CN208995036U CN201821456706.9U CN201821456706U CN208995036U CN 208995036 U CN208995036 U CN 208995036U CN 201821456706 U CN201821456706 U CN 201821456706U CN 208995036 U CN208995036 U CN 208995036U
Authority
CN
China
Prior art keywords
fixedly connected
plate
hoisting device
support column
slideway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821456706.9U
Other languages
Chinese (zh)
Inventor
王二兵
李江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Fifth Engineering Co Ltd
Original Assignee
王二兵
李江
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王二兵, 李江 filed Critical 王二兵
Priority to CN201821456706.9U priority Critical patent/CN208995036U/en
Application granted granted Critical
Publication of CN208995036U publication Critical patent/CN208995036U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of pre-stressed bridge Coping Construction hoisting devices, it is related to hoisting device technical field of constructing, specially a kind of pre-stressed bridge Coping Construction hoisting device, including pedestal, the upper surface of the pedestal is fixedly connected with left support column, the side of the left support column is fixedly connected with left work box, the inner wall of the left work box is fixedly connected with left motor, the output end of the left motor is fixedly connected with left-hand rotation Moving plate by conducted rod, and the side of the left-hand rotation Moving plate is provided with chain.The pre-stressed bridge Coping Construction hoisting device, pass through the setting of middle plate and link block, middle plate is fixed by fixture nut and link block, hook is replaced with middle plate, it stretches and draws cylinder that clamping plate is pushed up outward by top plate, it is fixed again by the active force of telescopic rod and extruding spring, so that bent cap is jammed to be moved, to achieve the purpose that be moved easily bent cap.

Description

A kind of pre-stressed bridge Coping Construction hoisting device
Technical field
The utility model relates to hoisting device technical field of constructing, specially a kind of hanged dress of pre-stressed bridge Coping Construction It sets.
Background technique
The load that bent cap refers to as bearing, distribution and transmitting superstructure, the crossbeam being arranged at the top of pile bent pier, again Claim cap beam, in bridge pier or the crossbeam of setting armored concrete or rare-reinforcement concrete on campshed, main function is on supporting bridge Portion's structure, and whole load is passed into substructure, there is bridge pier to be directly connected to bent cap, lid is reconnected after also having bridge pier to connect column Beam, the primary load of bent cap is the concentrated force passed over by beam body thereon by support, and bent cap is as flexural member, in lotus Under load effect in each section other than causing moment of flexure, the effect of simultaneous shearing is needed in the construction process to bent cap Steel bar framework progress is hanged, and still, major part hoisting device function is more single now.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of pre-stressed bridge Coping Construction hoisting device, solution It has determined the problems mentioned above in the background art.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs: a kind of pre-stressed bridge bent cap Construction hoisting device, including pedestal, the upper surface of the pedestal are fixedly connected with left support column, and the side of the left support column is solid Surely it is connected with left work box, the inner wall of the left work box is fixedly connected with left motor, and the output end of the left motor passes through biography Lead rod is fixedly connected with left-hand rotation Moving plate, and the side of the left-hand rotation Moving plate is provided with chain, and the left support outer surface of column is close to left The side of work box is connected with left support disk, and support spreader, the support are fixedly connected at the top of the left support column The outer surface of spreader is fixedly connected with left retaining ring, and the support spreader outer surface is provided with slideway close to the side of left retaining ring, institute The outer surface for stating slideway is provided with sliding shoe, and the lower surface of the sliding shoe is fixedly connected with rectangle frame, the rectangle frame it is interior Roof is fixedly connected with hanged cylinder, and the side of the hanged cylinder is fixedly connected with hanged slideway, and the one of the hanged slideway Side is connected with motion bar, and one end of the motion bar is fixedly connected with hook, and the support spreader outer surface is close to slideway Side be fixedly connected with right retaining ring, the base upper surface is fixedly connected with damping spring close to the side of left support column, institute The one end for stating damping spring is fixedly connected with vibration damper plate, and the side of the vibration damper plate is connected with vertical slideway, described hanged One end of cylinder is fixedly connected with link block, and the link block is internally provided with fixture nut, the appearance of the fixture nut Face is disposed with left fixed frame and right fixed frame from left to right, and the lower surface of the left fixed frame is fixedly connected with middle plate, institute The side for stating middle plate is fixedly connected with fixed plate.
Optionally, the upper surface of the fixed plate is fixedly connected with limit plate, and the side of the limit plate is fixedly connected with Stretch drawing cylinder.
Optionally, described stretch draws one end of cylinder to be fixedly connected with top plate, and the side of the fixed plate, which is fixedly connected with, stretches Contracting bar.
Optionally, one end of the telescopic rod is fixedly connected with extruding spring, and described one end for squeezing spring is fixedly connected There is clamping plate, the outer surface of the clamping plate is fixedly connected with suspension hook.
Optionally, the base upper surface is fixedly connected with right support column, the right support far from the side of left support column The outer surface of column is fixedly connected with right work box, and one end of the motion bar is provided with nut, and one end of the motion bar passes through Nut is fixedly connected with hook.
Optionally, the inner wall of the right work box is fixedly connected with right motor, and the output end of the right motor passes through conduction Stick is fixedly connected with right-hand rotation Moving plate, and the right support outer surface of column is connected with right support disk close to the side of right work box.
(3) beneficial effect
The utility model provides a kind of pre-stressed bridge Coping Construction hoisting device, have it is following the utility model has the advantages that
1, the pre-stressed bridge Coping Construction hoisting device, by the setting of left motor and right motor, left motor passes through biography Lead rod drives left turn disc, and left-hand rotation Moving plate carries out folding and unfolding to chain, so that sliding shoe is moved left and right by slideway, together When drive hanged cylinder and hook to move left and right moved left and right so that also can be carried out by the bent cap steel bar framework that hook is caught on, into And bent cap steel bar framework is easily placed into correct position, to achieve the purpose that be moved easily bent cap steel bar framework.
2, the pre-stressed bridge Coping Construction hoisting device, by the setting of middle plate, middle plate by fixture nut with connect Block is fixed, and hook is replaced with middle plate, stretches and draws cylinder that clamping plate is pushed up outward by top plate, then by flexible Bar and the active force for squeezing spring are fixed, so that bent cap is jammed to be moved, are moved easily bent cap to reach Purpose.
3, the pre-stressed bridge Coping Construction hoisting device, when accident occurs, is fallen and is being subtracted by the setting of vibration damper plate The weight of shake plate upper surface is buffered by the active force of damping spring, reduce that weight falls down at that moment to this It is shaken caused by pre-stressed bridge Coping Construction hoisting device, it is therefore prevented that carrying out hanged article and slided because of shaking De- danger, to achieve the purpose that safe progress is hanged.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the left work box structural schematic diagram of the utility model;
Fig. 3 is the utility model hook structure schematic diagram;
Fig. 4 is the hanged slideway structure schematic diagram of the utility model;
Fig. 5 is the utility model fixture nut structural schematic diagram;
Fig. 6 is plate structural schematic diagram in the utility model;
Fig. 7 is the utility model clamp region schematic diagram;
Fig. 8 is the utility model side structure schematic view.
In figure: 1- pedestal, 2- left support column, the left work box of 3-, the left motor of 4-, 5- left-hand rotation Moving plate, 6- chain, 7- left support Disk, 8- support spreader, the left retaining ring of 9-, 10- slideway, 11- sliding shoe, 12- rectangle frame, the hanged cylinder of 13-, the hanged slideway of 14-, 15- motion bar, 16- hook, the right retaining ring of 17-, 18- damping spring, 19- vibration damper plate, the vertical slideway of 20-, 21- link block, 22- are solid Determine nut, in 23- plate, 24- fixed plate, 25- limit plate, 26- stretch draw cylinder, 27- top plate, 28- telescopic rod, 29- squeeze spring, 30- clamping plate, 31- suspension hook.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Please refer to Fig. 1 to Fig. 8, the utility model provides a kind of technical solution: a kind of pre-stressed bridge Coping Construction is hanged Device, including pedestal 1,1 upper surface of pedestal are fixedly connected with right support column far from the side of left support column 2, right support column it is outer Surface is fixedly connected with right work box, and one end of motion bar 15 is provided with nut, and one end of motion bar 15 connects by the way that nut is fixed It is connected to hook 16, the inner wall of right work box is fixedly connected with right motor, and the output end of right motor is fixedly connected with by conducted rod Right-hand rotation Moving plate, right support outer surface of column are connected with right support disk close to the side of right work box, and the upper surface of pedestal 1 is fixed It is connected with left support column 2, the side of left support column 2 is fixedly connected with left work box 3, and the inner wall of left work box 3 is fixedly connected with Left motor 4, by the setting of left motor 4, left motor 4 drives left-hand rotation Moving plate 5 to rotate by conducted rod, and left-hand rotation Moving plate 5 is to chain 6 Folding and unfolding is carried out, so that sliding shoe 11 is moved left and right by slideway 10, while hanged cylinder 13 and hook 16 or so being driven to move It is dynamic, it is moved left and right so that also can be carried out by the bent cap steel bar framework that hook 16 is caught on, and then easily bent cap steel bar framework is put Correct position is set, to achieve the purpose that be moved easily bent cap steel bar framework, the output end of left motor 4 passes through conducted rod It is fixedly connected with left-hand rotation Moving plate 5, the side of left-hand rotation Moving plate 5 is provided with chain 6, and 2 outer surface of left support column is close to left work box 3 Side is connected with left support disk 7, and the top of left support column 2 is fixedly connected with support spreader 8, supports the outer surface of spreader 8 It is fixedly connected with left retaining ring 9, supports 8 outer surface of spreader that the side of left retaining ring 9 is provided with slideway 10, passes through setting for slideway 10 It sets, sliding shoe 11 is moved by slideway 10 in the outer surface of support spreader 8, the outer surface of slideway 10 is provided with Sliding shoe 11, the lower surface of sliding shoe 11 are fixedly connected with rectangle frame 12, and the inner roof wall of rectangle frame 12 is fixedly connected with hanged gas Cylinder 13, the side of hanged cylinder 13 are fixedly connected with hanged slideway 14, by the setting of hanged slideway 14, so that motion bar 15 can It is slided with the outer surface in hanged cylinder 13, to control the size of 16 clamping angle of hook, the side of hanged slideway 14 It is connected with motion bar 15, one end of motion bar 15 is fixedly connected with hook 16, supports 8 outer surface of spreader close to slideway 10 Side is fixedly connected with right retaining ring 17, and 1 upper surface of pedestal is fixedly connected with damping spring 18 close to the side of left support column 2, subtracts One end of shake spring 18 is fixedly connected with vibration damper plate 19, by the setting of vibration damper plate 19, when accident occurs, falls in vibration damper plate The weight of 19 upper surfaces is buffered by the active force of damping spring 18, reduce that weight falls down at that moment to this It is shaken caused by pre-stressed bridge Coping Construction hoisting device, it is therefore prevented that carrying out hanged article and slided because of shaking De- danger, to achieve the purpose that safe progress is hanged, the side of vibration damper plate 19 is connected with vertical slideway 20, passes through The setting of vertical slideway 20, slides up and down vibration damper plate 19, one end of hanged cylinder 13 is fixedly connected with connection Block 21, link block 21 are internally provided with fixture nut 22, and the outer surface of fixture nut 22 is disposed with left solid from left to right Determine frame and right fixed frame, the lower surface of left fixed frame is fixedly connected with middle plate 23, and by the setting of middle plate 23, middle plate 23 passes through solid Determine nut 22 to be fixed with link block 21, hook 16 is replaced with middle plate 23, stretches and cylinder 26 is drawn to pass through top plate 27 clamping plates 30 push up outward, then are fixed by the active force of telescopic rod 28 and extruding spring 29, come so that bent cap is jammed It is moved, to achieve the purpose that be moved easily bent cap, the side of middle plate 23 is fixedly connected with fixed plate 24, fixed plate 24 Upper surface be fixedly connected with limit plate 25, the side of limit plate 25, which is fixedly connected with to stretch, draws cylinder 26, stretches and draws the one of cylinder 26 End is fixedly connected with top plate 27, and the side of fixed plate 24 is fixedly connected with telescopic rod 28, and one end of telescopic rod 28 is fixedly connected with Spring 29 is squeezed, the one end for squeezing spring 29 is fixedly connected with clamping plate 30, and the outer surface of clamping plate 30 is fixedly connected with suspension hook 31.
A kind of optimal technical scheme as the utility model: 2 outer surface of left support column is solid close to the side of left work box 3 Surely it is connected with L shape column, one end of L shape column is connected with left support disk 7.
The electric elements occurred in this article are electrically connected with extraneous main controller and 220V alternating current, and main controller can be meter Calculation machine etc. plays the conventionally known equipment of control.
In conclusion the pre-stressed bridge Coping Construction hoisting device, in use, setting by left motor 4 and right motor It sets, left motor 4 drives left-hand rotation Moving plate 5 to rotate by conducted rod, and left-hand rotation Moving plate 5 carries out folding and unfolding to chain 6, so that sliding shoe 11 is logical It crosses slideway 10 to be moved left and right, while hanged cylinder 13 and hook 16 being driven to move left and right, so that the lid caught on by hook 16 Beam steel frame, which also can be carried out, to be moved left and right, and then bent cap steel bar framework is easily placed into correct position, to reach It is moved easily the purpose of bent cap steel bar framework, by the setting of middle plate 23, middle plate 23 passes through fixture nut 22 and link block 21 It is fixed, hook 16 is replaced with middle plate 23, stretch and draw cylinder 26 that clamping plate 30 is pushed up outward by top plate 27, then It is fixed by telescopic rod 28 and the active force for squeezing spring 29, so that bent cap is jammed to be moved, to reach It is moved easily the purpose of bent cap, by the setting of vibration damper plate 19, when accident occurs, falls the weight in 19 upper surface of vibration damper plate Buffered by the active force of damping spring 18, reduce that weight falls down at that moment to the pre-stressed bridge bent cap It is shaken caused by construction hoisting device, it is therefore prevented that the danger that hanged article is slipped because of shaking is being carried out, thus Achieve the purpose that safe progress is hanged.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " suitable The orientation or positional relationship of the instructions such as hour hands ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " is orientation based on the figure Or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than the device of indication or suggestion meaning or Element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as the limit to the utility model System.
In the present invention unless specifically defined or limited otherwise, term " setting ", " connected ", " connects " installation " Connect ", the terms such as " fixation " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral; It can be mechanical connection, can be directly connected, can also can be inside two elements indirectly connected through an intermediary The interaction relationship of connection or two elements.For the ordinary skill in the art, it can manage as the case may be Solve the concrete meaning of above-mentioned term in the present invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.The meaning of " plurality " is two or two in the description of the present invention, More than, unless otherwise specifically defined.
It should be noted that in the present invention unless specifically defined or limited otherwise, fisrt feature is in the second spy It can be that the first and second features directly contact or the first and second features are connect indirectly by intermediary "above" or "below" sign Touching.Moreover, fisrt feature can be above the second feature " above ", " above " and " above " fisrt feature right above second feature or Oblique upper, or first feature horizontal height is merely representative of higher than second feature.Fisrt feature second feature " under ", " lower section " " following " can be fisrt feature and be directly under or diagonally below the second feature, or is merely representative of first feature horizontal height and is less than Second feature.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of pre-stressed bridge Coping Construction hoisting device, including pedestal (1), it is characterised in that: the upper table of the pedestal (1) Face is fixedly connected with left support column (2), and the side of the left support column (2) is fixedly connected with left work box (3), the left work The inner wall of case (3) is fixedly connected with left motor (4), and the output end of the left motor (4) is fixedly connected with left-hand rotation by conducted rod The side of Moving plate (5), the left-hand rotation Moving plate (5) is provided with chain (6), and left support column (2) outer surface is close to left work box (3) side is connected with left support disk (7), and support spreader (8), institute are fixedly connected at the top of the left support column (2) The outer surface for stating support spreader (8) is fixedly connected with left retaining ring (9), and support spreader (8) outer surface is close to left retaining ring (9) Side is provided with slideway (10), and the outer surface of the slideway (10) is provided with sliding shoe (11), the following table of the sliding shoe (11) Face is fixedly connected with rectangle frame (12), and the inner roof wall of the rectangle frame (12) is fixedly connected with hanged cylinder (13), described hanged The side of cylinder (13) is fixedly connected with hanged slideway (14), and the side of the hanged slideway (14) is connected with motion bar (15), one end of the motion bar (15) is fixedly connected with hook (16), and the support spreader (8) outer surface is close to slideway (10) Side be fixedly connected with right retaining ring (17), pedestal (1) upper surface is fixedly connected with close to the side of left support column (2) to be subtracted It shakes spring (18), one end of the damping spring (18) is fixedly connected with vibration damper plate (19), and the side of the vibration damper plate (19) is living Dynamic to be connected with vertical slideway (20), one end of the hanged cylinder (13) is fixedly connected with link block (21), the link block (21) be internally provided with fixture nut (22), the outer surface of the fixture nut (22) is disposed with left fixation from left to right Frame and right fixed frame, the lower surface of the left fixed frame are fixedly connected with middle plate (23), and the side of the middle plate (23) is fixed to be connected It is connected to fixed plate (24).
2. a kind of pre-stressed bridge Coping Construction hoisting device according to claim 1, it is characterised in that: the fixed plate (24) upper surface is fixedly connected with limit plate (25), and the side of the limit plate (25), which is fixedly connected with to stretch, draws cylinder (26).
3. a kind of pre-stressed bridge Coping Construction hoisting device according to claim 2, it is characterised in that: described to stretch drawing gas One end of cylinder (26) is fixedly connected with top plate (27), and the side of the fixed plate (24) is fixedly connected with telescopic rod (28).
4. a kind of pre-stressed bridge Coping Construction hoisting device according to claim 3, it is characterised in that: the telescopic rod (28) one end, which is fixedly connected with, squeezes spring (29), and described one end for squeezing spring (29) is fixedly connected with clamping plate (30), institute The outer surface for stating clamping plate (30) is fixedly connected with suspension hook (31).
5. a kind of pre-stressed bridge Coping Construction hoisting device according to claim 1, it is characterised in that: the pedestal (1) upper surface is fixedly connected with right support column far from the side of left support column (2), and the outer surface of the right support column is fixedly connected There is right work box, one end of the motion bar (15) is provided with nut, and one end of the motion bar (15) connects by the way that nut is fixed It is connected to hook (16).
6. a kind of pre-stressed bridge Coping Construction hoisting device according to claim 5, it is characterised in that: the right work The inner wall of case is fixedly connected with right motor, and the output end of the right motor is fixedly connected with right-hand rotation Moving plate by conducted rod, described Right support outer surface of column is connected with right support disk close to the side of right work box.
CN201821456706.9U 2018-09-06 2018-09-06 A kind of pre-stressed bridge Coping Construction hoisting device Active CN208995036U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821456706.9U CN208995036U (en) 2018-09-06 2018-09-06 A kind of pre-stressed bridge Coping Construction hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821456706.9U CN208995036U (en) 2018-09-06 2018-09-06 A kind of pre-stressed bridge Coping Construction hoisting device

Publications (1)

Publication Number Publication Date
CN208995036U true CN208995036U (en) 2019-06-18

Family

ID=66798482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821456706.9U Active CN208995036U (en) 2018-09-06 2018-09-06 A kind of pre-stressed bridge Coping Construction hoisting device

Country Status (1)

Country Link
CN (1) CN208995036U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112238169A (en) * 2020-09-14 2021-01-19 衡阳市大成锅炉有限公司 Adjustable low-cost simple coiler

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112238169A (en) * 2020-09-14 2021-01-19 衡阳市大成锅炉有限公司 Adjustable low-cost simple coiler

Similar Documents

Publication Publication Date Title
CN208995036U (en) A kind of pre-stressed bridge Coping Construction hoisting device
CN207404707U (en) A kind of electric vehicle general assembly line automatic unfolding suspender
CN107055340B (en) A kind of gantry crane that can detect the born weight of supporting rack
CN206999277U (en) A kind of wallboard turning device
CN1748613A (en) Cleaning device for open air article surface
CN202751533U (en) Lifting suspension transfer trolley
CN109436455A (en) A kind of compound fertilizer's sack-filling device
CN209052283U (en) A kind of modular architectural hanging apparatus
CN208915989U (en) Rotate shelf
CN207919381U (en) A kind of building machinery engineering Hanging Basket
CN206937267U (en) Assembly line workbench
CN214114654U (en) Lifting appliance for steel structure engineering
CN208054766U (en) A kind of vessel, which is built, uses handling apparatus
CN209238774U (en) A kind of steel pipe spiral groove rolling device
CN208747548U (en) A kind of concrete material lifting device for building
CN208087092U (en) A kind of single track parallel-moving type crane
CN209080909U (en) Machine people's device is automatically stored in a kind of rotor
CN207390398U (en) Object disposing platform in cloth lifting apparatus
CN206665992U (en) A kind of plant equipment mast-up
CN206357212U (en) A kind of robot device of Automatic-feeding
CN206455623U (en) The laborsaving operator of gun for coiling nail
CN209547892U (en) A kind of silicone backbone
CN213552361U (en) Trolley for medical treatment
CN110155887A (en) A kind of Miniature hanging device
CN107664149A (en) The retention mechanism that a kind of computer is connected with serial ports

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191113

Address after: 065200 No. 5 Engineering Company, No. 691 Jingyu Street, Sanhe City, Langfang City, Hebei Province

Patentee after: CCCC First Highway Fifth Engineering Co., Ltd.

Address before: 065200 No. 5 Engineering Company, No. 691 Jingyu Street, Sanhe City, Langfang City, Hebei Province

Co-patentee before: Li Jiang

Patentee before: Wang Erbing

TR01 Transfer of patent right