CN208965867U - The connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam - Google Patents

The connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam Download PDF

Info

Publication number
CN208965867U
CN208965867U CN201821681888.XU CN201821681888U CN208965867U CN 208965867 U CN208965867 U CN 208965867U CN 201821681888 U CN201821681888 U CN 201821681888U CN 208965867 U CN208965867 U CN 208965867U
Authority
CN
China
Prior art keywords
prefabricated board
tank
type connecting
connecting component
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821681888.XU
Other languages
Chinese (zh)
Inventor
钱至棽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821681888.XU priority Critical patent/CN208965867U/en
Application granted granted Critical
Publication of CN208965867U publication Critical patent/CN208965867U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a kind of prefabricated board and prefabricated boards and prefabricated board, the connection structure of beam connection, the prefabricated board on connection structure beam two sides that wherein prefabricated board is connect with beam is fixed by channel-section connecting piece respectively pre-buried on its supported end end face with pin, then self-compacting concrete band is poured in the plate stitch between first prefabricated board and the second prefabricated board, so that the first prefabricated board, it is linked to be entirety between second prefabricated board and beam three, to solve the problems, such as large area wet operation existing for existing assembled architecture laminated floor slab technique, and there are working procedure complexity, long in time limit and construction precision is poor, the disadvantages such as quality is low, there are prefabricated board " beard muscle " rapid wears, live assembling reinforcement, the problems such as cast in situs floorslab concrete.

Description

The connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam
Technical field
The utility model relates to assembled architecture field, be specifically related to a kind of prefabricated board and prefabricated board and prefabricated board, The connection structure of beam connection.
Background technique
Assembled architecture is the developing direction of engineering construction, and fining is used to construct, and not only accomplishes energy saving, reduction Pollution, moreover it is possible to improve efficiency and quality.
For the globality for guaranteeing floor, existing floor still relatively mostly uses prefabricated board to add the way of overlapping layers, i.e. underfloor Half part is prefabricated in the factory, and top half concrete is cast-in-place at the scene, and lower half portion floor prefabricated in advance only plays the upper half The effect of point floorslab concrete bed die, floor top half be overlap layer concrete construction still need live assembling reinforcement, Casting concrete delays work and mistakes.In addition, the mutual connection of prefabricated board uses bar splicing mode, i.e. the plate end of prefabricated board " recklessly Sub- muscle " is exposed;Arrive scene, after prefabricated board installation is in place, then by " beard muscle " together with beam steel bar colligation, stitching portion and upper Half part floorslab concrete pours together.Since " beard muscle " is exposed, easily trampled in production, transport, installation process, very To being trimmed.This causes floor slab construction to be difficult to meet design requirement, and construction quality is unable to get guarantee, leaves safely to structure hidden Suffer from.And construction site need to carry out a large amount of concreting wet operations, and there are complex procedures, construction period length, situ wets to make The problems such as industry is more, construction precision is poor, construction quality rely primarily on scene construction management and worker quality, human factor compared with More, construction quality is difficult to ensure.
Utility model content
The utility model is intended to provide the connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam, with solution Large area wet operation problem existing for certainly existing assembled architecture laminated floor slab technique, and there are working procedure complexity, work The disadvantages such as phase length and construction precision are poor, quality is low, there are prefabricated board " beard muscle " rapid wears, live assembling reinforcement, cast in situs The problems such as floorslab concrete.
Concrete scheme is as follows:
A kind of prefabricated board, including prefabricated board ontology, tank-type connecting component and dowel, the tank-type connecting component include upper ear plate, Vertical plate and lower ear plate, the upper ear plate and lower ear plate are located in the upper and lower ends of vertical plate, in the upper ear plate and lower ear plate Portion offers pin hole, and the vertical plate is equipped with dowel hole, and the dowel includes the dowel body of rod and is located at dowel bar Semicircle anchor head and bolt anchor head on body both ends, the other end is locked after the dowel body of rod of the dowel passes through the dowel hole on vertical plate Tank-type connecting component is fixed on the supported end end face of prefabricated board ontology and beam support by bolt anchor head, and upper ear plate and lower ear Opening between plate deviates from the supported end end face of prefabricated board ontology and beam support.
Further, the effective cross section area after the tank-type connecting component upper ear plate, lower ear plate " being waited strong replacement " is not Less than the area of steel bar stress in prefabricated board ontology.
The utility model additionally provides a kind of connection structure that prefabricated board is connect with prefabricated board, beam, including beam, first prefabricated The supported end end face of plate and the second prefabricated board, first prefabricated board and beam support is embedded with the first tank-type connecting component, and described One tank-type connecting component is equipped with the first pin hole, and the supported end end face of second prefabricated board and beam support is embedded with the second groove profile Connector, second tank-type connecting component are equipped with the second pin hole;First prefabricated board and the second prefabricated board support respectively It is inserted into the first tank-type connecting component on the opposite two sides of beam, and by the second tank-type connecting component, pin is inserted into the first groove profile Connector, the second tank-type connecting component the first pin hole and the second pin hole in, by the first tank-type connecting component and the second groove profile Connector is fixed;Self-compacting concrete band is poured in plate stitch between first prefabricated board and the second prefabricated board, so that first It is linked to be entirety between prefabricated board, the second prefabricated board and beam three.Further, the first pin hole of first tank-type connecting component The second pin hole with the second tank-type connecting component is slotted hole, and the first pin hole and the perpendicular setting of the second pin hole.
Further, the first tank-type connecting component notch clear height is 10mm bigger than the notch clear height of the second tank-type connecting component.
Further, the strength grade of the beam slab boundary seam self-compacting concrete band poured in step S3 is more prefabricated than first The high level-one of the strength grade of plate and the second prefabricated board.
Further, first prefabricated board and the second prefabricated board are one-way slabs, and first prefabricated board and second is in advance The first tank-type connecting component and the second tank-type connecting component, first prefabricated board and the second prefabricated board are respectively equipped on the short side of making sheet Long side on be respectively arranged with the upper tongue and groove being mutually twisted and lower tongue and groove.
Further, it is embedded with peg on the lower tongue and groove, is reserved on the upper tongue and groove and the peg phase on lower tongue and groove Matched peg hole.
Further, first prefabricated board and the second prefabricated board are mutual using adjacent pillars net standard width of a room in an old-style house prefabricated board plate-laying direction Vertical mode is arranged.
Further, with layout of the wrong seam between upward adjacent two piece prefabricated board.
The connection structure that prefabricated board and prefabricated board provided by the utility model are connect with beam has compared with prior art It has the advantage that
1, the connection structure that prefabricated board and prefabricated board provided by the utility model are connect with beam improves existing prefabricated board Connection type realizes that live Fast Installation is in place;The secondary concrete floor overlapping layers poured is eliminated, is only poured in top surface of the beam Concrete fin band.
2, the section of tank-type connecting component is not less than prefabricated board steel area, will not weaken prefabricated board stress performance, by inserting Oneself of an interior cast-in-place high strength grade is stitched on pin, back peg, back distributing bar and the beam slab boundary for entering connector pin hole The measures such as air-free concrete take special way by the design of prefabricated board and arrangement mode of prefabricated board etc., guarantee building Being reliably connected for plate and steel construction, realizes the overall performance of floor.
3, after floor is installed in place, only beam slab piece after-pouring concrete, only takes up the work surface of fraction, can vacate big Plate face working space does not interfere next working procedure, is constructed by rationalization, using continuous productive process, is substantially shorter construction Duration.
Detailed description of the invention
Fig. 1 shows the schematic diagram of prefabricated board.
Fig. 2 shows the side views of tank-type connecting component.
Fig. 3 shows the top view of tank-type connecting component.
Fig. 4 shows the side view that prefabricated board is mounted on beam.
Fig. 5 shows the top view that prefabricated board is mounted on beam.
Fig. 6 shows the schematic diagram of the prefabricated board with the first tongue-and-groove structure.
Fig. 7 shows the schematic diagram of the prefabricated board with second of tongue-and-groove structure.
Fig. 8 shows the schematic diagram of the arrangement mode of prefabricated board in the adjacent pillars net standard width of a room in an old-style house.
Specific embodiment
To further illustrate each embodiment, the utility model is provided with attached drawing.These attached drawings are in the utility model discloses A part of appearance mainly to illustrate embodiment, and can cooperate the associated description of specification former come the running for explaining embodiment Reason.Cooperation refers to these contents, and those of ordinary skill in the art will be understood that other possible embodiments and sheet are practical new The advantages of type.Component in figure is not necessarily to scale, and similar component symbol is conventionally used to indicate similar component.
Now in conjunction with the drawings and specific embodiments, the present invention will be further described.
Embodiment 1
As depicted in figs. 1 and 2, a kind of prefabricated board is present embodiments provided, which includes prefabricated board ontology 10, groove profile Connector 20 and dowel 30, the tank-type connecting component 20 include upper ear plate 202, vertical plate 200 and lower ear plate 204, the upper ear plate 202 and lower ear plate 204 be located in the upper and lower ends of vertical plate 200, upper ear plate 202, vertical plate 200, lower ear plate 204 can be used Shape steel plate cuts production, and the upper and lower edge of vertical plate 200 uses fillet welding in succession at one with upper ear plate 202, lower ear plate 204 respectively Body;Die sinking cast molding can also be used in mass production.The upper ear plate 202 and 204 middle part of lower ear plate offer pin hole 206, the vertical plate 200 is equipped with dowel hole 208.
With reference to Fig. 3, upper ear plate 202,204 size of lower ear plate are the same, are axial symmetry irregular, and outer is guaranteeing pin It is cut in the case where the stress in hole and is processed into arc-shaped.The pin hole opened up among upper ear plate 202, lower ear plate 204 is slotted hole, Slotted hole is long to parallel or perpendicular to prefabricated board bearing end plate sideline, upper ear plate 202, lower ear plate 204 cross section should be by " etc. The mode of strong replacement " calculates determination, and the effective cross section area after " waiting strong replacement " is no less than prefabricated board steel bar stress face Product.Vertical plate 200 is rectangle, and axial symmetry setting is there are two dowel hole 208, and dowel hole 208 is preferably arranged in pairs, and aperture should be according to meter Dowel diameter setting needed for calculating.
The dowel 30 includes the dowel body of rod 300 and 302 He of semicircle anchor head being located on 300 both ends of the dowel body of rod Bolt anchor head 304.The dowel body of rod 300 is made of Ribbed Bar, and diameter, length are computed determination.Wherein, at vertical plate 200 Dowel anchor head be semicircle anchor head 302, production method be by dowel bar fusing jumping-up processing, keep the diameter of semicircle anchor head 302 big In dowel hole 208, to prevent the dowel body of rod 300 from detaching from dowel hole 208;The other end uses bolt anchor head 304, and when production is pre- First the end tapping of the dowel body of rod 300 is handled, conventional hexagonal bolt and nut can be used in bolt anchor head 304.
The other end locks bolt anchor head after the dowel body of rod 300 of the dowel 30 passes through the dowel hole 208 on vertical plate 200 304, tank-type connecting component 20 is fixed on the supported end end face of prefabricated board ontology 10 and beam support, and upper ear plate 202 is under Opening between otic placode 204 deviates from the supported end end face of prefabricated board ontology and beam support.
Prefabricated board manufacturing process in this implementation is as follows, first pre-buried tank-type connecting component, every piece of prefabricated board before factory pours Left and right both ends are arranged in pairs left, tank-type connecting component, and the position at connector opposite plate supported end edge and quantity should be computed really Fixed, the every end of the number of connector is no less than 2.Tank-type connecting component is hit exactly set on prefabricated board supported end height.When pre-buried, first by anchor Muscle is inserted into vertical plate, locks the bolt of dowel bolt anchor head, tank-type connecting component is put into the slab muscle for having bound placement, using facing When fixation (such as iron wire) tank-type connecting component tightened into fixation, it is pre-buried to can be completed connector, later can with casting concrete, So that tank-type connecting component and prefabricated board ontology pour it is integral.
The connection structure and brought advantage that prefabricated board provided in this embodiment is connect with prefabricated board, beam are shown in embodiment Specific descriptions in 2.
Embodiment 2
With reference to Fig. 4 and Fig. 5, present embodiments provide a kind of using the prefabricated board provided in embodiment 1 and prefabricated board, Liang Lian The connection structure connect, the connection structure include beam 4, the first prefabricated board 1a and the second prefabricated board 1b, the first prefabricated board 1a with The supported end end face that beam 4 supports is embedded with the first tank-type connecting component 20a, the first tank-type connecting component 20a and is equipped with the first pin The supported end end face of nail hole 206a, the second prefabricated board 1b and beam support is embedded with the second tank-type connecting component 20b, and described second Tank-type connecting component 20b is equipped with the second pin hole 206b;The first prefabricated board 1a and the second prefabricated board 1b are supported on beam 4 respectively On opposite two sides, and the second tank-type connecting component 20b is inserted into the first tank-type connecting component 20a, pin 5 is inserted into the first slot Type connector 20a, the second tank-type connecting component 20b the first pin hole 206a and the second pin hole 206b in, by the first groove profile Connector 20a and the second tank-type connecting component 20b are fixed;It is poured in plate stitch between the first prefabricated board 1a and the second prefabricated board 1b Self-compacting concrete band, so as to be linked to be entirety between 4 three of the first prefabricated board 1a, the second prefabricated board 1b and beam.
Above-mentioned includes that the first prefabricated board 1a and the second prefabricated board 1b is mounted on beam 4 and can be realized by following steps:
S1, the bearing that beam 4, the first prefabricated board 1a and the second prefabricated board 1b, the first prefabricated board 1a and beam 4 support is provided End end face is embedded with the first tank-type connecting component 20a, and the first tank-type connecting component 20a is equipped with the first pin hole 206a, described The supported end end face that second prefabricated board 1b and beam 4 support is embedded with the second tank-type connecting component 20b, second tank-type connecting component 20b is equipped with the second pin hole 206b;First tank-type connecting component 20a and the second tank-type connecting component 20b are embedded in the first prefabricated board Manufacturing process in 1a and the second prefabricated board 1b is embedded in the intrinsic method phase of prefabricated board with the tank-type connecting component in embodiment 1 Together.Wherein the structure of the first tank-type connecting component 20a and the second tank-type connecting component 20b are identical, and appearance is alike, but not of uniform size, In the present embodiment, the size of the first tank-type connecting component 20a is big compared with the second tank-type connecting component 20b.Wherein preferred, the first groove profile connects The notch clear height of fitting 20a is 10mm bigger than the notch clear height of the second tank-type connecting component 20b, to consider concrete prefabricated element Installation error.
S2, the first prefabricated board 1a and the second prefabricated board 1b are lifted respectively and is supported on the opposite two sides of beam 4, beam The the first tank-type connecting component 20a and the second tank-type connecting component 20b of prefabricated board on two sides are matched one by one, and the second groove profile is connected Part 20b is inserted into the first tank-type connecting component 20a, and pin 5 is inserted into the first tank-type connecting component 20a, the second tank-type connecting component 20b The first pin hole 206a and the second pin hole 206b in, the first tank-type connecting component 20a and the second tank-type connecting component 20b are connected It is connected into one, so that the first prefabricated board 1a and the second prefabricated board 1b are temporarily fixed on beam 4.
Specifically, first hoisting column, beam, then lift, prefabricated board in place, preliminarily form force structure system.After beam fixes, The prefabricated board of beam arranged on left and right sides can be lifted to layout board position in pairs, first be lifted, the prefabricated board on beam side in place, then will The beam other side is lifted to design position, is pushed tank-type connecting component correspondence to adjacent prefabricated board tank-type connecting component, is made arranged on left and right sides The pin hole alignment of ability tank-type connecting component, is inserted into pin hole for pin, the fixation of one group of attachment device can be completed on prefabricated board. After the tank-type connecting component of prefabricated board ends is fixed, that is, complete the fixation of monolith prefabricated board.
In the present embodiment, the appearance of pin 5 is similar to conventional rivets, but chamfered is done in end, can be used common Snap rivet simultaneously forms nail pin cutting chamfering, and Ribbed Bar cutting, fusing jumping-up, cutting chamfered can also be used.
Back is laid on S3, the gap between two prefabricated boards of beam 4 and constructs muscle, distributing reinforcement, and casting beams edges of boards circle stitch Self-compacting concrete band, so as to be linked to be entirety between 4 three of the first prefabricated board 1a, the second prefabricated board 1b and beam.To guarantee building The globality of plate can also lay peg 6 on the gap between two prefabricated boards of beam 4.
Wherein, it is preferred that the strength grade of the beam slab boundary that pours seam self-compacting concrete band than the first prefabricated board with The high level-one of the strength grade of second prefabricated board, to guarantee the globality between prefabricated board and beam.
In the present embodiment, it is preferred that the first pin hole 206a of the first tank-type connecting component 20a and the second groove profile connect The second pin hole 206b of fitting 20b is slotted hole, and the first pin hole 206a and the second perpendicular setting of pin hole 206b, Pore size is contemplated that the construction error of concrete embedded part, length 10mm more than steel member manufacture allowable error, in order to Contraposition between one tank-type connecting component 20a and the second tank-type connecting component 20b.
In the present embodiment, first prefabricated board and the second prefabricated board can be one-way slabs or two-way slab, wherein The structure that the structure of one-way slabs is preferably as described below, with reference to Fig. 6 and Fig. 7, i.e., in the first prefabricated board 1a and the second prefabricated board The first tank-type connecting component 20a and the second tank-type connecting component 20b, the first prefabricated board 1a and second are respectively equipped on the short side of 1b The upper tongue and groove 100 being mutually twisted and lower tongue and groove 110 are respectively arranged in the long side of prefabricated board 1b.Upper tongue and groove 100 and lower tongue and groove 110 There are two types of mode, i.e., mode one as shown in FIG. 6 and modes two as shown in Figure 7 for way, and mode one, two way Datong District are small It is different, it is all the tongue and groove being mutually twisted, lower tongue and groove 110 is embedded with peg 6 ', and peg hole 102 is reserved in upper tongue and groove corresponding position, prefabricated Plate after-pouring self-compacting concrete in place is fixed.Unlike, the cross section of the prefabricated board of mode one is "the" shape, prefabricated board Successively arrange;The prefabricated board cross section of mode two is then divided into positive T shape and inverted T-shaped, the two staggered.
It in the present embodiment, is the integral firmness for guaranteeing floor after prefabricated board installation is in place, the first prefabricated board and second Prefabricated board is arranged by the way of " adjacent pillars net standard width of a room in an old-style house prefabricated board plate-laying direction is mutually perpendicular to ".I.e. as shown in figure 8, A, B, C, D For four adjacent column net standard widths of a room in an old-style house, for the sake of simplicity, colum network size 9m*9m, prefabricated board is having a size of 0.9m*3m.In the A standard width of a room in an old-style house Prefabricated board is East and West direction plate-laying, i.e. A1, A2, A3 ... A10 is supported on East and West direction beam;And the B standard width of a room in an old-style house is then north-south plate-laying, i.e., B1, B2, B3 ... B10 are supported on the beam of north-south, and the C standard width of a room in an old-style house is then north-south plate-laying and the D standard width of a room in an old-style house is East and West direction plate-laying.
It is further preferred that with layout of the wrong seam between upward contiguous prefabricated plate.I.e. as shown in figure 8, the groove profile of prefabricated board Connector is set at 1/4 width of supported end, and the position of contiguous prefabricated plate in the same direction differs 1/2 width.The prefabricated board of the A standard width of a room in an old-style house is put On East and West direction beam, positive 1/2 board width of good job in position of A1, A3, A5 ... and A2, A4, A6 ....In this way, the 1st of A2 the North the The groove profile of the tank-type connecting component of a tank-type connecting component insertion south A1, the 2nd tank-type connecting component insertion south A3 of A2 the North connects Fitting, and so on.In this way, it is ensured that prefabricated board will not straight joint destroy, guarantee the whole jail of floor after prefabricated board installation is in place Solidity.
Furthermore, it is contemplated that prefabricated board size is generally standard module, and standard width of a room in an old-style house size not necessarily standard module is built, in advance Remaining part is using cast-in-place after making sheet arrangement.In addition, building, escalator and the architectural plane corner etc. of building, are floors The weak link of stress, also part is cast-in-place.These position ranges are small, and concrete quantity is seldom, not using cast-in-place concrete floor Large-area construction operation can be interfered.Since the prefabricated board of beam two sides is connects in pairs, and the prefabricated board supported end of most end No corresponding contiguous prefabricated plate is connected thereto, therefore can default in corresponding connector on beam, realizes the prefabricated board of most end Supported end is connected and fixed.
By taking above-mentioned several strengthening measures, it is ensured that the floor overall performance after prefabricated board installation is in place is protected Card floor and steel construction are reliably connected, and guarantee the effective transmitting of floor levels power.
Construction method in the present embodiment can be used for assembling type steel structure building floor and assembly concrete building floor. When assembly concrete building floor uses the construction method in the present embodiment, prefabricated concrete floor way and scene row Cloth prefabricated board and in place, bolt nail is installed, the way laying beam construction reinforcing bar, pour self-compacting concrete band need not change Become, prefabricated girder steel need to be only changed to precast reinforced concrete beam or prefabricated girder with rolled steel section en cased in concrete.
When using precast reinforced concrete beam, then it will be welded with steel anchor slab under aforementioned girder steel peg, be embedded in advance precast reinforced In beams of concrete.When the setting elongated along beam of steel anchor slab, it is contemplated that substitution precast beam back reinforcing bar.When solidifying using prefabrication type steel reinforced concrete When native beam, aforementioned girder steel peg then downward continuation directly is welded in fashioned iron top flange.In-situ precast reinforced beam, prefabrication type steel reinforced concrete The installation construction method that assembly concrete is built by place of solidifying Tu Liang.
In addition, the construction method in the present embodiment is equally applicable for assembly concrete building concrete precast beam, in addition to Each part dimension of device is answered outside required design, and way is similar with prefabricated board, and is arranged in pairs in beam support end, precast beam The precast beam of support two sides can be connected two-by-two by prefabricated board tank-type connecting component, and peg is arranged on demand, and the secondary self-compaction that pours mixes Solidifying soil, can be realized the connection of precast beam.In general, beam profile height is greater than width, tank-type connecting component can be according to actual needs Horizontally disposed (otic placode is horizontal positioned), can also be vertically arranged (otic placode is vertically placed).Two ways respectively has advantage and disadvantage, it is opposite and Speech, otic placode, which is vertically placed, more meets beam stress mode, and the secondary casting concrete in junction is also more convenient.
Prefabricated board provided by the utility model and the construction method connecting with beam change existing assembled architecture and use The way of concrete floor slab, solves existing for concrete floor slab that working procedure is complicated, long in time limit and construction precision Difference, the problems such as quality is low, overcome that prefabricated board " beard muscle " rapid wear, the occlusion of contiguous prefabricated plate be difficult, pin is not easy positioning and The disadvantages of steel using amount is big, secondary casting concrete amount is big.
Its major advantage has:
(1) reasonable stress: the main primary structure member of prefabricated board tank-type connecting component is the otic placode of connector, and otic placode etc. replaces by force Slab muscle does not weaken prefabricated board steel bar stress section, and only changing dispersed placement slab muscle is centralized arrangement steel ear plate.Secondly, connection Part in groups, in pairs, be symmetrically arranged in prefabricated board ends, each connector is arranged in the center of plate height, and connector stress is closed Reason bears the mutual pulling force of prefabricated board, will not generate additional bending moment because of arranged off-centre, cause to reverse.
It after prefabricated board lifting is in place, deducts prefabricated board and shelves width, there are also the installation spaces of 150mm or so, in addition to the company of inserting For fitting pin to fix outside prefabricated board, installation of the space of the 150mm or so width simultaneously as back reinforcing bar, beam peg is empty Between.Peg interlaced can be arranged with connector, will not be fought each other.After prefabricated board installation is fixed in place, back can be laid Reinforcing bar (peg can be welded on beam in advance in factory), pours piece concrete between the prefabricated board of back, by left and right prefabricated board, beam three Person is closely joined together, and realizes the globality of floor.
The prefabricated board tank-type connecting component Path of Force Transfer is clear, reasonable, does not change the force way of floor using the device, ties The anti-seismic performance of structure system does not weaken, and structure is secure safely.
(2) production is simple: the main component connected between two prefabricated boards is tank-type connecting component and dowel, pin, structure Part arranges compact, deft design.Cut profiled sheet, punching, welding fabrication can be used in tank-type connecting component, and die sinking can also be used Cast molding;Dowel can be used common cold rolled reinforcing steel bar with ribs in engineering and make through end fusing, jumping-up and tapping, bolt anchor head Bolt the conventional hexagonal bolt and nut that can be purchased in the market can be used;Pin is then that using common snap rivet and will follow closely Foot cuts chamfering molding, or using Ribbed Bar cutting, fusing jumping-up, cutting chamfered.
When tank-type connecting component production quantity is less, tank-type connecting component can be used cut profiled sheet, punching, welding and It can be cut with Ribbed Bar at, dowel, jumping-up, tapping molding (nut of bolt anchor head is purchased from market), rivet can be used general Logical rivet cutting chamfering is formed.If production quantity is big, all components be can be mass, and can be opened casting, and processing technology is simpler Just, machining accuracy is also more guaranteed, and prefabricated board tank-type connecting component production is simple, reliable in quality, use easy to spread.
(3) quick for installation: dowel is first inserted into groove profile company by the pre-buried tank-type connecting component before prefabricated board casting concrete respectively In the vertical plate dowel hole of fitting, clamping screw anchor head, then in pairs, centrally pre-buried arrangement tank-type connecting component.Prefabricated board factory It is transported to scene, the prefabricated board of beam two sides lifts in pairs, tank-type connecting component is pushed into the tank-type connecting component of contiguous prefabricated plate, is inserted into Pin, i.e., completion prefabricated board is in place, fixed, and the mounting means of the prefabricated board tank-type connecting component is simple, quick, efficient, construction Quality is guaranteed.
(4) storage is convenient: prefabricated board tank-type connecting component each section component is all using separate type way, and dowel, pin are equal Can dismantle, in factory's built-in connection just be inserted into dowel, at the scene in place, regulation prefabricated board when just insertion pin, accessory Can store, occupy little space respectively, store, transport it is all very convenient.
(5) cost is saved: since the main primary structure member of the tank-type connecting component of prefabricated board is the otic placode of tank-type connecting component, ear The strong replacement slab muscle such as plate, does not weaken prefabricated board steel bar stress section, and only changing dispersed placement slab muscle is centralized arrangement steel ear plate. Therefore it is compared with traditional cast-in-place concrete floor, increased steel using amount very little.And coagulation is commonly overlapped with existing assembled Tulou plate is compared, and due to floor one-pass molding, steel content not will increase, or even there are also reduce.It is prior, because changing folded The way of concrete floor is closed, new prefabricated board connection type is simple and direct, and it is easy for construction efficiently to save labour cost, and reduce existing The building materials expense of field waste.Therefore, cost can be reduced using the prefabricated board, saves cost.
Although specifically showing and describing the utility model in conjunction with preferred embodiment, those skilled in the art is answered This is understood, in the spirit and scope for not departing from the utility model defined by the appended claims, in form and details On the utility model can be made a variety of changes, be the protection scope of the utility model.

Claims (10)

1. a kind of prefabricated board, it is characterised in that: including prefabricated board ontology, tank-type connecting component and dowel, the tank-type connecting component packet Include upper ear plate, vertical plate and lower ear plate, the upper ear plate and lower ear plate are located in the upper and lower ends of vertical plate, the upper ear plate and Pin hole is offered in the middle part of lower ear plate, the vertical plate is equipped with dowel hole, and the dowel includes the dowel body of rod and difference position It is another behind the dowel hole on vertical plate in the dowel body of rod of semicircle anchor head and bolt anchor head on dowel body of rod both ends, the dowel Bolt anchor head is locked in one end, tank-type connecting component is fixed on the supported end end face of prefabricated board ontology and beam support, and upper ear Opening between plate and lower ear plate deviates from the supported end end face of prefabricated board ontology and beam support.
2. prefabricated board according to claim 1, it is characterised in that: the tank-type connecting component upper ear plate, lower ear plate are through " waiting strong Effective cross section area after replacement " is not less than the area of steel bar stress in prefabricated board ontology.
3. the connection structure that a kind of prefabricated board is connect with prefabricated board, beam, which is characterized in that including beam, the first prefabricated board and second The supported end end face of prefabricated board, first prefabricated board and beam support is embedded with the first tank-type connecting component, and first groove profile connects Fitting is equipped with the first pin hole, and the supported end end face of second prefabricated board and beam support is embedded with the second tank-type connecting component, Second tank-type connecting component is equipped with the second pin hole;It is opposite that first prefabricated board and the second prefabricated board are supported on beam respectively Two sides on, and the second tank-type connecting component is inserted into the first tank-type connecting component, pin is inserted into the first tank-type connecting component, the In the first pin hole and the second pin hole of two tank-type connecting components, the first tank-type connecting component and the second tank-type connecting component are consolidated It is fixed;Self-compacting concrete band is poured in plate stitch between first prefabricated board and the second prefabricated board, so that the first prefabricated board, It is linked to be entirety between two prefabricated boards and beam three.
4. connection structure according to claim 3, it is characterised in that: the first pin hole of first tank-type connecting component and Second pin hole of the second tank-type connecting component is slotted hole, and the first pin hole and the perpendicular setting of the second pin hole.
5. connection structure according to claim 3, it is characterised in that: the first tank-type connecting component notch clear height is than second The big 10mm of notch clear height of tank-type connecting component.
6. connection structure according to claim 3, it is characterised in that: the plate stitch between the first prefabricated board and the second prefabricated board Inside pour the strength grade level-one higher than the strength grade of the first prefabricated board and the second prefabricated board of self-compacting concrete band.
7. connection structure according to claim 3, it is characterised in that: first prefabricated board and the second prefabricated board are list To plate, the first tank-type connecting component and the connection of the second groove profile are respectively equipped on the short side of first prefabricated board and the second prefabricated board The upper tongue and groove being mutually twisted and lower tongue and groove are respectively arranged in the long side of part, first prefabricated board and the second prefabricated board.
8. connection structure according to claim 7, it is characterised in that: be embedded with peg, the upper enterprise on the lower tongue and groove The peg hole to match with the peg on lower tongue and groove is reserved on mouth.
9. connection structure according to claim 3, it is characterised in that: first prefabricated board and the second prefabricated board use phase The orthogonal mode in adjacent column net standard width of a room in an old-style house prefabricated board plate-laying direction is arranged.
10. connection structure according to claim 9, it is characterised in that: wrong between the contiguous prefabricated plate of equidirectional upper laying It sews cloth and sets.
CN201821681888.XU 2018-10-17 2018-10-17 The connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam Expired - Fee Related CN208965867U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821681888.XU CN208965867U (en) 2018-10-17 2018-10-17 The connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821681888.XU CN208965867U (en) 2018-10-17 2018-10-17 The connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam

Publications (1)

Publication Number Publication Date
CN208965867U true CN208965867U (en) 2019-06-11

Family

ID=66760050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821681888.XU Expired - Fee Related CN208965867U (en) 2018-10-17 2018-10-17 The connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam

Country Status (1)

Country Link
CN (1) CN208965867U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184070A (en) * 2018-10-17 2019-01-11 钱至棽 A kind of connection type of prefabricated board and prefabricated board and prefabricated board, beam
CN110306681A (en) * 2019-06-28 2019-10-08 毛易州 A kind of crystalline p p sheet
CN110409630A (en) * 2019-07-16 2019-11-05 绍兴文理学院 A kind of prefabricated plate end joint connection in site method
CN110593473A (en) * 2019-10-12 2019-12-20 西藏涛扬新型建材科技有限公司 Adopt steel construction building floor structure of light floor
CN110670758A (en) * 2019-10-12 2020-01-10 西藏涛扬新型建材科技有限公司 Fabricated steel structure building based on fiber reinforced clad wood substrate and construction method
CN112431115A (en) * 2020-11-12 2021-03-02 张国彦 Bridge superstructure precast slab mounting and lapping device for road engineering and use method thereof
CN109184070B (en) * 2018-10-17 2024-10-29 钱至棽 Prefabricated plate and connection method of prefabricated plate and beam

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184070A (en) * 2018-10-17 2019-01-11 钱至棽 A kind of connection type of prefabricated board and prefabricated board and prefabricated board, beam
CN109184070B (en) * 2018-10-17 2024-10-29 钱至棽 Prefabricated plate and connection method of prefabricated plate and beam
CN110306681A (en) * 2019-06-28 2019-10-08 毛易州 A kind of crystalline p p sheet
CN110409630A (en) * 2019-07-16 2019-11-05 绍兴文理学院 A kind of prefabricated plate end joint connection in site method
CN110409630B (en) * 2019-07-16 2020-11-06 绍兴文理学院 On-site connection method for end of prefabricated slab
CN110593473A (en) * 2019-10-12 2019-12-20 西藏涛扬新型建材科技有限公司 Adopt steel construction building floor structure of light floor
CN110670758A (en) * 2019-10-12 2020-01-10 西藏涛扬新型建材科技有限公司 Fabricated steel structure building based on fiber reinforced clad wood substrate and construction method
CN110593473B (en) * 2019-10-12 2021-02-26 西藏涛扬新型建材科技有限公司 Adopt steel construction building floor structure of light floor
CN110670758B (en) * 2019-10-12 2021-04-06 西藏涛扬新型建材科技有限公司 Fabricated steel structure building based on fiber reinforced clad wood substrate and construction method
CN112431115A (en) * 2020-11-12 2021-03-02 张国彦 Bridge superstructure precast slab mounting and lapping device for road engineering and use method thereof

Similar Documents

Publication Publication Date Title
CN208965867U (en) The connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam
CN208981603U (en) A kind of assembly concrete laminated floor slab connection structure
CN106401036B (en) A kind of assembled steel frame prefabricated concrete floor structure
CN113202219B (en) Fully prefabricated assembled steel-concrete composite floor system and design calculation method
CN109667374B (en) Assembled steel-concrete combined floor system adopting prefabricated plates with no ribs at plate ends
CN110512765A (en) A kind of fabricated shear wall and construction method with steel plate peg combined type diagonal brace
WO2020253811A1 (en) Local composite slab connection node, and construction method therefor
CN110512730B (en) Assembled concrete primary and secondary roof beam connection structure
CN106760036A (en) A kind of prefabricated steel combined concrete shear wall
CN208918133U (en) A kind of assembly concrete beam connection structure
CN110439142A (en) A kind of assembly concrete shear wall and construction method with H profile steel diagonal brace
CN108412099A (en) Bar connecting formula concrete prefabricated board and connection method are buried after through thickness
CN109184070A (en) A kind of connection type of prefabricated board and prefabricated board and prefabricated board, beam
CN109653375A (en) It separates monoblock type and overlaps concrete structural system
CN215977981U (en) Assembled floor piece joint connected node
CN212078858U (en) Assembled reinforced concrete pond
CN207959642U (en) A kind of bidirectional hollow laminated floor slab
CN209163035U (en) A kind of assembled group frame beam column construction
CN207959532U (en) A kind of structure that wallboard is connect with coupling beam
CN208441257U (en) A kind of mounting structure of assembling-type precast hybrid beam and stiffened column
CN207749699U (en) Superimposed sheet splicing seams construction based on reinforcement bolt connection
JP2790959B2 (en) Underground beam construction method
CN214364312U (en) Full-prefabricated bidirectional stressed floor slab and connection node
CN218264364U (en) Connection proof of superimposed sheet
CN217204699U (en) A integral seam structure of coincide floor post-cast in concrete for standard bottom plate