A kind of assembled furred ceiling
Technical field
The utility model relates to building decoration technology field more particularly to a kind of assembled furred ceilings.
Background technique
Currently, needing first to determine keel position in wall top face snap the line, in keel table when carrying out architecture indoor ceiling construction
After face has carried out fire prevention processing, it is fixed with nailing gun two keel junctions;Frame will be fixed after fixing keel
On the wall, while the Wooden Batten fastness between each frame is checked;Plasterboard is fixed on the wooden dragon using the drywall screw of stainless steel material
On bone, the nail hole on plasterboard, which usually will do it, adds flat processing, and existing gap carries out joint filling processing between two block gypsum plates, and
Mopping preservative treatment is carried out to gypsum board surface.But above-mentioned ceiling construction mode, construction condition is severe, and due to brush
Paint corrosion prevention operation be top surface operation, it is higher to operator's technical requirements, can operation difficulty it is larger;Simultaneously as furred ceiling
Top surface is uneven (there are wave in inclination or part), but also construction quality can not be unified;Further, since being fixed using wood screw, make
It obtains wood screw and plasterboard back gauge is inconsistent, cause the irregular of furred ceiling quality, also, be also possible that gypsum furred ceiling is opened
Split, harmomegathus deformation etc..
Utility model content
In view of the above-mentioned problems in the prior art, the utility model provides one kind and in factory can add in batches
Work only needs assembling and setting at the scene, to improve the assembled furred ceiling of assembly efficiency and assembling quality.
To solve the above problems, the utility model embodiment provides a kind of assembled furred ceiling, comprising:
At least two separately and the pedestal that is set side by side, and each pedestal includes ontology, the upper end of the ontology
It is connected with the first connecting portion for connecting with roof, the ontology is connected with close to the side of wall for connecting with the wall
The second connecting portion connect;
Load-bearing part is arranged in a one-to-one correspondence with the pedestal, and each load-bearing part distinguishes the corresponding base
The ontology of seat is fixedly connected, and the load-bearing part is far from being formed with supporting part at the top of the wall side;
Packaging part, top are formed with the holding section being sticked on the supporting part, and the lower part of the packaging part and institute
Load-bearing part is stated to offset far from the bottom of the wall side.
In some embodiments of the utility model, the ontology is equipped with the first fixation hole of strip, the load-bearing part
It is equipped with the second fixation hole of strip, first fixation hole and second fixation hole are mutually perpendicular to, and described first is fixed
At least one of hole and second fixation hole are in horizontally disposed, and the ontology and the load-bearing part are by being arranged in described the
One fixation hole is fixedly connected with the first connector in second fixation hole.
In some embodiments of the utility model, the first connecting portion is equipped with location hole and the third of strip is fixed
Hole, and the second connector by being threaded through in the third fixation hole is fixedly connected with roof, is set in the second connecting portion
There is the 4th fixation hole of strip, and the third connector by being threaded through in the 4th fixation hole is fixedly connected with wall.
In some embodiments of the utility model, the assembled furred ceiling further include:
At least two separately and the fixed corner code that is set side by side, each fixed corner code include being arranged in angle
First fixed part and the second fixed part, first fixed part are fixedly connected with the wall;
Supporting element is arranged in a one-to-one correspondence with the fixed corner code, one end of each supporting element with it is corresponding
Second fixed part of the fixed corner code be fixedly connected, the other end is fixedly connected with the lower end of the packaging part, and
At least the supporting element is equipped at the both ends of the packaging part.
In some embodiments of the utility model, the lower part of the packaging part is extended to form to far from the wall side
There is the first extension, the other end of the supporting element is fixedly connected with first extension of the packaging part.
In some embodiments of the utility model, correspondence is each formed on the downside of spaced each supporting element
The first groove being arranged, to be fixedly connected with the first keel by first groove being correspondingly arranged cooperation.
In some embodiments of the utility model, spaced each supporting element is at the end far from the wall
The third groove that portion is each formed with the second groove being correspondingly arranged and is correspondingly arranged, to pass through second groove being correspondingly arranged
Cooperation is fixedly connected with the second keel, is fixedly connected with third keel by the cooperation of the third groove that is correspondingly arranged, and described the
Two keel and the third keel are in same perpendicular.
In some embodiments of the utility model, the assembled furred ceiling further include:
Decorating film, one side are pressed together between the holding section and the supporting part, and the other side is bonded the holding section
Outer upper surface be unfolded to far from the wall side, to be formed to the decoration on the roof.
In some embodiments of the utility model, spaced each load-bearing part is close to the packaging part
The end of side is each formed with the 4th groove being correspondingly arranged, to be fixedly connected by the 4th groove being correspondingly arranged cooperation
4th keel, the side of the decorating film are wrapped on the 4th keel, and the other side of the decorating film is along the load-bearing part
It is arranged far from the wall side, and after by between the holding section and the supporting part, is bonded the outer of the holding section
It is unfolded to far from the wall side side upper surface.
In some embodiments of the utility model, multiple holding sections, and multiple cards are equipped at the top of the packaging part
Conjunction portion corresponds with the supporting part of the load-bearing part respectively and is sticked in the corresponding supporting part, the packaging part respectively
On be formed with ventilation opening.
Compared with prior art, the utility model provides a kind of assembled furred ceiling, it can be seen that the packaging part by
Top is formed with the holding section being sticked on the supporting part, and by the lower part and the load-bearing part of the packaging part far from institute
The form that the bottom of wall side offsets is stated, so that installation form is simple, and without passing through fixing piece, it just can be with load-bearing part shape
At stable connection, meanwhile, there is enough spaces inside furred ceiling, cabling, setting ventilating system etc. can be arranged, in addition,
Above-mentioned pedestal, load-bearing part and packaging part is that can obtain construction field in measurement in the workpiece that factory is produced in batches
After the size for the furred ceiling installed needed for ground, directly the size of pedestal, load-bearing part and the packaging part processed will can be needed to be supplied to work
Factory is simultaneously processed, and finally, so that the installation of furred ceiling just can be completed only by installation and debugging at the construction field (site), ensure that
While installation progress, additionally it is possible to which the quality for guaranteeing construction operation mitigates the construction intensity of construction worker, and to construct
The environment at scene can obtain good holding.
Detailed description of the invention
Fig. 1 is to turn the whole three dimensional structure diagram with formula furred ceiling in the utility model embodiment;
Fig. 2 is the whole three dimensional structure diagram for turning another visual angle with formula furred ceiling in the utility model embodiment
Fig. 3 is the three dimensional structure diagram of the pedestal in the utility model embodiment;
Fig. 4 is the three dimensional structure diagram of the load-bearing part in the utility model embodiment;
Fig. 5 is the three dimensional structure diagram of the packaging part in the utility model embodiment;
Fig. 6 is the three dimensional structure diagram of the corner brace in the utility model embodiment;
Fig. 7 is the three dimensional structure diagram of the supporting element in the utility model embodiment.
Appended drawing reference:
1, pedestal;11, ontology;12, first connecting portion;13, second connecting portion;111, the first fixation hole;121, location hole;
122, third fixation hole;131, the 4th fixation hole;
2, load-bearing part;21, supporting part;22, the second fixation hole;23, the 4th groove;24, pushing and pressing part;
3, packaging part;31, holding section;32, the first extension;33, ventilation opening;
4, fixed corner code;41, the first fixed part;42, the second fixed part;
5, supporting element;51, the first groove;52, the second groove;53, third groove;
6, the first keel;7, the second keel;8, third keel.
Specific embodiment
It is with reference to the accompanying drawing and specific real to make those skilled in the art better understand the technical solution of the utility model
Mode is applied to elaborate to the utility model.
The various schemes and feature of the utility model are described herein with reference to attached drawing.
By the description of the preferred form with reference to the accompanying drawings to the embodiment for being given as non-limiting example, this is practical new
These and other characteristic of type will become apparent.
It is also understood that although the utility model is described referring to some specific examples, this field skill
Art personnel realize many other equivalents of the utility model in which can determine, they have feature as claimed in claim
And be therefore all located at whereby defined by protection scope.
When read in conjunction with the accompanying drawings, in view of following detailed description, above and other aspect, feature and advantage of the utility model will
It becomes more apparent from.
Specific embodiment of the utility model is described hereinafter with reference to attached drawing;It will be appreciated, however, that the embodiment invented is only
It is only the example of the utility model, various ways implementation can be used.Known and/or duplicate function and structure is not retouched in detail
It states to distinguish true intention according to the operation of the history of user, unnecessary or extra details is avoided to make the utility model
It is smudgy.Therefore, the specific structural and functional details invented herein are not intended to restriction, but as just power
The basis and representative basis that benefit requires are used to instruct those skilled in the art with substantially any appropriate detailed construction multiplicity
Ground uses the utility model.
This specification can be used phrase " in one embodiment ", " in another embodiment ", " in another embodiment
In " or " in other embodiments ", it can be referred to one or more in identical or different embodiment according to the present utility model
It is a.
The utility model embodiment provides a kind of assembled furred ceiling, as shown in Figures 1 to 5 comprising: at least two phases
It is spaced and the pedestal 1 being set side by side and the load-bearing part 2 being arranged in a one-to-one correspondence with the pedestal 1, each pedestal 1 includes this
Body 11, the upper end of the ontology 11 are connected with the first connecting portion 12 for connecting with roof, and the ontology 11 is close to wall
Side is connected with for the second connecting portion 13 with the wall connecting;Each load-bearing part 2 is distinguished corresponding described
The ontology 11 of pedestal 1 is fixedly connected, and the load-bearing part 2 is far from being formed with supporting part 21 at the top of the wall side;The dress
It further include packaging part 3 with formula furred ceiling, top is formed with the holding section 31 being sticked on the supporting part 21, and the packaging part
3 lower part offsets with the load-bearing part 2 far from the bottom of the wall side.
Through the above technical solution as can be seen that the packaging part 3 is sticked in the carrying by being formed at top
Holding section 31 in portion 21, and the bottom phase by the lower part of the packaging part 3 with the load-bearing part 2 far from the wall side
The form supported, so that installation form is simple, and without that just can form stable connection with load-bearing part 2, together by fixing piece
When, furred ceiling inside has enough spaces, cabling, setting ventilating system etc. can be arranged, in addition, above-mentioned pedestal 1, carrying
Part 2 and packaging part 3 are that can obtain hanging for installation needed for construction site in measurement in the workpiece that factory is produced in batches
After the size on top, directly the size of pedestal 1, load-bearing part 2 and the packaging part 3 processed will can be needed to be supplied to factory and be added
Work finally so that the installation of furred ceiling just can be completed only by installation and debugging at the construction field (site), ensure that installation progress
Simultaneously, additionally it is possible to which the quality for guaranteeing construction operation mitigates the construction intensity of construction worker, and makes the environment of construction site
It can obtain good holding.
In some embodiments of the utility model, as shown in Figures 1 to 4, the ontology 11 is equipped with the first of strip
Fixation hole 111, the load-bearing part 2 are equipped with the second fixation hole 22 of strip, and first fixation hole 111 and described second are fixed
Hole 22 is mutually perpendicular to, and at least one of first fixation hole 111 and second fixation hole 22 are in be horizontally disposed with, described
Ontology 11 is connect with the load-bearing part 2 by be arranged in first fixation hole 111 and second fixation hole 22 first
Part is fixedly connected.First fixation hole 111 and second fixation hole 22 are mutually perpendicular to, and first fixation hole 111
With at least one of second fixation hole 22 in horizontally disposed, so that the ontology 11 is being connected with the load-bearing part 2
It, can be by adjusting the first connector in the position of the first fixation hole 111 or adjusting the first connector second when connecing
The position of fixation hole 22, realize to 2 opposing body 11 of load-bearing part in the horizontal direction and vertical position adjust so that holding
Holder 2 can be installed on most suitable position, and the packaging part 3 to be mounted on load-bearing part 2 provides support, and be guaranteed final
The total quality of the assembled furred ceiling of completion.
In some embodiments of the utility model, as shown in Figures 1 to 4, the first connecting portion 12 is equipped with positioning
The third fixation hole 122 in hole 121 and strip, and the second connector and roof by being threaded through in the third fixation hole 122
It is fixedly connected, wherein location hole 121 can enable to the installation site that pedestal 1 is improved by location hole 121 to be multiple
Accuracy, meanwhile, be combined with third fixation hole 122 into strips, it is convenient that position tune when installing fixed is being carried out to pedestal 1
Section, the second connecting portion 13 are equipped with the 4th fixation hole 131 of strip, and by being threaded through in the 4th fixation hole 131
Third connector be fixedly connected with wall, position when installing fixed carried out to pedestal 1 adjust also for convenient.Meanwhile
In some embodiments, the second connecting portion 13 of the pedestal 1, which can be, is carried out second connecting portion 13 and wall by bolt
It is fitted and connected, is also possible to be attached by stay bolt and wall, as long as guaranteeing the steady of second connecting portion 13 and wall connecting
Solidity does not do specific restriction herein.
In some embodiments of the utility model, as shown in Figure 1, Figure 2, shown in Fig. 6 and Fig. 7, the assembled furred ceiling is also wrapped
Include: at least two separately and the fixed corner code 4 being set side by side and the supporting element 5 being arranged in a one-to-one correspondence with the fixed corner code 4,
Each fixed corner code 4 includes in the first fixed part 41 and the second fixed part 42 of angle setting, first fixed part
41 are fixedly connected with the wall, and first fixed part 41 is equipped with the 5th fixation hole in a strip shape, to facilitate by institute
When stating fixed corner code 4 and wall connecting, the installation site of the fixed corner code 4 is adjusted, finally, further reinforces assembled and hangs
Connection between top and wall guarantees the stability of assembled furred ceiling;The equal and corresponding institute in one end of each supporting element 5
Second fixed part 42 for stating fixed corner code 4 is fixedly connected, and the other end is fixedly connected with the lower end of the packaging part 3, and
It at least is equipped with the supporting element 5 at the both ends of the packaging part 3, so that 5 one end of the supporting element passes through corresponding setting
Corner brace is fixedly connected with wall, and the other end passes sequentially through the packaging part 3, the load-bearing part 2 and the pedestal 1 and roof and wall
Body is fixedly connected, and realization is stably connected with.Wherein, the 6th fixation hole in a strip shape is equipped on second fixed part 42,
The 7th fixation hole in a strip shape is equipped on the supporting element 5, the 6th fixation hole and the 7th fixation hole pass through third
Connector is fixedly connected, so that second fixed part 42 is fixedly connected with the supporting element 5, and during connection, it can
Installation fit dimension is accurately adjusted by the 6th fixation hole of strip and the 7th fixation hole, guarantees integral installation precision.
In some embodiments of the utility model, as shown in Figure 1, Figure 2 and shown in Fig. 5, the lower part of the packaging part 3 is to separate
The wall side has extended to form the first extension 32, the other end of the supporting element 5 and described the first of the packaging part 3
Extension 32 is fixedly connected, and the lamp holder for installing ornament lamp can be equipped on first extension 32, so that completing
While the installation of the furred ceiling of assembled furred ceiling, additionally it is possible to which there is decorative lighting effect.
In some embodiments of the utility model, as shown in Figure 1, Figure 2 and Figure 7, spaced each support
The downside of part 5 is each formed with the first groove 51 being correspondingly arranged, to be fixed by first groove 51 being correspondingly arranged cooperation
The first keel 6 are connected, design is laid out to the cabling being mounted on inside assembled furred ceiling so as to preferably realize, it is another
Aspect also more convenient fixation stronger to the progress such as the cabling being mounted on inside assembled furred ceiling, ventilation device, meanwhile,
Groove edge at the first groove 51 along first groove 51 is formed with first for first keel 6 to be fixed
It is fixedly connected with piece.
In some embodiments of the utility model, as shown in Figure 1, Figure 2 and shown in Fig. 5, spaced each support
Part 5 is each formed with the third groove 53 that second be correspondingly arranged groove 52 He be correspondingly arranged in the end far from the wall, with
The second keel 7 are fixedly connected with by second groove 52 cooperation being correspondingly arranged, pass through the third groove being correspondingly arranged
53 cooperations are fixedly connected with third keel 8, and the third keel 8 be in the top of second keel 7, and with it is described second imperial
Bone 7 is in same perpendicular.Design is adopted the structure, may make the location of first extension 32 of packaging part 3
Lower than the position (that is, the bottom for being in a groove) of the third keel 8, at this point, dress is arranged on the first extension 32
Lamp is adornd, enables to the decorative effect of ornament lamp more preferable, improves the aesthetics of assembled furred ceiling overall appearance.In addition, second
Groove edge at groove 52 along second groove 52 is formed with the second fixed company for second keel 7 to be fixed
Contact pin, meanwhile, the groove edge at third groove 53 along the third groove 53 is formed with for carrying out to the third keel 8
Fixed third is fixedly connected with piece
In some embodiments of the utility model, the assembled furred ceiling further include: decorating film, one side are pressed together on
Between the holding section 31 and the supporting part 21, the other side is bonded the outer upper surface of the holding section 31 to far from the wall
Body side expansion, to form the decoration to the roof.Pass through the snap fit of the holding section 31 and the supporting part 21 reality
Now the decorating film is gripped, avoids and digs extra cavity on wall, while facilitating operation, ensure that
The installation strength of decorating film.
In some embodiments of the utility model, as shown in Figure 1, Figure 2 and Figure 4, spaced each carrying
Part 2 is each formed with the 4th groove 23 being correspondingly arranged in the end of side close to the packaging part 3, by being correspondingly arranged
4th groove 23 cooperation is fixedly connected with the 4th keel, and the side of the decorating film is wrapped on the 4th keel, described
The other side of decorating film is arranged along the load-bearing part 2 far from the wall side, and by the holding section 31 and described is holding
After between load portion 21, the outer upper surface for being bonded the holding section 31 is unfolded to far from the wall side.By by the dress
The side of decorations film is wrapped on the 4th keel, further strengthens the fixation of the end to the decorating film, and can
Guarantee the consolidation of decorating film entirety, the decorative effect for improving furred ceiling entirety is further additionally provided with use on the load-bearing part 2
In the 5th fixation hole that the 4th keel being arranged in the 4th groove 23 are fixed, and the 5th fixation hole can be more
It is a.In addition, in some embodiments, it is additionally provided on the downside of the end of the side of the packaging part 3 pair in the load-bearing part 2
The pushing and pressing part 24 that the packaging part 3 is pushed against, the fixation with more stable formation to the packaging part 3.
In some embodiments of the utility model, it is equipped with as shown in Figure 1, Figure 2 and shown in Fig. 5, at the top of the packaging part 3 multiple
Holding section 31, and the supporting part 21 of multiple holding sections 31 and the load-bearing part 2 correspond and respectively engaging with it is corresponding
The supporting part 21, that is, only need correspond to the supporting part 21 position on be arranged holding section 31, make it possible to
While guaranteeing to be connected intensity, material cost is saved, meanwhile, it is formed with ventilation opening 33 on the packaging part 3, to fill
When with being equipped with ventilating system inside formula furred ceiling or be provided with air outlet, it can be aerated by the ventilation opening 33 of setting,
In addition, corresponding ventilation opening 33 is arranged, also facilitate operator when installing assembled furred ceiling, carries out construction operation.
Above embodiments are only the exemplary embodiment of the utility model, are not used in limitation the utility model, this is practical new
The protection scope of type is defined by the claims.Those skilled in the art can be in the essence and protection scope of the utility model
It is interior, various modifications or equivalent replacements are made to the utility model, this modification or equivalent replacement also should be regarded as falling in originally practical new
In the protection scope of type.