CN208995082U CN201821898594.2U CN201821898594U CN208995082U CN 208995082 U CN208995082 U CN 208995082U CN 201821898594 U CN201821898594 U CN 201821898594U CN 208995082 U CN208995082 U CN 208995082U
Authority
CN
China
Prior art keywords
cape
altitude
hole
threaded hole
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821898594.2U
Other languages
Chinese (zh)
Inventor
徐楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Ruisheng Electric Power Technology Co ltd
Original Assignee
Henan Ruisheng Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Ruisheng Power Technology Co Ltd filed Critical Henan Ruisheng Power Technology Co Ltd
Priority to CN201821898594.2U priority Critical patent/CN208995082U/en
Application granted granted Critical
Publication of CN208995082U publication Critical patent/CN208995082U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Catching Or Destruction (AREA)

Abstract

The utility model relates to electrical equipment technical field, in particular a kind of electric power overhaul high-altitude cape, including cape, cape are equipped with boom;The electric power overhaul high-altitude cape passes through the liftable guardrail being equipped with, so that the guardrail height of the cape is adjustable, it is suitable for the maintenance personals of different heights, avoid the immutable safety accident that may cause of existing cape guardrail height, solving the problems, such as that existing cape guardrail height is immutable has security risk, the electric power overhaul high-altitude cape passes through the connector and limited screw being equipped with, so that cape is when height is affected by the wind in the air, the case where being not in shaking between cape and boom, simultaneously, the distance between two connectors are freely adjusted according to the actual situation, so that the balance effect after entire cape lift-off is more preferable, solve the problems, such as that existing cape balance is poor.

Description

A kind of electric power overhaul high-altitude cape
Technical field
The utility model relates to electrical equipment technical field, specially a kind of electric power overhaul high-altitude cape.
Background technique
Cape is a kind of platform for high altitude operation that cooperation crane uses, and electric power overhaul is a kind of with high-altitude cape For high-altitude power equipment maintaining, the product of the mobility high altitude operation of repairing, the existing high-altitude cape for power equipment maintaining its Structure is relatively simple, and on the one hand the height of its guardrail is fixed, maintenance personal higher for height its with security risk, On the other hand existing cape is affected by the wind easy shaking in high altitude operation, and balance is poor, in consideration of it, it is proposed that a kind of Electric power overhaul high-altitude cape.
Utility model content
The purpose of this utility model is to provide a kind of electric power overhaul high-altitude capes, to solve to mention in above-mentioned background technique Existing its structure for the high-altitude cape of power equipment maintaining out is relatively simple, and on the one hand the height of its guardrail is fixed, right In the higher maintenance personal of height its with security risk, on the other hand existing cape is affected by the wind appearance in high altitude operation It easily shakes, the problem of balance difference.
To achieve the above object, the utility model provides the following technical solutions:
A kind of electric power overhaul high-altitude cape, including cape, the cape are equipped with boom, and the top surface of the boom is equipped with Two connectors being parallel to each other, the bottom surface of each connector are closely welded with sliding sleeve, and each sliding sleeve both passes through The two sides on the top of the boom, each connector are equipped with third through-hole, each connection close to the position on top The top surface of part is equipped with the second threaded hole, is equipped with clamping screw in second threaded hole, the two sides of the boom are close to bottom end Position be equipped with third threaded hole, mounting hole is equipped with below each third threaded hole, in each mounting hole It is equipped with pin shaft.
Closely there are fixed plate, position of each fixed plate close to top on two opposed inner walls of the cape It sets and offers the first threaded hole, be equipped with limited screw in each first threaded hole, under each first threaded hole Side is equipped with first through hole, and the inside four corners of the cape are closely welded with casing, linear in each described sleeve pipe It is equipped with several card slots at equal intervals, is equipped with guardrail between two opposed described sleeve pipes, the two sides of each guardrail are close Bottom end is equipped with arc groove, and the inside of the arc groove is set there are two the spring being parallel to each other, and one end of the spring is close It is welded with arc snap-gauge, the cape is all provided with that there are two second to be parallel to each other on two opposed sides of fixed plate Through-hole.
Preferably, air port is equipped on the four sides of the cape.
Preferably, the clamping screw is threadedly coupled with second threaded hole.
Preferably, the arc snap-gauge and the card slot are engaged by clamping.
Preferably, the second through-hole and third threaded hole that the limited screw is each passed through the first threaded hole, is located above, The limited screw is threadedly coupled with first threaded hole and the third threaded hole respectively.
Preferably, the pin shaft is each passed through the mounting hole, underlying second through-hole and first through hole, described to hang Arm is hinged by pin shaft and the cape.
Preferably, the top of the sliding sleeve and the boom is slidably connected.
Compared with prior art, the utility model has the beneficial effects that
1. the electric power overhaul high-altitude cape passes through the liftable guardrail being equipped with, so that the guardrail height of the cape is adjustable Section, it is suitable for the maintenance personals of different heights, avoid the immutable safety that may cause of existing cape guardrail height Accident, solving the problems, such as that existing cape guardrail height is immutable has security risk;
2. the electric power overhaul high-altitude cape passes through the connector and limited screw being equipped with, so that cape is in high aerial wind-engaging When power influences, the case where being not in shaking between cape and boom, meanwhile, two connectors are freely adjusted according to the actual situation The distance between, so that the balance effect after entire cape lift-off is more preferable, solve existing cape balance difference Problem.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the structural schematic diagram of cape in the utility model;
Fig. 3 is the structural schematic diagram of fixed plate in the utility model;
Fig. 4 is the structural schematic diagram of the utility model middle sleeve;
Fig. 5 is the structural schematic diagram of guardrail in the utility model;
Fig. 6 is the structural schematic diagram of arc groove in the utility model;
Fig. 7 is the structural schematic diagram of boom in the utility model;
Fig. 8 is the structural schematic diagram of connector in the utility model.
In figure: 1, cape;11, fixed plate;111, the first threaded hole;112, first through hole;113, limited screw;12, it covers Pipe;121, card slot;13, guardrail;131, arc groove;132, spring;133, arc snap-gauge;14, air port;15, the second through-hole;2, it hangs Arm;21, connector;211, sliding sleeve;212, third through-hole;213, the second threaded hole;214, clamping screw;22, third threaded hole; 23, mounting hole;231, pin shaft.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", The orientation or positional relationship of the instructions such as " clockwise ", " counterclockwise " be based on the orientation or positional relationship shown in the drawings, be only for Convenient for description the utility model and simplify description, rather than the equipment of indication or suggestion meaning or element must have specifically Orientation is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
In addition, term " first ", " second ", " third " are used for description purposes only, it is not understood to indicate or imply phase To importance or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be with Explicitly or implicitly include one or more of the features.
Fig. 1-8 is please referred to, the utility model provides a kind of technical solution:
A kind of electric power overhaul high-altitude cape, as shown in figs. 1,7 and 8, including cape 1, cape 1 are equipped with boom 2, The top surface of boom 2 is set there are two the connector 21 being parallel to each other, and the bottom surface of each connector 21 is closely welded with sliding sleeve 211, Each sliding sleeve 211 both passes through the top of boom 2, and the two sides of each connector 21 are equipped with third through-hole close to the position on top 212, the top surface of each connector 21 is equipped with the second threaded hole 213, is equipped with clamping screw 214, boom in the second threaded hole 213 2 two sides are equipped with third threaded hole 22 close to the position of bottom end, and the lower section of each third threaded hole 22 is equipped with mounting hole 23, Pin shaft 231 is equipped in each mounting hole 23.
In the present embodiment, air port 14 is equipped on the four sides of cape 1.When cape 1 is in senior middle school and is affected by the wind, air port 14 flow away wind, and then avoid the situation that cape significantly shakes under the influence of wind-force, are conducive to protect The safety of maintenance personal.
In the present embodiment, clamping screw 214 is threadedly coupled with the second threaded hole 213.Clamping screw 214 is screwed into the second screw thread Hole 213 is simultaneously inconsistent with the top surface of boom 2, can be fixed by sliding sleeve 211.
In the present embodiment, pin shaft 231 is each passed through mounting hole 23, underlying second through-hole 15 and first through hole 112, Boom 2 is hinged by pin shaft 231 with cape 1.When hinged mode is convenient for not having to cape 1, boom 2 can be put down, be convenient for Storage and carrying.
In the present embodiment, sliding sleeve 211 and the top of boom 2 are slidably connected.In the hoist steel cable of connector 21 and crane With the use of when, can guarantee the balance of cape by moving sliding sleeve 211 to suitable position.
As shown in Figures 1 to 6, fixed plate 11, each fixation are closely welded on two opposed inner walls of cape 1 Plate 11 offers the first threaded hole 111 close to the position on top, is equipped with limited screw 113 in each first threaded hole 111, often The lower section of a first threaded hole 111 is equipped with first through hole 112, and the inside four corners of cape 1 are closely welded with casing 12, often It is linear on a casing 12 to be equipped with several card slots 121 at equal intervals, it is equipped with guardrail 13 between two opposed casings 12, often The two sides of a guardrail 13 are equipped with arc groove 131 by positon of near bottom, and the inside of arc groove 131 sets that there are two the springs being parallel to each other 132, one end of spring 132 is closely welded with arc snap-gauge 133, and cape 1 is on two opposed sides of fixed plate 11 The second through-hole 115 being parallel to each other there are two being all provided with.
In the present embodiment, arc snap-gauge 133 and card slot 121 are engaged by clamping.The mode of clamping engagement is convenient for 13 liters of guardrail High or reduction, effectively prevents the too low security risk being likely to occur of guardrail 13.
In the present embodiment, the second through-hole 15 and that limited screw 113 is each passed through the first threaded hole 111, is located above Three threaded holes 22, limited screw 113 are threadedly coupled with the first threaded hole 111 and third threaded hole 22 respectively.Cape 1 and boom 2 Between hinged mode, be easy to be affected by the wind generation shaking in the air high, limited screw 113 makes between cape 1 and boom 2 It is fixed, avoids cape and shake the security risk generated.
When in use with high-altitude cape, user of service is first by sliding sleeve 211 along the top of boom 2 for the electric power overhaul of the present embodiment End is moved to suitable position, and tightens clamping screw 214, and connector 21 is fixed, and is then each passed through the wirerope of crane Third through-hole 212, subsequent user of service enter in cape 1, and limited screw 113 is each passed through the first threaded hole 111, is located at The second through-hole 15 and third threaded hole 22 of top, while user of service tightens limited screw 113, it can be by cape 1 and boom 2 Fixed, following user of service pulls up guardrail 13, and guardrail 13 moves straight up in casing 12, when arc snap-gauge 133 When moving to 121 same level of card slot, spring 132 is sprung back, and arc snap-gauge 133 is outwardly against card slot 121 blocks arc snap-gauge 133, guardrail 13 can be fixed, and when 13 insufficient height of guardrail, continue to pull up guardrail 13, last user of service Crane can be started by the lift-off operation of cape 1;When cape 1 is when high altitude operation encounters windage, air port of the wind from side 14 enter in cape 1 and flow out from remaining air port 14.
Basic principles, main features, and advantages of the present invention has been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Be only the utility model preference, be not intended to limit the utility model, do not departing from the spirit and scope of the utility model Under the premise of, the utility model also has various changes and improvements, these changes and improvements both fall within claimed it is practical In novel range.The protection scope of the present invention is defined by the appended claims and their equivalents.

Claims (7)

1. a kind of electric power overhaul high-altitude cape, including cape (1), it is characterised in that: the cape (1) is equipped with boom (2), The top surface of the boom (2) is set there are two the connector (21) being parallel to each other, and the bottom surface of each connector (21) is close It is welded with sliding sleeve (211), each sliding sleeve (211) both passes through the top of the boom (2), each connector (21) Two sides are equipped with third through-hole (212) close to the position on top, and the top surface of each connector (21) is equipped with the second screw thread Hole (213) is equipped with clamping screw (214) in second threaded hole (213), the position of the two sides of the boom (2) close to bottom end It sets and is equipped with third threaded hole (22), be equipped with mounting hole (23) below each third threaded hole (22), it is each described Pin shaft (231) are equipped in mounting hole (23);
It is closely welded with fixed plate (11) on two opposed inner walls of the cape (1), each fixed plate (11) Position close to top offers the first threaded hole (111), is equipped with limited screw in each first threaded hole (111) (113), it is equipped with first through hole (112) below each first threaded hole (111), the inside quadrangle of the cape (1) Place is closely welded with casing (12), linear on each described sleeve pipe (12) to be equipped with several card slots (121) at equal intervals, and two Guardrail (13) are equipped between a opposed described sleeve pipe (12), the two sides of each guardrail (13) are equipped with by positon of near bottom Arc groove (131), the inside of the arc groove (131) are set there are two the spring (132) being parallel to each other, the spring (132) One end is closely welded with arc snap-gauge (133), and the cape (1) is all provided on two opposed sides of fixed plate (11) There are two the second through-holes (15) being parallel to each other.
2. electric power overhaul according to claim 1 high-altitude cape, it is characterised in that: equal on the four sides of the cape (1) Equipped with air port (14).
3. electric power overhaul according to claim 1 high-altitude cape, it is characterised in that: the clamping screw (214) and institute State the second threaded hole (213) threaded connection.
4. electric power overhaul according to claim 1 high-altitude cape, it is characterised in that: the arc snap-gauge (133) and institute State card slot (121) clamping engagement.
5. electric power overhaul according to claim 1 high-altitude cape, it is characterised in that: the limited screw (113) is respectively Across the first threaded hole (111), the second through-hole (15) and third threaded hole (22) that are located above, the limited screw (113) It is threadedly coupled respectively with first threaded hole (111) and the third threaded hole (22).
6. electric power overhaul according to claim 1 high-altitude cape, it is characterised in that: the pin shaft (231) is each passed through The mounting hole (23), underlying second through-hole (15) and first through hole (112), the boom (2) pass through pin shaft (231) It is hinged with the cape (1).
7. electric power overhaul according to claim 1 high-altitude cape, it is characterised in that: the sliding sleeve (211) is hung with described The top of arm (2) is slidably connected.
CN201821898594.2U 2018-11-19 2018-11-19 A kind of electric power overhaul high-altitude cape Active CN208995082U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821898594.2U CN208995082U (en) 2018-11-19 2018-11-19 A kind of electric power overhaul high-altitude cape

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821898594.2U CN208995082U (en) 2018-11-19 2018-11-19 A kind of electric power overhaul high-altitude cape

Publications (1)

Publication Number Publication Date
CN208995082U true CN208995082U (en) 2019-06-18

Family

ID=66806811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821898594.2U Active CN208995082U (en) 2018-11-19 2018-11-19 A kind of electric power overhaul high-altitude cape

Country Status (1)

Country Link
CN (1) CN208995082U (en)

Similar Documents

Publication Publication Date Title
CN208995082U (en) A kind of electric power overhaul high-altitude cape
CN207039033U (en) Voltage transformer inspection platform
CN209896574U (en) High-altitude line sliding operation platform
CN206052546U (en) A kind of bridge construction suspension bracket
CN204597415U (en) A kind of safety high-pressure Electric wire support
CN206882065U (en) A kind of circuit board spot gluing equipment
CN205791317U (en) A kind of composite cable bridge-rack
CN206646424U (en) A kind of express highway intelligent speed limit direction board
CN203833575U (en) Vertical rod hoisting multifunctional tool of substation high-altitude device
CN209890101U (en) Electric hoist convenient to fix
CN210331420U (en) Portable anti-falling safety rope hanging device for transformer
CN208478996U (en) Bushing shell for transformer ladder
CN205901172U (en) Nearly pole of transmission line overhauls corridor hanger device
CN207090935U (en) A kind of electric capacity changes servicing unit
CN206820357U (en) A kind of Multifunctional power transmission line service kit
CN209014615U (en) A kind of alternating current-direct current matches electric detection means
CN207459523U (en) Suitable for substation's pillar air band suspended structure of overhaul of the equipments platform
CN206280885U (en) A kind of portable bicycle illuminating lamp
CN208169926U (en) A kind of environment monitoring auxiliary device
CN208111252U (en) A kind of auxiliary device of oil-immersed transformer
CN208585952U (en) A kind of body-in-white sling
CN205610083U (en) Dismantlement formula pay off rack that electric power construction used
CN214849083U (en) Wind-resistant parallel groove clamp
CN209233358U (en) A kind of lifting type Multilayer bridge frame
CN204680963U (en) A kind of SF 6the safety device of the anti-height pendant of switch maintenance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 306, 3rd Floor, North Building, Comprehensive Building, No. 81 Songshan South Road, Daxue Road Street, Erqi District, Zhengzhou City, Henan Province, 450000

Patentee after: HENAN RUISHENG ELECTRIC POWER TECHNOLOGY Co.,Ltd.

Country or region after: China

Address before: 450000 No. 615, floor 6, No. 18, business outer ring road, Zhengzhou area (Zhengdong), pilot Free Trade Zone, Zhengzhou City, Henan Province

Patentee before: HENAN RUISHENG ELECTRIC POWER TECHNOLOGY Co.,Ltd.

Country or region before: China

CP03 Change of name, title or address