CN109473909A - For expanding the electric pole construction auxiliary body of aerial condutor spacing - Google Patents

For expanding the electric pole construction auxiliary body of aerial condutor spacing Download PDF

Info

Publication number
CN109473909A
CN109473909A CN201811174256.9A CN201811174256A CN109473909A CN 109473909 A CN109473909 A CN 109473909A CN 201811174256 A CN201811174256 A CN 201811174256A CN 109473909 A CN109473909 A CN 109473909A
Authority
CN
China
Prior art keywords
strut
tubulose
tubulose strut
spacing
aerial condutor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811174256.9A
Other languages
Chinese (zh)
Other versions
CN109473909B (en
Inventor
黄宏和
许屹
姜正德
洪贵潮
周光乐
巫水萍
万伟江
余令勇
黄炎阶
徐拥华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811174256.9A priority Critical patent/CN109473909B/en
Publication of CN109473909A publication Critical patent/CN109473909A/en
Application granted granted Critical
Publication of CN109473909B publication Critical patent/CN109473909B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Electric Cable Installation (AREA)

Abstract

The electric pole construction auxiliary body that the invention discloses a kind of for expanding aerial condutor spacing, can reliably two aerial condutors be strutted by being intended to provide one kind, enough working spaces are provided for pole operation, and are operated easily for expanding the electric pole construction auxiliary body of aerial condutor spacing.It includes vertical standpipe, the vertically sliding sleeve of standpipe sliding, the tubulose strut of two opposite sides for being distributed in vertical standpipe, the connecting rod of connection tubulose strut and sliding sleeve and the coordinated type conducting wire hold-fast body that is arranged on tubulose strut correspondingly, the upper end of tubulose strut and the upper end of vertical standpipe are hinged and connected, coordinated type conducting wire hold-fast body includes connecting line, tension spring, guide sleeve and the hoop plate of two semicirculars in shape for holding aerial condutor tightly on the tubulose strut that is slidably located in, one of hoop plate is fixed on tubulose strut, another hoop plate is fixed on guide sleeve.

Description

For expanding the electric pole construction auxiliary body of aerial condutor spacing
Technical field
The present invention relates to a kind of power construction utensils, and in particular to a kind of electric pole construction for expanding aerial condutor spacing Auxiliary body.
Background technique
Currently, when needing to need when erectting new high-tension pole for wherein certain section of high-voltage line by two parallel conducting wires It pulls open, increases the distance between conducting wire, provide enough working spaces for pole operation, it is ensured that operation safety.At present by two The distracted mode of operation of root conducting wire has following several:
First, carrying out operation using two band electric cars, band electric car is parked at two conducting wires, and construction personnel passes through band electric car for conducting wire It pulls open, which needs band electric car and several construction personnel to cooperate, inconvenient;
Second, binding insulated working rope on two conducting wires, two construction personnel on the ground pull open conducting wire, the operation mode Aerial condutor is pulled open by manpower, there are biggish security risks.
Third, being connect respectively by tied rope with insulating bar after two conducting wires are pulled open, to two conducting wires be strutted, the work Industry mode tied rope is connect with Zhi Guanzhuan strut to be generally required several Collaboration operations and could strut conducting wire, position, and is deposited In biggish security risk.
Summary of the invention
The purpose of the invention is to provide one kind can reliably strut two aerial condutors, provided for pole operation Enough working spaces, and operate easily for expanding the electric pole construction auxiliary body of aerial condutor spacing.
The technical scheme is that
A kind of electric pole construction auxiliary body for expanding aerial condutor spacing, including vertical standpipe, is arranged in vertical standpipe On tube wall and vertically the axially extending strip-shaped hole of standpipe, be connected by connector with vertical standpipe and be located at vertical standpipe The guide ring of top, the vertically sliding sleeve of standpipe sliding, the sliding sleeve clamping screw being arranged on sliding sleeve, the inside that sliding sleeve is set Pull rod on face, two be distributed in vertical standpipe the tubulose strut of opposite sides, the connecting rod of connection tubulose strut and sliding sleeve and Coordinated type conducting wire hold-fast body on tubulose strut, upper end and the vertical standpipe of the tubulose strut are set correspondingly Upper end is hinged and connected, and the other end sliding sleeve of connecting rod is hinged and connected, and the end of the pull rod passes through strip-shaped hole and is located at vertical standpipe Interior, the coordinated type conducting wire hold-fast body includes connecting line, tension spring, guide sleeve and two are used on the tubulose strut that is slidably located in Hold the hoop plate of the semicircular in shape of aerial condutor tightly, one of hoop plate is fixed on tubulose strut, another hoop plate, which is fixed on, leads To putting on, the axis and tubulose strut of the hoop plate are perpendicular, the guide sleeve be located at the hoop plate being fixed on tubulose strut and Between the lower end of tubulose strut, the hoop plate and tension spring that are fixed on tubulose strut are located at the same side of guide sleeve, one end of tension spring It is connected with guide sleeve, the other end of tension spring is connected with tubulose strut, and the first end of the connecting line is connected with pull rod, even The second end of wiring sequentially passes through upper end, guide ring and the corresponding tubulose strut of vertical standpipe and is connected with guide sleeve.
The electric pole construction auxiliary body for expanding aerial condutor spacing of this programme, which can reliably make somebody a mere figurehead two, to be led Line struts, and provides enough working spaces for pole operation, and operates convenient, is conducive to operating personnel quickly for two framves Hollow wire struts.
Preferably, the lateral surface of tubulose strut is equipped with the bar shaped convex block extended along the length direction of tubulose strut, lead The guide groove matched with bar shaped convex block is equipped with to the medial surface of set.
Preferably, being additionally provided with conductor loop on the lower end surface of tubulose strut, the connecting line passes through corresponding conductor loop.
Preferably, the lateral surface of guide sleeve is equipped with pull ring lower installation board, pull ring lower installation board, which is equipped under pull ring, pacifies Fill hole, tubulose strut be equipped with pull ring upper mounting plate, pull ring upper mounting plate be equipped with pull ring upper installing hole, one end of tension spring with lead It is connected to mounting hole under upper pull ring is covered, the other end of tension spring is connected with the pull ring upper installing hole on tubulose strut.
Preferably, two root canal shape struts are symmetrically distributed in the opposite sides of vertical standpipe.
Preferably, the material of hoop plate is isolation material.
Preferably, the material of vertical standpipe is isolation material.
Preferably, the material of connecting rod is isolation material.
The beneficial effects of the present invention are: can reliably strut two aerial condutors, provided for pole operation enough Working space, and operate convenient, be conducive to operating personnel and quickly strut two aerial condutors.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the electric pole construction auxiliary body for expanding aerial condutor spacing of the invention.
Fig. 2 is the partial enlarged view in Fig. 1 at A.
Fig. 3 is the partial enlarged view in Fig. 1 at B.
Fig. 4 is that the electric pole for expanding aerial condutor spacing of the invention constructs auxiliary body in actual application A kind of structural schematic diagram.
In figure:
Vertical standpipe 1, strip-shaped hole 1.1, sliding sleeve spacing block set 1.2;
Sliding sleeve 2, pull rod 2.1;
Guide ring 3;
Tubulose strut 4;
Connecting rod 5;
Coordinated type conducting wire hold-fast body 6, guide sleeve 6.1 bind round plate 6.2, and tension spring 6.3, connecting line 6.4, conductor loop 6.5, bar shaped is convex Block 6.6, pull ring lower installation board 6.7, pull ring upper mounting plate 6.8;
Sliding sleeve clamping screw 7;
Aerial condutor 8.
Specific embodiment
To keep technical solution of the present invention embodiment purposes, technical schemes and advantages clearer, with reference to the accompanying drawing to this The technical solution of inventive embodiments carries out clearly explanation and illustration, but following embodiments are merely a preferred embodiment of the present invention, Rather than whole embodiments.Based on the implementation example in the implementation mode, those skilled in the art are not making creative work Under the premise of obtained other embodiments, belong to protection scope of the present invention.
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, and is only used for explaining this programme, and cannot be construed to the limitation to the present invention program.
Referring to following description and drawings, it will be clear that these and other aspects of the embodiment of the present invention.In these descriptions In attached drawing, some particular implementations in the embodiment of the present invention are specifically disclosed to indicate to implement the embodiment of the present invention Principle some modes, but it is to be understood that the scope of embodiments of the invention is not limited.On the contrary, reality of the invention Applying example includes all changes, modification and the equivalent fallen within the scope of the spirit and intension of attached claims.
In the description of the present invention, it is to be understood that, term " thickness ", "upper", "lower", "horizontal", "top", "bottom", The orientation or positional relationship of the instructions such as "inner", "outside", " circumferential direction " be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In the description of the present invention, " multiple " It is meant that at least two, such as two, three etc., unless otherwise specifically defined, " several " are meant that expression one Or it is multiple.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral: can be mechanical connect It connects, is also possible to be electrically connected or can communicate each other;It can be directly connected, can also indirectly connected through an intermediary, it can be with It is the interaction relationship of the connection or two elements inside two elements, unless otherwise restricted clearly.For this field For those of ordinary skill, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
Specific embodiment one: as shown in Fig. 1, Fig. 2, a kind of electric pole construction auxiliary machine for expanding aerial condutor spacing Structure, including vertical standpipe 1, be arranged on the tube wall of vertical standpipe and vertically the axially extending strip-shaped hole 1.1 of standpipe, pass through Connector is connected with vertical standpipe and is located at the guide ring 3 of the top of vertical standpipe, the sliding sleeve 2 that vertically standpipe slides, setting Sliding sleeve clamping screw 7 on sliding sleeve, 2.1, two, pull rod be arranged on the medial surface of sliding sleeve are distributed in the phase of vertical standpipe Tubulose strut 4 and the one-to-one coordinated type conducting wire hold-fast body 6 being arranged on tubulose strut to two sides.
The upper and lower ends opening of vertical standpipe.The material of vertical standpipe is isolation material, such as plastic material.Vertical standpipe On lateral surface and it is located at the lower section of sliding sleeve equipped with sliding sleeve spacing block set 1.2.
Guide ring and vertical standpipe are coaxial.
Tubulose strut is a support tube, and the upper and lower ends of tubulose strut are open.Two root canal shape struts are symmetrically distributed in The opposite sides of vertical standpipe.The upper end of tubulose strut and the upper end of vertical standpipe are hinged and connected.Tubulose strut passes through with sliding sleeve Connecting rod 5 is connected, and is hinged and connected in the middle part of one end of connecting rod and tubulose strut, the other end sliding sleeve of connecting rod is hinged and connected.Tubulose support The material of bar is isolation material, such as plastic material.The material of connecting rod is isolation material, such as plastic material.
The material of sliding sleeve is isolation material, such as plastic material.The end of pull rod passes through strip-shaped hole and is located in vertical standpipe.
As shown in Fig. 1, Fig. 2, Fig. 3, coordinated type conducting wire hold-fast body includes connecting line 6.4, tension spring 6.3, is slidably located in Guide sleeve 6.1 and the hoop plate 6.2 of two semicirculars in shape for holding aerial condutor tightly, one of hoop plate are fixed on tubulose strut On tubulose strut, another hoop plate is fixed on guide sleeve.Conductor loop 6.5, conducting wire are additionally provided on the lower end surface of tubulose strut Ring and tubulose strut are coaxial.
The material for binding round plate is isolation material, such as plastic material.The lateral surface of tubulose strut is equipped with the length along tubulose strut The bar shaped convex block 6.6 that direction extends is spent, the medial surface of guide sleeve is equipped with the guide groove matched with bar shaped convex block.
Axis and the tubulose strut for binding round plate are perpendicular.Guide sleeve is located at the hoop plate and tubulose strut being fixed on tubulose strut Lower end between.The lateral surface of guide sleeve is equipped with pull ring lower installation board 6.7, and pull ring lower installation board is equipped under pull ring and installs Hole.Tubulose strut is equipped with pull ring upper mounting plate 6.8, and pull ring upper mounting plate is equipped with pull ring upper installing hole.Pull ring upper mounting plate It is located at the opposite sides of guide sleeve with the lower end of tubulose strut.
The hoop plate and tension spring that are fixed on tubulose strut are located at the same side of guide sleeve.One end of tension spring is connected with guide sleeve It connects, the other end of tension spring is connected with tubulose strut, specifically, one end of tension spring is connected with mounting hole under the pull ring on guide sleeve It connects, the other end of tension spring is connected with the pull ring upper installing hole on tubulose strut.Tension spring is used for guide sleeve toward being fixed on tubulose It draws in hoop plate direction on strut.
The first end of connecting line 6.4 is connected with pull rod 2.1, and the second end of connecting line sequentially passes through the upper of vertical standpipe End, guide ring, corresponding tubulose strut and conductor loop are simultaneously connected with guide sleeve, specifically, the second end of connecting line initially passes through The upper end of vertical standpipe and guide ring, are then protruded into tubulose strut by the upper end opening of tubulose strut, by under tubulose strut End opening stretches out and passes through conductor loop, is connected with guide sleeve.
The present embodiment for expand aerial condutor spacing electric pole construction auxiliary body it is specifically used as follows:
First, as shown in Figure 1, vertically standpipe slides down by sliding sleeve, make tubulose strut toward vertical standpipe direction rotating shrinking, Until sliding sleeve is against on sliding sleeve spacing block set, it is past to pull on the hoop plate on guide sleeve and guide sleeve for connecting line during this The lower end of tubulose strut is mobile, makes two hoop plate separation;
Second, aerial condutor 8 binds round the gap between plate by two and is placed between two hoop plates, by one in two aerial condutors Root aerial condutor is placed in one between two hoop plates on a tubulose strut, and another aerial condutor is placed in the support of another tubulose Between two hoop plates on bar;
Third makes tubulose strut rotary expansion outward, this process as shown in figure 4, vertically standpipe up slides by sliding sleeve In, connecting line discharges guide sleeve, makes the hoop plate on guide sleeve and guide sleeve under the action of reset spring toward the upper of tubulose strut End movement, until two hoop plates hold aerial condutor tightly, aerial condutor is fixed between two hoop plates;Meanwhile at this During a, tubulose strut struts two aerial condutors 8, provides enough working spaces for pole operation;
Then, sliding sleeve is locked on vertical standpipe by sliding sleeve clamping screw.
The electric pole construction auxiliary body for expanding aerial condutor spacing of the present embodiment can be reliably aerial by two Conducting wire struts, and provides enough working spaces for pole operation, and operates convenient, is conducive to operating personnel quickly for two Aerial condutor struts.

Claims (8)

  1. The auxiliary body 1. a kind of electric pole for expanding aerial condutor spacing is constructed, characterized in that exist including vertical standpipe, setting On the tube wall of vertical standpipe and vertically the axially extending strip-shaped hole of standpipe, by connector be connected and be located at vertical standpipe The guide ring of the top of vertical standpipe, the vertically sliding sleeve of standpipe sliding, the sliding sleeve clamping screw being arranged on sliding sleeve, setting exist Tubulose strut, connection tubulose strut and the cunning of pull rod on the medial surface of sliding sleeve, two opposite sides for being distributed in vertical standpipe The connecting rod of set and the coordinated type conducting wire hold-fast body being arranged on tubulose strut correspondingly,
    The upper end of the tubulose strut and the upper end of vertical standpipe are hinged and connected, and the other end sliding sleeve of connecting rod is hinged and connected, described The end of pull rod passes through strip-shaped hole and is located in vertical standpipe,
    The coordinated type conducting wire hold-fast body includes connecting line, tension spring, guide sleeve and two use on the tubulose strut that is slidably located in In the hoop plate for the semicircular in shape for holding aerial condutor tightly, one of hoop plate is fixed on tubulose strut, another hoop plate is fixed on On guide sleeve, the axis and tubulose strut of the hoop plate are perpendicular, and the guide sleeve is located at the hoop plate being fixed on tubulose strut Between the lower end of tubulose strut, the hoop plate that is fixed on tubulose strut and tension spring are located at the same side of guide sleeve, and the one of tension spring End is connected with guide sleeve, and the other end of tension spring is connected with tubulose strut, and the first end of the connecting line is connected with pull rod, The second end of connecting line sequentially passes through upper end, guide ring and the corresponding tubulose strut of vertical standpipe and is connected with guide sleeve.
  2. 2. the electric pole construction auxiliary body according to claim 1 for expanding aerial condutor spacing, characterized in that described The lateral surface of tubulose strut is equipped with the bar shaped convex block extended along the length direction of tubulose strut, the medial surface of guide sleeve be equipped with The guide groove that bar shaped convex block matches.
  3. 3. the electric pole construction auxiliary body according to claim 1 for expanding aerial condutor spacing, characterized in that described Conductor loop is additionally provided on the lower end surface of tubulose strut, the connecting line passes through corresponding conductor loop.
  4. 4. the electric pole construction auxiliary body according to claim 1 or 2 or 3 for expanding aerial condutor spacing, feature It is that the lateral surface of the guide sleeve is equipped with pull ring lower installation board, pull ring lower installation board is equipped with mounting hole under pull ring, tubulose support Bar is equipped with pull ring upper mounting plate, and pull ring upper mounting plate is equipped with pull ring upper installing hole, the drawing on one end and guide sleeve of tension spring Mounting hole is connected under ring, and the other end of tension spring is connected with the pull ring upper installing hole on tubulose strut.
  5. 5. the electric pole construction auxiliary body according to claim 1 or 2 or 3 for expanding aerial condutor spacing, feature It is that the two root canals shape strut is symmetrically distributed in the opposite sides of vertical standpipe.
  6. 6. the electric pole construction auxiliary body according to claim 1 or 2 or 3 for expanding aerial condutor spacing, feature It is that the material of the hoop plate is isolation material.
  7. 7. the electric pole construction auxiliary body according to claim 1 or 2 or 3 for expanding aerial condutor spacing, feature It is that the material of the vertical standpipe is isolation material.
  8. 8. the electric pole construction auxiliary body according to claim 1 or 2 or 3 for expanding aerial condutor spacing, feature It is that the material of the connecting rod is isolation material.
CN201811174256.9A 2018-10-09 2018-10-09 A pole construction complementary unit for expanding overhead conductor interval Active CN109473909B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811174256.9A CN109473909B (en) 2018-10-09 2018-10-09 A pole construction complementary unit for expanding overhead conductor interval

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811174256.9A CN109473909B (en) 2018-10-09 2018-10-09 A pole construction complementary unit for expanding overhead conductor interval

Publications (2)

Publication Number Publication Date
CN109473909A true CN109473909A (en) 2019-03-15
CN109473909B CN109473909B (en) 2020-06-05

Family

ID=65664532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811174256.9A Active CN109473909B (en) 2018-10-09 2018-10-09 A pole construction complementary unit for expanding overhead conductor interval

Country Status (1)

Country Link
CN (1) CN109473909B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29804595U1 (en) * 1997-04-01 1998-07-09 Pfalzwerke Ag Bird protection valve
JP5159412B2 (en) * 2008-04-24 2013-03-06 中国電力株式会社 Safety equipment
CN203301073U (en) * 2013-04-25 2013-11-20 国家电网公司 Installation apparatus of conducting rod
CN203800521U (en) * 2014-04-25 2014-08-27 江苏捷诚车载电子信息工程有限公司 Cable rainproof switching device
CN203932820U (en) * 2014-06-12 2014-11-05 国网山东省电力公司潍坊供电公司 A kind of electric stringing cross-line device
CN104852329A (en) * 2015-05-29 2015-08-19 国网山东济南市历城区供电公司 Construction tool of protective casing of high-pressure overhead line
CN105356371A (en) * 2015-12-04 2016-02-24 国家电网公司 Same-tower multi-loop power transmission line strain insulator string electrification replacing method and device
CN107666133A (en) * 2016-07-29 2018-02-06 中国航发商用航空发动机有限责任公司 Cable special installation tool
CN209029807U (en) * 2018-10-09 2019-06-25 国网浙江省电力有限公司衢州供电公司 A kind of electric pole construction auxiliary body for expanding aerial condutor spacing

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29804595U1 (en) * 1997-04-01 1998-07-09 Pfalzwerke Ag Bird protection valve
JP5159412B2 (en) * 2008-04-24 2013-03-06 中国電力株式会社 Safety equipment
CN203301073U (en) * 2013-04-25 2013-11-20 国家电网公司 Installation apparatus of conducting rod
CN203800521U (en) * 2014-04-25 2014-08-27 江苏捷诚车载电子信息工程有限公司 Cable rainproof switching device
CN203932820U (en) * 2014-06-12 2014-11-05 国网山东省电力公司潍坊供电公司 A kind of electric stringing cross-line device
CN104852329A (en) * 2015-05-29 2015-08-19 国网山东济南市历城区供电公司 Construction tool of protective casing of high-pressure overhead line
CN105356371A (en) * 2015-12-04 2016-02-24 国家电网公司 Same-tower multi-loop power transmission line strain insulator string electrification replacing method and device
CN107666133A (en) * 2016-07-29 2018-02-06 中国航发商用航空发动机有限责任公司 Cable special installation tool
CN209029807U (en) * 2018-10-09 2019-06-25 国网浙江省电力有限公司衢州供电公司 A kind of electric pole construction auxiliary body for expanding aerial condutor spacing

Also Published As

Publication number Publication date
CN109473909B (en) 2020-06-05

Similar Documents

Publication Publication Date Title
CN209029807U (en) A kind of electric pole construction auxiliary body for expanding aerial condutor spacing
US20140262434A1 (en) Adjustable cover for conductors and insulators
CN202696056U (en) One-man operated charged current guide junction device
CN209029806U (en) A kind of rotary aerial condutor device for spreading
CN109462181A (en) Rotary aerial condutor device for spreading
CN109473909A (en) For expanding the electric pole construction auxiliary body of aerial condutor spacing
CN103681142B (en) A kind of crane insulating barrier
CN104865419B (en) A kind of device installed for transmission line fault detector
CN106207525A (en) A kind of split-type is connected wires installation tool
CN109449851A (en) Telescoping cable spacing expander
CN203260950U (en) 10kV power distribution rack live-replacement drop-out type fuse device
CN205583173U (en) Cable connector
CN206076156U (en) A kind of compound inslation column support type SF6Chopper
CN210577616U (en) Protection device for mounting wire pipe in embedded construction of building electrical casing plugging point positioner
CN205282852U (en) Multifunctional grounding wire
CN203859421U (en) Insulation current-transmitting telescoping device above 220 kV
CN207530280U (en) The removable lining low-voltage grounding wire clamp of handle
CN206944083U (en) A kind of folded socket joint type light pole
CN106710994B (en) A kind of mounting fuse device operation stick
CN206976931U (en) Supporting wire rack device
CN202221859U (en) Lifting bar possessing novel line connection system
CN209472269U (en) A kind of pole type transformer low-pressure section extension apparatus
CN103326277A (en) Charged operation spiral type convenient binding wire device
CN104682210A (en) Single-pole switch frame for 10 KV line
CN103022933A (en) Temporary insulating clamper for electrically connecting drainage wire

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant