CN209029807U - A kind of electric pole construction auxiliary body for expanding aerial condutor spacing - Google Patents
A kind of electric pole construction auxiliary body for expanding aerial condutor spacing Download PDFInfo
- Publication number
- CN209029807U CN209029807U CN201821636263.1U CN201821636263U CN209029807U CN 209029807 U CN209029807 U CN 209029807U CN 201821636263 U CN201821636263 U CN 201821636263U CN 209029807 U CN209029807 U CN 209029807U
- Authority
- CN
- China
- Prior art keywords
- tubulose
- strut
- tubulose strut
- guide sleeve
- spacing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 239000000463 material Substances 0.000 claims description 25
- 238000002955 isolation Methods 0.000 claims description 10
- 239000004020 conductor Substances 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 8
- 210000004262 dental pulp cavity Anatomy 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Abstract
The electric pole construction auxiliary body that the utility model discloses a kind of for expanding aerial condutor spacing, can reliably two aerial condutors be strutted by being intended to provide one kind, enough working spaces are provided for pole operation, and are operated easily for expanding the electric pole construction auxiliary body of aerial condutor spacing.It includes vertical standpipe, the vertically sliding sleeve of standpipe sliding, the tubulose strut of two opposite sides for being distributed in vertical standpipe, the connecting rod and the one-to-one coordinated type conducting wire hold-fast body being arranged on tubulose strut of connection tubulose strut and sliding sleeve, the upper end of tubulose strut and the upper end of vertical standpipe are hinged and connected, coordinated type conducting wire hold-fast body includes connecting line, tension spring, the hoop plate of the guide sleeve being slidably located on tubulose strut and two semicirculars in shape for holding aerial condutor tightly, one of hoop plate is fixed on tubulose strut, another hoop plate is fixed on guide sleeve.
Description
Technical field
The utility model relates to a kind of power construction utensils, and in particular to a kind of for expanding the electric pole of aerial condutor spacing
Construct auxiliary body.
Background technique
Currently, when needing to need when erectting new high-tension pole for wherein certain section of high-voltage line by two parallel conducting wires
It pulls open, increases the distance between conducting wire, provide enough working spaces for pole operation, it is ensured that operation safety.At present by two
The distracted mode of operation of root conducting wire has following several:
First, carrying out operation using two band electric cars, band electric car is parked at two conducting wires, and construction personnel passes through band electric car will
Conducting wire pulls open, which needs band electric car and several construction personnel to cooperate, inconvenient;
Second, binding insulated working rope on two conducting wires, two construction personnel on the ground pull open conducting wire, the operation
Mode is pulled open aerial condutor by manpower, and there are biggish security risks.
Third, being connect respectively by tied rope with insulating bar after two conducting wires are pulled open, to two conducting wires be strutted, the work
Industry mode tied rope is connect with Zhi Guanzhuan strut to be generally required several Collaboration operations and could strut conducting wire, position, and is deposited
In biggish security risk.
Utility model content
The purpose of this utility model, which is to provide for one kind, reliably to be strutted two aerial condutors, be pole operation
Enough working spaces are provided, and are operated easily for expanding the electric pole construction auxiliary body of aerial condutor spacing.
The technical solution of the utility model is:
A kind of electric pole construction auxiliary body for expanding aerial condutor spacing, including vertical standpipe, setting are vertically being stood
On the tube wall of pipe and vertically the axially extending strip-shaped hole of standpipe, be connected by connector with vertical standpipe and be located at and vertically stood
The sliding sleeve clamping screw being arranged on sliding sleeve, sliding sleeve is arranged in the guide ring of the top of pipe, the vertically sliding sleeve of standpipe sliding
Pull rod on medial surface, two opposite sides for being distributed in vertical standpipe tubulose strut, connect the company of tubulose strut and sliding sleeve
Bar and the coordinated type conducting wire hold-fast body being arranged on tubulose strut correspondingly, the upper end of the tubulose strut are stood with vertical
The upper end of pipe is hinged and connected, and the other end and the sliding sleeve of connecting rod are hinged and connected, and the end of the pull rod passes through strip-shaped hole and is located at perpendicular
Into standpipe, the coordinated type conducting wire hold-fast body include connecting line, tension spring, the guide sleeve being slidably located on tubulose strut and
The hoop plate of two semicirculars in shape for holding aerial condutor tightly, one of hoop plate are fixed on tubulose strut, another hoop plate
It is fixed on guide sleeve, the axis and tubulose strut of the hoop plate are perpendicular, and the guide sleeve, which is located at, to be fixed on tubulose strut
Hoop plate and the lower end of tubulose strut between, the hoop plate that is fixed on tubulose strut and tension spring are located at the same side of guide sleeve, drawing
One end of spring is connected with guide sleeve, and the other end of tension spring is connected with tubulose strut, the first end and pull rod of the connecting line
It is connected, the second end of connecting line sequentially passes through upper end, guide ring and the corresponding tubulose strut of vertical standpipe and and guide sleeve
It is connected.
The electric pole construction auxiliary body for expanding aerial condutor spacing of this programme, which can reliably make somebody a mere figurehead two, to be led
Line struts, and provides enough working spaces for pole operation, and operates convenient, is conducive to operating personnel quickly for two framves
Hollow wire struts.
Preferably, the lateral surface of tubulose strut is equipped with the bar shaped convex block extended along the length direction of tubulose strut, lead
The guide groove matched with bar shaped convex block is equipped with to the medial surface of set.
Preferably, being additionally provided with conductor loop on the lower end surface of tubulose strut, the connecting line passes through corresponding conductor loop.
Preferably, the lateral surface of guide sleeve is equipped with pull ring lower installation board, pull ring lower installation board, which is equipped under pull ring, pacifies
Fill hole, tubulose strut be equipped with pull ring upper mounting plate, pull ring upper mounting plate be equipped with pull ring upper installing hole, one end of tension spring with lead
It is connected to mounting hole under upper pull ring is covered, the other end of tension spring is connected with the pull ring upper installing hole on tubulose strut.
Preferably, two root canal shape struts are symmetrically distributed in the opposite sides of vertical standpipe.
Preferably, the material of hoop plate is isolation material.
Preferably, the material of vertical standpipe is isolation material.
Preferably, the material of connecting rod is isolation material.
The beneficial effects of the utility model are: can reliably strut two aerial condutors, foot is provided for pole operation
Enough working spaces, and operate convenient, be conducive to operating personnel and quickly strut two aerial condutors.
Detailed description of the invention
Fig. 1 is a kind of structural representation of the electric pole construction auxiliary body for expanding aerial condutor spacing of the utility model
Figure.
Fig. 2 is the partial enlarged view in Fig. 1 at A.
Fig. 3 is the partial enlarged view in Fig. 1 at B.
Fig. 4 is the electric pole construction auxiliary body for expanding aerial condutor spacing of the utility model in actual application
One of structural schematic diagram.
In figure:
Vertical standpipe 1, strip-shaped hole 1.1, sliding sleeve spacing block set 1.2;
Sliding sleeve 2, pull rod 2.1;
Guide ring 3;
Tubulose strut 4;
Connecting rod 5;
Coordinated type conducting wire hold-fast body 6, guide sleeve 6.1 bind round plate 6.2, tension spring 6.3, connecting line 6.4, conductor loop 6.5, item
Shape convex block 6.6, pull ring lower installation board 6.7, pull ring upper mounting plate 6.8;
Sliding sleeve clamping screw 7;
Aerial condutor 8.
Specific embodiment
To keep technical solutions of the utility model embodiment purposes, technical schemes and advantages clearer, with reference to the accompanying drawing
Clearly explanation and illustration is carried out to the technical solution of the utility model embodiment, but following embodiments are only the utility model
Preferred embodiment, rather than whole embodiments.Based on the implementation example in the implementation mode, those skilled in the art are not making wound
Obtained other embodiments under the premise of the property made is worked, belong to the protection scope of the utility model.
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning
Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng
The embodiment for examining attached drawing description is exemplary, and is only used for explaining this programme, and cannot be construed to the utility model
Limitation.
Referring to following description and drawings, it will be clear that these and other aspects of the embodiments of the present invention.At these
In description and attached drawing, it is originally practical to indicate to implement to specifically disclose some particular implementations in the embodiments of the present invention
Some modes of the principle of novel embodiment, but it is to be understood that the range of the embodiments of the present invention is not limited.
On the contrary, the embodiments of the present invention include the spirit for falling into attached claims and all changes within the scope of intension,
Modification and equivalent.
In the description of the present invention, it should be understood that term " thickness ", "upper", "lower", "horizontal", "top",
The orientation or positional relationship of the instructions such as "bottom", "inner", "outside", " circumferential direction " is to be based on the orientation or positional relationship shown in the drawings, only
It is the utility model and simplified description for ease of description, rather than the device or element of indication or suggestion meaning must have spy
Fixed orientation is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In the utility model
Description in, the meaning of " plurality " is at least two, such as two, three etc., unless otherwise specifically defined, " several "
Being meant that indicates one or more.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu
It is fixed " etc. terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral: can be
Mechanical connection is also possible to be electrically connected or can communicate each other;It can be directly connected, the indirect phase of intermediary can also be passed through
Even, the connection inside two elements or the interaction relationship of two elements be can be, unless otherwise restricted clearly.For this
For the those of ordinary skill in field, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
Specific embodiment one: as shown in Fig. 1, Fig. 2, a kind of electric pole construction auxiliary machine for expanding aerial condutor spacing
Structure, including vertical standpipe 1, be arranged on the tube wall of vertical standpipe and vertically the axially extending strip-shaped hole 1.1 of standpipe, pass through
Connector is connected with vertical standpipe and is located at the guide ring 3 of the top of vertical standpipe, the sliding sleeve 2 that vertically standpipe slides, setting
Sliding sleeve clamping screw 7 on sliding sleeve, 2.1, two, pull rod be arranged on the medial surface of sliding sleeve are distributed in the phase of vertical standpipe
Tubulose strut 4 and the one-to-one coordinated type conducting wire hold-fast body 6 being arranged on tubulose strut to two sides.
The upper and lower ends opening of vertical standpipe.The material of vertical standpipe is isolation material, such as plastic material.Vertical standpipe
On lateral surface and it is located at the lower section of sliding sleeve equipped with sliding sleeve spacing block set 1.2.
Guide ring and vertical standpipe are coaxial.
Tubulose strut is a support tube, and the upper and lower ends of tubulose strut are open.Two root canal shape struts are symmetrically distributed in
The opposite sides of vertical standpipe.The upper end of tubulose strut and the upper end of vertical standpipe are hinged and connected.Tubulose strut passes through with sliding sleeve
Connecting rod 5 is connected, and is hinged and connected in the middle part of one end of connecting rod and tubulose strut, the other end and the sliding sleeve of connecting rod are hinged and connected.Tubulose
The material of strut is isolation material, such as plastic material.The material of connecting rod is isolation material, such as plastic material.
The material of sliding sleeve is isolation material, such as plastic material.The end of pull rod passes through strip-shaped hole and is located in vertical standpipe.
As shown in Fig. 1, Fig. 2, Fig. 3, coordinated type conducting wire hold-fast body includes connecting line 6.4, tension spring 6.3, is slidably located in
The hoop plate 6.2 of guide sleeve 6.1 and two semicirculars in shape for holding aerial condutor tightly on tubulose strut, one of hoop plate are solid
It is scheduled on tubulose strut, another hoop plate is fixed on guide sleeve.It is additionally provided with conductor loop 6.5 on the lower end surface of tubulose strut, leads
Wire loop and tubulose strut are coaxial.
The material for binding round plate is isolation material, such as plastic material.The lateral surface of tubulose strut is equipped with the length along tubulose strut
The bar shaped convex block 6.6 that direction extends is spent, the medial surface of guide sleeve is equipped with the guide groove matched with bar shaped convex block.
Axis and the tubulose strut for binding round plate are perpendicular.Guide sleeve is located at the hoop plate and tubulose strut being fixed on tubulose strut
Lower end between.The lateral surface of guide sleeve is equipped with pull ring lower installation board 6.7, and pull ring lower installation board is equipped under pull ring and installs
Hole.Tubulose strut is equipped with pull ring upper mounting plate 6.8, and pull ring upper mounting plate is equipped with pull ring upper installing hole.Pull ring upper mounting plate
It is located at the opposite sides of guide sleeve with the lower end of tubulose strut.
The hoop plate and tension spring that are fixed on tubulose strut are located at the same side of guide sleeve.One end of tension spring is connected with guide sleeve
It connects, the other end of tension spring is connected with tubulose strut, specifically, one end of tension spring is connected with mounting hole under the pull ring on guide sleeve
It connects, the other end of tension spring is connected with the pull ring upper installing hole on tubulose strut.Tension spring is used for guide sleeve toward being fixed on tubulose
It draws in hoop plate direction on strut.
The first end of connecting line 6.4 is connected with pull rod 2.1, and the second end of connecting line sequentially passes through the upper of vertical standpipe
End, guide ring, corresponding tubulose strut and conductor loop are simultaneously connected with guide sleeve, specifically, the second end of connecting line initially passes through
The upper end of vertical standpipe and guide ring, are then protruded into tubulose strut by the upper end opening of tubulose strut, by under tubulose strut
End opening stretches out and passes through conductor loop, is connected with guide sleeve.
The present embodiment for expand aerial condutor spacing electric pole construction auxiliary body it is specifically used as follows:
First, as shown in Figure 1, vertically standpipe slides down by sliding sleeve, rotate tubulose strut toward vertical standpipe direction
It shrinks, until sliding sleeve is against on sliding sleeve spacing block set, connecting line is pulled on guide sleeve and guide sleeve during this
It is mobile toward the lower end of tubulose strut to bind round plate, makes two hoop plate separation;
Second, aerial condutor 8 binds round the gap between plate by two and is placed between two hoop plates, will be in two aerial condutors
An aerial condutor be placed in one between two hoop plates on a tubulose strut, another aerial condutor is placed in another pipe
Between two hoop plates on shape strut;
Third makes tubulose strut rotary expansion outward, this mistake as shown in figure 4, vertically standpipe up slides by sliding sleeve
Cheng Zhong, connecting line discharge guide sleeve, make the hoop plate on guide sleeve and guide sleeve under the action of reset spring toward tubulose strut
Upper end is mobile, and until two hoop plates hold aerial condutor tightly, aerial condutor is fixed between two hoop plates;Meanwhile
During this, tubulose strut struts two aerial condutors 8, provides enough working spaces for pole operation;
Then, sliding sleeve is locked on vertical standpipe by sliding sleeve clamping screw.
The electric pole construction auxiliary body for expanding aerial condutor spacing of the present embodiment can be reliably aerial by two
Conducting wire struts, and provides enough working spaces for pole operation, and operates convenient, is conducive to operating personnel quickly for two
Aerial condutor struts.
Claims (6)
- The auxiliary body 1. a kind of electric pole for expanding aerial condutor spacing is constructed, characterized in that exist including vertical standpipe, setting On the tube wall of vertical standpipe and vertically the axially extending strip-shaped hole of standpipe, by connector be connected and be located at vertical standpipe The guide ring of the top of vertical standpipe, the vertically sliding sleeve of standpipe sliding, the sliding sleeve clamping screw being arranged on sliding sleeve, setting exist Tubulose strut, connection tubulose strut and the cunning of pull rod on the medial surface of sliding sleeve, two opposite sides for being distributed in vertical standpipe The connecting rod of set and the coordinated type conducting wire hold-fast body being arranged on tubulose strut correspondingly,The upper end of the tubulose strut and the upper end of vertical standpipe are hinged and connected, and the other end and the sliding sleeve of connecting rod are hinged and connected, institute The end for stating pull rod passes through strip-shaped hole and is located in vertical standpipe,The coordinated type conducting wire hold-fast body includes connecting line, tension spring, the guide sleeve being slidably located on tubulose strut and two For holding the hoop plate of the semicircular in shape of aerial condutor tightly, one of hoop plate is fixed on tubulose strut, another hoop plate is fixed On guide sleeve, the axis and tubulose strut of the hoop plate are perpendicular, and the guide sleeve is located at the hoop being fixed on tubulose strut Between plate and the lower end of tubulose strut, the hoop plate and tension spring that are fixed on tubulose strut are located at the same side of guide sleeve, tension spring One end is connected with guide sleeve, and the other end of tension spring is connected with tubulose strut, and the first end of the connecting line is connected with pull rod It connects, the second end of connecting line sequentially passes through upper end, guide ring and the corresponding tubulose strut of vertical standpipe and is connected with guide sleeve It connects.
- 2. the electric pole construction auxiliary body according to claim 1 for expanding aerial condutor spacing, characterized in that described The lateral surface of tubulose strut is equipped with the bar shaped convex block extended along the length direction of tubulose strut, the medial surface of guide sleeve be equipped with The guide groove that bar shaped convex block matches.
- 3. the electric pole construction auxiliary body according to claim 1 for expanding aerial condutor spacing, characterized in that described Conductor loop is additionally provided on the lower end surface of tubulose strut, the connecting line passes through corresponding conductor loop.
- 4. the electric pole construction auxiliary body according to claim 1 or 2 or 3 for expanding aerial condutor spacing, feature It is that the lateral surface of the guide sleeve is equipped with pull ring lower installation board, pull ring lower installation board is equipped with mounting hole under pull ring, tubulose support Bar is equipped with pull ring upper mounting plate, and pull ring upper mounting plate is equipped with pull ring upper installing hole, the drawing on one end and guide sleeve of tension spring Mounting hole is connected under ring, and the other end of tension spring is connected with the pull ring upper installing hole on tubulose strut.
- 5. the electric pole construction auxiliary body according to claim 1 or 2 or 3 for expanding aerial condutor spacing, feature It is that the material of the hoop plate is isolation material.
- 6. the electric pole construction auxiliary body according to claim 1 or 2 or 3 for expanding aerial condutor spacing, feature It is that the material of the vertical standpipe is isolation material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821636263.1U CN209029807U (en) | 2018-10-09 | 2018-10-09 | A kind of electric pole construction auxiliary body for expanding aerial condutor spacing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821636263.1U CN209029807U (en) | 2018-10-09 | 2018-10-09 | A kind of electric pole construction auxiliary body for expanding aerial condutor spacing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209029807U true CN209029807U (en) | 2019-06-25 |
Family
ID=66905854
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821636263.1U Active CN209029807U (en) | 2018-10-09 | 2018-10-09 | A kind of electric pole construction auxiliary body for expanding aerial condutor spacing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209029807U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109473909A (en) * | 2018-10-09 | 2019-03-15 | 国网浙江省电力有限公司衢州供电公司 | For expanding the electric pole construction auxiliary body of aerial condutor spacing |
CN110445068A (en) * | 2019-08-01 | 2019-11-12 | 安康 | A kind of communication equipment cable support device |
CN112054435A (en) * | 2020-08-11 | 2020-12-08 | 国家电网有限公司 | High-altitude threading tool, mounting method and threading method |
-
2018
- 2018-10-09 CN CN201821636263.1U patent/CN209029807U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109473909A (en) * | 2018-10-09 | 2019-03-15 | 国网浙江省电力有限公司衢州供电公司 | For expanding the electric pole construction auxiliary body of aerial condutor spacing |
CN109473909B (en) * | 2018-10-09 | 2020-06-05 | 国网浙江省电力有限公司衢州供电公司 | A pole construction complementary unit for expanding overhead conductor interval |
CN110445068A (en) * | 2019-08-01 | 2019-11-12 | 安康 | A kind of communication equipment cable support device |
CN112054435A (en) * | 2020-08-11 | 2020-12-08 | 国家电网有限公司 | High-altitude threading tool, mounting method and threading method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209029807U (en) | A kind of electric pole construction auxiliary body for expanding aerial condutor spacing | |
US20140262434A1 (en) | Adjustable cover for conductors and insulators | |
CN202696056U (en) | One-man operated charged current guide junction device | |
CN209029806U (en) | A kind of rotary aerial condutor device for spreading | |
CN104377049B (en) | Multi-functional intelligent switch controller operating device | |
CN109462181A (en) | Rotary aerial condutor device for spreading | |
CN208835554U (en) | The operating device that insulate and insulation operation equipment | |
CN103166135B (en) | Multifunctional operational tool | |
CN102916363B (en) | Quick plug-in device of pluggable bus and using method thereof | |
CN102496887B (en) | Folding live-working safety shelter | |
CN203103882U (en) | Insulation bracing frame for live 10kV cable lead disconnection and connection operation | |
CN109473909A (en) | For expanding the electric pole construction auxiliary body of aerial condutor spacing | |
CN109449851A (en) | Telescoping cable spacing expander | |
CN210577616U (en) | Protection device for mounting wire pipe in embedded construction of building electrical casing plugging point positioner | |
CN217362341U (en) | Distribution network live working anti-loosening cable clamp installation rod | |
CN107681537B (en) | Charge the adjustable strut of upright bar locking device | |
CN211655576U (en) | Special tool for installing hot-line operation wire clamp | |
CN208835586U (en) | A kind of telescoping cable spacing expander | |
CN108963857A (en) | A kind of application method of 10kV overhead transmission line combined type limit seal and the device | |
CN206944083U (en) | A kind of folded socket joint type light pole | |
CN108010689A (en) | A kind of dry-type transformer | |
CN207092582U (en) | A kind of building protective screening | |
CN209056852U (en) | A kind of distribution portable telescopic is taken gripper device | |
CN209447661U (en) | A kind of mounting structure of flat surface transformer | |
CN209562237U (en) | A kind of communication base station electric power safeguard power generation stake |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |