- CN208996483U CN208996483U CN201821713813.5U CN201821713813U CN208996483U CN 208996483 U CN208996483 U CN 208996483U CN 201821713813 U CN201821713813 U CN 201821713813U CN 208996483 U CN208996483 U CN 208996483U
- Authority
- CN
- China
- Prior art keywords
- threaded rod
- support column
- helical gear
- cavity
- adjustable plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 230000007246 mechanism Effects 0.000 claims abstract description 11
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 21
- 230000001105 regulatory effect Effects 0.000 claims description 8
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 208000002925 dental caries Diseases 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a civil engineering construction support, which comprises a support pillar, wherein the upper end of the support pillar is provided with an adjusting plate, the lower end of the adjusting plate is provided with a sliding chute matched with the supporting column, the supporting column is connected with the sliding chute in a sliding way, an adjusting cavity is arranged in the supporting column, an adjusting mechanism for adjusting the adjusting plate is arranged in the adjusting cavity, a supporting plate is arranged above the adjusting plate, the adjusting plate is fixedly connected with the supporting plate through a buffer mechanism, the lower end of the supporting column is fixedly connected with a base, four corners of the lower end of the base are fixedly connected with fixing needles, the lower end of the base is provided with a groove, a sliding plate is connected in the groove in a sliding way, a cavity is arranged in the base, the cavity is internally provided with a retraction mechanism used for retracting and releasing the sliding plate, and the four corners of the lower end of the sliding plate are fixedly connected with pulleys. The utility model discloses be convenient for remove and can support the wall body of co-altitude not.
Description
Technical field
The utility model relates to technical field of building construction more particularly to a kind of civil engineering work construction brackets.
Background technique
Construction is people using various construction materials, mechanical equipment according to specifically devising and drawing the blueprint in certain sky
Between, carry out in the time being the production activity building miscellaneous building products and carrying out, it includes from preparation of construction, breaks ground
It starts building to the overall production process of completion of works examination;Construction is the production process of a technology complexity, needs to build and apply
Work worker plays intelligence and wisdom, and creatively application material, mechanics, structure, technique scheduling theory solve to continuously emerge in construction
Technical problem, it is ensured that construction quality and construction safety, in the construction process, building support are essential.
Existing bracket mostly uses greatly steel pipe and connector to be attached support, can not effectively carry out to construction height
Adaptation, it usually needs cutting cutting is carried out to steel pipe, meanwhile, it needs to dismantle it after support and it is removed again
Fortune, time-consuming and laborious and inefficiency.
For this purpose, it is proposed that a kind of next civil engineering work construction bracket solves the above problems.
Utility model content
Wall progress purpose of the utility model is to solve the movement of bracket in the prior art to different height
The problem of support, and a kind of civil engineering work construction bracket proposed.
To achieve the goals above, the utility model adopts the technical scheme that
The upper end of a kind of civil engineering work construction bracket, including support column, the support column is equipped with adjustable plate, the tune
The lower end of section plate is equipped with the sliding slot to match with support column, and the support column is slidably connected with sliding slot, is equipped in the support column
Adjusting cavity, the interior regulating mechanism being equipped with for adjustable plate to be adjusted of the adjusting cavity, the top of the adjustable plate is equipped with branch
Fagging is fixedly connected between the adjustable plate and support plate by buffer gear, and the lower end of the support column is fixedly connected with base
Seat, the lower end four corners of the pedestal are fixedly connected to fixed pin, and the lower end of the pedestal is equipped with groove, slides in the groove
It is dynamic to be connected with sliding panel, it is equipped with cavity in the pedestal, the radio and tape player for carrying out folding and unfolding to sliding panel is equipped in the cavity
The lower end four corners of structure, the sliding panel are fixedly connected to pulley.
Preferably, the regulating mechanism includes the first threaded rod being rotatablely connected vertically with adjusting cavity, first screw thread
The upper end rotation of bar is threadedly coupled through support column and with adjustable plate, is horizontally rotated in the adjusting cavity and is connected with the first rotation
One end rotation of bar, first rotating bar through support column and has been fixedly and coaxially connected the first turning handle, first rotating bar
It is sequentially connected between the first threaded rod by the first bevel gear set.
Preferably, first bevel gear set includes intermeshing first helical gear and the second helical gear, and described first
Helical gear is fixedly and coaxially connected with the first rotating bar, and second helical gear is fixedly and coaxially connected with the first threaded rod.
Preferably, the buffer gear includes telescopic rod, the upper and lower ends of the telescopic rod respectively with the lower end of support plate
It is fixedly connected with the upper end of adjustable plate, spring is arranged with outside the telescopic rod, the upper and lower ends difference support plate of the spring
Lower end is fixedly connected with the upper end of adjustable plate.
Preferably, the jack includes the second threaded rod being rotatablely connected vertically with cavity inner sidewall, and described second
The lower end of threaded rod is through pedestal and extends in groove, and the lower end of second threaded rod and the threaded upper ends of sliding panel connect
It connects, horizontally rotates in the cavity and be connected with the second rotating bar, pass through second between second rotating bar and the second threaded rod
One end rotation of bevel gear set transmission connection, second rotating bar through pedestal and has been fixedly and coaxially connected the second turning handle.
Preferably, second bevel gear set includes intermeshing third helical gear and the 4th helical gear, the third
Helical gear is fixedly and coaxially connected with the second rotating bar, and the 4th helical gear is fixedly and coaxially connected with the second threaded rod.
Compared with prior art, the utility model has the following beneficial effects:
1, it by setting regulating mechanism, is adjusted convenient for the height of adjustable plate, so that support plate is adjusted, thus
The wall of different height can be supported, it is easy to operate, improve the working efficiency of staff;
2, it by setting jack, is adjusted after support by the height to sliding panel, so that pulley can be with
It is located in ground, it is time saving and energy saving when being moved, it is more convenient.
The utility model is easy to remove and can be supported to the wall of different height.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of civil engineering work construction bracket structural perspective;
Fig. 2 is the enlarged drawing in Fig. 1 at A;
Fig. 3 be the utility model proposes a kind of civil engineering work construction bracket external structure schematic diagram.
In figure: 1 support column, 2 adjustable plates, 3 sliding slots, 4 adjusting cavities, 5 regulating mechanisms, 6 support plates, 7 buffer gears, 8 pedestals,
9 fixed pins, 10 grooves, 11 sliding panels, 12 cavitys, 13 jacks, 14 pulleys, 15 first threaded rods, 16 first rotating bars, 17
First turning handle, 18 first bevel gear sets, 19 first helical gears, 20 second helical gears, 21 telescopic rods, 22 springs, 23 second screw threads
Bar, 24 second rotating bars, 25 second bevel gear sets, 26 second turning handles, 27 the 4th helical gears, 28 third helical gears.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
Referring to Fig.1-3, a kind of civil engineering work construction bracket, including support column 1, it should be noted that support column 1
Lateral wall is equipped with scale, and the upper end of support column 1 is equipped with adjustable plate 2, and the lower end of adjustable plate 2 is equipped with the cunning to match with support column
Slot 3, support column 1 are slidably connected with sliding slot 3, and adjusting cavity 4 is equipped in support column 1, be equipped in adjusting cavity 4 for adjustable plate 2 into
The regulating mechanism 5 that row is adjusted, it is worth mentioning at this point that, regulating mechanism 5 includes the first threaded rod being rotatablely connected vertically with adjusting cavity 4
15, the upper end rotation of the first threaded rod 15 is threadedly coupled through support column 1 and with adjustable plate 2, and connection is horizontally rotated in adjusting cavity 4
There is the first rotating bar 16, one end rotation of the first rotating bar 16 through support column 1 and has been fixedly and coaxially connected the first turning handle 17.
In the utility model, connected between the first rotating bar 16 and the first threaded rod 15 by the transmission of the first bevel gear set 18
It connects, it should be noted that the first bevel gear set 18 includes intermeshing first helical gear 19 and the second helical gear 20, and first tiltedly
Gear 19 is fixedly and coaxially connected with the first rotating bar 16, and the second helical gear 20 is fixedly and coaxially connected with the first threaded rod 15, is adjusted
The top of plate 2 is equipped with support plate 6, is fixedly connected between adjustable plate 2 and support plate 6 by buffer gear 7, specifically, buffer
Structure 7 includes telescopic rod 21, and the upper and lower ends of telescopic rod 21 are fixedly connected with the upper end of the lower end of support plate 6 and adjustable plate 2 respectively,
Spring 22, the fixed company in upper end of the lower end and adjustable plate 2 of the upper and lower ends difference support plate 6 of spring 22 are arranged with outside telescopic rod 21
It connects, the lower end of support column 1 is fixedly connected with pedestal 8.
In the utility model, the lower end four corners of pedestal 8 are fixedly connected to fixed pin 9, and the lower end of pedestal 8 is equipped with groove
10, sliding panel 11 is slidably connected in groove 10, cavity 12 is equipped in pedestal 8, be equipped in cavity 12 for sliding panel 11 into
The jack 13 of row folding and unfolding, it should be noted that jack 13 includes be rotatablely connected vertically with 12 inner sidewall of cavity
The lower end of two threaded rods 23, the second threaded rod 23 through pedestal 8 and extends in groove 10, the lower end of the second threaded rod 23 and cunning
The threaded upper ends of movable plate 11 connect, and horizontally rotate in cavity 12 and are connected with the second rotating bar 24, the second rotating bar 24 and the second spiral shell
It is sequentially connected between rasp bar 23 by the second bevel gear set 25, it should be noted that the second bevel gear set 25 includes intermeshing
Third helical gear 28 and the 4th helical gear 27, third helical gear 28 is fixedly and coaxially connected with the second rotating bar 24, the 4th helical teeth
Wheel 27 is fixedly and coaxially connected with the second threaded rod 23, and one end rotation of the second rotating bar 24 through pedestal 8 and is fixedly and coaxially connected
There is the second turning handle 26, the lower end four corners of sliding panel 11 are fixedly connected to pulley 14.
The utility model needs then to rotate the second turning handle 26, the second turning handle in use, bracket is moved to suitable position
26 drive the rotation of the second rotating bar 24, and the second rotating bar 24 drives third helical gear 28 to rotate, and third helical gear 28 drives the 4th
Helical gear 27 rotates, and the 4th helical gear 27 drives the rotation of the second threaded rod 23, and the second threaded rod 23 drives sliding panel 11 to moving up
Dynamic, until suitable position, fixed pin 9 is inserted into ground at this time, and the utility model is fixed;Then the first turning handle 17 is rotated,
First turning handle 17 drives the rotation of the first rotating bar 16, and the first rotating bar 16 drives the rotation of the first helical gear 19, the first helical gear 19
The second helical gear 20 is driven to rotate, the second helical gear 20 drives the rotation of the first threaded rod 15, and the first threaded rod 15 drives adjustable plate 2
It moving up, adjustable plate 2 drives telescopic rod 21 and spring 22 mobile, and telescopic rod 21 and spring 22 drive support plate 6 to move up,
Until support plate 6 and wall abut and clamping, at this point, can be supported to wall.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not
It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (6)
1. a kind of civil engineering work construction bracket, including support column (1), which is characterized in that the upper end of the support column (1) is set
Have adjustable plate (2), the lower end of the adjustable plate (2) is equipped with the sliding slot (3) to match with support column, the support column (1) and cunning
Slot (3) is slidably connected, and is equipped with adjusting cavity (4) in the support column (1), is equipped in the adjusting cavity (4) for adjustable plate (2)
The top of the regulating mechanism (5) being adjusted, the adjustable plate (2) is equipped with support plate (6), the adjustable plate (2) and support plate
(6) it is fixedly connected between by buffer gear (7), the lower end of the support column (1) is fixedly connected with pedestal (8), the pedestal
(8) lower end four corners are fixedly connected to fixed pin (9), and the lower end of the pedestal (8) is equipped with groove (10), the groove
(10) slidably connected sliding panel (11) in, be equipped with cavity (12) in the pedestal (8), be equipped in the cavity (12) for pair
Sliding panel (11) carries out the jack (13) of folding and unfolding, and the lower end four corners of the sliding panel (11) are fixedly connected to pulley
(14).
2. a kind of civil engineering work construction bracket according to claim 1, which is characterized in that the regulating mechanism (5)
Including the first threaded rod (15) being rotatablely connected vertically with adjusting cavity (4), the upper end rotation of first threaded rod (15) runs through
Support column (1) is simultaneously threadedly coupled with adjustable plate (2), is horizontally rotated in the adjusting cavity (4) and is connected with the first rotating bar (16), institute
One end rotation of the first rotating bar (16) is stated through support column (1) and has been fixedly and coaxially connected the first turning handle (17), described first
It is sequentially connected between rotating bar (16) and the first threaded rod (15) by the first bevel gear set (18).
3. a kind of civil engineering work construction bracket according to claim 2, which is characterized in that first bevel gear set
It (18) include intermeshing first helical gear (19) and the second helical gear (20), first helical gear (19) rotates with first
Bar (16) is fixedly and coaxially connected, and second helical gear (20) is fixedly and coaxially connected with the first threaded rod (15).
4. a kind of civil engineering work construction bracket according to claim 1, which is characterized in that the buffer gear (7)
Including telescopic rod (21), the upper and lower ends of the telescopic rod (21) upper end with the lower end of support plate (6) and adjustable plate (2) respectively
It is fixedly connected, is arranged with spring (22) outside the telescopic rod (21), upper and lower ends difference support plate (6) of the spring (22)
Lower end is fixedly connected with the upper end of adjustable plate (2).
5. a kind of civil engineering work construction bracket according to claim 1, which is characterized in that the jack (13)
Including the second threaded rod (23) being rotatablely connected vertically with cavity (12) inner sidewall, the lower end of second threaded rod (23) is run through
Pedestal (8) simultaneously extends in groove (10), and the lower end of second threaded rod (23) is connect with the threaded upper ends of sliding panel (11),
Horizontally rotate in the cavity (12) and is connected with the second rotating bar (24), second rotating bar (24) and the second threaded rod (23)
Between be sequentially connected by the second bevel gear set (25), the rotation of one end of second rotating bar (24) is through pedestal (8) and same
Axis is fixedly connected with the second turning handle (26).
6. a kind of civil engineering work construction bracket according to claim 5, which is characterized in that second bevel gear set
It (25) include intermeshing third helical gear (28) and the 4th helical gear (27), the third helical gear (28) rotates with second
Bar (24) is fixedly and coaxially connected, and the 4th helical gear (27) is fixedly and coaxially connected with the second threaded rod (23).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821713813.5U CN208996483U (en) | 2018-10-23 | 2018-10-23 | Civil engineering construction support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821713813.5U CN208996483U (en) | 2018-10-23 | 2018-10-23 | Civil engineering construction support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208996483U true CN208996483U (en) | 2019-06-18 |
Family
ID=66804346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821713813.5U Expired - Fee Related CN208996483U (en) | 2018-10-23 | 2018-10-23 | Civil engineering construction support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208996483U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112031183A (en) * | 2020-09-14 | 2020-12-04 | 靳双玲 | T-shaped connecting structure of building top plate and building wallboard and construction method thereof |
-
2018
- 2018-10-23 CN CN201821713813.5U patent/CN208996483U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112031183A (en) * | 2020-09-14 | 2020-12-04 | 靳双玲 | T-shaped connecting structure of building top plate and building wallboard and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206405838U (en) | A kind of tubular construction material sanding apparatus | |
CN207436543U (en) | Novel building ergonomic support device | |
CN209021492U (en) | A kind of welding bench fixed clamping device for building | |
CN206707332U (en) | A kind of construction support meanss | |
CN105883693A (en) | Special supporting table for transformer substation electric inspection equipment | |
CN210634340U (en) | Portable drawing board | |
CN208996483U (en) | Civil engineering construction support | |
CN215598426U (en) | Vertical detection device for constructional engineering | |
CN204797051U (en) | Hand formula lift table | |
CN209099767U (en) | A kind of construction mould plate supporting device | |
CN209094243U (en) | A kind of Plate Bending Machine for stainless steel door production | |
CN112554537A (en) | Building external climbing type building construction operation platform | |
CN212984717U (en) | Slant construction equipment for construction | |
CN209958773U (en) | Formwork removing tool for floor aluminum alloy building formwork | |
CN216971029U (en) | Industrial production line aluminum profile frame | |
CN214771878U (en) | Turbine water pump overhauls platform | |
CN220334654U (en) | Processing production line | |
CN220203924U (en) | Coal mining area tunneling supporting device | |
CN219543115U (en) | Operating platform for engineering management | |
CN210239082U (en) | Temporary hydropower integrated bracket for construction site | |
CN208529030U (en) | Overhaul grain-clamping table | |
CN220478070U (en) | Volleyball frame | |
CN221002804U (en) | Coal mining supporting structure | |
CN219469588U (en) | Lifting frame for assembled building | |
CN215741572U (en) | But super equal length experiment and training are with high jump platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||