CN208979745U - Mine flight conveyer chain rupture monitoring signals processor - Google Patents

Mine flight conveyer chain rupture monitoring signals processor Download PDF

Info

Publication number
CN208979745U
CN208979745U CN201821539211.2U CN201821539211U CN208979745U CN 208979745 U CN208979745 U CN 208979745U CN 201821539211 U CN201821539211 U CN 201821539211U CN 208979745 U CN208979745 U CN 208979745U
Authority
CN
China
Prior art keywords
chain
hall sensor
module
hall
permanent magnet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821539211.2U
Other languages
Chinese (zh)
Inventor
闫建伟
李洋
刘震
唱荣蕾
王哲
谢森琪
田大肥
孙星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Heavy-Duty Heavy-Duty Equipment Technology Co Ltd
Ningxia Tiandi Benniu Industrial Group Co Ltd
Original Assignee
Ningxia Heavy-Duty Heavy-Duty Equipment Technology Co Ltd
Ningxia Tiandi Benniu Industrial Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Heavy-Duty Heavy-Duty Equipment Technology Co Ltd, Ningxia Tiandi Benniu Industrial Group Co Ltd filed Critical Ningxia Heavy-Duty Heavy-Duty Equipment Technology Co Ltd
Priority to CN201821539211.2U priority Critical patent/CN208979745U/en
Application granted granted Critical
Publication of CN208979745U publication Critical patent/CN208979745U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Conveyors (AREA)

Abstract

A kind of mine flight conveyer chain rupture monitoring signals processor, packet signal processor, include chain rupture monitoring device, chain rupture monitoring device includes the first hall sensor, second hall sensor, first hall sensor, second hall sensor is respectively used to the flat ring of detection left and right sides scraper conveyer chain, vertical ring, in the utility model, the precision of chain rupture monitoring device is high, high reliablity, the flat ring in mine flight conveyer chain and vertical ring can be accurately identified, based on above-mentioned chain rupture monitoring device detection information more abundant, binding time parameter built in signal processor, the counting module of flat ring and vertical number of rings amount, chain rupture judgment module, it can be accurate, reliably judge whether flight chain disconnection accident occurs, compared with existing chain rupture fault diagnosis system, the utility model contemplates a kind of entirely different technical solution, it should Signal processor and the cooperation of chain rupture monitoring device really to realize the industrial application of chain rupture monitoring function by technical solution, in the industry cycle still belong to the first.

Description

Mine flight conveyer chain rupture monitoring signals processor
Technical field
The utility model relates to mine flight conveyer equipment technical field, in particular to a kind of mine flight conveyer is disconnected Chain monitoring signals processor.
Background technique
In the process of running, since operating condition is complicated, severe, the scraper chain of drag conveyor is sometimes for mine flight conveyer Because the acute variation of external applied load leads to the generation of chain rupture.Since scraper chain is generally made of two chains, wherein a chain After disconnection, scraper chain can continue to run under the traction of another chain.And disconnect that root chain can occur it is different degrees of Accumulation.Chain after accumulation is easy and intermediate channel swipe and is hindered when passing through small space, leads to entire scraper chain It is unable to run, and then causes a greater degree of equipment breakdown.Therefore, carrying out real-time monitoring to scraper chain operating condition has very greatly Necessity.Existing chain rupture monitoring device cannot effectively set flat ring and vertical ring in chain, and signal processor is caused to judge The accuracy of chain rupture is low, and in recent years, some colleges and universities and device manufacturer have done part for chain rupture monitoring and studied, but with regard to practicability and Speech, not yet forms reliable solution.Authorization Notice No. is that the Chinese invention patent of CN105858126B discloses that " one kind is scraped Plate conveyor chain fault diagnosis system and method ", fault diagnosis system therein is possible in theory, but is difficult to the Yu Shiji paid It uses.In addition, coal working face bad environments, also particularly important to the protection of working face electrical equipment.
Summary of the invention
In view of this, in view of the above deficiencies, it is necessary to propose that one kind is hardly damaged, energy Fast Installation, detects reliability height Mine flight conveyer chain rupture monitoring signals processor.
A kind of mine flight conveyer chain rupture monitoring signals processor, the processor packet signal processor, chain rupture monitoring dress Set, in the plate of the intermediate channel of chain rupture monitoring device insertion drag conveyor, chain rupture monitoring device include stainless steel base, First hall sensor, the second hall sensor, the first hall sensor, the second hall sensor are left for being respectively used to detection The flat ring of right two sides scraper conveyer chain, vertical ring, and output indicates the flat ring of chain at left and right sides of drag conveyor, stands respectively The voltage signal of ring, signal processor include power module, signal conditioning module, conversion module, micro-control module, alarm mould Block, the power module are used to provide operating voltage, letter to the conversion module, filtering module, micro-control module, alarm module The voltage signal that number conditioning module is used to receive the first hall sensor, the second hall sensor exports, and to the voltage signal Filtration treatment, then filtered voltage signal is sent to conversion module, conversion module is used for the first Hall sense that will be received The voltage signal digital quantity of device, the output of the second hall sensor is answered to be converted to corresponding digital signal, micro-control module includes meter Digital-to-analogue block, judgment module, counting module are used for the digital signal exported based on conversion module, calculate in preset interval time respectively By the flat ring of the first hall sensor or the second hall sensor, the instant number of vertical ring, judgment module is used for based on described Flat ring, the instant number for founding ring and judgment module prestore flat ring, the load quantity of vertical ring compares, and obtain and scrape according to comparison result On the left of plate conveyer chain or right side chain whether chain rupture, alarm module provides the information of no chain rupture based on judgment module, Actuation of an alarm is executed, the stainless steel base is the at T-shaped prolate body in section, the first hall sensor, the second hall sensor Be spaced apart from each other certain distance and be mounted on stainless steel base, the first hall sensor, the second hall sensor corresponding position not Steel matrix of becoming rusty is equipped with the first mounting groove, and first hall sensor includes the first permanent magnet, the second permanent magnet, Hall base Seat, Hall element, magnetic conductive board, the first permanent magnet, the second permanent magnet are built in the first hall sensor position corresponding respectively The both ends of one mounting groove, the end polarity that the first permanent magnet, the second permanent magnet are oppositely arranged is on the contrary, Hall pedestal is also built in In one mounting groove, and it is placed in the middle position of the first permanent magnet, the second permanent magnet, the Hall pedestal is to set second in one The piece of stainless steel of mounting groove is fixedly installed with Hall element in the second mounting groove, and the notch of the first mounting groove is covered with magnetic conductive board, The first permanent magnet, the second permanent magnet, Hall pedestal, Hall element to be packaged in the first mounting groove, magnetic conductive board is directed toward left side The upper chain of chain is arranged, and the magnetic conductive board is fixedly connected with stainless steel base by fastening bolt, second hall sensing Device and the first hall sensor structure having the same, and be installed on stainless steel base in an identical manner, the first Hall sense It answers the distance between device, second hall sensor and is equidistant between chain, right side chain on the left of drag conveyor, first suddenly Your inductor is located between the uplink section chain of left side chain, downlink section chain, the first permanent magnet of the first hall sensor, the Two permanent magnets are located at the two sides of downlink section chain, to form small range in the two sides of downlink section chain, be exclusively used in downlink section chain Closed magnetic field, the second hall sensor is located between the uplink section chain of right side chain, downlink section chain, the second hall sensing The first permanent magnet, the second permanent magnet of device are located at the two sides of downlink section chain, with the two sides of downlink section chain formed small range, It is exclusively used in the closed magnetic field of downlink section chain.
Preferably, chain rupture monitoring device further includes cable connector, and the cable connector is fixedly installed in stainless base steel The end of body, in stainless steel base be equipped with cabling channel, the cabling channel along stainless steel base length direction be arranged, cabling channel with The connection of second mounting groove, is equipped with power supply line in cabling channel, and Hall element is connect by power supply line with cable connector, cable connection Device is connect with power module, and signal wire is equipped in cabling channel, and Hall element is connect by signal wire with signal processor.
In the utility model, the precision of chain rupture monitoring device is high, and high reliablity can accurately identify mine flight conveyer chain Flat ring and vertical ring in item are based on above-mentioned chain rupture monitoring device detection information more abundant, the combination built in signal processor Whether time parameter, the counting module of flat ring and vertical number of rings amount, chain rupture judgment module, accurately, reliably can judge flight chain There is disconnection accident, compared with existing chain rupture fault diagnosis system, the utility model contemplates a kind of entirely different technology Signal processor and the cooperation of chain rupture monitoring device are really realized that the industry of chain rupture monitoring function is answered by scheme, the technical solution With in the industry cycle still category is the first, in the chain rupture monitoring device in the utility model, by the first permanent magnet, the second permanent magnet, Hall base Seat, Hall element are all put together in stainless steel base, and chain rupture monitoring device is inserted into inserting for the intermediate channel of drag conveyor In plate, such design had both been able to satisfy the requirement for facilitating installation, while realizing duplicate protection to the chain rupture monitoring device, kept this disconnected Chain monitoring device is hardly damaged, using the first hall sensor, the second hall sensor respectively come detect left side chain, right side chain Item, and the end polarity that the first permanent magnet, the second permanent magnet are oppositely arranged in the first hall sensor or the second hall sensor On the contrary, complete Distribution of Magnetic Field can be formed, magnetic field strength is high, and magnetic conductive board can shield interference of the chain to magnetic field, guarantees flat ring With effective identification of vertical ring, solves the state that can only detect scraper plate in the prior art, precision is low, the technology bottle of poor reliability Neck.
Detailed description of the invention
Fig. 1 is the logic module figure of the signal processor.
Fig. 2 is the top view of the chain rupture monitoring device.
Fig. 3 is chain rupture monitoring device described in Fig. 2 along A-A sectional view.
Fig. 4 is chain rupture monitoring device described in Fig. 2 along B-B sectional view.
In figure: signal processor 10, power module 11, signal conditioning module 12, conversion module 13, micro-control module 14, Counting module 141, judgment module 142, alarm module 15, chain rupture monitoring device 20, stainless steel base 21, cabling channel 211, first Hall sensor 22, the first permanent magnet 221, the second permanent magnet 222, Hall pedestal 223, Hall element 224, magnetic conductive board 225, Two hall sensors 23, cable connector 24, left side chain 80, right side chain 90.
Specific embodiment
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment Attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is some embodiments of the utility model, for this For the those of ordinary skill of field, without creative efforts, it can also be obtained according to these attached drawings others Attached drawing.
Referring to Fig. 1 to Fig. 4, the utility model embodiment provides a kind of mine flight conveyer chain rupture monitoring signals processing Device, the processor packet signal processor 10, chain rupture monitoring device 20, chain rupture monitoring device 20 are inserted into the intermediate channel of drag conveyor Plate in, chain rupture monitoring device 20 includes stainless steel base 21, the first hall sensor 22, the second hall sensor 23, the One hall sensor 22, the second hall sensor 23 be used for be respectively used to detection the left and right sides scraper conveyer chain flat ring, Vertical ring, and output indicates that the voltage signal of the flat ring of chain at left and right sides of drag conveyor, vertical ring, signal processor 10 wrap respectively Power module 11, signal conditioning module 12, conversion module 13, micro-control module 14, alarm module 15 are included, power module 11 is used for Operating voltage is provided to conversion module 13, filtering module, micro-control module 14, alarm module 15, signal conditioning module 12 is used for The voltage signal of the first hall sensor 22, the output of the second hall sensor 23 is received, and to filtered voltage signal processing, then Filtered voltage signal is sent to conversion module 13, the first hall sensor 22 that conversion module 13 is used to receive, The voltage signal digital quantity of second hall sensor 23 output is converted to corresponding digital signal, and micro-control module 14 includes counting Module 141, judgment module 142, counting module 141 are used for the digital signal exported based on conversion module 13, calculate preset interval Mould is judged by the flat ring of the first hall sensor 22 or the second hall sensor 23, the instant number of vertical ring respectively in time Block 142 is used to prestore flat ring based on instant number and the judgment module 142 of flat ring, vertical ring, the load quantity of vertical ring compares, and according to According to comparison result obtain on the left of drag conveyor chain 80 or right side chain 90 whether chain rupture, alarm module 15 is based on judgment module 142 provide the information of no chain rupture, execute actuation of an alarm, and stainless steel base 21 is the at T-shaped prolate body in section, the first Hall Inductor 22, the second hall sensor 23 are spaced apart from each other certain distance and are mounted on stainless steel base 21, in the first hall sensor 22, the stainless steel base 21 of 23 corresponding position of the second hall sensor is equipped with the first mounting groove, the first hall sensor 22 packet Include the first permanent magnet 221, the second permanent magnet 222, Hall pedestal 223, Hall element 224, magnetic conductive board 225, the first permanent magnet 221, the second permanent magnet 222 is built in the both ends of corresponding first mounting groove in 22 position of the first hall sensor respectively, and first forever End polarity that magnet 221, the second permanent magnet 222 are oppositely arranged on the contrary, Hall pedestal 223 is also built in the first mounting groove, And it is placed in the middle position of the first permanent magnet 221, the second permanent magnet 222, Hall pedestal 223 is to set the second mounting groove in one Piece of stainless steel, be fixedly installed with Hall element 224 in the second mounting groove, the notch of the first mounting groove is covered with magnetic conductive board 225, The first permanent magnet 221, the second permanent magnet 222, Hall pedestal 223, Hall element 224 to be packaged in the first mounting groove, lead Magnetic sheet 225 is directed toward the upper chain setting of left side chain 80, magnetic conductive board 225 and stainless steel base 21 and connects by the way that fastening bolt is fixed It connects, the second hall sensor 23 and the structure having the same of the first hall sensor 22, and is installed in an identical manner stainless In steel matrix 21, chain 80 on the left of the distance between the first hall sensor 22, second hall sensor 23 and drag conveyor, It is equidistant between right side chain 90, the first hall sensor 22 is located at the uplink section chain of left side chain 80, downlink section chain Between, the first permanent magnet 221, the second permanent magnet 222 of the first hall sensor 22 are located at the two sides of downlink section chain, under The closed magnetic field that the two sides of row section chain form small range, are exclusively used in downlink section chain, the second hall sensor 23 are located at right side Between the uplink section chain of chain 90, downlink section chain, the first permanent magnet, the second permanent magnet of the second hall sensor 23 are located at The two sides of downlink section chain, with the closed magnetic field for forming small range in the two sides of downlink section chain, being exclusively used in downlink section chain.
First hall sensor 22 is for detecting left side chain 80 with the presence or absence of chain rupture, the second hall sensor 23 for examining Surveying right side chain 90 whether there is chain rupture.
Alarm module 15 includes dual-colored LED lamp, and micro-control module 14 issues corresponding chain rupture signal to alarm module 15, report After alert module 15 receives chain rupture signal, alarm module 15 by dual-colored LED lamp by red display, under continuous chain state, report Alert module 15 passes through green display by dual-colored LED lamp.
Alarm module 15 includes liquid crystal display, 14 alert of micro-control module to alarm module 15, alarm module 15 Corresponding warning message is shown by liquid crystal display, warning message for example can be the concrete position of chain rupture.
Hall element 224 changes for detecting Hall voltage with the variation of magnetic field strength, and magnetic field is stronger, and voltage is higher, When scraper plate passes through the first hall sensor 22, the second hall sensor 23, changes of magnetic field caused by scraper plate, so that the first permanent magnetism Changes of magnetic field between body 221, the second permanent magnet 222, Hall element 224 export a voltage signal.Flat ring in chain and The relatively caused changes of magnetic field of vertical ring is too small, and therefore, Hall element 224 cannot export the electricity for distinguishing flat ring and vertical ring in chain Buckling cannot also identify the flat ring in chain and vertical ring.
In present embodiment, chain 80, right side chain 90 are respectively by the first hall sensor 22, the on the left of drag conveyor Two hall sensors 23 detect, and first permanent magnet 221, second is forever in the first hall sensor 22 or the second hall sensor 23 The end polarity that magnet 222 is oppositely arranged between the first permanent magnet 221, the second permanent magnet 222 on the contrary, just can form complete Distribution of Magnetic Field, the center between the first permanent magnet 221, the second permanent magnet 222 is arranged in Hall element 224, in left side chain The position of item 80 and the center of right side chain 90 lower section has been respectively formed complete Distribution of Magnetic Field, detects and fills with chain rupture in the prior art It sets and compares, magnetic field strength is high, and flat ring and vertical ring are since position, angle are different, and corresponding changes of magnetic field intensity is different, so that Hall Element 224 can export different voltage signals, also set up magnetic conductive board 225 between the upper chain and lower chain of the same side chain, lead Magnetic sheet 225 can shield interference of the chain to magnetic field, guarantee to the flat ring of downlink section chain and effective identification of vertical ring, for example, Previous time point, upper chain are exactly flat ring, and lower chain is vertical ring, the latter time point, the exactly vertical ring of upper chain, lower chain Item is flat ring, in this way, changes of magnetic field caused by the summation of former and later two time points, upper chain and lower chain is exactly like, is caused The voltage signal that Hall element 224 exports is the same, and in this case, flat ring and vertical ring just cannot be distinguished from, and be based on above-mentioned set Meter, scraper plate can only be detected in the prior art by solving, and detection accuracy is low, the technical bottleneck of poor reliability, so that drag conveyor Chain rupture identification precision and reliability improve a height.
Following present the voltage for a Hall element 224 for using oscillograph to detect in a specific embodiment is defeated It is worth out, according to the output of oscillograph as a result, the voltage value for the vertical ring that Hall element 224 exports is 3.0V, the voltage value of flat ring is 2.7V, scraper plate voltage value be 3.7V, and voltage value is 2.5V when passing through without object, illustrates that the chain rupture monitoring device 20 can be effective Identify scraper plate, flat ring, vertical ring.
In the case where individual chain ruptures, by the first hall sensor 22, the second hall sensor 23 scraper plate quantity still It is normal condition, conventional chain rupture monitoring device 20 detects the state due to being only able to detect scraper plate, it just cannot detect chain rupture, Therefore, conventional 20 precision of chain rupture monitoring device is low, poor reliability.Chain rupture monitoring device 20 can identify flat ring in the utility model With vertical ring, in this case, by the first hall sensor 22, the flat ring of the second hall sensor 23 and vertical number of rings amount and normal In the case of it is inconsistent, judge chain rupture so as to effect.
Chain rupture monitoring device 20 in present embodiment can directly insert as needed into drag conveyor intermediate channel insert In plate, there is no hindering coal stream to pass through, do not need to be transformed used mine flight conveyer yet.
The first permanent magnet 221, the second permanent magnet 222, Hall pedestal in chain rupture monitoring device 20 in present embodiment 223, Hall element 224 is all put together in stainless steel base 21, make entire chain rupture monitoring device 20 form one it is whole Body, the design of this complete envelop-type, can effective protection chain rupture monitoring device 20, and integral design can be directly by chain rupture Monitoring device 20 is inserted into sensor special tooling, is further avoided the impact by coal cinder and spoil and is damaged, moreover it is possible to convenient Replacement after the failure of chain rupture monitoring device 20.
Here judgment module 142 is enumerated in a simple signal processor 10 to the deterministic process of chain rupture: usual situation, Flat ring between two adjacent groups scraper plate, the quantity of vertical ring be it is specified, when 141 real-time monitoring two adjacent groups scraper plate of counting module it Between flat ring, the quantity of vertical ring and load quantity it is inconsistent, illustrate chain by the possibility of chain rupture.
Provide the specific calculation method that a signal processor 10 judges chain chain rupture: the calculation method packet again below Include following steps:
Step 1: adjacent six scraper plates in record left side successively pass through the time t of the first hall sensor 221、t2、t3、t4、 t5、t6, and adjacent six scraper plates successively pass through the time T of the second hall sensor 23 on the right side of synchronous recording1、T2、T3、T4、T5、T6
Step 2: according to calculation formula: Calculate the speed of service of six scraper plates in left side, wherein L is the distance between two scraper plates;
Step 3: according to calculation formula: Calculate the speed of service of six scraper plates in right side, wherein L is the distance between two scraper plates;
Step 4: according to Step 2: step 3 calculated result, according to calculation formula:
Calculate left side six scraper plates, six, right side The speed of service mean value of scraper plate;
Step 5: according to the calculated result of step 4, ifDetermine that scrapper conveyor is in specified operation shape State is then back to step 1, ifScrapper conveyor is not at specified operating status, then executes downwards, wherein V0 Scrapper conveyor specified speed of service, δ are threshold value;
Step 6: acquisition in real time, record left side chain 80 pass through the first hall sensor 22 in given interval △ t Scraper plate quantity, flat ring quantity and vertical number of rings amount, and continuous acquisition, five groups of record, then by five groups of scraper plate quantity, flat ring quantity and Vertical number of rings amount is averaged A, B, C as reference value respectively, then acquires, records left side chain 80 in given interval △ t It is worth as a comparison by scraper plate the quantity a, flat ring quantity b and vertical number of rings amount c of the first hall sensor 22,
Step 7: according to the calculated result of step 6, if | A-a | > 0.5, | B-b | > 0.5, | C-c | > 0.5, simultaneously It sets up, then judges left side chain rupture, and send chain rupture warning message, if | A-a | > 0.5, | B-b | > 0.5, | C-c | > 0.5, It does not set up simultaneously, then left side not chain rupture;
Step 8: acquisition in real time, record right side chain 90 pass through the second hall sensor 23 in given interval △ t Scraper plate quantity, flat ring quantity and vertical number of rings amount, and continuous acquisition, five groups of record, then by five groups of scraper plate quantity, flat ring quantity and Vertical number of rings amount is averaged A, B, C as reference value respectively, then acquires, records right side chain 90 in given interval △ t It is worth as a comparison by scraper plate the quantity a, flat ring quantity b and vertical number of rings amount c of the second hall sensor 23,
Step 9: according to the calculated result of step 8, if | A-a | > 0.5, | B-b | > 0.5, | C-c | > 0.5, simultaneously It sets up, then judges right side chain rupture, and send chain rupture warning message, if | A-a | > 0.5, | B-b | > 0.5, | C-c | > 0.5, It does not set up simultaneously, then right side not chain rupture.
In the utility model, the precision of chain rupture monitoring device 20 is high, and high reliablity can accurately identify mine flight conveyer Flat ring and vertical ring in chain are based on above-mentioned chain rupture monitoring device 20 detection information more abundant, built in signal processor 10 Binding time parameter, flat ring and vertical number of rings amount counting module 141, chain rupture judgment module 142, can accurately, reliably judge Whether flight chain there is disconnection accident, and compared with existing chain rupture fault diagnosis system, the utility model contemplates one and finishes Complete different technical solution, the technical solution come signal processor 10 and the cooperation of chain rupture monitoring device 20 really to realize that chain rupture is supervised The industrial application of brake in the industry cycle still belongs to the first, in the chain rupture monitoring device 20 in the utility model, by the first permanent magnet 221, the second permanent magnet 222, Hall pedestal 223, Hall element 224 are all put together in stainless steel base 21, chain rupture prison It surveys in the plate for the intermediate channel that device 20 is inserted into drag conveyor, such design had both been able to satisfy the requirement for facilitating installation, simultaneously Duplicate protection is realized to the chain rupture monitoring device 20, is hardly damaged the chain rupture monitoring device 20, using the first hall sensor 22, the second hall sensor 23 detects left side chain 80, right side chain 90 respectively, and the first hall sensor 22 or second is suddenly First permanent magnet, the second permanent magnet are oppositely arranged in your inductor 23 end polarity on the contrary, complete Distribution of Magnetic Field can be formed, Magnetic field strength is high, and magnetic conductive board 225 can shield interference of the chain to magnetic field, guarantees effective identification of flat ring and vertical ring, solves The state of scraper plate can only be detected in the prior art, and precision is low, the technical bottleneck of poor reliability.
Referring to fig. 2, further, chain rupture monitoring device 20 further includes cable connector 24, and cable connector 24 is fixedly mounted In the end of stainless steel base 21, cabling channel 211 is equipped in stainless steel base 21, cabling channel 211 is long along stainless steel base 21 Direction setting is spent, cabling channel 211 is connected to the second mounting groove, and equipped with power supply line in cabling channel 211, power supply line is by Hall element 224 connect with cable connector 24, and cable connector 24 is connect with power module 11, and signal wire, letter are equipped in cabling channel 211 Hall element 224 is connect by number line with signal processor 10.
Module or unit in the utility model embodiment device can be merged according to actual needs, divide and be deleted Subtract.
Above disclosures are merely preferred embodiments of the utility model, the utility model cannot be limited with this certainly Interest field, those skilled in the art can understand all or part of the processes for realizing the above embodiment, and according to this reality The equivalent variations made by novel claim, still falls within the scope of the utility model.

Claims (2)

1. a kind of mine flight conveyer chain rupture monitoring signals processor, it is characterised in that: the processor packet signal processor breaks Chain monitoring device, the chain rupture monitoring device are inserted into the plate of the intermediate channel of drag conveyor, and chain rupture monitoring device includes not Rust steel matrix, the first hall sensor, the second hall sensor, the first hall sensor, the second hall sensor are for distinguishing For detecting the flat ring of left and right sides scraper conveyer chain, founding ring, and output indicates chain at left and right sides of drag conveyor respectively The voltage signal of the flat ring of item, vertical ring, signal processor includes power module, signal conditioning module, conversion module, micro-control molding Block, alarm module, the power module are used to provide work to the conversion module, filtering module, micro-control module, alarm module Make voltage, signal conditioning module is used to receive the voltage signal of the first hall sensor, the output of the second hall sensor, and to this Filtered voltage signal processing, then filtered voltage signal is sent to conversion module, conversion module be used to receive the The voltage signal digital quantity that one hall sensor, the second hall sensor export is converted to corresponding digital signal, micro-control molding Block includes counting module, judgment module, and counting module is used for the digital signal exported based on conversion module, when calculating preset interval The instant number of the interior flat ring for passing through the first hall sensor or the second hall sensor respectively, vertical ring, judgment module are used for Instant number and judgment module based on the flat ring, vertical ring prestore flat ring, the load quantity of vertical ring compares, and tie according to comparing Fruit obtain on the left of drag conveyor chain or right side chain whether chain rupture, alarm module is based on judgment module and provides no chain rupture Information, execute actuation of an alarm, the stainless steel base is the at T-shaped prolate body in section, the first hall sensor, the second Hall Inductor is spaced apart from each other certain distance and is mounted on stainless steel base, in the first hall sensor, the second hall sensor corresponding positions The stainless steel base set is equipped with the first mounting groove, and first hall sensor includes the first permanent magnet, the second permanent magnet, suddenly That pedestal, Hall element, magnetic conductive board, it is corresponding that the first permanent magnet, the second permanent magnet are built in the first hall sensor position respectively The first mounting groove both ends, end polarity that the first permanent magnet, the second permanent magnet are oppositely arranged is on the contrary, Hall pedestal is also built-in In in the first mounting groove, and it is placed in the middle position of the first permanent magnet, the second permanent magnet, the Hall pedestal is to set in one The piece of stainless steel of second mounting groove is fixedly installed with Hall element in the second mounting groove, and the notch of the first mounting groove, which is covered with, leads First permanent magnet, the second permanent magnet, Hall pedestal, Hall element are packaged in the first mounting groove by magnetic sheet, and magnetic conductive board is directed toward The upper chain of left side chain is arranged, and the magnetic conductive board is fixedly connected with stainless steel base by fastening bolt, second Hall Inductor and the first hall sensor structure having the same, and be installed on stainless steel base in an identical manner, first suddenly It is equidistant between the distance between your inductor, second hall sensor and drag conveyor left side chain, right side chain, the One hall sensor is located between the uplink section chain of left side chain, downlink section chain, the first permanent magnetism of the first hall sensor Body, the second permanent magnet are located at the two sides of downlink section chain, to form small range in the two sides of downlink section chain, be exclusively used in downlink section The closed magnetic field of chain, the second hall sensor are located between the uplink section chain of right side chain, downlink section chain, the second Hall The first permanent magnet, the second permanent magnet of inductor are located at the two sides of downlink section chain, are formed with the two sides in downlink section chain small Range, the closed magnetic field for being exclusively used in downlink section chain.
2. mine flight conveyer chain rupture monitoring signals processor as described in claim 1, it is characterised in that: chain rupture monitoring dress Setting further includes cable connector, and the cable connector is fixedly installed in the end of stainless steel base, is set in stainless steel base There is cabling channel, the cabling channel is arranged along stainless steel base length direction, and cabling channel is connected to the second mounting groove, in cabling channel Equipped with power supply line, Hall element is connect by power supply line with cable connector, and cable connector is connect with power module, in cabling channel Interior to be equipped with signal wire, Hall element is connect by signal wire with signal processor.
CN201821539211.2U 2018-09-20 2018-09-20 Mine flight conveyer chain rupture monitoring signals processor Expired - Fee Related CN208979745U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821539211.2U CN208979745U (en) 2018-09-20 2018-09-20 Mine flight conveyer chain rupture monitoring signals processor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821539211.2U CN208979745U (en) 2018-09-20 2018-09-20 Mine flight conveyer chain rupture monitoring signals processor

Publications (1)

Publication Number Publication Date
CN208979745U true CN208979745U (en) 2019-06-14

Family

ID=66784861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821539211.2U Expired - Fee Related CN208979745U (en) 2018-09-20 2018-09-20 Mine flight conveyer chain rupture monitoring signals processor

Country Status (1)

Country Link
CN (1) CN208979745U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109051627A (en) * 2018-09-20 2018-12-21 宁夏天地奔牛实业集团有限公司 Mine flight conveyer chain rupture monitoring signals processor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109051627A (en) * 2018-09-20 2018-12-21 宁夏天地奔牛实业集团有限公司 Mine flight conveyer chain rupture monitoring signals processor
CN109051627B (en) * 2018-09-20 2024-02-02 宁夏天地奔牛实业集团有限公司 Broken chain monitoring signal processor for mining scraper conveyor

Similar Documents

Publication Publication Date Title
CN109051627A (en) Mine flight conveyer chain rupture monitoring signals processor
CN105501256B (en) A kind of middle low speed magnetic suspension train combination speed-position detection device
CN206456916U (en) Drag conveyor chain rupture monitoring device
CN208979745U (en) Mine flight conveyer chain rupture monitoring signals processor
CN204269739U (en) Based on thunderbolt diagnosis and the real time warning device of leakage conductor
CN203359735U (en) Anti-abrasion protecting device for elevator traction wheel and elevator rope
CN204679557U (en) Judge that AC signal seals in the detection system of straight-flow system
CN111874035A (en) Railway switch tongue or point rail state real-time supervision close-fitting inspection ware
CN208979744U (en) Mine flight conveyer chain rupture monitoring signals acquisition processing system
CN208979743U (en) Mine flight conveyer chain rupture monitoring device
CN105865532A (en) Monitoring and alarming system for transformer substation secondary system TMOV lightning arrester main board
CN106645851A (en) Electric meter box with electric energy comparison function
CN109051624A (en) Mine flight conveyer chain rupture monitoring signals acquisition processing system
CN212556280U (en) Railway switch tongue or point rail state real-time supervision close-fitting inspection ware
CN104444224B (en) A kind of rubber conveyer longitudinal ripping detecting device and method thereof
CN202372451U (en) Current collector monitoring device
KOYAMA et al. Methods for detecting pantograph defects using sensors installed on contact lines
CN110687401A (en) Fault detection system and method for overhead contact system on railway
CN206193160U (en) Direct current equipment frame insulation monitoring and warning device among subway direct current traction power supply system
CN203472887U (en) Axle counting system
CN110160679A (en) Method and system for detecting railway turnout contact force
CN205022608U (en) Novel railway sensor detects device
CN108061918A (en) Lubricating oil metal fillings detection device
CN112611941A (en) Novel distribution line fault indicator and implementation method
CN110459931B (en) Monitoring device for monitoring carbon brush length in real time and carbon brush and wind turbine generator comprising same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190614