CN209040519U - A kind of novel simplicity sets up job platform - Google Patents
A kind of novel simplicity sets up job platform Download PDFInfo
- Publication number
- CN209040519U CN209040519U CN201821498666.4U CN201821498666U CN209040519U CN 209040519 U CN209040519 U CN 209040519U CN 201821498666 U CN201821498666 U CN 201821498666U CN 209040519 U CN209040519 U CN 209040519U
- Authority
- CN
- China
- Prior art keywords
- cross bar
- job platform
- brace
- vertical supporting
- supporting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The purpose of this utility model is to solve the problems, such as that present construction operation platform sets up that inconvenient, security risk is more.To realize the utility model aim and the technical solution adopted is that such, a kind of novel simplicity sets up job platform, it is characterised in that: including at least four vertical supporting rods and at least four cross bars, job platform.It is buckled on vertical supporting rod described in each equipped with disk, the aperture on disk buckle is for movable wedge insertion, and the movable wedge is in the end of cross bar, brace, and both ends have, and size dimension is answered identical.The job platform includes hook, dull-finish steel, bottom angle steel, and the hook can achieve the purpose that carry construction worker and power tool in the both ends of bottom angle steel, the job platform by hanging on cross bar.
Description
Technical field
The utility model relates to constructions work field, it is specifically related to need erection construction operating platform in operation process
Place.
Background technique
Raising with the development and people of Building technology to esthetic requirement, some structures uniquenesses, the building of modern design
Structure constantly emerges in large numbers, but when architectural design personnel carry out conceptual design, can not usually make comprehensively in view of construction
Whether concrete condition when industry can not can also facilitate at the scene with respect to building element that some are designed, decoration element
Installation.Such as in the architectural design that Chinese style closes institute, it often will appear the moulding such as some gable and hip roofs, cornice, volume canopy, sets of brackets on top of the columns, these
A large amount of decoration element is needed, designer also brings much to work progress while providing peculiar building to people
Inconvenience, unit in charge of construction usually require the connection and installation of taking a variety of safeguards to complete these components.Usually these installations
It needs to complete in the sky, this just needs to provide a kind of reliable job platform to operator.
In addition to above-mentioned decoration element, as country widelys popularize assembled architecture, the dress of many building primary structure members
With equally can all use aerial job platform, it is more and more frequent that this allows for such platform application.But for now, and
There is no a kind of job platform of simplicity to be convenient to use for construction personnel, present most operation field is all still using
The scaffold set up creates a kind of workbench, and this mode has been continued to use for many years, so far all without there is not particularly preferred changes
Into mode.Although the existing this mode for setting up scaffold provides a kind of available operation horizontal for on-site personnel
Platform, but the shortcomings that this mode is also it will be apparent that specifically:
(1) fastener for setting up each node of process requires to tighten bolt, and it is long to set up the time, and turnover is inconvenient;
(2) fastener is easily lost, and processing and fabricating fastener is more troublesome;
(3) influence of quality of connection fastener of fastener node quality itself and worker operation is significant, if connection is built on the sand,
It is easy to cause engineering accident;
(4) rod piece at node is eccentric connection, by skid resistance transmitting load and internal force, thus reduces it and carries energy
Power;
(5) it although it can be used repeatedly, easily gets rusty, is easy to appear security risk, utilization rate is not high;
(6) set up process, disassembly process is required by tools such as spanner, screwdrivers, process is comparatively laborious, and consumption is a large amount of
Human and material resources, it is uneconomical;
For above situation, invention designs a kind of novel simplicity and sets up job platform, can provide extremely for operating personnel
The execution conditions of safety, it is very important.
Summary of the invention
Job platform is set up the purpose of the utility model is to provide a kind of simplicity, existing job platform is solved and set up
The problems such as journey is cumbersome, insecurity factor is more.
To realize the utility model aim and the technical solution adopted is that such, a kind of novel simplicity sets up operation horizontal
Platform, it is characterised in that: be made of vertical supporting rod, cross bar, brace and job platform.
There are four disks to buckle on vertical supporting rod described in each, eight holes is provided on disk buckle, wherein four
Aperture, four macropores, four apertures are ellipse, and four macropores are trapezoidal.
Disk buckles on the vertical supporting rod, one of them is mounted on the top of vertical bar, and remaining three are uniformly mounted on
On vertical supporting rod, its spacing can be divided into vertical bar isometric four sections, and height of the bottom disk buckle apart from ground should be equal to
Other three sections, jointing is arranged at the top of the vertical supporting rod, and outer diameter is slightly less than the internal diameter of vertical supporting rod.
The end at the cross bar both ends is designed with can be inserted into disk buckle with movable wedge, chock by steel disc production
Hole in, and cross bar can be kept fixed.
The brace both ends are designed with brace connector, and equally, the chock on brace connector can smoothly be inserted into circle
In the macropore of disk buckle, brace connector and oblique pull shaft are fixed with pin shaft, brace can be rotated around pin shaft, and be inserted
Enter after disk buckle that be able to maintain brace fixed.
The job platform is made of hook, dull-finish steel, bottom support angle steel, and the internal diameter of hook can be bonded cross
Bar, so that job platform is firmly hung on cross bar.
Further, the vertical supporting rod is perpendicular to the round steel pipe of horizontal plane, and the cross bar is parallel to the circle of horizontal plane
Steel pipe.
Further, the vertical supporting rod, cross bar, brace, disk buckle are all made of hot dip galvanizing process.
Further, the vertical supporting rod, cross bar, brace all use national standard Q345B low-alloy structural steel.
Having the technical effect that for the utility model is unquestionable.In use, component is few for the job platform, without borrowing
Help other tools that can conveniently take, if special-purpose member and the multiple combinations of basic structure can be such that the platform adapts to for various buildings
Object.Main member is made of vertical supporting rod, brace, crossbar member, can be all made in factory, be prevented to the maximum extent
Movable spare and accessory parts problem easy to damage, easy to be lost, reduces the economic loss of engineering, is without any movable locking member, to greatest extent
Ground avoids the presence of dangerous structure member.
The Kong Zhonghou for the chock insertion disk buckle being arranged on brace, cross bar, what brace, cross bar can be firm consolidates
It is scheduled on vertical supporting rod, guarantees that reasonable stress, transmitting are errorless.This may save the times that installation is set up, and shorten operation horizontal
Platform sets up the period, effective to improve construction economy benefit.Self-locking mechanism is interted using independent chock, since interlocking and gravity are made
With, even if chock is not struck tightly, crossbar joint can not also be deviate from, in addition the contact surface of rod piece connector and vertical supporting rod is larger, it is horizontal
The bending strength of bar is to be improved, and when the two combines, bearing mode is reliably reasonable, and vertical supporting rod is not in askew
Tiltedly.Effectively ensure the safety of platform.Job platform is directly hung on cross bar, very easy to use, and it is also very convenient to dismantle,
It is set up completely without can be completed by other tools.Above-mentioned a series of measures not only makes job platform installation, disassembly
Facilitate simple and direct, and it meets safety requirements in operation process to greatest extent.
Detailed description of the invention
Fig. 1 is the use state of the utility model with reference to figure;
Fig. 2 is the L1 magnified partial view of Fig. 1;
Fig. 3 is the upper end enlarged drawing of vertical supporting rod;
Fig. 4 is the structural schematic diagram of brace;
Fig. 5 is the structural schematic diagram of job platform;
Fig. 6 is another use state of the utility model with reference to figure;
Fig. 7 is another use state of the utility model with reference to figure;
In figure: vertical supporting rod 1 disk buckle 101, connects sleeve 102, is long to cross bar 2, cross bar chock 201, short
Cross bar 3, brace 4, brace chock 401, brace connector 402, pin shaft 403, job platform 5, angle steel 501, hook 502,
Dull-finish steel 503, oval taper hole 1011, trapezoidal taper hole 1012.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples, but should not be construed the utility model
Above-mentioned subject area is only limitted to following embodiments.In the case where not departing from the above-mentioned technical idea of the utility model, according to ability
Domain ordinary technical knowledge and customary means make various replacements and change, should all include within the protection scope of the present utility model.
Referring to attached drawing 1, a kind of novel simplicity sets up job platform, including vertical supporting rod 1, it is long to cross bar 2, short cross bar 3,
Brace 4, job platform 5.
The vertical supporting rod 1 is the cylinder steel body an of inner hollow, and passes through zinc-plated processing, and the upper end includes connector sleeve
Cylinder 102, the outer diameter of sleeve 102 is 2~4mm smaller than the inner diameter of vertical supporting rod, further cylinder steel body upper and lower side
It is open.
There is disk to buckle 101 on the vertical supporting rod 1, is provided with oval taper hole 1011, trapezoidal taper hole on disk buckle
1012, oval taper hole 1011 is aperture, and trapezoidal taper hole 1012 is macropore.Aperture is inserted into for the movable wedge of cross bar, and macropore can
For the connector chock insertion of brace, likewise, disk buckle also passes through zinc-plated processing, surface smooth and beautiful appearance.
The cross bar 2 is the round steel pipe cylinder steel body of inner hollow, and by zinc-plated processing, there is cross bar in the end of cross bar 2
Chock 201, chock can activities.Chock is made of steel disc, and in embodiment, cross bar chock 201 can be inserted on disk buckle and open up
Oval taper hole 1011 in, and it is fixed in oval taper hole 1011, after installation, cross bar 2 and the perpendicular shape of vertical supporting rod 1
State.
The brace 4 is similarly the cylinder steel body of inner hollow, and passes through zinc-plated processing, and the brace uses
Brace chock 401 is fixed, and 4 end of brace has brace connector 402, brace connector 402 and brace main body to connect using pin shaft 403
It connects, the brace 4 can be rotated around pin shaft 403.The brace connector 402, which can be detained, to be inserted on disk buckle, and can be with
In the trapezoidal taper hole 1012 of alignment thereon, and keep fastening.
The dull-finish steel 503 of the job platform 5 is arranged in bottom support angle steel 501, the bottom support angle steel
Two cephalic pars have a hook 502, and job platform 5 is hung on short cross bar 3 by hook 502, the length of the dull-finish steel 503 and
The length of cross bar 2 is identical.The dull-finish steel in case of emergency can also provide one for operating personnel and effectively lead to
Road guarantees personal safety.
In embodiment, the requirement that a unit is not able to satisfy longer construction and installation operating surface is can be combined with multiple units
Using specifically may refer to attached drawing 6.
In embodiment, the cross bar can be mounted on first disk card of vertical supporting rod according to the height that construction needs
It buckles, also mountable on second disk buckle, for highly not high construction site, the brace can be uneasy
Dress.In embodiment, when the place needs higher job platform, two vertical supporting rods 1 can be utilized connection sleeve 102
It is grouped together and meets construction requirement, referring specifically to attached drawing 7.
In embodiment, it is obvious that a kind of novel simplicity sets up job platform advantage:
(1) joint construction is reasonable, and light and handy easy, operation is easy, and technologically advanced, reasonable design of node can all reach each bar
Part power transmission passes through node center;
(2) bearing capacity is good, and using Q345B steel, the load that can be born is larger;
(3) dosage is few, light-weight, and stabilized structure is reliable;
(4) function is more, is able to satisfy the requirement of different height operating platform, and operator carries out group with can be convenient
Dress.Component is series standardized, and traffic expense, maintenance expense are taken the expense of tearing open, rental charge and all can correspondingly be saved.
Above-mentioned single simplicity, which sets up job platform, can undertake the weight of 400~700KG, be fully able to burden construction personnel and
Object construct, it can be achieved that modularization assembling, reduces production and operation cost, raising working efficiency.With engineering practice is crossed, at present in good fortune
It builds turnover in certain engineering project to use for half a year, effect is obvious, the peace of the job platform before not only greatly simplifying
Process is filled, and also improves the safety of job platform.Since the assembling for setting up job platform of this novel simplicity is fixed
Movable wedge is all utilized, installation, removal efficiency are greatly improved.Above-mentioned technical breakthrough, the effective warp for improving construction
Ji benefit, it will set up job platform as the simplicity most by market approval.
Claims (3)
1. a kind of novel simplicity sets up job platform, it is characterised in that: long including at least four vertical supporting rods (1), at least two
To cross bar (2), at least two short cross bars (3), at least four braces (4) and at least two job platforms (5);
Vertical supporting rod (1) described in each includes disk buckle (101), connection sleeve (102), is provided with ellipse on disk buckle
Taper hole (1011), trapezoidal taper hole (1012);The length can be inserted into cross bar chock (201) to cross bar (2) both ends, the short cross bar
(3) both ends cage structure is with long to cross bar (2);The brace (4) includes brace chock (401), brace connector (402), pin shaft
(403);The job platform (5) includes angle steel (501), hook (502), dull-finish steel (503);
The length is each perpendicular to vertical supporting rod (1) to cross bar (2), short cross bar (3), and the vertical supporting rod (1) is grown to cross bar
(2), short cross bar (3), brace (4), disk buckle (101) are all made of hot dip galvanizing process, national standard Q345B low-alloy structural
Steel.
2. a kind of novel simplicity according to claim 1 sets up job platform, it is characterised in that: the vertical supporting rod (1)
It is perpendicular to the galvanized steel bar of horizontal plane;The length is parallel to the galvanized steel bar of horizontal plane to cross bar (2), short cross bar (3).
3. a kind of novel simplicity according to claim 1 sets up job platform, it is characterised in that: the brace (4) can
To be rotated around pin shaft (403);The brace connector (402) and cross bar (2) angle at 45 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821498666.4U CN209040519U (en) | 2018-09-13 | 2018-09-13 | A kind of novel simplicity sets up job platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821498666.4U CN209040519U (en) | 2018-09-13 | 2018-09-13 | A kind of novel simplicity sets up job platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209040519U true CN209040519U (en) | 2019-06-28 |
Family
ID=67033111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821498666.4U Active CN209040519U (en) | 2018-09-13 | 2018-09-13 | A kind of novel simplicity sets up job platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209040519U (en) |
-
2018
- 2018-09-13 CN CN201821498666.4U patent/CN209040519U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9861190B2 (en) | Wood gang form and method for constructing concrete building using same | |
CN100480481C (en) | Quadrangular pyramid sphere net case falsework-free constructing and mounting method and hoisting machine tool | |
CN101280613B (en) | Girders assembling kit as well as girders and girders support system | |
WO2011100941A1 (en) | Scaffold and methods for installing or removing such a scaffold | |
AU2006201721B1 (en) | Hook-On-Scaffold | |
CN205476545U (en) | Multipurpose combined strength construction ground protection shed structure support frame | |
CN209040519U (en) | A kind of novel simplicity sets up job platform | |
CN206753085U (en) | A kind of sliding platform for being used to install high-altitude wire frame steel construction | |
CN107338965A (en) | The discharging of modularization ready-package and outer protection integrated system for assembled architecture | |
CN109898820B (en) | Outer protective frame of assembled building and assembled building construction method | |
CN110552495A (en) | assembled building combined tool type outer protective frame system and construction method thereof | |
CN201003224Y (en) | Unit type suspended ceiling point claw transfer member | |
CN207110500U (en) | The discharging of modularization ready-package and outer protection integrated system for assembled architecture | |
CN210767926U (en) | Safety protection platform | |
CN210713906U (en) | Guardrail bar is prevented to prefabricated assembled | |
CN210482949U (en) | Novel plug-in type scaffold | |
CN208456185U (en) | A kind of tower crane wall-connecting piece safe walkway | |
CN208347279U (en) | A kind of building faces side structural column construction protecting rack | |
CN205873735U (en) | Device is climbed to special tower built -in in superelevation layer | |
CN201730306U (en) | Light-weight scaffold | |
CN205617763U (en) | Omnipotent support combined bay support element and omnipotent support combined bay | |
CN206110328U (en) | Steel construction interlayer | |
CN219118718U (en) | Climbing frame horizontal protection | |
CN216893384U (en) | Indoor scaffold convenient to disassemble for building construction | |
CN219585686U (en) | Safe telescopic channel for suspended tower crane driver |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230203 Address after: 409-419, Floor 4, Martial Arts Hall Building, 168 Yugu Road, Xihu District, Hangzhou City, Zhejiang Province, 310013 (singular) Patentee after: Jiedi Design Group Co.,Ltd. Address before: 361008 unit 901-904, 68 Taidong Road, Siming District, Xiamen City, Fujian Province Patentee before: FUJIAN LVCHENG BUILDING DESIGN Co.,Ltd. |