CN208998391U - The automatic adjustable box priming apparatus of water filling - Google Patents

The automatic adjustable box priming apparatus of water filling Download PDF

Info

Publication number
CN208998391U
CN208998391U CN201821816177.9U CN201821816177U CN208998391U CN 208998391 U CN208998391 U CN 208998391U CN 201821816177 U CN201821816177 U CN 201821816177U CN 208998391 U CN208998391 U CN 208998391U
Authority
CN
China
Prior art keywords
water
ice
ice bucket
tank
controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821816177.9U
Other languages
Chinese (zh)
Inventor
罗立勃
王剑平
曾庆龙
叶周平
周学荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU BINGQUAN REFRIGERATION EQUIPMENT Co Ltd
Original Assignee
GUANGZHOU BINGQUAN REFRIGERATION EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU BINGQUAN REFRIGERATION EQUIPMENT Co Ltd filed Critical GUANGZHOU BINGQUAN REFRIGERATION EQUIPMENT Co Ltd
Priority to CN201821816177.9U priority Critical patent/CN208998391U/en
Application granted granted Critical
Publication of CN208998391U publication Critical patent/CN208998391U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Production, Working, Storing, Or Distribution Of Ice (AREA)

Abstract

The utility model discloses a kind of automatic adjustable box priming apparatus of water filling, including tank, partition and gap and water replenishment pump.Each section that partition is separated out forms the ice bucket of producing ice cakes.It wherein, further include the mouth of a river, the water pipe being connected on the mouth of a river, the water solenoid valve being equipped on water pipe, the controller being connect with water solenoid valve, and water level monitoring mechanism connected to the controller is equipped in the ice bucket of gap side.Water replenishment pump is connect with controller.Water level monitoring mechanism includes the floating ball mounting plate being equipped in tank, the bracket being equipped on floating ball mounting plate, and is equipped with according to ice cube weight value manufactured in single ice bucket on bracket to monitor liquid level and preset number of division and obtains the electronic float of ice bucket cubical content.Electronic float is connect with controller.The utility model, which has, to be reduced the moisturizing time, is precisely controlled amount of water and reduces manual operation, and the effect for improving the practical efficiency of equipment and economizing on resources.

Description

The automatic adjustable box priming apparatus of water filling
Technical field
The utility model belongs to ice making field, in particular to a kind of automatic adjustable box priming apparatus of water filling.
Background technique
Salt water ice brick machine is very important link in ice-making process, to ice mould moisturizing.Currently, ice bucket on the market adds There are three types of water installations: the first is water filling posture priming apparatus, and (as shown in Figure 1) device is welded according to ice bucket on single ice shelf The size installation filler pipe for connecing position, uses the connection small pump on filler pipe integrally to fill the water in ice bucket later, is generally adding Ball valve can be installed on water pipe additional, adjust the water flow on every road;The production of this priming apparatus and operation are fairly simple, and when use only needs Water pump is controlled to open and stop, so that it may completing an ice discharging bucket plus water conservancy project make, but above-mentioned plus water process be difficult control plus Water, single channel water flow are difficult uniformly often to will cause the waste to ice making water.Second is the box priming apparatus of water filling, (such as Shown in Fig. 2-3) its structure be first manufacture a water storage pond, ice cube is made according to single ice bucket in the tank later Pond is separated out the corresponding section of quantity with plate by the quantity that ice bucket can be formed in weight and single ice shelf, each section storage Water is roughly the same with the weight that ice cube is made in single ice bucket, and ice bucket welding on the section position being separated out and single ice shelf Position dimension is consistent, it is therefore an objective to guarantee to add water in each ice bucket on single ice shelf.Each of be separated out in pond Section bottom, which is provided with toward ice bucket, adds the mouth of a river of water, and one piece of steel cylinder and seal gasket are used on the mouth of a river, done above pond bearing with Shaft is linked together the steel cylinder in shaft and the mouth of a river using chain, has done a handle in the shaft stretched out outside pond Hand, hand, steel cylinder and seal gasket on the mouth of a river are opened manual rotation when adding water toward ice bucket, are waited into pond Handle, steel cylinder and rubber mat are unclamped when water discharges and compresses the mouth of a river by gravity reduction, are then opened water replenishment and are pumped toward pond Moisturizing.One electronic float is installed to control water replenishment amount in pond, it is ensured that the rate of water make-up of pond one time is equal to single ice shelf Water required for ice is made in upper all ice buckets.This priming apparatus can control amount of water very well, not will cause ice making water Waste, but it is more troublesome to operate.The third is water injecting tank priming apparatus, and (as illustrated in figures 4-5) its structure is first to manufacture The pond of one water storage, ice can be formed later by being made in the weight and single ice shelf of ice cube in the tank according to single ice bucket Pond is separated out the corresponding section of quantity with plate by the quantity of bucket, and ice cube is made in the water of each section storage and single ice bucket Weight is roughly the same, and the section position being separated out is consistent with the position dimension that ice bucket on single ice shelf welds, it is therefore an objective to ensure It can add water in each ice bucket on single ice shelf.The bottom that each section is separated out in pond, which is done toward ice bucket, adds water A set of filler pipe is done according to the position at the basin bottom mouth of a river is corresponding in the mouth of a river, and a steel circle is respectively welded at the fixed ice shelf both ends of filler pipe Column is fixed on bearing block, welds a handle in the fixed ice shelf one end therein of filler pipe, with hose by the water of basin bottom Mouth and filler pipe are correspondingly connected with, and filler pipe is laid flat hand, the water in pond is leaned on by manual rotation when adding water toward ice bucket Gravity flows in ice bucket, is rotated further by handle when waiting the water flow into pond dry, filler pipe is raised, this when filler pipe Top have to the highest liquid level for being higher by water replenishment, after filler pipe is raised, open water replenishment and pump toward water replenishment.Separately One electronic float is installed to control water replenishment amount in outer pond, purpose ensures that the rate of water make-up of pond one time is equal to single ice shelf The water that upper all ice bucket ice makings need.This priming apparatus is similar with second of box priming apparatus of water filling, and difference is exactly past Ice bucket adds the mode of water different, and this priming apparatus equally can be very good control amount of water, not will cause the waste of ice making water, But it is same more troublesome to operate.
Utility model content
In view of the above problems, the purpose of this utility model is to provide a kind of reduction moisturizing time, be precisely controlled amount of water And manual operation is reduced, and the automatic adjustable box priming apparatus of water filling for improving the practical efficiency of equipment and economizing on resources.
To achieve the above object, the automatic adjustable box priming apparatus of water filling provided by the utility model, including tank, It is equipped in tank and tank is divided into the partition in multiple sections and is set in tank side according to the weight that each ice cube is made Some gaps, and the access water supplement port that is equipped at the top of tank and in the coconnected water replenishment pump of access water supplement port.Every Each section that plate is separated out forms the ice bucket of producing ice cakes.It wherein, further include the water being equipped in the ice bucket bottom that each section is formed Mouthful, the water pipe being connected on the mouth of a river, the water solenoid valve being equipped on water pipe, the controller being connect with water solenoid valve, Ji Yi Water level monitoring mechanism connected to the controller is equipped in the ice bucket of mouth of a river side.Water replenishment pump is connect with controller.Water level prison Surveying mechanism includes the floating ball mounting plate being equipped in tank, the bracket being equipped on floating ball mounting plate, and is equipped on bracket The default number of division of liquid level is monitored according to ice cube weight value manufactured in single ice bucket obtains the electronic float of ice bucket cubical content.Electricity Sub- floating ball is connect with controller.
In some embodiments, 3 brackets are provided on floating ball mounting plate;The electronic float in ice bucket according to mending The different liquid levels of water are respectively arranged on 3 brackets.Above-mentioned liquid-level floater can be multiple or single.
In some embodiments, electronic float be respectively arranged at the minimum scale corresponding position of moisturizing liquid level in ice bucket, Mid-scale corresponding position and highest scale corresponding position.
In some embodiments, controller includes the circuit board for controlling electronic box, being equipped in control electronic box, and is being controlled Electronic box is equipped with the third gear rotary switch for connecting with circuit board and presetting number of division for adjusting liquid level in electronic float monitoring ice bucket.
In some embodiments, the connectivity slot being provided on partition between two ice buckets of connection.
The moisturizing time is reduced, amount of water is precisely controlled and reduces artificial behaviour the utility model has the beneficial effects that having Make, and the effect for improving the practical efficiency of equipment and economizing on resources.It is specific as follows: due to improved structure, to first pass through pond Small pump is toward ice bucket moisturizing, and when the water surface in ice bucket reaches the liquid level of the control of electronic float 2, floating ball will feedback signal closing Water replenishment pump.Water solenoid valve, which is opened, later adds water into ice bucket, closes water solenoid valve after reaching preset value.In addition, controller On three gear rotary switches be which electronic float selected to connect, to be controlled in pond with this by gear above Rate of water make-up finally produces the ice cube of corresponding weight.In this way, it is not only easy to operate, ice making water will not be wasted, and adjustable Water replenishment amount, the corresponding ice cube for producing different weight.It realizes and reduces the moisturizing time, is precisely controlled amount of water and reduces people Work operation, and the effect for improving the practical efficiency of equipment and economizing on resources.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the first water filling posture priming apparatus in the prior art;
Fig. 2 is the structural schematic diagram of second of box priming apparatus of water filling in the prior art;
Fig. 3 is the side structure schematic view of Fig. 2;
Fig. 4 is that the third fills the water the structural schematic diagram of box priming apparatus in the prior art;
Fig. 5 is the side structure schematic view of Fig. 4;
Fig. 6 is the structural schematic diagram of the utility model;
Fig. 7 is the side structure schematic view of Fig. 6;
Fig. 8 is the schematic cross-sectional view of A-A in Fig. 6;
Fig. 9 is structural schematic diagram.
Specific embodiment
Utility model is described in further detail with reference to the accompanying drawing.
As Figure 6-9, the automatic adjustable box priming apparatus of water filling, including tank 01, be equipped in tank 01 according to The spilling water that tank 01 is divided into the partition 02 in multiple sections and is equipped in 01 side of tank according to the weight that each ice cube is made Mouthful 03, and the access water supplement port 04 that is equipped at the top of tank 01 and in the access coconnected water replenishment of water supplement port 04 pump 05. Each section that partition 02 is separated out forms the ice bucket 06 of producing ice cakes.It further include being equipped in 06 bottom of ice bucket that each section is formed The mouth of a river 07, the water pipe 08 being connected on the mouth of a river 07, the water solenoid valve 09 being equipped on water pipe 08 are connect with water solenoid valve 09 Controller 10, and the water level monitoring mechanism 11 connecting with controller 10 is equipped in the ice bucket 06 of 0703 side of gap.Pond Small pump 05 is connect with controller 10.Water level monitoring mechanism 11 includes the floating ball mounting plate 111 being equipped in tank 01, floating The bracket 112 that ball mounting plate 111 is equipped with, and be equipped on bracket 112 according to manufactured ice cube weight value in single ice bucket 06 The electronic float 113 of 06 cubical content of ice bucket is obtained to monitor the default number of division of liquid level.Above-mentioned floating ball mounting plate 111 is mounted in In the U-shaped card slot 115 welded in advance in tank 01, floating ball mounting plate 111 is embedded in after passing through top margin, the left side and the right flanging In U-shaped card slot 115.In addition, electronic float 113 is mounted on the strip-shaped hole opened in advance in floating ball mounting plate 111 using bracket 112 On 114.Electronic float 113 is connect with controller 10.It is provided with 3 brackets 112 on floating ball mounting plate 111, electronic float 113 It is respectively arranged on 3 brackets 112 according to the different liquid levels of moisturizing in ice bucket 06.Above-mentioned liquid-level floater can be it is multiple or Person is single.Controller 10 includes control electronic box 101, is controlling the circuit board being equipped in electronic box 101, and on control electronic box 101 The third gear rotary switch that liquid level in ice bucket 06 presets number of division is monitored for adjusting electronic float 113 equipped with connecting with circuit board 102.The connectivity slot 12 being provided on partition 02 between two ice buckets 06 of connection.
Working principle
First manufacture a water storage pond, later in the tank 01 according to single ice bucket 06 be made ice cube weight and Pond is separated out the corresponding section of quantity with plate by the quantity that ice mould can be formed on single ice shelf, the water of each section storage with The weight that single ice is molded as ice cube on ice shelf is roughly the same, and ice die welding connects on the section position being separated out and single ice shelf Position dimension is consistent, it is therefore an objective to guarantee to add water in each ice mould on single ice shelf.What is be separated out in tank 01 is every The bottom in a section, which is equipped with toward ice mould, adds the mouth of a river 07 of water, can connect one section of water pipe 08 outside the mouth of a river 07 and facilitates and is added to the water in pond In ice mould, it will be installed the control of water solenoid valve 09 plus water on water pipe 08, water solenoid valve 09, water opened when adding water toward ice mould Water solenoid valve 09 is closed when water in pond adds, opening and closing water solenoid valve 09 is opened by the control of controller 10 It closes.It is separately installed with electronic float 113 there are three different height in tank 01, controls corresponding three water replenishment liquid respectively Face is set as electronic float 1, electronic float 2 and electronic float 3 here, corresponding since the liquid level of water replenishment is different The water being added in ice bucket 06 also can be different, it is possible to produce the ice cube of different weight.It is assumed herein that electronic float 1 controlled Water replenishment liquid level is minimum liquid level, and the ice cube weight in the corresponding single ice bucket 06 produced is 100kg, and so on, electricity The corresponding ice cube weight of sub- floating ball 2 is 110kg, and the corresponding ice cube weight of electronic float 3 is 120kg, this 3 electronic floats all can The third gear rotary switch 102 being connected to above controller 10, by adjusting the gear above third gear rotary switch 102, to select to connect Which electronic float led to, the rate of water make-up in pond is controlled with this, finally produces the ice cube of corresponding weight.Above-mentioned ice bucket 06 can reduce or increase;Rate of water make-up can also increase or reduce.
Embodiment 1
The ice cube for needing to make 110kg weight connects electronics with regard to the third gear rotary switch 102 above adjusting controller 10 Then floating ball 2 is pressed the button for opening water replenishment pump 05, is started toward 01 moisturizing of tank, when the water surface in tank 01 reaches When the liquid level controlled to electronic float 2, floating ball will feedback signal close water replenishment pump 05, then open and add water water toward ice mould Water solenoid valve 09 on pipe 08 adds water into ice mould, and when the water in pond adds, the water being added in each ice mould is rigid Fortunately 110kg or so, this when close water solenoid valve 09, just complete and once add water process.Continue starting water replenishment pump 05 starts moisturizing next time, the third gear rotation if to make the ice cube of 100kg 120kg weight, above adjusting controller 10 Turn on pass 102 and connect corresponding electronic float, remaining operation with it is above-mentioned consistent.
Above-described is only some embodiments of the utility model.For those of ordinary skill in the art, Without departing from the concept of the present invention, various modifications and improvements can be made, these belong to practical new The protection scope of type.

Claims (5)

1. the automatic adjustable box priming apparatus of water filling, is equipped with including tank, in tank according to the weight that each ice cube is made The gap that tank is divided into the partition in multiple sections and be equipped in tank side by amount, and what is be equipped at the top of tank connect Enter water supplement port and in the coconnected water replenishment pump of access water supplement port;
Each section that the partition is separated out forms the ice bucket of producing ice cakes,
It is characterized in that, further include the mouth of a river that is equipped with of ice bucket bottom formed in each section, the water pipe being connected on the mouth of a river, The water solenoid valve being equipped on water pipe, the controller being connect with water solenoid valve, and be equipped with and control in the ice bucket of gap side The water level monitoring mechanism of device connection processed;
The water replenishment pump is connect with controller;
The water level monitoring mechanism includes the floating ball mounting plate being equipped in tank, the support being equipped on floating ball mounting plate Frame, and on bracket be equipped with according to ice cube weight value manufactured in single ice bucket come monitor liquid level preset number of division obtain ice bucket hold The electronic float of accumulated amount;The electronic float is connect with controller.
2. the automatic adjustable box priming apparatus of water filling according to claim 1, which is characterized in that the floating ball mounting plate On be provided with 3 brackets;The electronic float is respectively arranged in 3 brackets according to the different liquid levels of moisturizing in ice bucket On.
3. the automatic adjustable box priming apparatus of water filling according to claim 2, which is characterized in that the electronic float point It is not set to the minimum scale corresponding position, mid-scale corresponding position and highest scale corresponding position of moisturizing liquid level in ice bucket.
4. the automatic adjustable box priming apparatus of water filling according to claim 1,2 or 3, which is characterized in that the control Device includes the circuit board for controlling electronic box, being equipped in control electronic box, and is equipped on control electronic box and connect with circuit board for adjusting Save the third gear rotary switch that liquid level in electronic float monitoring ice bucket presets number of division.
5. the automatic adjustable box priming apparatus of water filling according to claim 1, which is characterized in that be arranged on the partition There is the connectivity slot between two ice buckets of connection.
CN201821816177.9U 2018-11-02 2018-11-02 The automatic adjustable box priming apparatus of water filling Active CN208998391U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821816177.9U CN208998391U (en) 2018-11-02 2018-11-02 The automatic adjustable box priming apparatus of water filling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821816177.9U CN208998391U (en) 2018-11-02 2018-11-02 The automatic adjustable box priming apparatus of water filling

Publications (1)

Publication Number Publication Date
CN208998391U true CN208998391U (en) 2019-06-18

Family

ID=66807329

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821816177.9U Active CN208998391U (en) 2018-11-02 2018-11-02 The automatic adjustable box priming apparatus of water filling

Country Status (1)

Country Link
CN (1) CN208998391U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114484957A (en) * 2022-01-18 2022-05-13 浙江星星冷链集成股份有限公司 Environment-friendly energy-saving ice maker

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114484957A (en) * 2022-01-18 2022-05-13 浙江星星冷链集成股份有限公司 Environment-friendly energy-saving ice maker
CN114484957B (en) * 2022-01-18 2023-10-31 浙江星星冷链集成股份有限公司 Environment-friendly energy-saving ice maker

Similar Documents

Publication Publication Date Title
CN203546850U (en) Automatic protection device for inlet and drain valve failure and toilet clogging
CN208998391U (en) The automatic adjustable box priming apparatus of water filling
CN105926735A (en) Drain device for draining water from water tank by aid of pressure difference
CN103960108B (en) A kind of energy-conservation automatic irrigation device
CN207363651U (en) A kind of system of full-automatic reinjected water or additive
CN206616531U (en) A kind of diversification automatic water gate
CN102561273B (en) Self-adjusting water intake device
CN216895136U (en) But valve for hydraulic component of automatically regulated flow
CN201901921U (en) Water replenishing regulator for drain valve
CN211554758U (en) Intelligent water pump water pressure adjusting device
CN203256867U (en) Water supplementation control structure of double-discharging type flushing device
CN204781212U (en) Water saving cistern
CN202627130U (en) Automatic flushing water tank
CN207119165U (en) A kind of PVC extraction tank muddy with liquidproof
CN211407307U (en) Self-identification water level monitoring control switch device
CN107975117B (en) Toilet bowl
CN111101568A (en) Flushing device of intelligent closestool
CN105843266B (en) A kind of water level controller
CN209356929U (en) A kind of intelligence anti-overflow water controller in household building
CN205910357U (en) Land for growing field crops is planted and is used hyetometer
CN210389679U (en) Water-saving concrete block type quantitative water replenishing device
CN214796469U (en) Digital media sand table
CN218062587U (en) Vacuum pump set of foundation pit deep well dewatering zone gas-water separator
CN207633454U (en) A kind of saving toilet cistern
CN219825451U (en) River water intake system along with water level change

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant