CN205524387U - Building material frock that operates - Google Patents
Building material frock that operates Download PDFInfo
- Publication number
- CN205524387U CN205524387U CN201620247839.XU CN201620247839U CN205524387U CN 205524387 U CN205524387 U CN 205524387U CN 201620247839 U CN201620247839 U CN 201620247839U CN 205524387 U CN205524387 U CN 205524387U
- Authority
- CN
- China
- Prior art keywords
- working plate
- plate
- frock
- gripper shoe
- main working
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a building material frock that operates, including main frock board, the left side of main frock board is provided with the push -and -pull handle, the push -and -pull is provided with the battery on, both sides all are provided with the regulation hole around the main frock board, be provided with fixing bolt in the regulation hole, electromagnet and electrical connections battery, vice frock board is pegged graft in the cavity, both sides all are provided with flute form elastic plate around the vice frock board, the backup pad is fixed respectively at the upper surface of main frock board left end and the upper surface of vice frock board right -hand member through the pin, the one end of backup pad articulates through the hinge has the pressure strip, it has the arc standing groove to open in the backup pad, be provided with anti -skidding line in the arc standing groove, the bounding wall is fixed around main frock board and the upper surface of right -hand member. This building material frock that operates, the structure is succinct reasonable, and the material of manufacturing, operate is convenient, has accomplished that a thing is multi -purpose.
Description
Technical field
This utility model relates to the frock technical field that operates, and is specially a kind of construction material operating frock.
Background technology
The construction of building trade needs the material needed to be transported to another place from a place, the most existing reinforcing bar, cement etc. need manually to complete in building site entrucking or the process of transfer, and need different equipment to transport, carry back and forth with several workmans, the ferrous materials such as steel noise easy to fall off during transporting, friction is bigger, not only add substantial amounts of labour force to put into, but also drastically influence work efficiency.
Summary of the invention
The purpose of this utility model is to provide a kind of construction material operating frock, with the problem solving to propose in above-mentioned background technology.
nullFor achieving the above object,This utility model following technical scheme of offer: a kind of construction material operating frock,Including main working plate、Secondary working plate、Gripper shoe and coaming plate,The left side of described main working plate is provided with push-and-pull handle,Described push-and-pull on be provided with accumulator,The right side opening of described main working plate has cavity,Before and after described main working plate, both sides are provided with adjustment hole,Fixing bolt it is provided with in described adjustment hole,And one end of fixing bolt extends in cavity,The middle part of described main working plate is embedded with magnechuck,Described magnechuck is connected with storage battery,Described secondary working plate is plugged in cavity,And pair working plate is flexibly connected with one end of fixing bolt,Before and after described secondary working plate, both sides are provided with corrugated elastic plate,Described gripper shoe is separately fixed at upper surface and the upper surface of secondary working plate right-hand member of main working plate left end by pin,Described corrugated elastic plate is at cavity with between the gripper shoe of secondary working plate,One end of described gripper shoe is hinged with pressure strip by hinge,Arc placing trough is had in described gripper shoe,It is provided with anti-slip veins in described arc placing trough,Described coaming plate is fixed on before and after main working plate and the upper surface of right-hand member.
Preferably, the lower end of described main working plate and secondary working plate is provided with universal wheel.
Preferably, the height of described gripper shoe is higher than corrugated elastic plate and the height of coaming plate.
Preferably, the setting of described arc placing trough be no less than 8 groups, and between be equally spaced arrangement.
Compared with prior art, the beneficial effects of the utility model are: this construction material operating frock, gripper shoe on main working plate and secondary working plate, arc placing trough in gripper shoe can place reinforcing bar, iron etc., pressure strip, anti-slip veins and cooperation magnechuck are possible to prevent reinforcing bar, the coming off in transportation such as iron, and friction can be reduced, reduce noise, main working plate and secondary working plate regulate length by cavity, to adapt to transport in the reinforcing bar of different length, iron etc., simultaneously the most not the used time be easy to shrink after collect and take up room to reduce, use flexibly, the receiving cavity that corrugated elastic plate and coaming plate surround can place cement and other construction materials, accomplish one-object-many-purposes.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
In figure: 1 main working plate, 10 cavitys, 11 adjustment holes, 12 fix bolt, 2 push-and-pull handles, 3 accumulator, 4 secondary working plate, 40 corrugated elastic plates, 5 gripper shoes, 50 pressure strips, 51 arc placing troughs, 52 anti-slip veins, 6 coaming plates, 7 magnechucks, 8 universal wheels.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of this utility model protection.
Refer to Fig. 1, a kind of technical scheme of this utility model offer: a kind of construction material operating frock, including main working plate 1, secondary working plate 4, gripper shoe 5 and coaming plate 6, the left side of main working plate 1 is provided with push-and-pull 2, push-and-pull is being provided with accumulator 3 on 2, the right side opening of main working plate 1 has cavity 10, before and after main working plate 1, both sides are provided with adjustment hole 11, the lower end of main working plate 1 and secondary working plate 4 is provided with universal wheel 8, fixing bolt 12 it is provided with in adjustment hole 11, and one end of fixing bolt 12 extends in cavity 10, the middle part of main working plate 1 is embedded with magnechuck 7, magnechuck 7 electrically connects with accumulator 3.
Secondary working plate 4 is plugged in cavity 10, and pair working plate 4 is flexibly connected with one end of fixing bolt 12, before and after secondary working plate 4, both sides are provided with corrugated elastic plate 40, gripper shoe 5 is separately fixed at upper surface and the upper surface of secondary working plate 4 right-hand member of main working plate 1 left end by pin, corrugated elastic plate 40 is at cavity 10 with between the gripper shoe 5 of secondary working plate 4, one end of gripper shoe 5 is hinged with pressure strip 50 by hinge, arc placing trough 51 is had in gripper shoe 5, the setting of arc placing trough 51 is no less than 8 groups, it it is equally spaced arrangement between and, anti-slip veins 52 it is provided with in arc placing trough 51, before and after coaming plate 6 is fixed on main working plate 1 and the upper surface of right-hand member, the height of gripper shoe 5 is higher than corrugated elastic plate 40 and the height of coaming plate 6.
In transport process, universal wheel 8 is easy to push-and-pull, gripper shoe 5 on main working plate 1 and secondary working plate 4, arc placing trough 51 in gripper shoe 5 can place reinforcing bar, iron etc., pressure strip 50, anti-slip veins 52 and cooperation magnechuck 7 are possible to prevent reinforcing bar, the coming off in transportation such as iron, and friction can be reduced, reduce noise, main working plate 4 and secondary working plate 4 regulate length by cavity 10, to adapt to transport in the reinforcing bar of different length, iron etc., simultaneously the most not the used time be easy to shrink after collect and take up room to reduce, use flexibly, the receiving cavity that corrugated elastic plate 40 and coaming plate 6 surround can place cement and other construction materials, accomplish one-object-many-purposes.
Embodiment the most of the present utility model, for the ordinary skill in the art, being appreciated that in the case of without departing from principle of the present utility model and spirit and these embodiments can carry out multiple change, revise, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (4)
- null1. a construction material operating frock,Including main working plate (1)、Secondary working plate (4)、Gripper shoe (5) and coaming plate (6),It is characterized in that: the left side of described main working plate (1) is provided with push-and-pull (2),Described push-and-pull is provided with accumulator (3) on (2),The right side opening of described main working plate (1) has cavity (10),Before and after described main working plate (1), both sides are provided with adjustment hole (11),Fixing bolt (12) it is provided with in described adjustment hole (11),And one end of fixing bolt (12) extends in cavity (10),The middle part of described main working plate (1) is embedded with magnechuck (7),Described magnechuck (7) electrically connects with accumulator (3),Described secondary working plate (4) is plugged in cavity (10),And pair working plate (4) is flexibly connected with one end of fixing bolt (12),Before and after described secondary working plate (4), both sides are provided with corrugated elastic plate (40),Described gripper shoe (5) is separately fixed at upper surface and the upper surface of secondary working plate (4) right-hand member of main working plate (1) left end by pin,Described corrugated elastic plate (40) is positioned at cavity (10) and between the gripper shoe (5) of secondary working plate (4),One end of described gripper shoe (5) is hinged with pressure strip (50) by hinge,Arc placing trough (51) is had in described gripper shoe (5),It is provided with anti-slip veins (52) in described arc placing trough (51),Described coaming plate (6) is fixed on before and after main working plate (1) and the upper surface of right-hand member.
- A kind of construction material operating frock the most according to claim 1, it is characterised in that: the lower end of described main working plate (1) and secondary working plate (4) is provided with universal wheel (8).
- A kind of construction material operating frock the most according to claim 1, it is characterised in that: the height of described gripper shoe (5) is higher than corrugated elastic plate (40) and the height of coaming plate (6).
- A kind of construction material operating frock the most according to claim 1, it is characterised in that: the setting of described arc placing trough (51) is no less than 8 groups, and between be equally spaced arrangement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620247839.XU CN205524387U (en) | 2016-03-29 | 2016-03-29 | Building material frock that operates |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620247839.XU CN205524387U (en) | 2016-03-29 | 2016-03-29 | Building material frock that operates |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205524387U true CN205524387U (en) | 2016-08-31 |
Family
ID=56786237
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620247839.XU Expired - Fee Related CN205524387U (en) | 2016-03-29 | 2016-03-29 | Building material frock that operates |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205524387U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106627700A (en) * | 2017-01-10 | 2017-05-10 | 成都聚立汇信科技有限公司 | Novel power carrier |
CN109229774A (en) * | 2018-10-10 | 2019-01-18 | 杨开村 | The apparatus for temporary storage of serpentine spring |
-
2016
- 2016-03-29 CN CN201620247839.XU patent/CN205524387U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106627700A (en) * | 2017-01-10 | 2017-05-10 | 成都聚立汇信科技有限公司 | Novel power carrier |
CN109229774A (en) * | 2018-10-10 | 2019-01-18 | 杨开村 | The apparatus for temporary storage of serpentine spring |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205524387U (en) | Building material frock that operates | |
CN103437547B (en) | A kind of aluminum alloy pattern plate | |
CN207398302U (en) | A kind of BMS plastic structures of easy disassembly | |
CN205407155U (en) | Power communication transmits crane span structure | |
CN206813556U (en) | One kind is laid bricks storage device | |
CN220181484U (en) | Road administration construction soil stone material collecting box | |
CN206205445U (en) | A kind of template connects handle | |
CN209942059U (en) | Clean panel seamless splicing structure with strong sealing performance | |
CN208102028U (en) | A kind of architectural engineering material transfer equipment | |
CN206599986U (en) | A kind of U-shaped reinforcement aluminum wood combination template with holes | |
CN206693655U (en) | A kind of over-water construction anti-drop net | |
CN105539935A (en) | Compressor automatic loading device and packing material clamping device of compressor automatic loading device | |
CN211108742U (en) | Cylindric manganese steel transportation fixing device | |
CN205530431U (en) | Excavator grabber | |
CN213800821U (en) | Steel structural component transports strorage device | |
CN207499339U (en) | A kind of finishing section bar | |
CN216734432U (en) | Material transfer device for construction | |
CN210709113U (en) | Carrying device for precast concrete U-shaped groove | |
CN203831034U (en) | Detaching device for rewinding tension roller coupler | |
CN202465773U (en) | Heat treatment material basket for upward push-pull chain box type furnace | |
CN210823400U (en) | Raw material carrying device on production line | |
CN208979602U (en) | Field operation steel petroleum pipeline steel pipe pallet | |
CN202872428U (en) | Water-cooled type storage battery charging rack beam | |
CN207063504U (en) | A kind of aluminum alloy mould plate end plate of the raised positioning of band | |
CN208329614U (en) | A kind of beam template splicing lifting appliance for hoisting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |