CN209013773U - Sintering furnace exhaust system - Google Patents

Sintering furnace exhaust system Download PDF

Info

Publication number
CN209013773U
CN209013773U CN201821817342.2U CN201821817342U CN209013773U CN 209013773 U CN209013773 U CN 209013773U CN 201821817342 U CN201821817342 U CN 201821817342U CN 209013773 U CN209013773 U CN 209013773U
Authority
CN
China
Prior art keywords
fixing piece
sintering furnace
elastic component
arc panel
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821817342.2U
Other languages
Chinese (zh)
Inventor
肖利强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI YING FA RUINENG TECHNOLOGY Co.,Ltd.
Original Assignee
Sichuan Yingfa Solar Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Yingfa Solar Technology Co Ltd filed Critical Sichuan Yingfa Solar Technology Co Ltd
Priority to CN201821817342.2U priority Critical patent/CN209013773U/en
Application granted granted Critical
Publication of CN209013773U publication Critical patent/CN209013773U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The utility model discloses sintering furnace exhaust systems, including air-exhausting duct, the lower part of air-exhausting duct and the exhaust pipe of sintering furnace connect, tubular filter bag is provided in air-exhausting duct, the top and bottom of tubular filter bag are respectively arranged with the first fixing piece, second fixing piece, first fixing piece includes the first arc panel of multistage, it is connected between adjacent first arc panel by the first elastic component, it further include the first connector, the outer wall of first connector is symmetrically hinged with two group of first bindiny mechanism, first bindiny mechanism includes 2 first connecting rods, it is connected between 2 first connecting rods by lead screw, the end of 2 first connecting rods and respectively the first connector, first arc panel is hinged, the structure of second fixing piece is similar to the first fixing piece, wherein connected between 2 the second connecting rods by third elastic component, first connecting rod set up and down and the second connection It is connected between bar by connecting rod.The utility model solves the problems, such as that existing exhaust equipment causes the evacuation ability of organic solvent insufficient.

Description

Sintering furnace exhaust system
Technical field
The utility model relates to solar energy polycrystal cell piece preparation technical fields, and in particular to sintering furnace exhaust system.
Background technique
Sintering is last one of critical process that solar energy polycrystal cell piece becomes finished product, and which determine solar energy polycrystal electricity The efficiency and qualification rate of pond piece, and sintering furnace directly affects the success or failure of sintering process.
The silicon wafer that sintering will exactly print slurry makes most of organic solvent in slurry after drying coke discharging process Volatilization, then sinters cell piece into, finally electrode and silicon wafer itself is made to form Ohmic contact, at high temperature to improve cell piece Open-circuit voltage and fill factor this 2 key factor parameters, make the contact of electrode that there is resistance characteristic, reach the high conversion of production The purpose of efficient cell piece.
Sintering furnace is equipped with air draft, fluorescent tube and crawler belt facility.Sintering furnace exhaust equipment causes to burn if there is problem The organic matter row volatilized inside freezing of a furnace does not go out, and accumulates inside sintering furnace, to make organic matter and silicon wafer contact stain electricity Pond piece leads to sintering exception, low efficiency.
Utility model content
The purpose of this utility model is to provide sintering furnace exhaust systems, and solving existing exhaust equipment leads to organic solvent The problem of evacuation ability deficiency.
The utility model is achieved through the following technical solutions:
Sintering furnace exhaust system, including air-exhausting duct, the lower part of the air-exhausting duct and the exhaust pipe of sintering furnace connect, the row The top of air hose is connect by ring flange with discharge pipe, is provided with tubular filter bag in the air-exhausting duct, and the two of the tubular filter bag End opening, the top and bottom of the tubular filter bag are respectively arranged with the first fixing piece, the second fixing piece, first fixing piece It is connected including passing through the first elastic component between the first arc panel of multistage, adjacent first arc panel, first arc panel and first The first annular structure in elastic component besieged city, the first annular structure are provided centrally with the first connector, first connector Outer wall be symmetrically hinged with two group of first bindiny mechanism, every group of first bindiny mechanism includes 2 first connecting rods, 2 first companies It is connected between extension bar by lead screw, the end of 2 first connecting rods and the first connector, the first arc panel respectively are hinged, described Second fixing piece includes being connected between the second arc panel of multistage, adjacent second arc panel by the second elastic component, second arc Shape plate and the second elastic component are encircled a city the second ring structure, and second ring structure is provided centrally with the second connector, described The outer wall of second connector is symmetrically hinged with two group of second bindiny mechanism, and every group of second bindiny mechanism includes 2 the second connecting rods, Connected between 2 the second connecting rods by third elastic component, the end of 2 the second connecting rods respectively with the second connector, second Arc panel is hinged, is connected between first connecting rod set up and down and the second connecting rod by connecting rod, in the air-exhausting duct Blower is provided with above tubular filter bag.
In the prior art, the main problem of exhaust equipment is that exhaust pipe is blocked in use, and then causes The problem of the evacuation ability deficiency of exhaust equipment organic solvent.
Originally it is that tubular filter bag described in utility model is used to collect the impurity in exhaust, impurity is avoided to be deposited in exhaust pipe Wall, first fixing piece, the second fixing piece can be realized contraction, and then realize that tubular filter bag is detachable and be clamped on exhaust pipe Inner wall, first fixing piece, the second fixing piece are symmetrical arranged in appreciation, and two group of first bindiny mechanism is arranged in a mutually vertical manner, and two The second bindiny mechanism of group is arranged in a mutually vertical manner, and the adjusting (lead screw with) of spacing between 2 first connecting rods is realized by adjusting screw It is connected through a screw thread between first connecting rod, and then realizes the contraction of the first fixing piece, due to the first connection set up and down It is connected between bar and the second connecting rod by connecting rod, when adjusting screw, spacing is realized with adjusting between 2 second connecting rods The contraction of second fixing piece, but when needing for tubular filter bag to be fixed on exhaust inside pipe wall, adjusting screw makes the first fixing piece, the Two fixing pieces expansion be vented inside pipe wall is close to, when needing to take out tubular filter bag, adjusting screw make the first fixing piece, Second fixing piece is shunk, and then opens ring flange, by exhaust pipe upper end taking-up tubular filter bag, the tubular filter bag more renewed, It is reusable after the cleaning of tubular filter bag;The top of sintering furnace is arranged in the air-exhausting duct, production when for exporting sintering furnace work Raw exhaust.
The utility model realizes the contraction and expansion of the first fixing piece, the second fixing piece by adjusting screw, passes through first Fixing piece, the contraction of the second fixing piece and expansion realize that the detachable setting of tubular filter bag is being vented inside pipe wall, while blower can To dismantle, the impurity in exhaust is collected by setting detachable tubular filter bag with installation tubular filter bag convenient for taking out, Impurity is avoided to be deposited in exhaust pipe, periodic cleaning tubular filter bag can avoid exhaust pipe and be blocked.In this way, the utility model Solve the problems, such as that existing exhaust equipment causes the evacuation ability of organic solvent insufficient.
Further, 2 arc fixed plates are symmetrically arranged in air-exhausting duct, the assembling is described on connecting plate Connecting plate is removably mounted on arc fixed plate.
Further, card slot is arranged in the upper surface of arc fixed plate, and the lower end surface of the connecting plate is provided with matches with card slot The protrusion of conjunction.
Structural stability is good when realizing the detachable setting of blower by the cooperation of card slot and protrusion, and fixing.
Further, it is provided with strainer in arrival end and outlet end in tubular filter bag, the strainer setting is solid first Determine between part and the second fixing piece.
The strainer can further be collected the impurity in exhaust, avoid tubular filter bag inner wall to a certain extent Dirt fall after rise to sintering furnace.
Further, the lower end of air-exhausting duct is provided with connecting tube, between the inner wall of the connecting tube and the outer wall of exhaust pipe It is connected through a screw thread.
Further, even there is handle on lead screw, the handle is cyclic structure.
Finger can just tip cyclic structure in when operation, and adjusting screw is convenient in the setting of the handle.
Further, the first elastic component, the second elastic component and third elastic component are spring.
The utility model compared with prior art, has the following advantages and benefits:
The utility model realizes the contraction and expansion of the first fixing piece, the second fixing piece by adjusting screw, passes through first Fixing piece, the contraction of the second fixing piece and expansion realize that the detachable setting of tubular filter bag is being vented inside pipe wall, while blower can To dismantle, the impurity in exhaust is collected by setting detachable tubular filter bag with installation tubular filter bag convenient for taking out, Impurity is avoided to be deposited in exhaust pipe, periodic cleaning tubular filter bag can avoid exhaust pipe and be blocked.In this way, the utility model Solve the problems, such as that existing exhaust equipment causes the evacuation ability of organic solvent insufficient.
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the utility model embodiment, constitutes the one of the application Part does not constitute the restriction to the utility model embodiment.In the accompanying drawings:
Fig. 1 is the structural schematic diagram of exhaust system;
Fig. 2 is the structural schematic diagram of the first fixing piece;
Fig. 3 is the structural schematic diagram of the second fixing piece.
Label and corresponding parts title in attached drawing:
1- air-exhausting duct, 2- tubular filter bag, the first fixing piece of 3-, 4- arc fixed plate, 5- connecting plate, 6- blower, 7- exhaust Pipe, 8- ring flange, the second fixing piece of 9-, 11- connecting tube, the first arc panel of 31-, the first elastic component of 32-, 33- strainer, 34- the One connecting rod, 35- lead screw, 36- handle, the first connector of 37-, the second arc panel of 91-, the second elastic component of 92-, 93- second connect Extension bar, 94- third elastic component, the second connector of 95-.
Specific embodiment
For the purpose of this utility model, technical solution and advantage is more clearly understood, below with reference to embodiment and attached drawing, The utility model is described in further detail, and the exemplary embodiment and its explanation of the utility model are only used for explaining this Utility model is not intended to limit the scope of the present invention.
Embodiment 1:
As shown in Figure 1 to Figure 3, sintering furnace exhaust system, including air-exhausting duct 1, the lower part of the air-exhausting duct 1 and sintering furnace Exhaust pipe 7 connects, and specifically, the lower end of the air-exhausting duct 1 is provided with connecting tube 11, the inner wall and exhaust pipe of the connecting tube 11 It is connected through a screw thread between 7 outer wall, the top of the air-exhausting duct 1 is connect by ring flange 8 with discharge pipe, the air-exhausting duct 1 It is inside provided with tubular filter bag 2, the top and bottom of the both ends open of the tubular filter bag 2, the tubular filter bag 2 are respectively arranged with First fixing piece 3, the second fixing piece 9, first fixing piece 3 include the first arc panel of multistage 31, adjacent first arc panel 31 Between connected by the first elastic component 32, first arc panel 31 and the first elastic component 32 are encircled a city first annular structure, described First annular structure is provided centrally with the first connector 37, and the outer wall of first connector 37 is symmetrically hinged with two group first Bindiny mechanism, two group of first bindiny mechanism are vertically arranged, and every group of first bindiny mechanism includes 2 first connecting rod 34,2 first It being connected between connecting rod 34 by lead screw 35, the lead screw 35 is used to adjust the spacing between 2 first connecting rods 34, and 2 the The end of one connecting rod 34 and respectively the first connector 37, the first arc panel 31 are hinged, and second fixing piece 9 includes multistage the It is connected between two arc panels 91, adjacent second arc panel 91 by the second elastic component 92, second arc panel 91 and the second bullet Property part 92 encircle a city the second ring structure, second ring structure is provided centrally with the second connector 95, second connection The outer wall of body 95 is symmetrically hinged with two group of second bindiny mechanism, and every group of second bindiny mechanism includes 2 the second connecting rods 93,2 Between second connecting rod 93 by third elastic component 94 connect, the end of 2 the second connecting rods 93 respectively with the second connector 95, Second arc panel 91 is hinged, is connected between first connecting rod 34 set up and down and the second connecting rod 93 by connecting rod, described The top of tubular filter bag 2 is provided with blower 6 in air-exhausting duct 1, specifically, it is solid that 2 arcs are symmetrically arranged in the air-exhausting duct 1 Fixed board 4, the blower 6 are mounted on connecting plate 5, and the connecting plate 5 is removably mounted on arc fixed plate 4, the arc Card slot is arranged in the upper surface of shape fixed plate 4, and the lower end surface of the connecting plate 5 is provided with the protrusion with card slot cooperation;Described first Elastic component 32, the second elastic component 92 and third elastic component 94 are spring, and the flow of the blower 6 is 450m3/h。
Embodiment 2:
As shown in Figure 1 to Figure 3, the present embodiment is based on embodiment 1, and the tubular filter bag 2 is interior equal in arrival end and outlet end It is provided with strainer 33, the strainer 33 is arranged between the first fixing piece 3 and the second fixing piece 9;Even have on the lead screw 35 Handle 36, the handle 36 are cyclic structure, and finger can just stick into cyclic structure when operation.
Above-described specific embodiment, to the purpose of this utility model, technical scheme and beneficial effects carried out into One step is described in detail, it should be understood that being not used to limit the foregoing is merely specific embodiment of the present utility model Determine the protection scope of the utility model, within the spirit and principle of the utility model, any modification for being made equally is replaced It changes, improve, should be included within the scope of protection of this utility model.

Claims (7)

1. sintering furnace exhaust system, including air-exhausting duct (1), the lower part of the air-exhausting duct (1) and the exhaust pipe (7) of sintering furnace connect It connects, which is characterized in that the top of the air-exhausting duct (1) is connect by ring flange (8) with discharge pipe, is set in the air-exhausting duct (1) It is equipped with tubular filter bag (2), the top and bottom of the both ends open of the tubular filter bag (2), the tubular filter bag (2) are respectively set There are the first fixing piece (3), the second fixing piece (9), first fixing piece (3) includes the first arc panel of multistage (31), adjacent It is connected between one arc panel (31) by the first elastic component (32), first arc panel (31) and the first elastic component (32) besieged city First annular structure, the first annular structure are provided centrally with the first connector (37), first connector (37) Outer wall is symmetrically hinged with two group of first bindiny mechanism, and every group of first bindiny mechanism includes 2 first connecting rods (34), and 2 first It is connected between connecting rod (34) by lead screw (35), the ends of 2 first connecting rods (34) and respectively the first connector (37), the One arc panel (31) hingedly, second fixing piece (9) include the second arc panel of multistage (91), adjacent second arc panel (91) it Between by the second elastic component (92) connect, second arc panel (91) and the second elastic component (92) besieged city the second ring structure, Second ring structure is provided centrally with the second connector (95), and the outer wall of second connector (95) is symmetrically hinged with Two group of second bindiny mechanism, every group of second bindiny mechanism include 2 the second connecting rods (93), between 2 the second connecting rods (93) By third elastic component (94) connect, the end of 2 the second connecting rods (93) respectively with the second connector (95), the second arc panel (91) hingedly, it is connected between first connecting rod (34) set up and down and the second connecting rod (93) by connecting rod, the air draft Blower (6) are provided with above tubular filter bag (2) in pipe (1).
2. sintering furnace exhaust system according to claim 1, which is characterized in that be symmetrically arranged with 2 in the air-exhausting duct (1) A arc fixed plate (4), the blower (6) are mounted on connecting plate (5), and the connecting plate (5) is removably mounted to arc In fixed plate (4).
3. sintering furnace exhaust system according to claim 2, which is characterized in that the upper surface of the arc fixed plate (4) Card slot is set, and the lower end surface of the connecting plate (5) is provided with the protrusion with card slot cooperation.
4. sintering furnace exhaust system according to claim 1, which is characterized in that in arrival end in the tubular filter bag (2) It is provided with strainer (33) with outlet end, the strainer (33) is arranged between the first fixing piece (3) and the second fixing piece (9).
5. sintering furnace exhaust system according to claim 1, which is characterized in that the lower end of the air-exhausting duct (1) is provided with Connecting tube (11) is connected through a screw thread between the inner wall of the connecting tube (11) and the outer wall of exhaust pipe (7).
6. sintering furnace exhaust system according to claim 1, which is characterized in that even there is handle on the lead screw (35) (36), the handle (36) is cyclic structure.
7. sintering furnace exhaust system according to any one of claims 1 to 6, which is characterized in that first elastic component (32), the second elastic component (92) and third elastic component (94) are spring.
CN201821817342.2U 2018-11-05 2018-11-05 Sintering furnace exhaust system Active CN209013773U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821817342.2U CN209013773U (en) 2018-11-05 2018-11-05 Sintering furnace exhaust system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821817342.2U CN209013773U (en) 2018-11-05 2018-11-05 Sintering furnace exhaust system

Publications (1)

Publication Number Publication Date
CN209013773U true CN209013773U (en) 2019-06-21

Family

ID=66841481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821817342.2U Active CN209013773U (en) 2018-11-05 2018-11-05 Sintering furnace exhaust system

Country Status (1)

Country Link
CN (1) CN209013773U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110360588A (en) * 2019-06-28 2019-10-22 成都高峰石油机械有限公司 The heating means of seawater shale gas exploitation boiler
CN110360752A (en) * 2019-06-28 2019-10-22 成都高峰石油机械有限公司 Boiler exhaust pipeline for seawater shale gas exploitation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110360588A (en) * 2019-06-28 2019-10-22 成都高峰石油机械有限公司 The heating means of seawater shale gas exploitation boiler
CN110360752A (en) * 2019-06-28 2019-10-22 成都高峰石油机械有限公司 Boiler exhaust pipeline for seawater shale gas exploitation

Similar Documents

Publication Publication Date Title
CN209013773U (en) Sintering furnace exhaust system
CN102373489B (en) Aluminium electrolysis flue gas dry purification method
CN102719265B (en) Solid waste or biomass high-efficiency pyrolysis oil-producing system
CN104401966A (en) Continuous type production equipment and method of carbon nano tube
CN209013775U (en) The cleaning plant of exhaust system
CN207385713U (en) A kind of high wind speed high temperature high efficiency electrostatic precipitator
CN207412968U (en) Novel dust collection device on aluminium oxide extraction process from coal ash
CN107520049B (en) A kind of multistage combined mesh electrode coal dust dust-precipitator
CN203469712U (en) Ceramic tube filtering device applicable to high-temperature dust removal filter
CN209254427U (en) A kind of novel adsorption desorption case
CN215654497U (en) Energy-concerving and environment-protective multistage high-efficient dust collector for industrial furnace kiln
CN206560743U (en) One kind is used for the electric exhaust emissions dedusting filtering bag of coal
CN204255069U (en) A kind of sintering furnace
CN214861904U (en) Electric arc furnace dust removal transformation device
CN104307265A (en) Fume dust collection tank
CN214261087U (en) Bag type pulse dust collection device for atmospheric treatment
CN212881493U (en) Be used for coal electricity tail gas discharge dust removal PPS filter bag
CN213326750U (en) Carbonization and activation energy-saving integrated furnace for preparing activated carbon
CN218282140U (en) Electric dust remover for high-voltage electrostatic dust removal
CN218307840U (en) Tubular filter membrane bottom fusing device
CN219972169U (en) Calcining device for lime powder
CN218064941U (en) Atmospheric direct-fired module boiler tail gas processing apparatus
CN204816091U (en) Low noise pulse dust removal device
CN108518962A (en) A kind of environment-friendly type waste heat recovering energy conserving device
CN209522578U (en) A kind of arc discharge device being used to prepare fullerene

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211014

Address after: 239300 Jingliu road and Weisan Road, Tianchang Economic Development Zone, Chuzhou City, Anhui Province

Patentee after: ANHUI YING FA RUINENG TECHNOLOGY Co.,Ltd.

Address before: 610000 Chengdu, Sichuan, China (Sichuan) free trade zone, 1 Print-Rite Road, Southwest Airport Economic Development Zone, Shuangliu District, Chengdu.

Patentee before: SICHUAN YINGFA SOLAR ENERGY TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right