CN209066487U - Assembled piping lane installation frame - Google Patents

Assembled piping lane installation frame Download PDF

Info

Publication number
CN209066487U
CN209066487U CN201821431365.XU CN201821431365U CN209066487U CN 209066487 U CN209066487 U CN 209066487U CN 201821431365 U CN201821431365 U CN 201821431365U CN 209066487 U CN209066487 U CN 209066487U
Authority
CN
China
Prior art keywords
frame body
piping lane
rotating bar
screw rod
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821431365.XU
Other languages
Chinese (zh)
Inventor
邢霖
刘春波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jianzhu College
Original Assignee
Chongqing Jianzhu College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jianzhu College filed Critical Chongqing Jianzhu College
Priority to CN201821431365.XU priority Critical patent/CN209066487U/en
Application granted granted Critical
Publication of CN209066487U publication Critical patent/CN209066487U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of assembled piping lane installation frames, including frame body, frame body to be equipped with first motor;The frame body is provided with one group of first screw rod along the vertical direction, the first nut set is provided on two first screw rods, first crossbeam is fixedly installed between two the first nut sets, the second motor is also equipped in frame body above first rotating bar, the second rotating bar is provided in fixed plate, second rotating bar both ends are through fixed plate and the second rotating bar both ends are provided with third hand tap gear, one group of second screw rod is additionally provided in the frame body, the second nut set is provided on two second screw rods, second cross beam is fixedly installed between two the second nut sets;This installation frame can facilitate the adjusting of piping lane, guarantee the accuracy of piping lane installation site, meanwhile, structure is simple, easy to operate.

Description

Assembled piping lane installation frame
Technical field
The utility model relates to piping lane and field, and in particular to a kind of assembled piping lane installation frame.
Background technique
Piping lane, the i.e. corridor of pipeline.Many pipelines are brought together in chemical industry and its related class factory, along device or It arranges outside workshop, usually in the sky, is propped up with bracket, form the appearance similar with corridor.Also there are a small number of piping lanes located underground. A tunnel space is built in Urban Underground, by electric power, communication, the various utilities pipelines such as combustion gas, heat supply, plumbing combine in one Body is equipped with special access hole, hoisting port and monitoring system, implements unified planning, Uniting, unified construction and management, is Ensure the important infrastructure and " lifeline " of city operations;And when the installation of existing piping lane, it is supported with bracket, but due to pipe Connection installation needs to be aligned between corridor, and piping lane is not only long but also again, and manually installed time-consuming and laborious, this is just that connection installation brings pole Big puzzlement.
Therefore, in order to solve the above problem, a kind of assembled piping lane installation frame is needed, the adjusting of piping lane can be facilitated, is protected The accuracy of piping lane installation site is demonstrate,proved, meanwhile, structure is simple, easy to operate.
Utility model content
In view of this, providing assembled piping lane fitting machine the purpose of the utility model is to overcome defect in the prior art Frame can facilitate the adjusting of piping lane, guarantee the accuracy of piping lane installation site, meanwhile, structure is simple, easy to operate.
A kind of assembled piping lane installation frame, including frame body, the frame body bottom are equipped with first motor, the The output shaft of one motor is connected with the first output revolving shaft, and first output revolving shaft one end is mounted in the first supporting block, and described first The first driving wheel is additionally provided on output revolving shaft, the first motor top is arranged in parallel with the first rotation with the first output revolving shaft Bar, the first rotating bar connect setting by V belt translation with the first driving wheel, and first rotating bar, two ends are provided with One bevel gear;The frame body is provided with one group of first screw rod along the vertical direction, and first screw rod one end is through frame body On mounting plate, on first screw rod fixing sleeve be equipped with the intermeshing second bevel gear of first bevel gear, two first It is provided with the first nut set on screw rod, is fixedly installed first crossbeam between two the first nuts sets, on the first crossbeam It is provided with pressing groove;The second motor, the second motor output are also equipped in frame body above first rotating bar Axis connection has the second output revolving shaft, and the second output revolving shaft is mounted in the second supporting block;One group is provided in the frame body Fixed plate, is provided with the second rotating bar in fixed plate, the second rotating bar both ends through fixed plate and the second rotating bar both ends it is equal It is provided with third hand tap gear, the second output revolving shaft is equipped with driving wheel with the second rotating bar and connect installation by chain;It is described It is additionally provided with one group of second screw rod in frame body, second screw rod one end is through the mounting plate in frame body, the second screw rod Upper fixing sleeve is equipped with the 4th bevel gear being meshed with third hand tap gear, is provided with the second nut set on two second screw rods, It is fixedly installed second cross beam between two the second nut sets, piping lane mounting groove, the piping lane are provided on the second cross beam Mounting groove is set to the underface of pressing device.
Further, the frame body bottom is provided with the universal wheel of strap brake.
Further, elastic block rubber is provided in the pressing groove and mounting groove.
The beneficial effects of the utility model are: a kind of assembled piping lane installation frame disclosed by the utility model, Neng Goufang Just the adjusting of piping lane guarantees the accuracy of piping lane installation site, meanwhile, structure is simple, easy to operate.
Detailed description of the invention
The utility model is further described with reference to the accompanying drawings and examples:
Fig. 1 is the structural schematic diagram of the utility model.
Appended drawing reference
First nut set 1;First screw rod 2;First rotating bar 3;First bevel gear 4;Second bevel gear 5;Frame body 6; Universal wheel 7;First supporting block 8;First output revolving shaft 9;Belt 10;First motor 11;Second supporting block 12;Second motor 13; Chain 14;Second rotating bar 15;4th bevel gear 16;Third hand tap gear 17;Second nut set 18;Second screw rod 19;Second is horizontal Beam 20;First crossbeam 21;Mounting plate 22;Pressing device 23;Mounting groove 24.
Specific embodiment
Fig. 1 is the structural schematic diagram of the utility model, as shown, a kind of assembled piping lane installation frame, including rack Ontology 6,6 bottom of frame body are equipped with first motor 11, and the output shaft of first motor 11 is connected with the first output revolving shaft 9,9 one end of the first output revolving shaft is mounted in the first supporting block 8, and the first driving wheel is additionally provided on the output revolving shaft 9, described 11 top of first motor is arranged in parallel with the first rotating bar 3 with the first output revolving shaft 9, and the first rotating bar 3 and the first driving wheel are logical V belt translation connection setting is crossed, first rotating bar, 3 two ends are provided with first bevel gear 4;The frame body 6 is along perpendicular Histogram is to being provided with one group of first screw rod 2, and 2 one end of the first screw rod is through the mounting plate 22 in frame body 6, and described first Fixing sleeve is equipped with the second bevel gear 5 being meshed with first bevel gear 4 on bar 2, is provided with the first spiral shell on two first screw rods 2 Mother set 1, two the first nuts, which cover, is fixedly installed first crossbeam 21 between 1, is provided with pressing device on the first crossbeam 21 23;It is also equipped with the second motor 13 in the frame body 6 of first rotating bar, 3 top, 13 output shaft of the second motor connects It is connected to the second output revolving shaft, the second output revolving shaft is mounted in the second supporting block 12;One group is provided in the frame body 6 to consolidate Fixed board, the second rotating bar 15 is provided in fixed plate, and fixed plate and 15 both ends of the second rotating bar are run through in 15 both ends of the second rotating bar Portion is provided with third hand tap gear 17, and the second output revolving shaft is equipped with driving wheel with the second rotating bar 15 and is connect by chain 14 Installation;It is additionally provided with one group of second screw rod 19 in the frame body 6,19 one end of the second screw rod is through in frame body 6 Mounting plate 22, fixing sleeve is equipped with the 4th bevel gear 16 being meshed with third hand tap gear 17 on the second screw rod 19, and two second The second nut set 18 is provided on bar 19, two the second nuts, which cover, is fixedly installed second cross beam 20 between 18, and described second Piping lane mounting groove 24 is provided on crossbeam 20, the piping lane mounting groove 24 is set to the underface of pressing device 23.
When work, 11 first output shaft 9 of first motor drives the rotation of the first rotating bar 3, the first rotating bar 3 by belt 11 Screw rod 2 is driven to rotate by first bevel gear group while rotation, screw rod and nut set are planetary roller screw structure, the first spiral shell Mother set 1 drives first crossbeam 21 to move up and down, meanwhile, the second motor 13 drives the rotation of the second rotating bar 15 by chain 14, the The second bevel gear group engagement rotation at two rotating bars, 15 both ends drives the rotation of the second screw rod 19, the second screw rod 15 and the second nut set 18 be also planetary roller screw structure, and the second nut set 18 drives second cross beam 20 to move up and down while up and down motion, piping lane It is mounted on inside mounting groove 24, mounting height is adjusted by the second motor, when piping lane height is fixed, first motor 11 adjusts pressure Tight device 23 and piping lane upper contact simultaneously fix piping lane, and piping lane is facilitated to install, using planetary roller screw rod, with high carrying Ability can meet the piping lane installation and adjustment of weight weight, while overall structure is stablized when up and down adjustment, can be under arduous environment Heavy duty is born, there can be higher impact resistance.
In the present embodiment, 6 bottom of frame body is additionally provided with the universal wheel 7 that can be braked, and passes through setting for universal wheel 7 It sets, the conveniently moving of rack is facilitated to install in the connection of each piping lane.
In the present embodiment, it is provided with elastic block rubber in the pressing device 23 and mounting groove 24, elastic block rubber is equal It is even to be arranged in inside semicircular pressing device and semicircular mounting groove, by the setting of elastic block rubber, enhancing and piping lane Between frictional force, rotate when can prevent piping lane from installing, facilitate installation.
Finally, it is stated that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, although ginseng The utility model is described in detail according to preferred embodiment, those skilled in the art should understand that, it can be to this The technical solution of utility model is modified or replaced equivalently, without departing from the objective and model of technical solutions of the utility model It encloses, should all cover in the scope of the claims of the utility model.

Claims (3)

1. a kind of assembled piping lane installation frame, it is characterised in that: including frame body, the frame body bottom is equipped with First output revolving shaft of one motor, first motor is mounted in the first supporting block by bearing, on first output revolving shaft also It is provided with the first driving wheel, the first motor top is arranged in parallel with the first rotating bar, the first rotation with the first output revolving shaft Bar connect setting by V belt translation with the first driving wheel, and first rotating bar, two ends are provided with first bevel gear;Institute State frame body and be provided with one group of first screw rod along the vertical direction, first screw rod one end through the mounting plate in frame body, On first screw rod fixing sleeve be equipped with the intermeshing second bevel gear of first bevel gear, be respectively provided on two first screw rods There is the first nut set, is fixedly installed first crossbeam between two the first nut sets, compression dress is provided on the first crossbeam It sets;
The second motor, the second output revolving shaft of second motor are also equipped in frame body above first rotating bar It is mounted in the second supporting block by bearing;It is provided with one group of fixed plate in the frame body, is provided with second in fixed plate Rotating bar, the second rotating bar both ends are through fixed plate and the second rotating bar both ends are provided with third hand tap gear, the second output Shaft is equipped with driving wheel with the second rotating bar and connect installation by chain;One group second is additionally provided in the frame body Screw rod, second screw rod one end is through the mounting plate in frame body, and fixing sleeve is equipped with and third hand tap gear phase on the second screw rod 4th bevel gear of engagement is provided with the second nut set on two second screw rods, is fixedly installed between two the second nuts sets Have second cross beam, be provided with piping lane mounting groove on the second cross beam, the piping lane mounting groove be set to pressing device just under Side.
2. assembled piping lane installation frame according to claim 1, it is characterised in that: the frame body bottom is provided with The universal wheel of strap brake.
3. assembled piping lane installation frame according to claim 1, it is characterised in that: the pressing device and piping lane are installed Elastic block rubber is provided in slot.
CN201821431365.XU 2018-08-31 2018-08-31 Assembled piping lane installation frame Active CN209066487U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821431365.XU CN209066487U (en) 2018-08-31 2018-08-31 Assembled piping lane installation frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821431365.XU CN209066487U (en) 2018-08-31 2018-08-31 Assembled piping lane installation frame

Publications (1)

Publication Number Publication Date
CN209066487U true CN209066487U (en) 2019-07-05

Family

ID=67091455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821431365.XU Active CN209066487U (en) 2018-08-31 2018-08-31 Assembled piping lane installation frame

Country Status (1)

Country Link
CN (1) CN209066487U (en)

Similar Documents

Publication Publication Date Title
CN214368190U (en) Building electromechanical pipeline synthesizes a gallows
CN206358715U (en) Double-track shuttle car rail changing device
CN209066487U (en) Assembled piping lane installation frame
CN203418255U (en) Adjustable pipe fitting fitting-up bracket
CN205310207U (en) Lift operation panel of electromechanical pipelining
CN203761004U (en) Fairlead with no axial movement
CN104308796A (en) Portable assembling and disassembling stand for downhole tool
CN104032942B (en) A kind of swinging scaffold
CN108533886B (en) Maintenance equipment for petroleum pipeline
CN103231363A (en) Operational type table-surface parallel robot
CN203924658U (en) A kind of suspension scaffold
CN205479741U (en) Adjustable pipeline bracket
CN205863799U (en) End auxiliary calibrator device
CN205765863U (en) A kind of heavy-duty machinery spanner
CN205689912U (en) A kind of multi-pipeline fixing device
CN205629204U (en) Bending apparatus for building engineering
CN205479747U (en) Bearing structure convenient to dismouting pipeline
CN206072539U (en) Novel pipeline suspension and support
CN204858429U (en) Cable traction frame
CN101509365B (en) Cluster well load mutually-balancing energy-conserving oil pumping system
CN105201531B (en) Rocker-arm-type segment erector
CN207814753U (en) A kind of pipe crawling device
CN203332868U (en) Linear motion mechanism
CN107139142A (en) A kind of sub-packaging workbench of heavy-duty car
CN216016322U (en) Combined cable bridge with remote real-time fault alarm function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant