putting New route conducting wire in top is too early to present apparatus friction damage, so that the present apparatus cannot repeatedly use.
Internal layer 6 described in further the present embodiment is polytetrafluoroethylene material, and outer layer 5 is stainless steel material.Can be preferably Ensure that the present apparatus is constructed in the case of former conducting wire normal operation, and the present apparatus can be repeatedly used preferably.
Upper tube half 1 described in further the present embodiment includes at least upper and lower two parts, is hinged between two parts;Under described Semicanal 2 includes at least two parts, is hinged between two parts;The present embodiment upper tube half 1 includes upper and lower two with lower tube half 2 Point, upper tube half 1 and lower tube half 2 can also be respectively divided into three parts in actual use, four parts, multi-section grade.Upper tube half 1 is with Semicanal 2 forms hollow pipe after docking, round tube inside diameter can be adjusted according to high voltage transmission line outside diameter difference.So that the present apparatus is applied Man-hour can be applicable in a variety of different high voltage transmission line outside diameters.
Disconnecting prevention structure 3 described in further the present embodiment is cylinder vertically upward, and cylinder free end is symmetrical opposite curved Bent hook type, can preferably prevent the new route conducting wire in top during payingoff construction from skidding off outside the present apparatus with being below New route conducting wire is in contact and rubs.To be laterally hinged between disconnecting prevention structure 3 and upper tube half 1, it is complete to be conducive to payingoff construction Finish, disconnecting prevention structure is folded, is convenient for carrying.
The height of disconnecting prevention structure 3 described in further the present embodiment is not less than 5cm, between symmetrical disconnecting prevention structure 3 away from From not less than 2cm.It can preferably prevent that the new route conducting wire in top is skidded off outside the present apparatus with being in down during payingoff construction The new route conducting wire of side is in contact and rubs.
Gravity balance structure 4 described in further the present embodiment is cylinder vertically downward, is symmetrically mounted on lower tube half Both ends, are to be laterally hinged between gravity balance structure and lower tube half.It is laterally hinged with and is conducive to payingoff construction and finishes, by gravity balance Structure folds, and is convenient for carrying.
The present invention effectively increases the safety coefficient of powered payingoff construction, and the present apparatus is reusable, easy to carry, installation After, without manually nurse, greatly reduce construction cost.The present apparatus has the characteristics that immobilization, modular, installs and uses Simplicity, it is safe, there is higher generalization and applicability.
Embodiment 2
As shown in Fig. 2,4,5,6,7, the gravity balance structure 4 of wherein Fig. 5 is uniformly distributed in the bottom of lower tube half 2, lower half The bottom of pipe 2 is in part convex, for a kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device of the present invention, bag Include upper tube half 1, lower tube half 2, upper tube half 1 forms hollow pipe after being docked with lower tube half 2, round tube inside diameter with outside high voltage transmission line Footpath is suitable;Upper tube half can tightly protect the original conducting wire in lower section with lower tube half, and 1 end symmetric of upper tube half is equipped with anticreep knot Structure 3, disconnecting prevention structure 3 can prevent during payingoff construction the new route conducting wire in top skid off outside the present apparatus be below it is new Line conductor is built to be in contact and rub.The first fixing device is arranged with the section of 3 outside upper tube half 1 of disconnecting prevention structure 11, the centre of the first fixing device 11 is equipped with circular hole 12;The lower tube half 2 is equipped with gravity balance structure 4 so that disconnecting prevention structure is vertical Upwards, the new route conducting wire outside the present apparatus with being below is skidded off to prevent the new route conducting wire in top during payingoff construction It is in contact and rubs.Second is equipped with 11 corresponding positional symmetry of the first fixing device fix dress at the section of lower tube half 2 21 are put, is equipped with bolt 22 among the second fixing device 21,22 outside diameter of bolt is suitable with 12 diameter of circular hole, and bolt 22 is provided with supporting Nut 23;Upper tube half 1 forms hollow pipe after being docked with lower tube half 2, hollow circular-tube passes through fixing device and bolt, nut Link together, the wire of high-tension line being below is wrapped up, prevents conducting wire from sliding.
Application method
The wire of high-tension line being below is wrapped up with lower tube half with the upper tube half of the present apparatus, is harmonious two-by-two, and use spiral shell Bolt compresses, and prevents conducting wire from sliding.By the new route conducting wire in top ride over above the present apparatus can unwrapping wire, can effectively prevent It is in contact and rubs between two conducting wire.
Upper tube half 1 and lower tube half 2 are double-decker described in further the present embodiment, and internal layer 6 is ambroin, so as to The former conducting wire normal operation of lower section can be guaranteed at during the construction line-putting;Outer layer 5 is hard wear-resistant material, during preventing the construction line-putting New route conducting wire in top is too early to present apparatus friction damage, so that the present apparatus cannot repeatedly use.
Internal layer 6 described in further the present embodiment is polytetrafluoroethylene material, and outer layer 5 is stainless steel material.Can be preferably Ensure that the present apparatus is constructed in the case of former conducting wire normal operation, and the present apparatus can be repeatedly used preferably.
Upper tube half 1 described in further the present embodiment includes at least upper and lower two parts, is hinged between two parts;Under described Semicanal 2 includes at least two parts, is hinged between two parts;The present embodiment upper tube half 1 includes upper and lower two with lower tube half 2 Point, upper tube half 1 and lower tube half 2 can also be respectively divided into three parts in actual use, four parts, multi-section grade.Upper tube half 1 is with Semicanal 2 forms hollow pipe after docking, round tube inside diameter can be adjusted according to high voltage transmission line outside diameter difference.So that the present apparatus is applied Man-hour can be applicable in a variety of different high voltage transmission line outside diameters.
Disconnecting prevention structure 3 described in further the present embodiment is cylinder vertically upward, and cylinder free end is symmetrical opposite curved Bent hook type, can preferably prevent the new route conducting wire in top during payingoff construction from skidding off outside the present apparatus with being below New route conducting wire is in contact and rubs.To be laterally hinged between disconnecting prevention structure 3 and upper tube half 1, it is complete to be conducive to payingoff construction Finish, disconnecting prevention structure is folded, is convenient for carrying.
The height of disconnecting prevention structure 3 described in further the present embodiment is not less than 5cm, between symmetrical disconnecting prevention structure 3 away from From not less than 2cm.It can preferably prevent that the new route conducting wire in top is skidded off outside the present apparatus with being in down during payingoff construction The new route conducting wire of side is in contact and rubs.
Gravity balance structure 4 described in further the present embodiment is uniformly distributed in the bottom of lower tube half 2, the bottom of lower tube half 2 Portion is in part convex.Be conducive to payingoff construction to finish, be more convenient to carry.
The present invention effectively increases the safety coefficient of powered payingoff construction, and the present apparatus is reusable, easy to carry, installation After, without manually nurse, greatly reduce construction cost.The present apparatus has the characteristics that immobilization, modular, installs and uses Simplicity, it is safe, there is higher generalization and applicability.
Embodiment 3
As Fig. 8~12 show a kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device of the present invention, bag Include upper tube half 1, lower tube half 2, upper tube half 1 forms hollow pipe after being docked with lower tube half 2, round tube inside diameter with outside high voltage transmission line Footpath is suitable;Upper tube half can tightly protect the original conducting wire in lower section with lower tube half.Tube ends are symmetrically installed semi-circular baffle 7; Baffle can prevent during payingoff construction that the new route conducting wire in top skids off and be led outside the present apparatus with the new route being below Line is in contact and rubs.The upper tube half 1 and lower tube half 2 are double-decker, and internal layer 6 is ambroin, is put to construct The former conducting wire normal operation of lower section can be guaranteed at during line;6 both ends of internal layer are symmetrically installed glass slide 61, and outer layer 5 is resistance to for hard Material is ground, the new route conducting wire in top is too early to the present apparatus friction damage during preventing the construction line-putting, so that the present apparatus It cannot repeatedly use.Glass guide-rail 51 corresponding with sliding block 61, upper tube half 1 and lower tube half 2 are installed in 5 relevant position of outer layer After docking forms hollow pipe, sliding block 61, the opposite slip of guide rail 51 can be passed through between outer layer 5 and internal layer 6.Slide block guide rail is favourable Rub in reducing, be more convenient construction.
Application method
The wire of high-tension line being below is wrapped up with lower tube half with the upper tube half of the present apparatus, is harmonious two-by-two, and use spiral shell Bolt compresses, and prevents conducting wire from sliding.By the new route conducting wire in top ride over above the present apparatus can unwrapping wire, can effectively prevent It is in contact and rubs between two conducting wire.
Internal layer 6 described in further the present embodiment is polytetrafluoroethylene material, and outer layer 5 is stainless steel material, the height of baffle 7 Degree is not less than 5cm.It can preferably ensure that the present apparatus is constructed in the case of former conducting wire normal operation, and the present apparatus can be preferably more Secondary reuse.
The present invention effectively increases the safety coefficient of powered payingoff construction, and the present apparatus is reusable, easy to carry, installation After, without manually nurse, greatly reduce construction cost.The present apparatus has the characteristics that immobilization, modular, installs and uses Simplicity, frictional force is small, safe, has higher generalization and applicability.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;This hair Bright content that is mentioned and not being described in detail is common knowledge, although having been carried out specifically to the present invention with reference to the foregoing embodiments It is bright, it will be understood by those of ordinary skill in the art that:It can still carry out the technical solution described in foregoing embodiments Modification, or equivalent substitution is carried out to which part technical characteristic;And these modifications or replacement, do not make appropriate technical solution Essence depart from various embodiments of the present invention technical solution spirit and scope.

Claims (5)

1. a kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device, it is characterised in that including upper tube half(1), under Semicanal(2), upper tube half (1) and lower tube half(2)Hollow pipe, round tube inside diameter and high voltage transmission line outside diameter phase are formed after docking When;The upper tube half(1)End symmetric is equipped with disconnecting prevention structure(3), in disconnecting prevention structure(3)Outside upper tube half(3)Section at pair Title is equipped with the first fixing device (11), and circular hole is equipped among the first fixing device (11)(12);The lower tube half(2)Equipped with center of gravity Balanced structure(4), in lower tube half(2)Section at the first fixing device(11)Corresponding positional symmetry is equipped with second and fixes dress Put(21), the second fixing device (21) is middle to be equipped with bolt(22), bolt(22)Outside diameter is suitable with circular hole (12) diameter, bolt (22)Supporting nut is installed(23),
The upper tube half (1) and lower tube half(2)It is double-decker, internal layer(6)For polytetrafluoroethylene material, outer layer (5) is not Become rusty Steel material,
The upper tube half(1)It is hinged including at least upper and lower two parts, between two parts;The lower tube half(2)Including at least two Part, is hinged between two parts;Upper tube half(1)With lower tube half(2)Hollow pipe is formed after docking, round tube inside diameter can basis High voltage transmission line outside diameter is different and adjusts.
2. a kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device according to claim 1, its feature exist It is cylinder vertically upward in, the disconnecting prevention structure (3), cylinder free end is symmetrical opposite curved hook type, disconnecting prevention structure(3) With upper tube half(1)Between to be laterally hinged with.
3. a kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device according to claim 1, its feature exist In the disconnecting prevention structure(3)Height be not less than 5cm, symmetrical disconnecting prevention structure(3)The distance between be not less than 2cm.
4. according to a kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device of claims 1 to 3 any one of them, It is characterized in that, the gravity balance structure (4) is cylinder vertically downward, lower tube half is symmetrically mounted on(2)Both ends, center of gravity Balanced structure(4)It is to be laterally hinged between lower tube half (2).
5. according to a kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device of claims 1 to 3 any one of them, It is characterized in that, the gravity balance structure(4)It is uniformly distributed in lower tube half(2)Bottom, lower tube half(2)Bottom be in part Convex.
CN201510780915.3A 2015-11-13 2015-11-13 A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device Expired - Fee Related CN105390979B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510780915.3A CN105390979B (en) 2015-11-13 2015-11-13 A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510780915.3A CN105390979B (en) 2015-11-13 2015-11-13 A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device

Publications (2)

Publication Number Publication Date
CN105390979A CN105390979A (en) 2016-03-09
CN105390979B true CN105390979B (en) 2018-04-24

Family

ID=55422954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510780915.3A Expired - Fee Related CN105390979B (en) 2015-11-13 2015-11-13 A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device

Country Status (1)

Country Link
CN (1) CN105390979B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107196229A (en) * 2017-05-15 2017-09-22 天津送变电工程公司 Application process of the PVC protection pipes in extra-high voltage crossing construction

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2430799Y (en) * 1999-12-21 2001-05-16 桐乡市供电局 Insulation shielding cover for live operation
CN201355748Y (en) * 2008-12-30 2009-12-02 上海市南电力工程有限公司 Insulating shielding device of cable transition bracket for distribution line
CN201601417U (en) * 2010-03-04 2010-10-06 山东电力研究院 Special wire shield for high-voltage live working
CN202009190U (en) * 2011-01-14 2011-10-12 河南省电力公司洛阳供电公司 Flared port line-protection tool for line spanning of spread conducting wire
CN202308915U (en) * 2011-11-10 2012-07-04 广东电网公司东莞供电局 Telescopic lead shielding cover used for live-wire work on power distribution network
CN203839828U (en) * 2014-05-21 2014-09-17 国网四川省电力公司成都市新都供电分公司 Wire insulation shielding tube
CN104332881A (en) * 2014-11-11 2015-02-04 国家电网公司 Insulating plate
CN204517286U (en) * 2015-04-29 2015-07-29 国网冀北电力有限公司廊坊供电公司 A kind of insulated shielding cover
CN205092510U (en) * 2015-11-13 2016-03-16 国网山东郓城县供电公司 High tension transmission line crossing unwrapping wire construction abrasionproof decreases device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008271684A (en) * 2007-04-19 2008-11-06 Chugoku Electric Power Co Inc:The High-voltage cable support, stringing structure for high-voltage cable, and method of stringing high-voltage cable

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2430799Y (en) * 1999-12-21 2001-05-16 桐乡市供电局 Insulation shielding cover for live operation
CN201355748Y (en) * 2008-12-30 2009-12-02 上海市南电力工程有限公司 Insulating shielding device of cable transition bracket for distribution line
CN201601417U (en) * 2010-03-04 2010-10-06 山东电力研究院 Special wire shield for high-voltage live working
CN202009190U (en) * 2011-01-14 2011-10-12 河南省电力公司洛阳供电公司 Flared port line-protection tool for line spanning of spread conducting wire
CN202308915U (en) * 2011-11-10 2012-07-04 广东电网公司东莞供电局 Telescopic lead shielding cover used for live-wire work on power distribution network
CN203839828U (en) * 2014-05-21 2014-09-17 国网四川省电力公司成都市新都供电分公司 Wire insulation shielding tube
CN104332881A (en) * 2014-11-11 2015-02-04 国家电网公司 Insulating plate
CN204517286U (en) * 2015-04-29 2015-07-29 国网冀北电力有限公司廊坊供电公司 A kind of insulated shielding cover
CN205092510U (en) * 2015-11-13 2016-03-16 国网山东郓城县供电公司 High tension transmission line crossing unwrapping wire construction abrasionproof decreases device

Also Published As

Publication number Publication date
CN105390979A (en) 2016-03-09

Similar Documents

Publication Publication Date Title
CN101582572B (en) Method of extra-high voltage tension stringing
CN105390979B (en) A kind of ultra-high-tension power transmission line scissors crossing payingoff construction antiwear device
CN206060035U (en) A kind of releasing pulley hanger
CN202121256U (en) High voltage horizontal double-splitting line checking pulley
CN207612009U (en) High voltage line maintenance job platform
CN206128808U (en) Novel single loop cable dead end tower
CN205791406U (en) A kind of overhead transmission line shaking device
CN202090629U (en) "Inverted-U-shaped" truss structure of main variable ingoing line used for 750 kV transformer station in Riyue Mountain
CN205092510U (en) High tension transmission line crossing unwrapping wire construction abrasionproof decreases device
CN207069435U (en) Branch's lead fixes locking bar
CN206220619U (en) A kind of single time overhead transmission line cable T joint draws lower anchor support
CN204633283U (en) A kind of built on stilts general cable hook suspension device
CN107492829A (en) Branch's lead fixes locking bar and the powered method for connecing lead of distribution line
CN106555497A (en) A kind of single time overhead transmission line cable T joint draws lower anchor support
CN104961044B (en) Method for installing or removing high voltage bushing by using C-shaped hoseclamp cross binding strap
CN210768060U (en) Dry-type conversion strain tower for 500kV single-circuit compact line
CN103485567A (en) Anti-climbing cabin of power transmission tower
CN107422206A (en) A kind of oil-SF6 sleeve pipe transformer test devices
CN202651694U (en) Simple pulley for power transmission line
CN203774728U (en) Pre-twisted damping wire
CN203487848U (en) Anti-climbing workshop of power transmission tower
CN205527304U (en) Flexible suspender of annular
CN207074838U (en) A kind of crane span structure fixed structure of electric power
CN207053062U (en) Releasing pulley hanger
CN205699061U (en) A kind of bungee jumping five-point type pulley bearer cable cable system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180424