- CN208979602U CN208979602U CN201821293831.2U CN201821293831U CN208979602U CN 208979602 U CN208979602 U CN 208979602U CN 201821293831 U CN201821293831 U CN 201821293831U CN 208979602 U CN208979602 U CN 208979602U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- steel
- pad
- beam body
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pallets (AREA)
- Packaging Of Annular Or Rod-Shaped Articles, Wearing Apparel, Cassettes, Or The Like (AREA)
Abstract
A kind of field operation steel petroleum pipeline steel pipe pallet, the upper and lower beam body both ends of the pallet are welded with the plate stay hook for fixing locking device, and upper and lower beam body is fixed with the positioning gutta pad of quantity identical as packaging steel pipe number against steel pipe side;Anti-skidding, shockproof positioning gutta pad is fixedly installed at the arc of the above and below of middle pad pipe;Upper and lower pull rod one end of the locking pull rod is made into closed U-loop with round steel, is articulated in upper and lower Liang Gudinggouchu, the screw rod of the other end is connected with the ratchet mechanism.In use, steel pipe is placed on the positioning gutta pad of lower beam body by root, middle pad pipe is placed on steel pipe, remaining intermediate steel pipe and middle pad pipe is successively piled up, finally places upper beam, pull rod is then locked and two upper and lower beams is locked, be packaged and complete.The pallet structure is simple, labor intensity is low, field operation steel oil transportation steel pipe can be assembled into beam by fixed specification, storage is not only conducive to after bundled, but also be suitble to mechanized handling, transport.
Description
Technical field
The utility model relates to a kind of boundling binding device of field operation steel oil transportation steel pipe, specifically a kind of field operation steel
Matter petroleum pipeline steel pipe pallet.
Background technique
Before the utility model lifts, the transport and storage of the field operation steel petroleum pipeline steel pipe of army's application are all using scattered
Dress.By the difference entrucking transport of single steel pipe, transport to after place to use or storehouse, unloading one by one, it is in heaps to be superimposed, entirely
Process is all manual operation, is not able to satisfy the requirement of mechanization operation.Manual operation large labor intensity, working efficiency is low, oil transportation
Steel pipe regular cannot be put, and be unfavorable for storing and be transported.
Summary of the invention
The utility model problem to be solved is to overcome the deficiencies of the prior art and provide that a kind of structure is simple, labour is strong
It spends low, the field operation steel petroleum pipeline steel pipe pallet of mechanized operation can be carried out, which can be by field operation steel petroleum pipeline
Packaging bunchy is readily transported and stores.
Realize the purpose of this utility model the technical solution adopted is that: a kind of field operation steel petroleum pipeline steel pipe pallet,
The pallet includes upper beam body, steel pipe, middle pad pipe, locking pull rod and lower beam body;The upper beam body, lower beam body use fashioned iron
It manufactures, both ends are welded with for fixed locking mount board shape stay hook, and upper beam body, lower beam body are fixed with against steel pipe side using rivet
The anti-skidding shockproof positioning gutta pad of quantity identical as packaging steel pipe number;The middle pad pipe use rectangular square tube, square tube it is upper,
On below, the arc of respective numbers is struck out according to the quantity of packaging steel pipe and diameter, is fixedly installed at arc using screw
Anti-skidding, shockproof middle positioning gutta pad;The locking pull rod is made of upper connecting rod, lower pull rod and ratchet mechanism, and upper connecting rod is under
Pull rod one end is made into closed U-loop with round steel, is articulated at upper and lower beam slab shape stay hook, the screw rod of the other end with it is described
Ratchet mechanism be connected.
In use, being first placed in parallel in two pieces underbeam is spaced apart on flat ground, make positioning gutta pad groove
Upward two sides alignment, steel pipe is placed on the positioning gutta pad of lower beam body by root, and keep steel pipe end surface concordant.First layer will after installing
Middle pad pipe is placed on steel pipe, and is aligned with two underbeams.Remaining intermediate steel pipe and middle pad pipe are successively piled up by the above process,
Upper beam is finally placed, then the lower pull rod for locking pull rod is linked into underbeam plate stay hook, carry is linked into upper connecting rod upwards
It in upper beam hanging plate shape stay hook, while moving ratchet spanner and two upper and lower beams is locked, be packaged and complete.
The utility model has the advantages that: the pallet structure is simple, labor intensity is low, can press field operation steel oil transportation steel pipe
Fixed specification is assembled into beam, and storage is not only conducive to after bundled, but also is suitble to mechanized handling, transport, while again can be with distributing vehicle phase
With use, meets the needs of mechanization stringing.
Detailed description of the invention
Fig. 1 is the main view of the utility model field operation steel petroleum pipeline steel pipe pallet.
Fig. 2 is the left view of the utility model field operation steel petroleum pipeline steel pipe pallet.
Fig. 3 is the structure connection figure that the utility model field operation steel petroleum pipeline steel pipe pallet locks pull rod.
Specific embodiment
In the accompanying drawings, for the utility model field operation steel petroleum pipeline steel pipe pallet include including upper beam body, steel pipe, in
Between pad pipe, locking pull rod and lower beam body;The upper beam body 1, lower beam body 8 are manufactured using fashioned iron, and both ends are welded with for fixing lock
The plate stay hook 3 of tight device, the lifting point when stay hook of lower beam body 8 is also the integral hoisting after packaging simultaneously, fashioned iron table
Face has carried out japanning anti-corrosion;Upper beam body 1, lower beam body 8 are fixed with quantity identical as packaging steel pipe number using rivet against steel pipe side
Anti-skidding shockproof positioning gutta pad 2;Positioning gutta pad 2 is fabricated to match with 6 outer diameter of steel pipe of institute packaging arc, and the consistent cloth of spacing
It sets in upper and lower beam body, for fixing and being isolated steel pipe.The upper beam body 1, lower beam body 8, and 2 He of positioning gutta pad thereon
3 structure and size of plate stay hook are identical.The middle pad pipe 4 uses rectangular square tube, and surface uses galvanized anticorrosive, in square tube
Above and below on, the arc of respective numbers is struck out according to the quantity of packaging steel pipe and diameter, is adopted at arc and is screwed peace
Equipped with anti-skidding, shockproof middle positioning gutta pad 5;The spacing of middle positioning gutta pad 5 on middle pad pipe 4 and the positioning glue on upper and lower beam
The spacing of pad 2 is consistent.The locking pull rod 7 is made of upper connecting rod 7.1, lower pull rod 7.3 and ratchet mechanism 7.2, pull-up
Bar 7.1 and lower 7.3 one end of pull rod are made into closed U-loop with round steel, are articulated at upper and lower beam slab shape stay hook 3, the other end
Screw rod be connected with ratchet mechanism 7.2.Elastic cue mark is had on ratchet mechanism 7.2, moves the handle of ratchet mechanism, it can
To realize light, quick locking and release operation.
In use, being first placed in parallel in two pieces underbeam is spaced apart on flat ground, make positioning gutta pad groove
Upward two sides alignment, steel pipe is placed on the positioning gutta pad of lower beam body by root, and keep steel pipe end surface concordant.First layer will after installing
Middle pad pipe is placed on steel pipe, and is aligned with two underbeams.Remaining intermediate steel pipe and pad pipe are successively piled up by the above process, finally
Upper beam is placed, then the lower pull rod for locking pull rod is linked into underbeam stay hook, carry makes upper connecting rod be linked into upper beam upwards hangs admittedly
Determine in hook, while moving ratchet spanner and two upper and lower beams are locked, is packaged and completes.
The utility model field operation steel petroleum pipeline steel pipe pallet, can be with two kinds of specifications of packaging DN100 and DN150
DN100 trough steel pipe or DN150 spigot-and-socket steel pipe both can be carried out packaging using a set of pallet by steel pipe.Every set DN150 packaging
Frame can be socket joint steel pipe 54 of package length 6068mm, and pattern is 9 row × 6 layer, and DN100 pallet can package length 6068mm
Trough steel pipe 120 root canal, pattern is 15 × 8 layers.A set of pallet includes 2 upper beam bodies, 2 lower beam bodies, 4 cover lockings
Pull rod, 10 or 14 middle pad pipe compositions.After entirety is tied up, there are two fixed points on every length of steel pipe direction, and lifting is not
It lays particular stress on, it can be achieved that integral hoisting, transport, can store pile up and down, save storage space.
Claims (3)
1. a kind of field operation steel petroleum pipeline steel pipe pallet, which includes upper beam body, steel pipe, middle pad pipe, lock
Strain at bar and lower beam body;It is characterized by: the upper beam body (1), lower beam body (8) are manufactured using fashioned iron, both ends, which are welded with, to be used for
The plate stay hook (3) of fixed locking device, upper beam body (1), lower beam body (8) is fixed with against steel pipe side using rivet and packaging
The anti-skidding shockproof positioning gutta pad (2) of the identical quantity of steel pipe number;The middle pad pipe (4) use rectangular square tube, square tube it is upper,
The arc of respective numbers is struck out below according to the quantity of packaging steel pipe and diameter, is fixedly installed at arc using screw anti-
Sliding, shockproof middle positioning gutta pad (5);The locking pull rod (7) is by upper connecting rod (7.1), lower pull rod (7.3) and ratchet mechanism
(7.2) composition, upper connecting rod (7.1) and lower pull rod (7.3) one end are made into closed U-loop with round steel, are articulated in upper and lower beam slab
At shape stay hook (3), the screw rod of the other end is connected with ratchet mechanism (7.2).
2. field operation steel petroleum pipeline steel pipe pallet as described in claim 1, it is characterised in that: the positioning gutta pad
(2) it is fabricated to the arc that matches with the outer diameter of steel pipes of institute packaging, and spacing is unanimously arranged in upper and lower beam body.
3. field operation steel petroleum pipeline steel pipe pallet as described in claim 1, it is characterised in that: the middle pad pipe
(4) spacing of the middle positioning gutta pad (5) on and the spacing of the positioning gutta pad (2) on upper and lower beam are consistent.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821293831.2U CN208979602U (en) | 2018-08-04 | 2018-08-04 | Field operation steel petroleum pipeline steel pipe pallet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821293831.2U CN208979602U (en) | 2018-08-04 | 2018-08-04 | Field operation steel petroleum pipeline steel pipe pallet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208979602U true CN208979602U (en) | 2019-06-14 |
Family
ID=66781392
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821293831.2U Expired - Fee Related CN208979602U (en) | 2018-08-04 | 2018-08-04 | Field operation steel petroleum pipeline steel pipe pallet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208979602U (en) |
-
2018
- 2018-08-04 CN CN201821293831.2U patent/CN208979602U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU96561U1 (en) | PACKING DEVICE | |
CN101905785A (en) | Pipe bunching device | |
CN209210186U (en) | A kind of container spreader convenient for being reinforced to cabinet | |
CN208979602U (en) | Field operation steel petroleum pipeline steel pipe pallet | |
CN205855767U (en) | A kind of for sheet material shipment, the suspender of transfer | |
RU2531887C1 (en) | Container transfer frame | |
CN206203036U (en) | A kind of packaging element for angle member | |
CN202107223U (en) | Device for packaging flywheel shell parts | |
CN206493889U (en) | Vehicle carrier fixing device | |
CN205524387U (en) | Building material frock that operates | |
CN107264594A (en) | A kind of petroleum pipeline clamping conveying arrangement for improving conevying efficiency | |
CN103213782B (en) | Pipe bunching device matching with pipe distributing vehicle and ordinary conveying vehicle | |
CN208070511U (en) | A kind of dislocation type steel cylinder packaging or generic transport frame in bulk | |
CN202245362U (en) | Pipeline transportation device | |
CN202944635U (en) | Double-faced tray | |
CN208470527U (en) | A kind of steel pipe boundling bracket | |
CN205632560U (en) | Civil engineering pipe fitting placer | |
CN210338698U (en) | Modular basket is transported in shape of preapring for an unfavorable turn of events | |
CN203429559U (en) | Suspension bridge anchor system steel anchor rod hoisting tool | |
CN207531518U (en) | Ornamental and afforestation trees support device | |
CN204660390U (en) | A kind of laterally zygomorphic pipe bunching device | |
CN205438501U (en) | Novel rod iron fixed baseplate | |
CN205602291U (en) | Diesel oil pump, motor -driven pump water pipe containerized storage and transportation device | |
CN205616256U (en) | Semi -automatic packing box hacking machine | |
CN204223395U (en) | A kind of pallet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||