Utility model content
The main purpose of the utility model is to propose a kind of component splicing waterproof construction, it is intended to solve existing assembled architecture
The problem of being easy to appear infiltration.
To achieve the above object, the utility model discloses a kind of components to splice waterproof construction, and the component splices waterproof
Structure includes:
Upper layer vertical member and horizontal member, the upper layer vertical member are located at the top of the horizontal member, it is described on
Horizontal splicing seams are formed between the bottom surface of layer vertical member and the top surface of the horizontal member;
Lower layer's vertical member, the horizontal member are carried on lower layer's vertical member, lower layer's vertical member
Top surface and the bottom surface of the horizontal member connect fixation;
Grouting material, the grouting material are filled in the horizontal splicing seams;
Upper sealing part, the upper sealing part extend along the length direction of the horizontal splicing seams, and splice with the level
The horizontal member is fixed in seam intersection, bottom insertion, and the horizontal splicing seams are protruded at top;And
Lower sealing part, length side of the lower sealing part along the joint of lower layer's vertical member and the horizontal member
Intersect to extension, and with the joint, lower layer's vertical member is fixed in bottom insertion, and institute is fixed in top insertion
State horizontal member.
Optionally, it is connected at the top of the bottom of the upper sealing part and the lower sealing part, to form integral structure.
Optionally, the upper sealing part is equipped with the through-hole that reinforcing bar can be allowed to penetrate;
And/or the lower sealing part is equipped with the through-hole that reinforcing bar can be allowed to penetrate;
And/or the upper sealing part is steel plate for sealing water or article rubber water stop;
And/or the lower sealing part is steel plate for sealing water or article rubber water stop.
Optionally, the through-hole that reinforcing bar can be allowed to penetrate is formed between the upper sealing part and the lower sealing part.
Optionally, the horizontal member includes preformed layer and the in-situ layer in conjunction with the preformed layer, and the in-situ layer covers
Cover the top surface and side of the preformed layer;
Horizontal splicing seams are formed between the upper layer vertical member and the in-situ layer, the bottom of the upper sealing part is run through
The top surface of the in-situ layer is fixed with the in-situ layer;
The top surface of lower layer's vertical member and the edge bottom surface of the in-situ layer and the edge of the preformed layer
Position bottom surface connects and fixes, and the in-situ layer, the bottom of the lower sealing part are fixed in the top insertion of the lower sealing part
Lower layer's vertical member is fixed in insertion.
Optionally, the component splices waterproof construction further include:
Sealing strip, the sealing strip are set to the outside and/or inside of the horizontal splicing seams, to block the horizontal splicing
Seam;
Or, the component splices waterproof construction further include:
Sealing strip, the sealing strip are set to the outside and/or inside of the horizontal splicing seams, to block the horizontal splicing
Seam;
Sealant, the sealant are arranged close to the sealing strip, and the sealing strip is plugged in the horizontal splicing
In seam.
Optionally, the bottom of the upper layer vertical member is equipped with the shearing keyway of indent, the shearing keyway and the water
Flat splicing seams connection, the shearing keyway extend along the length direction of the horizontal splicing seams;
Or, the bottom of the upper layer vertical member is equipped with the shearing keyway of indent, the shearing keyway and the horizontal spelling
Seam connection, the shearing keyway extend along the length direction of the horizontal splicing seams, and the depth of the shearing keyway is at least
20mm;
Or, the bottom of the upper layer vertical member is equipped with the shearing keyway of indent, the shearing keyway and the horizontal spelling
Seam connection, the shearing keyway extend along the length direction of the horizontal splicing seams, and the section of the shearing keyway is in by upper
The opening become larger under and.
Optionally, exhaust passage is equipped in the upper layer vertical member, the exhaust passage has interconnected import
And outlet, the import of the exhaust passage are through to the shearing keyway, the outlet of the exhaust passage is through to the upper layer
The surface of vertical member.
Optionally, exhaust passage is equipped in the upper layer vertical member, the exhaust passage has interconnected import
And outlet, the import of the exhaust passage are through to the shearing keyway, the outlet of the exhaust passage is through to the upper layer
The surface of vertical member;
Or, being equipped with exhaust passage in the upper layer vertical member, the exhaust passage has interconnected import and goes out
Mouthful, the import of the exhaust passage is through to the top of the shearing keyway, and the outlet of the exhaust passage is through on described
The surface of layer vertical member;
Or, being equipped with exhaust passage in the upper layer vertical member, the exhaust passage has interconnected import and goes out
Mouthful, the import of the exhaust passage is through to the shearing keyway, and it is vertical that the outlet of the exhaust passage is through to the upper layer
The surface of component, the outlet of the exhaust passage are higher than the top of the shearing keyway.
Optionally, grout sleeve is equipped in the upper layer vertical member, one end of the grout sleeve is connected to the level
Splicing seams;
The horizontal member is equipped with connection reinforcing bar, and the connection reinforcing bar is embedded in the grout sleeve;
The grouting material is also filled up in the grout sleeve.
Technical solutions of the utility model between upper layer vertical member and horizontal member by being arranged upper sealing part, on upper layer
When infiltration from outside to inside occurring between vertical member and horizontal member, upper sealing part blocks the infiltration of water;By in lower layer
Lower sealing part is set between vertical member and horizontal member, is occurred from outside to inside between lower layer's vertical member and horizontal member
When infiltration, lower sealing part blocks the infiltration of water, in this way, effectively increasing the infiltration energy of assembled architecture.By in water
Sealing strip is set in flat splicing seams, which plays the role of the horizontal splicing seams of closure and waterproof, even if condensing in grouting material
In the case where there is crack after solidification, also due to there is the blocking of sealing strip, water can not penetrate into interior, further improve anti-
Water effect.By forming shearing keyway in the bottom of upper layer vertical member, upper sealing part protrudes into shearing keyway, extends water seepage road
Diameter effectively prevents the infiltration of horizontal direction.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than all
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Under every other embodiment obtained, fall within the protection scope of the utility model.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute in the utility model embodiment
It is only used for explaining in relative positional relationship, the motion conditions etc. under a certain particular pose (as shown in the picture) between each component, such as
When the fruit particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In the present invention unless specifically defined or limited otherwise, term " connection ", " fixation " etc. should do broad sense reason
Solution, for example, " fixation " may be a fixed connection, may be a detachable connection, or integral;It can be mechanical connection, it can also
To be electrical connection;It can be directly connected, the connection inside two elements can also be can be indirectly connected through an intermediary
Or the interaction relationship of two elements, unless otherwise restricted clearly.It for the ordinary skill in the art, can be with
The concrete meaning of above-mentioned term in the present invention is understood as the case may be.
In addition, the description for being such as related to " first ", " second " in the present invention is used for description purposes only, and cannot manage
Solution is its relative importance of indication or suggestion or the quantity for implicitly indicating indicated technical characteristic.Define as a result, " the
One ", the feature of " second " can explicitly or implicitly include at least one of the features.In addition, the skill between each embodiment
Art scheme can be combined with each other, but must be based on can be realized by those of ordinary skill in the art, when technical solution
It will be understood that the combination of this technical solution is not present in conjunction with there is conflicting or cannot achieve when, also not in the utility model
It is required that protection scope within.
The utility model proposes a kind of components to splice waterproof construction.
As shown in Figures 1 to 4, in an embodiment of the utility model, the component splicing waterproof construction includes:
Upper layer vertical member 110 and horizontal member 200, the upper layer vertical member 110 are located at the horizontal member 200
Top forms horizontal splicing seams between the bottom surface of the upper layer vertical member 110 and the top surface of the horizontal member 200;
Lower layer's vertical member 120, the horizontal member 200 are carried on lower layer's vertical member 120, and the lower layer is perpendicular
The bottom surface of top surface and the horizontal member 200 to component 120 connects fixation;
Grouting material 400, the grouting material 400 are filled in the horizontal splicing seams;
Upper sealing part 710, the upper sealing part 710 along the horizontal splicing seams length direction extend, and with the water
The horizontal member 200 is fixed in flat splicing seams intersection, bottom insertion, and the horizontal splicing seams are protruded at top;And
Lower sealing part 720, phase of the lower sealing part 720 along lower layer's vertical member 120 and the horizontal member 200
The length direction for meeting place extends, and intersects with the joint, and lower layer's vertical member 120 is fixed in bottom insertion,
The horizontal member 200 is fixed in top insertion.
In the present embodiment, when upper layer vertical member 110 and lower layer's vertical member 120 are assembled to form building, the two
It is in vertically-mounted state;It is in be horizontally mounted state when horizontal member 200 is assembled to form building.
Horizontal member 200 is carried on lower layer's vertical member 120, the top surface of lower layer's vertical member 120 and horizontal member 200
Bottom surface connect fixation.Such as: horizontal member 200 is taken shape on lower layer's vertical member 120 by cast-in-place mode, in horizontal structure
It is fixedly connected with lower layer vertical member 120 after 200 condensation cure of part, certainly, in order to which what is both guaranteed is connected firmly, lower layer is perpendicular
The reinforcing bar be combineding with each other with horizontal member 200 is equipped with to component 120;It or is that horizontal ditch part 200 is by preformed layer 220 and cast-in-place
Layer 210, which combines, to be formed, and first the edge of preformed layer 220 is installed on lower layer's vertical member 120, then is set up template and poured now
Layer 210 is poured, the combination of lower layer's vertical member 120 and horizontal member 200 is realized after 210 condensation cure of in-situ layer.
Upper layer vertical member 110 is located at the top of horizontal member 200, the bottom surface of upper layer vertical member 110 and horizontal member
Horizontal splicing seams are formed between 200 top surface.The two is assembled state, forms a horizontal splicing seams between the two, therefore logical
It crosses grouting material 400 and blocks sealing.
In this way, forming assembled architecture by upper layer vertical member 110, lower layer's vertical member 120 and horizontal member 200
Basic framework.
Joint between lower layer's vertical member 120 and horizontal member 200 both under certain factors will form crack, outside
The rainwater on boundary is easy to penetrate into interior from the crack.Therefore, in the present embodiment, lower sealing part 720 intersects with joint, works as rainwater
When (outdoor to interior) is permeated from outside to inside, due to there is the blocking of lower sealing part 720, to prevent rain penetration to room
It is interior.
Lower sealing part 720 can be embedded in the top of lower layer's vertical member 120 in advance in advance, for example, with lower layer vertical member 120
Interior reinforcing bar is fixed, and top protrudes from the top surface of lower layer's vertical member 120, horizontal member 200 it is cast-in-place into when, horizontal structure
Part 200 is combined with the top of lower sealing part 720.
It needs to be sealed by grouting material 400 between upper layer vertical member 110 and horizontal member 200.Grouting material 400 can
Referring to prior art, be using high-strength material as aggregate, using cement as bonding agent, be accompanied by upper flow regime, microdilatancy,
The features such as substances such as anti-isolation are formulated, and have self drainage good, fast hard, early strong, high-strength, ungauged regions, microdilatancy.Grouting material
400 are easy to appear crack under certain factors, therefore in the present embodiment, and upper sealing part 710 intersects with horizontal splicing seams, work as rain
Water is when (outdoor to interior) is permeated from outside to inside, due to there is the blocking of upper sealing part 710, to prevent rain penetration to room
It is interior.Upper sealing part 710 can horizontal member 200 it is cast-in-place into when its bottom be fixed on the reinforcing bar of horizontal member 200, it is horizontal
I.e. fixed upper sealing part 710 after 200 condensation cure of component.
The present embodiment technical solution between upper layer vertical member 110 and horizontal member 200 by being arranged upper sealing part
710, when infiltration from outside to inside occurring between upper layer vertical member 110 and horizontal member 200, upper sealing part 710 is blocked
The infiltration of water;By sealing part 720 under being arranged between lower layer's vertical member 120 and horizontal member 200, in lower layer's vertical member
When infiltration from outside to inside occurring between 120 and horizontal member 200, lower sealing part 720 blocks the infiltration of water, in this way, effectively
Improve the infiltration energy of assembled architecture.
In one embodiment, as shown in Figure 1 and Figure 4, the bottom of the upper sealing part 710 and the lower sealing part 720
Top is connected, to form integral structure.
In the present embodiment, the upper sealing part 710 and the lower sealing part 720 form integral structure, to improve assembly
Efficiency.
Specifically, the bottom (bottom of lower sealing part 720) of the integral structure is first embedded in lower layer's vertical member 120 in advance,
When assembling horizontal member 200, horizontal member 200 is incorporated on lower layer's vertical member 120 by cast-in-place mode, so that
Integral structure runs through horizontal member 200, and the top (top of upper sealing part 710) of integral structure is exposed to horizontal member 200
Top surface reassembles upper layer vertical member 110 and filling grouting material 400.In this way, avoiding separately installed upper sealing part 710 under
Sealing part 720, improves assembly efficiency.
The integral structure can be with are as follows: upper sealing part 710 and the mutual welding of lower sealing part 720 are into a single integrated structure;Or it is
Upper sealing part 710 and lower sealing part 720 are integrally formed;Or pass through connector between upper sealing part 710 and lower sealing part 720
701 are connected as one (as shown in Figure 4).
In one embodiment, the upper sealing part 710 is equipped with the through-hole that reinforcing bar can be allowed to penetrate.
In one embodiment, the lower sealing part 720 is equipped with the through-hole that reinforcing bar can be allowed to penetrate.
In one embodiment, as shown in Figure 4 and Figure 5, it is formed between the upper sealing part 710 and the lower sealing part 720
There is the through-hole 730 that reinforcing bar can be allowed to penetrate.
In the embodiment above, upper layer vertical member 110, lower layer's vertical member 120 and horizontal member 200 form assembled
The basic framework of building, therefore in order to improve the mechanical property of each component, it usually needs in the inside of component, reinforcing bar is set.Cause
This, by the setting of through-hole 730, prevents from causing to stop to reinforcing bar for the ease of the arrangement of reinforcing bar.
In one embodiment, the upper sealing part 710 is steel plate for sealing water or article rubber water stop;And/or the lower sealing part
720 be steel plate for sealing water or article rubber water stop.In the present embodiment, steel plate for sealing water also known as be steel plate water stopper, can effectively prevent outer
The infiltration of the pressure water on boundary generally uses cold-reduced sheet as base material, can not only play the effect of waterproof, also can be further
Improve the structural strength of binding site.The article rubber water stop is prepared for high molecular material, can carry out according to the actual situation
Selection, equally can effectively prevent the infiltration of water.
In one embodiment, as shown in Figure 1, the horizontal member 200 include preformed layer 220 and with the preformed layer 220
In conjunction with in-situ layer 210, the in-situ layer 210 covers the top surface and side of the preformed layer 220;
Horizontal splicing seams, the upper sealing part 710 are formed between the upper layer vertical member 110 and the in-situ layer 210
Bottom it is fixed through the top surface of the in-situ layer 210 and the in-situ layer 210;
The edge bottom surface and the preformed layer of the top surface of lower layer's vertical member 120 and the in-situ layer 210
220 edge bottom surface connects and fixes, and the in-situ layer 210 is fixed in the top insertion of the lower sealing part 720, described
Lower layer's vertical member 120 is fixed in the bottom insertion of lower sealing part 720.
In the present embodiment, horizontal member 200 includes preformed layer 220 and in-situ layer 210, and preformed layer 220 can be pre- with factory
System, scene is in conjunction with in-situ layer 210 to improve construction efficiency.When assembly, the edge elder generation support of preformed layer 220 in
The top surface of lower layer's vertical member 120, then set up template and pour in-situ layer 210.
In one embodiment, as shown in Figure 1, the component splices waterproof construction further include:
Sealing strip 500, the sealing strip 500 is set to the outside and/or inside of the horizontal splicing seams, to block the water
Flat splicing seams.
In the present embodiment, the sealing strip 500 is placed in the outside and/or inside of the horizontal splicing seams.The inside
As close to indoor side, the outside is close to outdoor side.As background technique is previously mentioned, grouting material 400
Horizontal splicing seams are filled in, in the alternating by severe winter and heat, the grouting material of condensation cure is easy to appear crack and leads to rain
The infiltration of water.Therefore, by the way that sealing strip 500 is arranged, which can stop the horizontal permeation of rainwater, even if spelling in level
There is crack in the grouting material 400 of seam, and rainwater will not infiltrate into interior.
When the outside of horizontal splicing seams is arranged in sealing strip 500, when rain seeks entry into horizontal splicing seams, first
The blocking of sealing strip 500 is encountered, which prevents rainwater from spreading in horizontal splicing seams.
When the inside of horizontal splicing seams is arranged in sealing strip 500, if grouting material 400 has occurred and that crack, in rain
When seeking entry into horizontal splicing seams, rainwater can be spread in horizontal splicing seams, initially encounter the blocking of sealing part 710, after
And the blocking of sealing strip 500 is encountered, this form is slightly inferior to that the outside of horizontal splicing seams for sealing strip 500 is arranged in, but still
It can play the role of preventing rainwater to indoor infiltration.
When the inner side and outer side of horizontal splicing seams is arranged in sealing strip 500, in summary two kinds of set-up modes, are risen
The waterproof effect arrived is best.
The sealing strip 500 is set to the outside of the horizontal splicing seams and/or inside can be with are as follows: sealing strip 500 is fixed
In the corresponding position of horizontal member 200, such as it is bonded using adhesive;Or it is arranged at the corresponding position of horizontal member 200 and fixes
Slot, the sealing strip 500 are embedded in fixing groove;Or sealing strip 500 is placed into the corresponding position of horizontal member 200, pass through
The erection of template limits it.As long as sealing strip 500 is set to corresponding position, the perfusion of grouting material 400 is then carried out,
After 400 condensation cure of grouting material, sealing strip 500 is implemented in combination with fixation with grouting material 400.
Sealing strip 500 needs to play the osmosis for stopping rainwater, and therefore, sealing strip 500 can select high polymer elastic
Material, such as rubber strip, or using architectural waterproof materials such as polyethylene sticks.Sealing strip 500 and upper sealing part 710 cooperate reality
Show double waterproof, further improves percolation-proof effect.
In one embodiment, as shown in Figure 1, the component splices waterproof construction further include:
Sealant 600, the sealant 600 are arranged close to the sealing strip 500, the sealing strip 500 are plugged in
In the horizontal splicing seams.
In the present embodiment, sealing strip 500 occurs to divide under the alternating of severe cold and heat with grouting material 400 in order to prevent
From sealing strip 500 being plugged in horizontal splicing seams by filling with sealant 600, to prevent falling off for sealing strip 500.In addition,
Due to there is blocking for sealant 600, sealing strip 500 contacts light and the probability of air substantially reduces, to delay sealing strip 500
Aging speed, therefore the waterproof effect of horizontal splicing seams can be effectively ensured.Pass through sealant 600, sealing strip 500 and upper sealing
The cooperation of part 710 realizes triple waterproofs, further increases percolation-proof effect.The sealant 600 is with caking property
Sealing material, such as with the stemness such as pitch object, natural resin or synthetic resin, natural rubber or synthetic rubber or non-dry
Dope is base-material, and the inert fillers such as cooperation talcum powder, carclazyte, carbon black, titanium dioxide and asbestos add plasticizer, solvent, consolidate
Agent, promotor etc. are made.
In one embodiment, as shown in Figure 1 and Figure 2 and Figure 3, the bottom of the upper layer vertical member 110 is equipped with indent
Keyway 101 is sheared, the shearing keyway 101 is connected to the horizontal splicing seams, and the shearing keyway 101 is along the horizontal splicing
The length direction of seam extends.
In the present embodiment, by the way that shearing keyway 101 is arranged in the bottom of upper layer vertical member 110, grouting material 400 is perfused
Afterwards, the contact area between new-old concrete is increased, therefore can effectively increase upper layer vertical member 110, horizontal member 200
With the binding force between grouting material 400.After 400 condensation cure of grouting material, due to having the setting of shearing keyway 101, grouting material
400 form convex, therefore can effectively enhance the shear ability of 110 bottom of upper layer vertical member, increase safety of structure.
In one embodiment, in order to guarantee 110 bottom of enough new-old concrete contacts area and upper layer vertical member
Shear ability, it is described shearing keyway 101 depth be at least 20mm, for example, it is described shearing keyway 101 depth be 20mm,
23mm, 30mm, 40mm or 50mm.
In one embodiment, as shown in Figure 1, the section of the shearing keyway 101 is in the opening from top to bottom become larger.
In the present embodiment, which is along the section of 110 short transverse of upper layer vertical member.The upper layer vertical member 110 is prefabricated
It forms, in order to facilitate upper layer vertical member 110 convenient for demoulding after completing, therefore the section for shearing keyway 101 is arranged
In being in up-narrow and down-wide opening, in this way, after upper layer vertical member 110 completes, it can smoothly demould and be not easy to cutting
Power keyway 101 causes breakage.
Preferably, the opening be in be up-narrow and down-wide trapezoidal.The trapezoidal shearing keyway 101 in section mold arrangement in more
It is easy to accomplish, to improve production efficiency.
In one embodiment, as shown in figures 1 and 3, it is equipped with exhaust passage 102 in the upper layer vertical member 110, it is described
Exhaust passage 102 has interconnected inlet and outlet, and the import of the exhaust passage 102 is through to the shearing keyway
101, the outlet of the exhaust passage 102 is through to the surface of the upper layer vertical member 110.
In the present embodiment, the assembled process of upper layer vertical member 110 and horizontal member 200 is as follows: the vertical structure on upper layer
Before part 110 is lifted on horizontal member 200, prior to the corresponding position adhesive seal item 500 of horizontal member 200, then again by upper layer
Vertical member 110 is lifted into corresponding position, is then irrigated grouting material 400.Process of the grouting material 400 in perfusion
In, it is from bottom to top gradually risen in horizontal splicing seams, in elevation process, gas is gradually gathered in shearing keyway 101,
If not draining gas, then porosity defects are just formed in shearing keyway 101, to have an adverse effect to structural strength.Therefore,
In the present embodiment, by the way that exhaust passage 102 is arranged in upper layer vertical member 110, the import of the exhaust passage 102 is through to institute
Shearing keyway 101 is stated, outlet is through to the surface of the upper layer vertical member 110, therefore, and when grouting material 400 is perfused, shearing
Air in keyway 101 can be flowed out from exhaust passage 102, prevent from forming porosity defects in shearing keyway 101.In perfusion grouting material
When 400, there is the spilling of grouting material 400 in the outlet of exhaust passage 102, that is, represents horizontal splicing seams and shearing keyway 101 is filled out
Full irrigation slurry 400.
In one embodiment, as shown in Figure 1, the import of the exhaust passage 102 is through to the top of the shearing keyway 101
Portion.In the present embodiment, in order to which grouting material 400 to be guaranteed is fully filled with shearing keyway 101, by the exhaust passage 102 into
Mouth is through at the top of the top namely exhaust passage 102 and the vallecular cavity of shearing keyway 101 of the shearing keyway 101 and is connected to.
In one embodiment, as shown in Figure 1, the outlet of the exhaust passage 102 is higher than the top of the shearing keyway 101
Portion.In the present embodiment, for the ease of judging that the grouting material 400 is fully filled with shearing keyway 101, by exhaust passage 102
Outlet is higher than the top of the shearing keyway 101, enters exhaust passage immediately after grouting material 400 fills up the shearing keyway 101
102, with the continuous filling of grouting material 400, grouting material 400 overflows from the outlet of exhaust passage 102, sentences as judgment basis
Disconnected filling is completed.
In one embodiment, as shown in Figure 1, the top of the upper sealing part 710 is protruded into the shearing keyway 101.
In the present embodiment, it is protruded at the top of upper sealing part 710 in the shearing keyway 101, is equivalent to and extends infiltration
Path can effectively prevent the infiltration of horizontal direction, effectively prevent rain penetration into interior.
Preferably, in order to effectively prevent the horizontal permeation of rainwater, the upper sealing part 710 protrudes into the shearing keyway 101
Height be no less than 15mm, this highly can be 15mm, 20mm, 27mm or 40mm.
In one embodiment, as shown in figures 1 and 3, it is equipped with grout sleeve 300 in the upper layer vertical member 110, it is described
One end of grout sleeve 300 is connected to the horizontal splicing seams;
The horizontal member 200 is equipped with connection reinforcing bar (not shown), and the connection reinforcing bar is embedded in the grouting set
In cylinder 300;
The grouting material 400 is also filled up in the grout sleeve 300.
In the present embodiment, grout sleeve technique is that spiral is inserted into inside metal sleeve, Reperfu- sion high-strength grouting
Expect mixture, realizes reinforcing bar pair using the bond-anchorage transmitting stress formed between spiral after grouting material condensation cure
It connects, is one of main connection method in assembled architecture.It is in the milk to the stock inlet of grout sleeve 300, to grout sleeve
When grouting material is overflowed in the outlet of 300 thick liquid discharge mouth and exhaust passage 102 namely horizontal splicing seams and shearing keyway 101 by
Grouting material 400 fills up, and connecing for upper layer vertical member 110 and horizontal member 200 is realized after 400 condensation cure of grouting material
It closes.
In one embodiment, the upper layer vertical member 110 and lower layer's vertical member 120 are precast concrete shear wall,
The horizontal member 200 is reinforced concrete slab.
The above is only the preferred embodiment of the present invention, and therefore it does not limit the scope of the patent of the utility model,
Under all utility models in the utility model are conceived, equivalent structure made based on the specification and figures of the utility model
Transformation, or directly/be used in other related technical areas indirectly and be included in the scope of patent protection of the utility model.