CN106013580A - Integrated ceiling structure and mounting method thereof - Google Patents

Integrated ceiling structure and mounting method thereof Download PDF

Info

Publication number
CN106013580A
CN106013580A CN201610524334.8A CN201610524334A CN106013580A CN 106013580 A CN106013580 A CN 106013580A CN 201610524334 A CN201610524334 A CN 201610524334A CN 106013580 A CN106013580 A CN 106013580A
Authority
CN
China
Prior art keywords
unit
stile
draconis
frame top
main joist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610524334.8A
Other languages
Chinese (zh)
Other versions
CN106013580B (en
Inventor
周东珊
步挺
钟诚
王瑾
程安顺
郑波波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201610524334.8A priority Critical patent/CN106013580B/en
Publication of CN106013580A publication Critical patent/CN106013580A/en
Application granted granted Critical
Publication of CN106013580B publication Critical patent/CN106013580B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
    • E04B9/0428Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like having a closed frame around the periphery
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/12Connections between non-parallel members of the supporting construction
    • E04B9/16Connections between non-parallel members of the supporting construction the members lying in different planes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • E04B9/20Means for suspending the supporting construction adjustable
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/30Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by edge details of the ceiling; e.g. securing to an adjacent wall

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Curtains And Furnishings For Windows Or Doors (AREA)
  • Floor Finish (AREA)

Abstract

The invention discloses an integrated ceiling structure which comprises at least one main keel, a vertical frame unit, a frame top plane unit, a connecting unit and an edge storage keel for being mounted on the wall. Main suspension pieces for being connected with the plane of a roof are arranged on the main keels; vertical frame suspension pieces for being connected with the plane of the roof are arranged on the vertical frame unit; the frame top plane unit covers a top opening of the vertical frame unit, and the frame top plane unit is suspended below the main keels by regulating suspension pieces of which positions can be regulated up and down and left and right; the inside edge of the connecting unit is connected with the vertical frame unit, and the outside edge of the connecting unit is stored in the edge storage keel. The invention further discloses a mounting method of the integrated ceiling structure. According to the integrated ceiling structure and the mounting method thereof, which are provided by the invention, the mounting procedure is reduced, the integrated ceiling structure can be rapidly assembled, the construction period can be shortened, the labor strength can be reduced, the environment pollution is reduced, the requirements of different clients are met, and the application range is enlarged.

Description

Assembled ceiling structure and installation method thereof
Technical field
The present invention relates to fit up furred ceiling technical field, particularly relate to a kind of assembled ceiling structure and peace thereof Dress method.
Background technology
Traditional plaster tablet suspended ceiling is one of decoration technique common in finishing, although its form of expression Flexibly, moulding is changeable, have fire prevention, sound insulation, heat insulation, lightweight, good stability, the most aging, The advantages such as Anti-moth-eating.But the installation process of plasterboard class furred ceiling is the most relatively complicated, easily makes Becoming job site dirty and messy, plasterboard material is easily split impaired simultaneously, ordinary gypsum board sound insulation, guarantor Temperature, moisture protection are poor, and gap-ratio is more intractable in addition.
Concrete defect is as follows:
1, plasterboard complicated construction technique, site operation step is various, extends construction period, increases Add time cost;
2, decorative effect depends on the technology of construction worker;
3, plasterboard needs on-site cutting operation, easily causes job site dirty and messy;
4, facing covers with paint, lacquer, colour wash, etc. site operation, easily completed decoration is caused secondary pollution, have impact on Environment;
5, plasterboard is disposable ornament materials, and unrepairable and secondary use, and cause the wave of resource Take;
Although 6 plaster tablet suspended ceiling moulding are the most changeable, but surface decoration effect is the most single, difficult The demand growing to meet people.
Relative to traditional plaster tablet suspended ceiling, existing aluminum-pinch furred ceiling, its in service life length and good Protection against the tide well, fire prevention, electrostatic-proof function, easy cleaning job site, relatively more neatly totally, Set-up time is relatively short.
But owing to aluminum-pinch furred ceiling price is higher, installation requirement is high, especially for flatness Requiring that the piece between the highest, plate is more, the acceptance of client is relatively low, uses space Limitation relatively.
Meanwhile, aluminum-pinch furred ceiling remains and first punches on roof, then squeezes into expansion bolt, dress Upper screw rod, hangs on main joist and secondary joist, is finally sequentially arranged on secondary joist by every piece of panel. When being arranged on secondary joist by panel, as less in the gap of secondary joist being difficult to is installed, and workload is numerous Weight, time-consuming, then cause relatively greatly the piece between panel big such as gap, the acceptance phase of client To relatively low.
Summary of the invention
It is an object of the invention to overcome defect of the prior art, it is provided that one can quickly assemble, Can the reduction of erection time, reduce the assembled ceiling structure of environmental pollution and installation method thereof.
Technical solution of the present invention provides a kind of assembled ceiling structure, including at least one main joist, stands Frame unit, frame top flat unit, connect unit and for the receipts keelson that is arranged on metope;? The main suspender for being connected it is provided with roof plane on described main joist;At described stile unit On be provided with the stile suspender for being connected with roof plane;Described frame top flat unit covers In the open top of described stile unit, and described frame top flat unit is by adjusting up and down The regulation suspension member of whole position is suspended on the lower section of described main joist;The inside edge of described connection unit Being connected with described stile unit, its outer ledge is accommodated in described receipts keelson.
Further, described frame top flat unit is previously provided with the back of the body and hangs Os Draconis;Described regulation Suspension member is connected between described main joist and described extension back of the body Os Draconis.
Further, described frame top flat unit is arranged in order by polylith plaque and is formed, and at every piece The back side of described plaque is both provided with at least one back of the body and hangs Os Draconis.
Further, the bearing of trend that the bearing of trend of described main joist and the described back of the body hang Os Draconis hangs down mutually Directly.
Further, described regulation suspension member includes C-shaped suspension member main body, regulation bolt and connection End;Being provided with adjustment hole on the upper end of described suspension member main body, described regulation bolt can go up downward Save land and be arranged in described adjustment hole;Described connection end is pivotally disposed at described suspension member main body On bottom;Described suspension member main body coordinates on described main joist;The end of described regulation bolt End holds out against above on described main joist;Described connection end is inserted in the described back of the body and hangs the groove of Os Draconis In.
Further, described adjustment hole is waist-shaped hole, and described waist-shaped hole is along the side of described main joist To extended.
Further, the inner surface of described stile unit is flat configuration, outside described stile unit Being preset with two described back ofs the body on surface and hang Os Draconis, two described back ofs the body are hung Os Draconis and are set in parallel in described vertical The both sides up and down of the outer surface of frame unit.
Further, described stile unit is connected by the bar of withholding of L-type with described frame top flat unit It is connected together.
Further, described stile unit is combined riser by polylith and is connected in sequence, adjacent two Described in block, compound riser is linked together by straight line connector.
Further, at least side of described stile unit is provided with curtain installation unit, described The concordant setting in bottom surface of the bottom surface of curtain installation unit and described stile unit;Install at described curtain It is provided with curtain in unit and guide rail is installed.
Further, described curtain installation unit is provided with the suspension rod for being connected with roof plane.
Further, described back of the body extension Os Draconis are connected on described plaque by binding agent.
Further, described frame top flat unit is additionally provided with the device for installing external devices Part installation unit.
Technical solution of the present invention also provides for the installation method of a kind of assembled ceiling structure, including walking as follows Rapid: S001: main joist is arranged on by main suspender the lower section of roof plane, keelson will be received It is fixedly mounted on metope;S002: frame top flat unit is suspended on described master by regulation suspension member The lower section of Os Draconis;S003: stile unit is suspended on frame top flat unit by stile suspender Lower section, and make described frame top flat unit cover in the open top of described stile unit;S004: The inside edge connecting unit is connected with described stile unit, by the outer side edges of described connection unit Edge is accommodated in described receipts keelson.
Further, the mounting means of described frame top flat unit is as follows: preset on every block of plaque The back of the body is had to hang Os Draconis;Successively every block of described plaque is suspended on described main joist by described regulation suspension member Lower section, thus formation frame top flat unit that plaque described in polylith is connected successively, wherein regulate extension Part is connected to the described back of the body and hangs between Os Draconis and described main joist.
Further, the assembling mode that the described back of the body is hung between Os Draconis and described main joist is as follows: will hang Part main body is fastened on described main joist;Regulation bolt is passed on the upper end of described suspension member main body Adjustment hole, and the end of described regulation bolt is held out against on described main joist;Connection end is turned Dynamic predetermined angle, is then inserted in described connection end in the groove that the described back of the body hangs Os Draconis, the most again Rotate backward described connection end to initial position, and described connection end is fastened on the described back of the body hangs Os Draconis Groove in.
Further, also comprise the steps: to install curtain at least side of described stile unit Installation unit, is suspended on described curtain installation unit the lower section of roof plane, and makes by suspension rod The concordant setting in bottom surface of the bottom surface of described curtain installation unit and described stile unit;Curtain is installed Guide rails assembling, in the inside of described curtain installation unit, makes described curtain install guide rail and is accommodated in described In curtain installation unit.
Further, also comprise the steps: that installing device is installed on the flat unit of described frame top Unit, is arranged on external devices on described device installation unit.
Use technique scheme, have the advantages that
By frame top flat unit to be hung directly from the lower section of main joist by regulation suspension member, permissible Realize plaque Fast Installation, thus eliminate secondary joist structure of the prior art, overcome existing There is in technology the difficult problem needing to be inserted in secondary joist by panel.
Plaque arranges the back of the body and hangs Os Draconis, and back of the body extension Os Draconis are connected by regulation suspension member with main joist, Can realize plaque Fast Installation.And this back of the body extension Os Draconis are by being previously assembled on plaque, carry High efficiency of construction, shorten construction period.
And furred ceiling is divided into the block combiner of difference in functionality, by frame top flat unit, stile unit and Connect unit can be assembled respectively, it is achieved that Fast Installation.
Thus, the assembled ceiling structure of present invention offer and installation method thereof, decrease installation procedure, It can quickly assemble, shortens the duration, reduce labor intensity, and reduces environmental pollution, full The demand of the different client of foot, expands the scope of application.
Accompanying drawing explanation
The schematic diagram of the assembled ceiling structure that Fig. 1 provides for one embodiment of the invention;
Fig. 2 is the axonometric chart of stile unit;
Fig. 3 is the partial enlarged drawing of stile unit;
Fig. 4 is the schematic diagram that frame top flat unit is assembled on main joist;
Fig. 5 is that main joist hangs Os Draconis by regulation suspension member connection diagram with the back of the body;
Fig. 6 is the partial schematic diagram that the back of the body hangs Os Draconis;
Fig. 7 is the axonometric chart of regulation suspension member;
Fig. 8 is the front view of regulation suspension member;
Fig. 9 is the structural representation of curtain installation unit.
Reference synopsis:
1-main joist;The main suspender of 11-;2-frame top flat unit;
21-plaque;3-stile unit;31-inner surface;
32-outer surface;33-stile suspender;34-withholds bar;
35-is combined riser;4-connects unit;5-receives keelson;
The 6-back of the body hangs Os Draconis;61-bulge-structure;7-regulates suspension member;
71-suspension member main body;72-upper end;73-bottom;
74-adjustment hole;75-connects end;76-regulates bolt;
8-curtain installation unit;81-plaque;82-suspension rod;
Guide rail installed by 83-curtain.
Detailed description of the invention
Further illustrate the detailed description of the invention of the present invention below in conjunction with the accompanying drawings.The most identical zero Parts are presented with like reference characters.It should be noted that the word used in describing below "front", "rear", "left", "right", "up" and "down" refer to the direction in accompanying drawing, word " interior " and " outward " Refer respectively to the direction towards or away from particular elements geometric center.
The assembled ceiling structure that the present invention provides is mainly used in being assembled in bedroom, naturally it is also possible to root Different functional modules is selected to be assembled in parlor or dining room according to needing.
As shown in Figure 1-2, the assembled ceiling structure that one embodiment of the invention provides, including at least one Main joist 1, stile unit 3, frame top flat unit 2, connect unit 4 and be used for being arranged on metope On receipts keelson 5.
Main joist 1 is provided with the main suspender 11 for being connected with roof plane, at stile list It is provided with the stile suspender 33 for being connected with roof plane in unit 3.
Frame top flat unit 2 covers in the open top of stile unit 3, and frame top flat unit 2 The lower section of main joist 1 it is suspended on by the regulation suspension member 7 of position can be adjusted up and down.
The inside edge connecting unit 4 is connected with stile unit 3, and its outer ledge is accommodated in limit In Os Draconis 5.
This assembled ceiling structure is by arranging stile unit 3 so that the headroom in bedroom has layer Secondary sense.
The frame top flat unit 2 of this assembled ceiling structure, is hung directly from main dragon by regulation suspension member 7 The lower section of bone 1, and this regulation suspension member 7 can adjust position up and down, it is possible to achieve quickly pacify Dress.
This is installed between stile unit 3 and metope and is connected unit 4, connect the inside edge of unit 4 Being connected by fastener with stile unit 3, its outer ledge is accommodated in keelson 5.
Near the edge of stile unit side when this inside edge refers to install, this outer ledge Near the edge of metope side when referring to install.
This receipts keelson 5 can be that bridging type receives keelson, is ridden at the edge connecting unit 4 The formula that connects is received on keelson, can complete to receive limit.
The assembled ceiling structure that the present invention provides, is directly hanged frame top flat unit by regulation suspension member Hang over the lower section of main joist, it is possible to achieve by plaque Fast Installation, thus eliminate in prior art Secondary joist structure, overcome the difficult problem needing to be inserted in secondary joist by panel in prior art, It can quickly assemble, shortens the duration, reduce labor intensity, and reduces environmental pollution, full The demand of the different client of foot, expands the scope of application.
It is preferred that as it is shown in figure 1, be previously provided with the back of the body on frame top flat unit 2 to hang Os Draconis 6, Regulation suspension member 7 is connected to main joist 1 and hangs between back of the body Os Draconis 6.This back of the body hangs Os Draconis 6 by advance Being assembled on frame top flat unit 2, during assembling, the back of the body is hung Os Draconis 6 and is directly hanged by regulation suspension member 7 Hang over the lower section of main joist 1, it is achieved that Fast Installation.
It is preferred that as shown in Figure 4, frame top flat unit 2 is arranged in order by polylith plaque 21 and is formed, And at least one back of the body extension Os Draconis 6 it are both provided with at the back side of every block of plaque 21.Frame top flat unit 2 Can be with modularity, it is combined by polylith plaque 21 and is formed.
For the ease of every block of plaque 21 being suspended on the lower section of main joist 1, the back of the body of every block of plaque 21 Face is both provided with at least one back of the body and hangs Os Draconis 6.
It is preferred that as shown in Figure 4, the bearing of trend of main joist 1 hangs the extension side of Os Draconis 6 with the back of the body To perpendicular, so that a plurality of main joist 1 and a plurality of back of the body are hung between Os Draconis 6 in network structure, It is easy to assemble and adjust the position of plaque 21.
It is preferred that as viewed in figures 5-8, regulation suspension member 7 includes C-shaped suspension member main body 71, adjusts Joint bolt 76 and connection end 75.
Being provided with adjustment hole 74 on the upper end 72 of suspension member main body 71, regulation bolt 76 can be upper and lower Adjustably it is arranged in adjustment hole 74, connects end 75 and be pivotally disposed at suspension member main body 71 times On end 73.
During assembling, suspension member main body 71 coordinates on main joist 1, the end of regulation bolt 76 Hold out against above on main joist 1, connect end 75 and be inserted in the groove that the back of the body hangs Os Draconis 6.
It is additionally provided with bulge-structure 61 in the groove of back of the body extension Os Draconis 6, is used for increasing connection end 75 and the back of the body Hang the friction between Os Draconis 6, it is to avoid connect end 75 and automatically deviate from.
Due to regulation bolt 76 can up-down adjustment, such that it is able to adjust regulation suspension member 7 upper-lower position.
It is pivotally disposed in suspension member main body 71 owing to connecting end 75, when assembling, connects end 75 first turn an angle, and are inserted in the groove that the back of the body hangs Os Draconis 6, then rotate backward above-mentioned angle Degree, makes connection end 75 reset, thus completes to connect, and it is convenient to assemble.
The stability being connected between end 75 with back of the body extension Os Draconis 6 is connected, it is also possible to connecting in order to improve On end 75, securing member is set, such as alignment pin, back-moving spring etc., improve its reset capability, it is to avoid It is deviate from automatically.
It is preferred that as it is shown in fig. 7, adjustment hole 74 is waist-shaped hole, waist-shaped hole is along main joist 1 Direction is extended, such that it is able to the position of the direction adjustment regulation bolt 76 along main joist 1, Realize regulating up and down.
It is preferred that as it is shown on figure 3, the inner surface 31 of stile unit 3 is flat configuration, stile list Being preset with two back ofs the body on the outer surface 32 of unit 3 and hang Os Draconis 6, two back ofs the body are hung Os Draconis 6 and are set in parallel in The both sides up and down of the outer surface 32 of stile unit 3.Inner surface 31 is towards indoor surface or court To middle surface, outer surface 32 is the surface towards body of wall.
Inner surface 31 is decorative cover, is set to burnishing surface, it appears structure is neat, and after being beneficial to Continuous moulding or rendering pattern.
Outer surface 32 arranges two back ofs the body and hangs Os Draconis 6, on the one hand can improve stile unit 3 Structural strength, on the other hand can be arranged on stile suspender 33 two back ofs the body and hang on Os Draconis 6, carry For installation position, and without stile suspender 33 being directly installed on the compound riser of stile unit 3 On 35, the requirement to compound riser hardness can be reduced.
The back of the body is hung Os Draconis 6 and is connected on stile unit 3 beforehand through binding agent, it is simple to assemble.
It is preferred that as it is shown on figure 3, stile unit 3 and frame top flat unit 2 buckleing by L-type Press strip 34 links together, and forms an overall structure, improves the stability of whole furred ceiling.
It is preferred that as Figure 2-3, stile unit 3 by polylith be combined riser 35 be sequentially connected with and Becoming, two pieces of adjacent compound risers 35 are linked together by straight line connector, such that it is able to according to Need to extend the length of stile unit 3, meet different demands.
It is preferred that as it is shown in figure 9, be provided with curtain at least side of stile unit 3 and install single Unit 8, the setting concordant with the bottom surface of stile unit 3 of the bottom surface of curtain installation unit 8, install at curtain It is provided with curtain in unit 8 and guide rail 83 is installed.
Curtain is installed guide rail 83 be accommodated in curtain installation unit 8, thus hidden, in room Inside can't see curtain and guide rail 83 is installed, improve the tidiness in room.
It is preferred that as it is shown in figure 9, be provided with on curtain installation unit 8 for roof plane even The suspension rod 82 connect.
Curtain installation unit 8 is directly hung in the plane of roof by suspension rod 82, can alleviate main dragon The load-bearing pressure of bone.
Curtain installation unit 8 can have plaque 81, is used for decorating.
It is connected on plaque 21 it is preferred that the back of the body hangs Os Draconis 6 beforehand through binding agent, it is simple to assemble, And Stability Analysis of Structures, volume is little.
It is preferred that be additionally provided with the device peace for installing external devices on frame top flat unit 2 Dress unit.Device installation unit is a module, can be arranged as required to, and it is used for installing sky Recall air port, lamp affixed to the ceiling etc. element, it is simple to external devices be integrated on frame top flat unit 2, Make outward appearance clean and tidy, and be easily installed.
In sum, the assembled ceiling structure that the present invention provides, by carrying out modularity by each unit Process, combination in any as required, it is simple to assemble, improve installation effectiveness, expanded installation sky Between, reduce difficulty of construction, shorten construction period.
Shown in Fig. 1-9, the installation method of the assembled ceiling structure that one embodiment of the invention provides, Comprise the steps:
S001: main joist 1 is arranged on by main suspender 11 lower section of roof plane, limit will be received Os Draconis 5 are fixedly mounted on metope.
S002: frame top flat unit 2 is suspended on by regulation suspension member 7 lower section of main joist 1.
S003: stile unit 3 is suspended on frame top flat unit 2 times by stile suspender 33 Side, and make frame top flat unit 2 cover in the open top of stile unit 2.
S004: be connected with stile unit 3 inside edge connecting unit 4, will connect unit 4 Outer ledge be accommodated in keelson 5.
The installation method of the assembled ceiling structure that the present invention provides, by frame top flat unit 2 by adjusting Joint suspension member 7 is hung directly from the lower section of main joist 1, it is possible to achieve by plaque 21 Fast Installation, from And eliminate secondary joist structure of the prior art, overcome and prior art needs inserted by panel A difficult problem in secondary joist.
It is preferred that the mounting means of frame top flat unit 2 is as follows:
Every block of plaque 21 is preset with the back of the body and hangs Os Draconis 6.
Successively every block of plaque 21 is suspended on by regulation suspension member 7 lower section of main joist 1, thus will Polylith plaque 21 connects successively and forms frame top flat unit 2, and wherein regulation suspension member 7 is connected to back of the body extension Between Os Draconis 6 and main joist 1.
Os Draconis 6 are hung by pre-setting the back of the body on plaque 21, and by regulation suspension member 7 by every piece of decorations Plate 21 is suspended on the lower section of main joist 1, it is possible to achieve by plaque 21 Fast Installation.
It is preferred that the assembling mode that the back of the body is hung between Os Draconis 6 and main joist 1 is as follows:
Suspension member main body 71 is fastened on main joist 1.
By regulation bolt 76 through the adjustment hole 74 on the upper end 72 of suspension member main body 71, and will adjust The end of joint bolt 76 holds out against on main joist 1.
Connection end 75 is rotated predetermined angle, is then inserted in back of the body extension Os Draconis 6 by connecting end 75 In groove, rotate backward connection end 75 to initial position the most again, and connection end 75 is fastened on The back of the body is hung in the groove of Os Draconis 6, it is achieved back of the body extension Os Draconis 6 are stably connected with main joist 1.
It is preferred that the installation steps of curtain installation unit 8 are as follows:
Curtain installation unit 8 is installed, by curtain installation unit 8 at least side of stile unit 3 It is suspended on the lower section of roof plane by suspension rod 82, and makes bottom surface and the stile of curtain installation unit 8 The concordant setting in bottom surface of unit 3.
Curtain is installed guide rail 83 and is arranged on the inside of curtain installation unit 8, make curtain that guide rail to be installed 83 are accommodated in curtain installation unit 2.
It is preferred that also comprise the steps:
Installing device installation unit on frame top flat unit 2, is arranged on device peace by external devices On dress unit.Thus by external devices, such as lamp affixed to the ceiling, air-conditioner air outlet etc. are integrated in frame top and put down On face unit 2 so that outward appearance is clean and tidy, and is easily installed.
Plaque used in the present invention is environmental-protection section bar plate, is all to cut in advance, so will not Pollute environment.
Connection unit 4 in the present invention is also made up of plaque 21.
In sum, the assembled ceiling structure of present invention offer and installation method thereof, decrease installation Program, it can quickly assemble, shortens the duration, reduce labor intensity, and it is dirty to reduce environment Dye, meets the demand of different client, expands the scope of application.
As required, above-mentioned each technical scheme can be combined, to reach best-of-breed technology effect.
Above-described is only principle and the preferred embodiment of the present invention.It should be pointed out that, for this For the those of ordinary skill in field, on the basis of the principle of the invention, it is also possible to make some its Its modification, also should be regarded as protection scope of the present invention.

Claims (18)

1. an assembled ceiling structure, it is characterised in that include at least one main joist, stile list Unit, frame top flat unit, connect unit and for the receipts keelson that is arranged on metope;
Described main joist is provided with the main suspender for being connected with roof plane;
Described stile unit is provided with the stile suspender for being connected with roof plane;
Described frame top flat unit covers in the open top of described stile unit, and described frame top Flat unit is suspended under described main joist by adjusting the regulation suspension member of position up and down Side;
The inside edge of described connection unit is connected with described stile unit, and its outer ledge is accommodated in In described receipts keelson.
Assembled ceiling structure the most according to claim 1, it is characterised in that on described frame top It is previously provided with the back of the body on flat unit and hangs Os Draconis;
Described regulation suspension member is connected between described main joist and described extension back of the body Os Draconis.
Assembled ceiling structure the most according to claim 2, it is characterised in that described frame top is put down Face unit is arranged in order by polylith plaque and is formed, and be both provided with at the back side of plaque every piece described to Few back of the body hangs Os Draconis.
Assembled ceiling structure the most according to claim 2, it is characterised in that described main joist Bearing of trend with described the back of the body hang Os Draconis bearing of trend perpendicular.
5. according to the assembled ceiling structure described in any claim in claim 2-4, its feature Being, described regulation suspension member includes C-shaped suspension member main body, regulation bolt and connects end;
Being provided with adjustment hole on the upper end of described suspension member main body, described regulation bolt can go up downward Save land and be arranged in described adjustment hole;
Described connection end is pivotally disposed on the bottom of described suspension member main body;
Described suspension member main body coordinates on described main joist;
The end of described regulation bolt holds out against above on described main joist;
Described connection end is inserted in the groove that the described back of the body hangs Os Draconis.
Assembled ceiling structure the most according to claim 5, it is characterised in that described adjustment hole For waist-shaped hole, described waist-shaped hole is extended along the direction of described main joist.
Assembled ceiling structure the most according to claim 2, it is characterised in that described stile list The inner surface of unit is flat configuration, the outer surface of described stile unit is preset with two described back ofs the body and hangs Os Draconis, two described back ofs the body hang the both sides up and down that Os Draconis are set in parallel in the outer surface of described stile unit.
Assembled ceiling structure the most according to claim 1, it is characterised in that described stile list First and described frame top flat unit is linked together by the bar of withholding of L-type.
Assembled ceiling structure the most according to claim 1, it is characterised in that described stile list Unit is combined riser by polylith and is connected in sequence, and two pieces of adjacent described compound risers are by straight line even Fitting links together.
Assembled ceiling structure the most according to claim 1, it is characterised in that described vertical At least side of frame unit is provided with curtain installation unit, the bottom surface of described curtain installation unit and institute State the concordant setting in bottom surface of stile unit;
In described curtain installation unit, it is provided with curtain guide rail is installed.
11. assembled ceiling structures according to claim 10, it is characterised in that described curtain The suspension rod for being connected it is provided with roof plane on installation unit.
12. assembled ceiling structures according to claim 1, it is characterised in that the described back of the body is hung Os Draconis are connected on described plaque by binding agent.
13. assembled ceiling structures according to claim 1, it is characterised in that at described frame It is additionally provided with the device installation unit for installing external devices on the flat unit of top.
The installation method of 14. 1 kinds of assembled ceiling structures, it is characterised in that comprise the steps:
S001: main joist is arranged on the lower section of roof plane by main suspender, will receive keelson It is fixedly mounted on metope;
S002: frame top flat unit is suspended on by regulation suspension member the lower section of described main joist;
S003: stile unit is suspended on by stile suspender the lower section of frame top flat unit, and Described frame top flat unit is made to cover in the open top of described stile unit;
S004: be connected with described stile unit the inside edge connecting unit, connects list by described The outer ledge of unit is accommodated in described receipts keelson.
15. installation methods according to claim 14, it is characterised in that described frame top plane The mounting means of unit is as follows:
Every block of plaque is preset with the back of the body and hangs Os Draconis;
Successively every block of described plaque is suspended on by described regulation suspension member the lower section of described main joist, Thus formation frame top flat unit that plaque described in polylith is connected successively, wherein regulation suspension member is connected to The described back of the body is hung between Os Draconis and described main joist.
16. installation methods according to claim 15, it is characterised in that the described back of the body hangs Os Draconis And the assembling mode between described main joist is as follows:
Suspension member main body is fastened on described main joist;
By regulation bolt through the adjustment hole on the upper end of described suspension member main body, and by described regulation The end of bolt holds out against on described main joist;
Connection end is rotated predetermined angle, then described connection end is inserted in the described back of the body and hangs Os Draconis In groove, rotate backward described connection end the most again to initial position, and described connection end is fastened In the described back of the body hangs the groove of Os Draconis.
17. installation methods according to claim 14, it is characterised in that also include walking as follows Rapid:
Curtain installation unit is installed at least side of described stile unit, described curtain is installed single Unit is suspended on the lower section of roof plane by suspension rod, and makes bottom surface and the institute of described curtain installation unit State the concordant setting in bottom surface of stile unit;
Curtain is installed the guide rails assembling inside at described curtain installation unit, makes described curtain install Guide rail is accommodated in described curtain installation unit.
18. installation methods according to claim 14, it is characterised in that also include walking as follows Rapid:
Installing device installation unit on the flat unit of described frame top, is arranged on described by external devices On device installation unit.
CN201610524334.8A 2016-06-29 2016-06-29 Assembled ceiling structure and its installation method Active CN106013580B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610524334.8A CN106013580B (en) 2016-06-29 2016-06-29 Assembled ceiling structure and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610524334.8A CN106013580B (en) 2016-06-29 2016-06-29 Assembled ceiling structure and its installation method

Publications (2)

Publication Number Publication Date
CN106013580A true CN106013580A (en) 2016-10-12
CN106013580B CN106013580B (en) 2017-07-28

Family

ID=57106546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610524334.8A Active CN106013580B (en) 2016-06-29 2016-06-29 Assembled ceiling structure and its installation method

Country Status (1)

Country Link
CN (1) CN106013580B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268866A (en) * 2017-06-26 2017-10-20 浙江亚厦装饰股份有限公司 A kind of combined type falls grade furred ceiling and installation method
CN108547402A (en) * 2018-05-14 2018-09-18 嘉兴领创电气科技有限公司 A kind of Multi-functional ceiling
CN111088870A (en) * 2019-12-31 2020-05-01 印象空间(深圳)室内设计工程有限公司 Multifunctional suspended ceiling mounting structure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205917953U (en) * 2016-06-29 2017-02-01 浙江亚厦装饰股份有限公司 Structure of integrated suspended ceiling

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205917953U (en) * 2016-06-29 2017-02-01 浙江亚厦装饰股份有限公司 Structure of integrated suspended ceiling

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268866A (en) * 2017-06-26 2017-10-20 浙江亚厦装饰股份有限公司 A kind of combined type falls grade furred ceiling and installation method
CN108547402A (en) * 2018-05-14 2018-09-18 嘉兴领创电气科技有限公司 A kind of Multi-functional ceiling
CN111088870A (en) * 2019-12-31 2020-05-01 印象空间(深圳)室内设计工程有限公司 Multifunctional suspended ceiling mounting structure

Also Published As

Publication number Publication date
CN106013580B (en) 2017-07-28

Similar Documents

Publication Publication Date Title
CN107268866A (en) A kind of combined type falls grade furred ceiling and installation method
CN205917955U (en) Integrated furred ceiling subassembly
CN205917950U (en) Integrated furred ceiling component
CN106013579A (en) Integrated ceiling device and mounting method thereof
CN105971180B (en) Integrated suspended ceiling assembly and assembling method thereof
CN106013584A (en) Modular ceiling cascade device and mounting method
CN106013580A (en) Integrated ceiling structure and mounting method thereof
CN207363148U (en) A kind of suspended ceiling mounting structure
CN106013581B (en) A kind of Integral ceiling and its installation method
CN105672547B (en) Ceiling lamp trough device and mounting method
CN206016026U (en) A kind of fast-assembling suspended ceiling device
CN108612249B (en) Suspended ceiling structure of integrated curtain box
CN105971179B (en) Light trough furred ceiling falls stage arrangement and installation method
CN205917953U (en) Structure of integrated suspended ceiling
CN204282618U (en) A kind of aluminium alloys furred ceiling assembly
CN214614935U (en) Can install fast and fall level furred ceiling connecting piece and furred ceiling system
CN205917949U (en) Integrated hung ceiling
CN205917952U (en) Integrated furred ceiling device
CN111576712B (en) Ceiling board mounting structure and ceiling board paving method with same
CN207063280U (en) A kind of combined type falls a grade furred ceiling
CN112554425A (en) Fall-level ceiling connecting piece capable of being installed rapidly, ceiling system and installation method
CN106013578A (en) Integrated ceiling component and mounting method thereof
CN208996288U (en) A kind of assembled furred ceiling
CN207609061U (en) The close splicing crack structure of aluminium veneer curtain wall
CN205530911U (en) Ceiling lamp groove device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant