CN209053413U - A kind of integrated form crane operating platform - Google Patents
A kind of integrated form crane operating platform Download PDFInfo
- Publication number
- CN209053413U CN209053413U CN201821276519.2U CN201821276519U CN209053413U CN 209053413 U CN209053413 U CN 209053413U CN 201821276519 U CN201821276519 U CN 201821276519U CN 209053413 U CN209053413 U CN 209053413U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- bar
- operating platform
- support rod
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a kind of integrated form crane operating platforms, including column, bearing bar and wall, the surface of the bearing bar, which is run through, support rod, the surface of the support rod and it is located between the opposite side of two bearing bars and is fixedly connected with the first stop collar, the both ends of support rod, which are run through, position-limited rack, one end of bearing bar runs through position-limited rack and extends to the outside of position-limited rack, and the top of support rod is fixedly connected with bottom plate by tied silk, and the utility model relates to building auxiliary equipment technical fields.The integrated form crane operating platform, operating platform is turned into bearing bar, support rod, position-limited rack and bottom plate, need using when carry out it is assembled, using modular structure, spelling assembly and disassembly all becomes very simple, and entire bottom plate is seamless, greatly avoid the appearance of falling accident, existing operating platform is solved since gap is larger, falling accident is easy to appear and fixation is tighter, it is difficult to the problem of mounting and dismounting.
Description
Technical field
The utility model relates to building auxiliary equipment technical field, specially a kind of integrated form crane operating platform.
Background technique
Existing building is mostly high level, therefore carries out building operating platform in building, and existing operating platform is big
It is mostly to be built using scaffold cooperation steel pipe, not only gap is larger in this way, is easy to appear falling accident, and life is caused to endanger
Danger, can also be because of extremely fastening, it is difficult to mount and dismount, bring many inconveniences to work, seriously affect the duration into
Exhibition, increases building cost.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of integrated form crane operating platform, solves existing
There is operating platform since gap is larger, is easy to appear falling accident and fixation is tighter, it is difficult to the problem of mounting and dismounting.
In order to achieve the above object, the utility model is achieved by the following technical programs: a kind of integrated form crane behaviour
Make platform, including column, bearing bar and wall, the surface of the bearing bar through there is a support rod, the surface of the support rod and
It is fixedly connected with the first stop collar between the side opposite positioned at two bearing bars, the both ends of the support rod, which are run through, limit
One end of frame, the bearing bar runs through position-limited rack and extends to the outside of position-limited rack, and the top of the support rod is solid by tied silk
Surely it is connected with bottom plate, the surface of the bearing bar and the side for being located at column, which are run through, the first gag lever post, and the first gag lever post table
The both ends in face, which are run through, the first screw, and the surface of the column offers through-hole, and the inner surface of the through-hole slidably connects
One end of second gag lever post, second gag lever post sequentially passes through column and bearing bar and extends to the outside of column, and second
The both ends on gag lever post surface, which are run through, the second screw.
Preferably, the surface of the bearing bar is fixedly connected with protection vertical bar, the protection vertical bar table by third screw
The second stop collar is fixedly connected at the top of face.
Preferably, it is described protection vertical bar outer surface and be located at the second stop collar at the top of be arranged with protection cross bar, it is described
The bottom of protection cross bar is fixedly connected with strut.
Preferably, the side of the column is fixedly connected with support foot rest, and the one of the side of the support foot rest and wall
It is fixedly connected between side by screw through walls.
Preferably, the outer surface of two columns is fixedly connected to fixed ring, and the surface of the fixed ring passes through tight
Gu screw is fixedly connected with stiffening plate, one end of the fastening screw runs through through-hole and extends to the outside of column.
Preferably, the side of the left side protection cross bar is rotatably connected to rotating bar, the side of the right side protection cross bar
It is fixedly connected with convex block, and the surface of rotating bar and the outer surface of convex block are clamped.
Beneficial effect
The utility model provides a kind of integrated form crane operating platform.Have it is following the utility model has the advantages that
(1), the integrated form crane operating platform has support rod, the table of support rod by running through on the surface of bearing bar
Face and it is located between the opposite side of two bearing bars and is fixedly connected with the first stop collar, the both ends of support rod, which are run through, limit
One end of frame, bearing bar runs through position-limited rack and extends to the outside of position-limited rack, and the top of support rod is fixedly connected with by tied silk
Bottom plate, the surface of bearing bar and the side for being located at column, which are run through, the first gag lever post, and the both ends on the first gag lever post surface are passed through
It is installed with the first screw, the surface of column offers through-hole, and the inner surface of through-hole slidably connects the second gag lever post, the second gag lever post
One end sequentially pass through column and bearing bar and extend to the outside of column, and the both ends on the second gag lever post surface are run through
Operating platform is turned into bearing bar, support rod, position-limited rack and bottom plate by two screws, need using when carry out assembled, use
Modular structure, spelling assembly and disassembly all becomes very simple, and entire bottom plate is seamless, greatly avoids going out for falling accident
It is existing, it solves existing operating platform since gap is larger, is easy to appear falling accident, and fixed tighter, it is difficult to mount and dismount
The problem of.
(2), the integrated form crane operating platform, it is anti-by being fixedly connected on the surface of bearing bar by third screw
Vertical bar is protected, protects at the top of vertical bar surface and is fixedly connected with the second stop collar, protect the outer surface of vertical bar and is located at the second limit
It is arranged with protection cross bar at the top of ring, the bottom of cross bar is protected to be fixedly connected with strut, utilizes protection vertical bar, protection cross bar and branch
The cooperation of bar can protect construction worker, while prevent the material on operating platform from falling, easy for assemble or unload, match
The setting for closing rotating bar and convex block can achieve the effect for being similar to door, facilitate the disengaging of construction worker.
Detailed description of the invention
Fig. 1 is the appearance diagram of the utility model structure;
Fig. 2 is the schematic diagram of the utility model partial structurtes;
Fig. 3 is the side view of the utility model structure.
In figure: 1-column, 2-bearing bars, 3-walls, 4-support rods, the 5-the first stop collar, 6-position-limited racks, 7-
Bottom plate, the 8-the first gag lever post, the 9-the first screw, 10-through-holes, the 11-the second gag lever post, the 12-the second screw, 13-protection
It is vertical bar, the 14-the second stop collar, 15-protection cross bars, 16-struts, 17-support foot rests, 18-screws through walls, 19-fixed
Ring, 20-fastening screws, 21-stiffening plates, 22-rotating bars, 23-convex blocks, 24-third screws.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of integrated form crane operating platform, including
Column 1, bearing bar 2 and wall 3, the surface of bearing bar 2 surface of support rod 4 and are located at two bearing bars through there is a support rod 4
The first stop collar 5 is fixedly connected between 2 opposite sides, the both ends of support rod 4, which are run through, position-limited rack 6, and the one of bearing bar 2
End runs through position-limited rack 6 and extends to the outside of position-limited rack 6, and the top of support rod 4 is fixedly connected with bottom plate 7, load-bearing by tied silk
The surface of bar 2 and it is located at the side of column 1 through there is the first gag lever post 8, and the both ends on 8 surface of the first gag lever post are run through the
One screw 9, the surface of column 1 offer through-hole 10, and the inner surface of through-hole 10 slidably connects the second gag lever post 11, the second limit
One end of bar 11 sequentially passes through column 1 and bearing bar 2 and the outside for extending to column 1, and the both ends on 11 surface of the second gag lever post
Through there is the second screw 12, operating platform is turned into bearing bar 2, support rod 4, position-limited rack 6 and bottom plate 7, it is to be used in need
When, carries out assembled, and using modular structure, spelling assembly and disassembly all becomes very simple, and entire bottom plate 7 is seamless, greatly
The appearance for avoiding falling accident solves existing operating platform since gap is larger, is easy to appear falling accident, and it is fixed compared with
Tightly, it is difficult to which the surface of the problem of mounting and dismounting, bearing bar 2 is fixedly connected with protection vertical bar 13, protection by third screw 24
It is fixedly connected with the second stop collar 14 at the top of 13 surface of vertical bar, protect the outer surface of vertical bar 13 and is located at the second stop collar 14
Top is arranged with protection cross bar 15, and the bottom of protection cross bar 15 is fixedly connected with strut 16, and left side protects the side of cross bar 15 to turn
Dynamic to be connected with rotating bar 22, the side of right side protection cross bar 15 is fixedly connected with convex block 23, and the surface of rotating bar 22 and convex block
23 outer surface clamping can protect construction worker using the cooperation protected vertical bar 13, protect cross bar 15 and strut 16
Shield, while preventing the material on operating platform from falling, easy for assemble or unload, cooperates the setting of rotating bar 22 and convex block 23, can be with
Achieve the effect that one is similar to door, facilitates the disengaging of construction worker, the side of column 1 is fixedly connected with support foot rest 17, branch
It is fixedly connected between the side of kickstand 17 and the side of wall 3 by screw 18 through walls, the outer surface of two columns 1 is solid
Surely it is connected with fixed ring 19, the surface of fixed ring 19 is fixedly connected with stiffening plate 21 by fastening screw 20, fastening screw 20
One end runs through through-hole 10 and extends to the outside of column 1.
In use, support rod 4 is inserted into bearing bar 2, then position-limited rack 6 is inserted into support rod 4, while being stuck in bearing bar
On 2, bottom plate 7 is placed on support rod 4, is fixed using tied silk, vertical bar 13 will be protected to be fixed on bearing bar 2 using third screw 24
On, then protection cross bar 15 is placed on and is protected on vertical bar 13, it is fixed using pin, bearing bar 2 is filled between column 1
In gap, the first gag lever post 8 is inserted into bearing bar 2, it is fixed using the first screw 9, platform is risen using loop wheel machine, reaching needs
When wanting position, stops rising, the second gag lever post 11 is inserted into through-hole 10, is consolidated the second gag lever post 11 using the second screw 12
It is fixed, the installation of integrated form crane operating platform is completed, when needing to be adjusted again, loop wheel machine can be used and hang again
It rises, the second gag lever post 11 is extracted out, carry out repetitive operation.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of integrated form crane operating platform, including column (1), bearing bar (2) and wall (3), it is characterised in that: described
The surface of bearing bar (2) through having support rod (4), the surface of the support rod (4) and be located at two bearing bars (2) it is opposite one
It is fixedly connected between side the first stop collar (5), the both ends of the support rod (4), which are run through, position-limited rack (6), the bearing bar
(2) one end runs through position-limited rack (6) and extends to the outside of position-limited rack (6), and the top of the support rod (4) is fixed by tied silk
It is connected with bottom plate (7), the surface of the bearing bar (2) and is located at the side of column (1) through having the first gag lever post (8), and the
The both ends on one gag lever post (8) surface, which are run through, to be had the first screw (9), and the surface of the column (1) offers through-hole (10), described
The inner surface of through-hole (10) slidably connects the second gag lever post (11), and one end of second gag lever post (11) sequentially passes through column
(1) and bearing bar (2) and the outside for extending to column (1), and the both ends on the second gag lever post (11) surface are run through the second spiral shell
It follows closely (12).
2. a kind of integrated form crane operating platform according to claim 1, it is characterised in that: the bearing bar (2)
Surface is fixedly connected with protection vertical bar (13) by third screw (24), is fixedly connected at the top of protection vertical bar (13) surface
There are the second stop collar (14).
3. a kind of integrated form crane operating platform according to claim 2, it is characterised in that: the protection vertical bar (13)
Outer surface and be located at the top of the second stop collar (14) and be arranged with protection cross bar (15), the bottom of protection cross bar (15) is solid
Surely strut (16) are connected with.
4. a kind of integrated form crane operating platform according to claim 1, it is characterised in that: the one of the column (1)
Side is fixedly connected with support foot rest (17), passes through spiral shell through walls between the side of the support foot rest (17) and the side of wall (3)
Nail (18) is fixedly connected.
5. a kind of integrated form crane operating platform according to claim 1, it is characterised in that: two columns (1)
Outer surface be fixedly connected to fixed ring (19), the surface of the fixed ring (19) is fixedly connected with by fastening screw (20)
One end of stiffening plate (21), the fastening screw (20) runs through through-hole (10) and extends to the outside of column (1).
6. a kind of integrated form crane operating platform according to claim 3, it is characterised in that: the left side protection cross bar
(15) side is rotatably connected to rotating bar (22), and the side of right side protection cross bar (15) is fixedly connected with convex block (23),
And the outer surface of the surface of rotating bar (22) and convex block (23) is clamped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821276519.2U CN209053413U (en) | 2018-08-09 | 2018-08-09 | A kind of integrated form crane operating platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821276519.2U CN209053413U (en) | 2018-08-09 | 2018-08-09 | A kind of integrated form crane operating platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209053413U true CN209053413U (en) | 2019-07-02 |
Family
ID=67047305
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821276519.2U Expired - Fee Related CN209053413U (en) | 2018-08-09 | 2018-08-09 | A kind of integrated form crane operating platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209053413U (en) |
-
2018
- 2018-08-09 CN CN201821276519.2U patent/CN209053413U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205931799U (en) | Mount is used in prefabricated wallboard transportation | |
CN209053413U (en) | A kind of integrated form crane operating platform | |
CN208587092U (en) | A kind of steel column installation ladder | |
CN208815868U (en) | A kind of construction scaffold | |
CN209509548U (en) | A kind of construction protective fence | |
CN208885048U (en) | A kind of assembled composite beam integral support device | |
CN207700656U (en) | One kind being used for electric mounting supporting rack | |
JP3189564U (en) | Fall prevention fence for concrete structures | |
CN107536518A (en) | A kind of bathtub of detachable support frame | |
CN209638174U (en) | A kind of laminate supporting parts for laminate frame | |
CN209079956U (en) | A kind of cable testing bridge placement pallet for transporting | |
CN209892574U (en) | Novel connecting device of storage rack | |
CN207744920U (en) | A kind of dormitory bed convenient for safeguarding | |
CN208037891U (en) | A kind of crane balance supporting seat | |
CN210067375U (en) | Scaffold frame bearing structure convenient to install and remove | |
CN208882585U (en) | A kind of moving staircase girders fixed structure for Container Transport | |
CN220979773U (en) | Replacement auxiliary device of fan speed reducer | |
CN108149909B (en) | Adjustable steel pipe scaffold | |
CN208022520U (en) | A kind of engineering residue cable disc coil holder | |
CN209585766U (en) | A kind of coal bunker umbrella steel platform support device of ease of assembly | |
CN206245694U (en) | A kind of construction and decoration ceiling mounting bracket | |
CN210216454U (en) | Building deep basal pit is link plate connecting device for strut | |
CN214302938U (en) | Temporary support device for mounting steel structure stand column | |
CN211817787U (en) | Scaffold for steel structure factory building | |
CN216663860U (en) | Protector for engineering safety management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190702 Termination date: 20210809 |
|
CF01 | Termination of patent right due to non-payment of annual fee |