CN208965867U - The connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam - Google Patents
The connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam Download PDFInfo
- Publication number
- CN208965867U CN208965867U CN201821681888.XU CN201821681888U CN208965867U CN 208965867 U CN208965867 U CN 208965867U CN 201821681888 U CN201821681888 U CN 201821681888U CN 208965867 U CN208965867 U CN 208965867U
- Authority
- CN
- China
- Prior art keywords
- prefabricated board
- tank
- type connecting
- connecting component
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011376 self-consolidating concrete Substances 0.000 claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 25
- 239000010959 steel Substances 0.000 claims description 25
- 239000004744 fabric Substances 0.000 claims description 2
- 239000004567 concrete Substances 0.000 abstract description 33
- 238000010276 construction Methods 0.000 abstract description 25
- 210000003205 muscle Anatomy 0.000 abstract description 13
- 238000000034 method Methods 0.000 abstract description 10
- 230000002787 reinforcement Effects 0.000 abstract description 4
- 238000011065 in-situ storage Methods 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 description 13
- 238000009434 installation Methods 0.000 description 11
- 238000005266 casting Methods 0.000 description 7
- 238000005520 cutting process Methods 0.000 description 6
- 238000013461 design Methods 0.000 description 5
- 238000000465 moulding Methods 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 239000011150 reinforced concrete Substances 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 4
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 238000010079 rubber tapping Methods 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000009417 prefabrication Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 201000009240 nasopharyngitis Diseases 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a kind of prefabricated board and prefabricated boards and prefabricated board, the connection structure of beam connection, the prefabricated board on connection structure beam two sides that wherein prefabricated board is connect with beam is fixed by channel-section connecting piece respectively pre-buried on its supported end end face with pin, then self-compacting concrete band is poured in the plate stitch between first prefabricated board and the second prefabricated board, so that the first prefabricated board, it is linked to be entirety between second prefabricated board and beam three, to solve the problems, such as large area wet operation existing for existing assembled architecture laminated floor slab technique, and there are working procedure complexity, long in time limit and construction precision is poor, the disadvantages such as quality is low, there are prefabricated board " beard muscle " rapid wears, live assembling reinforcement, the problems such as cast in situs floorslab concrete.
Description
Technical field
The utility model relates to assembled architecture field, be specifically related to a kind of prefabricated board and prefabricated board and prefabricated board,
The connection structure of beam connection.
Background technique
Assembled architecture is the developing direction of engineering construction, and fining is used to construct, and not only accomplishes energy saving, reduction
Pollution, moreover it is possible to improve efficiency and quality.
For the globality for guaranteeing floor, existing floor still relatively mostly uses prefabricated board to add the way of overlapping layers, i.e. underfloor
Half part is prefabricated in the factory, and top half concrete is cast-in-place at the scene, and lower half portion floor prefabricated in advance only plays the upper half
The effect of point floorslab concrete bed die, floor top half be overlap layer concrete construction still need live assembling reinforcement,
Casting concrete delays work and mistakes.In addition, the mutual connection of prefabricated board uses bar splicing mode, i.e. the plate end of prefabricated board " recklessly
Sub- muscle " is exposed;Arrive scene, after prefabricated board installation is in place, then by " beard muscle " together with beam steel bar colligation, stitching portion and upper
Half part floorslab concrete pours together.Since " beard muscle " is exposed, easily trampled in production, transport, installation process, very
To being trimmed.This causes floor slab construction to be difficult to meet design requirement, and construction quality is unable to get guarantee, leaves safely to structure hidden
Suffer from.And construction site need to carry out a large amount of concreting wet operations, and there are complex procedures, construction period length, situ wets to make
The problems such as industry is more, construction precision is poor, construction quality rely primarily on scene construction management and worker quality, human factor compared with
More, construction quality is difficult to ensure.
Utility model content
The utility model is intended to provide the connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam, with solution
Large area wet operation problem existing for certainly existing assembled architecture laminated floor slab technique, and there are working procedure complexity, work
The disadvantages such as phase length and construction precision are poor, quality is low, there are prefabricated board " beard muscle " rapid wears, live assembling reinforcement, cast in situs
The problems such as floorslab concrete.
Concrete scheme is as follows:
A kind of prefabricated board, including prefabricated board ontology, tank-type connecting component and dowel, the tank-type connecting component include upper ear plate,
Vertical plate and lower ear plate, the upper ear plate and lower ear plate are located in the upper and lower ends of vertical plate, in the upper ear plate and lower ear plate
Portion offers pin hole, and the vertical plate is equipped with dowel hole, and the dowel includes the dowel body of rod and is located at dowel bar
Semicircle anchor head and bolt anchor head on body both ends, the other end is locked after the dowel body of rod of the dowel passes through the dowel hole on vertical plate
Tank-type connecting component is fixed on the supported end end face of prefabricated board ontology and beam support by bolt anchor head, and upper ear plate and lower ear
Opening between plate deviates from the supported end end face of prefabricated board ontology and beam support.
Further, the effective cross section area after the tank-type connecting component upper ear plate, lower ear plate " being waited strong replacement " is not
Less than the area of steel bar stress in prefabricated board ontology.
The utility model additionally provides a kind of connection structure that prefabricated board is connect with prefabricated board, beam, including beam, first prefabricated
The supported end end face of plate and the second prefabricated board, first prefabricated board and beam support is embedded with the first tank-type connecting component, and described
One tank-type connecting component is equipped with the first pin hole, and the supported end end face of second prefabricated board and beam support is embedded with the second groove profile
Connector, second tank-type connecting component are equipped with the second pin hole;First prefabricated board and the second prefabricated board support respectively
It is inserted into the first tank-type connecting component on the opposite two sides of beam, and by the second tank-type connecting component, pin is inserted into the first groove profile
Connector, the second tank-type connecting component the first pin hole and the second pin hole in, by the first tank-type connecting component and the second groove profile
Connector is fixed;Self-compacting concrete band is poured in plate stitch between first prefabricated board and the second prefabricated board, so that first
It is linked to be entirety between prefabricated board, the second prefabricated board and beam three.Further, the first pin hole of first tank-type connecting component
The second pin hole with the second tank-type connecting component is slotted hole, and the first pin hole and the perpendicular setting of the second pin hole.
Further, the first tank-type connecting component notch clear height is 10mm bigger than the notch clear height of the second tank-type connecting component.
Further, the strength grade of the beam slab boundary seam self-compacting concrete band poured in step S3 is more prefabricated than first
The high level-one of the strength grade of plate and the second prefabricated board.
Further, first prefabricated board and the second prefabricated board are one-way slabs, and first prefabricated board and second is in advance
The first tank-type connecting component and the second tank-type connecting component, first prefabricated board and the second prefabricated board are respectively equipped on the short side of making sheet
Long side on be respectively arranged with the upper tongue and groove being mutually twisted and lower tongue and groove.
Further, it is embedded with peg on the lower tongue and groove, is reserved on the upper tongue and groove and the peg phase on lower tongue and groove
Matched peg hole.
Further, first prefabricated board and the second prefabricated board are mutual using adjacent pillars net standard width of a room in an old-style house prefabricated board plate-laying direction
Vertical mode is arranged.
Further, with layout of the wrong seam between upward adjacent two piece prefabricated board.
The connection structure that prefabricated board and prefabricated board provided by the utility model are connect with beam has compared with prior art
It has the advantage that
1, the connection structure that prefabricated board and prefabricated board provided by the utility model are connect with beam improves existing prefabricated board
Connection type realizes that live Fast Installation is in place;The secondary concrete floor overlapping layers poured is eliminated, is only poured in top surface of the beam
Concrete fin band.
2, the section of tank-type connecting component is not less than prefabricated board steel area, will not weaken prefabricated board stress performance, by inserting
Oneself of an interior cast-in-place high strength grade is stitched on pin, back peg, back distributing bar and the beam slab boundary for entering connector pin hole
The measures such as air-free concrete take special way by the design of prefabricated board and arrangement mode of prefabricated board etc., guarantee building
Being reliably connected for plate and steel construction, realizes the overall performance of floor.
3, after floor is installed in place, only beam slab piece after-pouring concrete, only takes up the work surface of fraction, can vacate big
Plate face working space does not interfere next working procedure, is constructed by rationalization, using continuous productive process, is substantially shorter construction
Duration.
Detailed description of the invention
Fig. 1 shows the schematic diagram of prefabricated board.
Fig. 2 shows the side views of tank-type connecting component.
Fig. 3 shows the top view of tank-type connecting component.
Fig. 4 shows the side view that prefabricated board is mounted on beam.
Fig. 5 shows the top view that prefabricated board is mounted on beam.
Fig. 6 shows the schematic diagram of the prefabricated board with the first tongue-and-groove structure.
Fig. 7 shows the schematic diagram of the prefabricated board with second of tongue-and-groove structure.
Fig. 8 shows the schematic diagram of the arrangement mode of prefabricated board in the adjacent pillars net standard width of a room in an old-style house.
Specific embodiment
To further illustrate each embodiment, the utility model is provided with attached drawing.These attached drawings are in the utility model discloses
A part of appearance mainly to illustrate embodiment, and can cooperate the associated description of specification former come the running for explaining embodiment
Reason.Cooperation refers to these contents, and those of ordinary skill in the art will be understood that other possible embodiments and sheet are practical new
The advantages of type.Component in figure is not necessarily to scale, and similar component symbol is conventionally used to indicate similar component.
Now in conjunction with the drawings and specific embodiments, the present invention will be further described.
Embodiment 1
As depicted in figs. 1 and 2, a kind of prefabricated board is present embodiments provided, which includes prefabricated board ontology 10, groove profile
Connector 20 and dowel 30, the tank-type connecting component 20 include upper ear plate 202, vertical plate 200 and lower ear plate 204, the upper ear plate
202 and lower ear plate 204 be located in the upper and lower ends of vertical plate 200, upper ear plate 202, vertical plate 200, lower ear plate 204 can be used
Shape steel plate cuts production, and the upper and lower edge of vertical plate 200 uses fillet welding in succession at one with upper ear plate 202, lower ear plate 204 respectively
Body;Die sinking cast molding can also be used in mass production.The upper ear plate 202 and 204 middle part of lower ear plate offer pin hole
206, the vertical plate 200 is equipped with dowel hole 208.
With reference to Fig. 3, upper ear plate 202,204 size of lower ear plate are the same, are axial symmetry irregular, and outer is guaranteeing pin
It is cut in the case where the stress in hole and is processed into arc-shaped.The pin hole opened up among upper ear plate 202, lower ear plate 204 is slotted hole,
Slotted hole is long to parallel or perpendicular to prefabricated board bearing end plate sideline, upper ear plate 202, lower ear plate 204 cross section should be by " etc.
The mode of strong replacement " calculates determination, and the effective cross section area after " waiting strong replacement " is no less than prefabricated board steel bar stress face
Product.Vertical plate 200 is rectangle, and axial symmetry setting is there are two dowel hole 208, and dowel hole 208 is preferably arranged in pairs, and aperture should be according to meter
Dowel diameter setting needed for calculating.
The dowel 30 includes the dowel body of rod 300 and 302 He of semicircle anchor head being located on 300 both ends of the dowel body of rod
Bolt anchor head 304.The dowel body of rod 300 is made of Ribbed Bar, and diameter, length are computed determination.Wherein, at vertical plate 200
Dowel anchor head be semicircle anchor head 302, production method be by dowel bar fusing jumping-up processing, keep the diameter of semicircle anchor head 302 big
In dowel hole 208, to prevent the dowel body of rod 300 from detaching from dowel hole 208;The other end uses bolt anchor head 304, and when production is pre-
First the end tapping of the dowel body of rod 300 is handled, conventional hexagonal bolt and nut can be used in bolt anchor head 304.
The other end locks bolt anchor head after the dowel body of rod 300 of the dowel 30 passes through the dowel hole 208 on vertical plate 200
304, tank-type connecting component 20 is fixed on the supported end end face of prefabricated board ontology 10 and beam support, and upper ear plate 202 is under
Opening between otic placode 204 deviates from the supported end end face of prefabricated board ontology and beam support.
Prefabricated board manufacturing process in this implementation is as follows, first pre-buried tank-type connecting component, every piece of prefabricated board before factory pours
Left and right both ends are arranged in pairs left, tank-type connecting component, and the position at connector opposite plate supported end edge and quantity should be computed really
Fixed, the every end of the number of connector is no less than 2.Tank-type connecting component is hit exactly set on prefabricated board supported end height.When pre-buried, first by anchor
Muscle is inserted into vertical plate, locks the bolt of dowel bolt anchor head, tank-type connecting component is put into the slab muscle for having bound placement, using facing
When fixation (such as iron wire) tank-type connecting component tightened into fixation, it is pre-buried to can be completed connector, later can with casting concrete,
So that tank-type connecting component and prefabricated board ontology pour it is integral.
The connection structure and brought advantage that prefabricated board provided in this embodiment is connect with prefabricated board, beam are shown in embodiment
Specific descriptions in 2.
Embodiment 2
With reference to Fig. 4 and Fig. 5, present embodiments provide a kind of using the prefabricated board provided in embodiment 1 and prefabricated board, Liang Lian
The connection structure connect, the connection structure include beam 4, the first prefabricated board 1a and the second prefabricated board 1b, the first prefabricated board 1a with
The supported end end face that beam 4 supports is embedded with the first tank-type connecting component 20a, the first tank-type connecting component 20a and is equipped with the first pin
The supported end end face of nail hole 206a, the second prefabricated board 1b and beam support is embedded with the second tank-type connecting component 20b, and described second
Tank-type connecting component 20b is equipped with the second pin hole 206b;The first prefabricated board 1a and the second prefabricated board 1b are supported on beam 4 respectively
On opposite two sides, and the second tank-type connecting component 20b is inserted into the first tank-type connecting component 20a, pin 5 is inserted into the first slot
Type connector 20a, the second tank-type connecting component 20b the first pin hole 206a and the second pin hole 206b in, by the first groove profile
Connector 20a and the second tank-type connecting component 20b are fixed;It is poured in plate stitch between the first prefabricated board 1a and the second prefabricated board 1b
Self-compacting concrete band, so as to be linked to be entirety between 4 three of the first prefabricated board 1a, the second prefabricated board 1b and beam.
Above-mentioned includes that the first prefabricated board 1a and the second prefabricated board 1b is mounted on beam 4 and can be realized by following steps:
S1, the bearing that beam 4, the first prefabricated board 1a and the second prefabricated board 1b, the first prefabricated board 1a and beam 4 support is provided
End end face is embedded with the first tank-type connecting component 20a, and the first tank-type connecting component 20a is equipped with the first pin hole 206a, described
The supported end end face that second prefabricated board 1b and beam 4 support is embedded with the second tank-type connecting component 20b, second tank-type connecting component
20b is equipped with the second pin hole 206b;First tank-type connecting component 20a and the second tank-type connecting component 20b are embedded in the first prefabricated board
Manufacturing process in 1a and the second prefabricated board 1b is embedded in the intrinsic method phase of prefabricated board with the tank-type connecting component in embodiment 1
Together.Wherein the structure of the first tank-type connecting component 20a and the second tank-type connecting component 20b are identical, and appearance is alike, but not of uniform size,
In the present embodiment, the size of the first tank-type connecting component 20a is big compared with the second tank-type connecting component 20b.Wherein preferred, the first groove profile connects
The notch clear height of fitting 20a is 10mm bigger than the notch clear height of the second tank-type connecting component 20b, to consider concrete prefabricated element
Installation error.
S2, the first prefabricated board 1a and the second prefabricated board 1b are lifted respectively and is supported on the opposite two sides of beam 4, beam
The the first tank-type connecting component 20a and the second tank-type connecting component 20b of prefabricated board on two sides are matched one by one, and the second groove profile is connected
Part 20b is inserted into the first tank-type connecting component 20a, and pin 5 is inserted into the first tank-type connecting component 20a, the second tank-type connecting component 20b
The first pin hole 206a and the second pin hole 206b in, the first tank-type connecting component 20a and the second tank-type connecting component 20b are connected
It is connected into one, so that the first prefabricated board 1a and the second prefabricated board 1b are temporarily fixed on beam 4.
Specifically, first hoisting column, beam, then lift, prefabricated board in place, preliminarily form force structure system.After beam fixes,
The prefabricated board of beam arranged on left and right sides can be lifted to layout board position in pairs, first be lifted, the prefabricated board on beam side in place, then will
The beam other side is lifted to design position, is pushed tank-type connecting component correspondence to adjacent prefabricated board tank-type connecting component, is made arranged on left and right sides
The pin hole alignment of ability tank-type connecting component, is inserted into pin hole for pin, the fixation of one group of attachment device can be completed on prefabricated board.
After the tank-type connecting component of prefabricated board ends is fixed, that is, complete the fixation of monolith prefabricated board.
In the present embodiment, the appearance of pin 5 is similar to conventional rivets, but chamfered is done in end, can be used common
Snap rivet simultaneously forms nail pin cutting chamfering, and Ribbed Bar cutting, fusing jumping-up, cutting chamfered can also be used.
Back is laid on S3, the gap between two prefabricated boards of beam 4 and constructs muscle, distributing reinforcement, and casting beams edges of boards circle stitch
Self-compacting concrete band, so as to be linked to be entirety between 4 three of the first prefabricated board 1a, the second prefabricated board 1b and beam.To guarantee building
The globality of plate can also lay peg 6 on the gap between two prefabricated boards of beam 4.
Wherein, it is preferred that the strength grade of the beam slab boundary that pours seam self-compacting concrete band than the first prefabricated board with
The high level-one of the strength grade of second prefabricated board, to guarantee the globality between prefabricated board and beam.
In the present embodiment, it is preferred that the first pin hole 206a of the first tank-type connecting component 20a and the second groove profile connect
The second pin hole 206b of fitting 20b is slotted hole, and the first pin hole 206a and the second perpendicular setting of pin hole 206b,
Pore size is contemplated that the construction error of concrete embedded part, length 10mm more than steel member manufacture allowable error, in order to
Contraposition between one tank-type connecting component 20a and the second tank-type connecting component 20b.
In the present embodiment, first prefabricated board and the second prefabricated board can be one-way slabs or two-way slab, wherein
The structure that the structure of one-way slabs is preferably as described below, with reference to Fig. 6 and Fig. 7, i.e., in the first prefabricated board 1a and the second prefabricated board
The first tank-type connecting component 20a and the second tank-type connecting component 20b, the first prefabricated board 1a and second are respectively equipped on the short side of 1b
The upper tongue and groove 100 being mutually twisted and lower tongue and groove 110 are respectively arranged in the long side of prefabricated board 1b.Upper tongue and groove 100 and lower tongue and groove 110
There are two types of mode, i.e., mode one as shown in FIG. 6 and modes two as shown in Figure 7 for way, and mode one, two way Datong District are small
It is different, it is all the tongue and groove being mutually twisted, lower tongue and groove 110 is embedded with peg 6 ', and peg hole 102 is reserved in upper tongue and groove corresponding position, prefabricated
Plate after-pouring self-compacting concrete in place is fixed.Unlike, the cross section of the prefabricated board of mode one is "the" shape, prefabricated board
Successively arrange;The prefabricated board cross section of mode two is then divided into positive T shape and inverted T-shaped, the two staggered.
It in the present embodiment, is the integral firmness for guaranteeing floor after prefabricated board installation is in place, the first prefabricated board and second
Prefabricated board is arranged by the way of " adjacent pillars net standard width of a room in an old-style house prefabricated board plate-laying direction is mutually perpendicular to ".I.e. as shown in figure 8, A, B, C, D
For four adjacent column net standard widths of a room in an old-style house, for the sake of simplicity, colum network size 9m*9m, prefabricated board is having a size of 0.9m*3m.In the A standard width of a room in an old-style house
Prefabricated board is East and West direction plate-laying, i.e. A1, A2, A3 ... A10 is supported on East and West direction beam;And the B standard width of a room in an old-style house is then north-south plate-laying, i.e.,
B1, B2, B3 ... B10 are supported on the beam of north-south, and the C standard width of a room in an old-style house is then north-south plate-laying and the D standard width of a room in an old-style house is East and West direction plate-laying.
It is further preferred that with layout of the wrong seam between upward contiguous prefabricated plate.I.e. as shown in figure 8, the groove profile of prefabricated board
Connector is set at 1/4 width of supported end, and the position of contiguous prefabricated plate in the same direction differs 1/2 width.The prefabricated board of the A standard width of a room in an old-style house is put
On East and West direction beam, positive 1/2 board width of good job in position of A1, A3, A5 ... and A2, A4, A6 ....In this way, the 1st of A2 the North the
The groove profile of the tank-type connecting component of a tank-type connecting component insertion south A1, the 2nd tank-type connecting component insertion south A3 of A2 the North connects
Fitting, and so on.In this way, it is ensured that prefabricated board will not straight joint destroy, guarantee the whole jail of floor after prefabricated board installation is in place
Solidity.
Furthermore, it is contemplated that prefabricated board size is generally standard module, and standard width of a room in an old-style house size not necessarily standard module is built, in advance
Remaining part is using cast-in-place after making sheet arrangement.In addition, building, escalator and the architectural plane corner etc. of building, are floors
The weak link of stress, also part is cast-in-place.These position ranges are small, and concrete quantity is seldom, not using cast-in-place concrete floor
Large-area construction operation can be interfered.Since the prefabricated board of beam two sides is connects in pairs, and the prefabricated board supported end of most end
No corresponding contiguous prefabricated plate is connected thereto, therefore can default in corresponding connector on beam, realizes the prefabricated board of most end
Supported end is connected and fixed.
By taking above-mentioned several strengthening measures, it is ensured that the floor overall performance after prefabricated board installation is in place is protected
Card floor and steel construction are reliably connected, and guarantee the effective transmitting of floor levels power.
Construction method in the present embodiment can be used for assembling type steel structure building floor and assembly concrete building floor.
When assembly concrete building floor uses the construction method in the present embodiment, prefabricated concrete floor way and scene row
Cloth prefabricated board and in place, bolt nail is installed, the way laying beam construction reinforcing bar, pour self-compacting concrete band need not change
Become, prefabricated girder steel need to be only changed to precast reinforced concrete beam or prefabricated girder with rolled steel section en cased in concrete.
When using precast reinforced concrete beam, then it will be welded with steel anchor slab under aforementioned girder steel peg, be embedded in advance precast reinforced
In beams of concrete.When the setting elongated along beam of steel anchor slab, it is contemplated that substitution precast beam back reinforcing bar.When solidifying using prefabrication type steel reinforced concrete
When native beam, aforementioned girder steel peg then downward continuation directly is welded in fashioned iron top flange.In-situ precast reinforced beam, prefabrication type steel reinforced concrete
The installation construction method that assembly concrete is built by place of solidifying Tu Liang.
In addition, the construction method in the present embodiment is equally applicable for assembly concrete building concrete precast beam, in addition to
Each part dimension of device is answered outside required design, and way is similar with prefabricated board, and is arranged in pairs in beam support end, precast beam
The precast beam of support two sides can be connected two-by-two by prefabricated board tank-type connecting component, and peg is arranged on demand, and the secondary self-compaction that pours mixes
Solidifying soil, can be realized the connection of precast beam.In general, beam profile height is greater than width, tank-type connecting component can be according to actual needs
Horizontally disposed (otic placode is horizontal positioned), can also be vertically arranged (otic placode is vertically placed).Two ways respectively has advantage and disadvantage, it is opposite and
Speech, otic placode, which is vertically placed, more meets beam stress mode, and the secondary casting concrete in junction is also more convenient.
Prefabricated board provided by the utility model and the construction method connecting with beam change existing assembled architecture and use
The way of concrete floor slab, solves existing for concrete floor slab that working procedure is complicated, long in time limit and construction precision
Difference, the problems such as quality is low, overcome that prefabricated board " beard muscle " rapid wear, the occlusion of contiguous prefabricated plate be difficult, pin is not easy positioning and
The disadvantages of steel using amount is big, secondary casting concrete amount is big.
Its major advantage has:
(1) reasonable stress: the main primary structure member of prefabricated board tank-type connecting component is the otic placode of connector, and otic placode etc. replaces by force
Slab muscle does not weaken prefabricated board steel bar stress section, and only changing dispersed placement slab muscle is centralized arrangement steel ear plate.Secondly, connection
Part in groups, in pairs, be symmetrically arranged in prefabricated board ends, each connector is arranged in the center of plate height, and connector stress is closed
Reason bears the mutual pulling force of prefabricated board, will not generate additional bending moment because of arranged off-centre, cause to reverse.
It after prefabricated board lifting is in place, deducts prefabricated board and shelves width, there are also the installation spaces of 150mm or so, in addition to the company of inserting
For fitting pin to fix outside prefabricated board, installation of the space of the 150mm or so width simultaneously as back reinforcing bar, beam peg is empty
Between.Peg interlaced can be arranged with connector, will not be fought each other.After prefabricated board installation is fixed in place, back can be laid
Reinforcing bar (peg can be welded on beam in advance in factory), pours piece concrete between the prefabricated board of back, by left and right prefabricated board, beam three
Person is closely joined together, and realizes the globality of floor.
The prefabricated board tank-type connecting component Path of Force Transfer is clear, reasonable, does not change the force way of floor using the device, ties
The anti-seismic performance of structure system does not weaken, and structure is secure safely.
(2) production is simple: the main component connected between two prefabricated boards is tank-type connecting component and dowel, pin, structure
Part arranges compact, deft design.Cut profiled sheet, punching, welding fabrication can be used in tank-type connecting component, and die sinking can also be used
Cast molding;Dowel can be used common cold rolled reinforcing steel bar with ribs in engineering and make through end fusing, jumping-up and tapping, bolt anchor head
Bolt the conventional hexagonal bolt and nut that can be purchased in the market can be used;Pin is then that using common snap rivet and will follow closely
Foot cuts chamfering molding, or using Ribbed Bar cutting, fusing jumping-up, cutting chamfered.
When tank-type connecting component production quantity is less, tank-type connecting component can be used cut profiled sheet, punching, welding and
It can be cut with Ribbed Bar at, dowel, jumping-up, tapping molding (nut of bolt anchor head is purchased from market), rivet can be used general
Logical rivet cutting chamfering is formed.If production quantity is big, all components be can be mass, and can be opened casting, and processing technology is simpler
Just, machining accuracy is also more guaranteed, and prefabricated board tank-type connecting component production is simple, reliable in quality, use easy to spread.
(3) quick for installation: dowel is first inserted into groove profile company by the pre-buried tank-type connecting component before prefabricated board casting concrete respectively
In the vertical plate dowel hole of fitting, clamping screw anchor head, then in pairs, centrally pre-buried arrangement tank-type connecting component.Prefabricated board factory
It is transported to scene, the prefabricated board of beam two sides lifts in pairs, tank-type connecting component is pushed into the tank-type connecting component of contiguous prefabricated plate, is inserted into
Pin, i.e., completion prefabricated board is in place, fixed, and the mounting means of the prefabricated board tank-type connecting component is simple, quick, efficient, construction
Quality is guaranteed.
(4) storage is convenient: prefabricated board tank-type connecting component each section component is all using separate type way, and dowel, pin are equal
Can dismantle, in factory's built-in connection just be inserted into dowel, at the scene in place, regulation prefabricated board when just insertion pin, accessory
Can store, occupy little space respectively, store, transport it is all very convenient.
(5) cost is saved: since the main primary structure member of the tank-type connecting component of prefabricated board is the otic placode of tank-type connecting component, ear
The strong replacement slab muscle such as plate, does not weaken prefabricated board steel bar stress section, and only changing dispersed placement slab muscle is centralized arrangement steel ear plate.
Therefore it is compared with traditional cast-in-place concrete floor, increased steel using amount very little.And coagulation is commonly overlapped with existing assembled
Tulou plate is compared, and due to floor one-pass molding, steel content not will increase, or even there are also reduce.It is prior, because changing folded
The way of concrete floor is closed, new prefabricated board connection type is simple and direct, and it is easy for construction efficiently to save labour cost, and reduce existing
The building materials expense of field waste.Therefore, cost can be reduced using the prefabricated board, saves cost.
Although specifically showing and describing the utility model in conjunction with preferred embodiment, those skilled in the art is answered
This is understood, in the spirit and scope for not departing from the utility model defined by the appended claims, in form and details
On the utility model can be made a variety of changes, be the protection scope of the utility model.
Claims (10)
1. a kind of prefabricated board, it is characterised in that: including prefabricated board ontology, tank-type connecting component and dowel, the tank-type connecting component packet
Include upper ear plate, vertical plate and lower ear plate, the upper ear plate and lower ear plate are located in the upper and lower ends of vertical plate, the upper ear plate and
Pin hole is offered in the middle part of lower ear plate, the vertical plate is equipped with dowel hole, and the dowel includes the dowel body of rod and difference position
It is another behind the dowel hole on vertical plate in the dowel body of rod of semicircle anchor head and bolt anchor head on dowel body of rod both ends, the dowel
Bolt anchor head is locked in one end, tank-type connecting component is fixed on the supported end end face of prefabricated board ontology and beam support, and upper ear
Opening between plate and lower ear plate deviates from the supported end end face of prefabricated board ontology and beam support.
2. prefabricated board according to claim 1, it is characterised in that: the tank-type connecting component upper ear plate, lower ear plate are through " waiting strong
Effective cross section area after replacement " is not less than the area of steel bar stress in prefabricated board ontology.
3. the connection structure that a kind of prefabricated board is connect with prefabricated board, beam, which is characterized in that including beam, the first prefabricated board and second
The supported end end face of prefabricated board, first prefabricated board and beam support is embedded with the first tank-type connecting component, and first groove profile connects
Fitting is equipped with the first pin hole, and the supported end end face of second prefabricated board and beam support is embedded with the second tank-type connecting component,
Second tank-type connecting component is equipped with the second pin hole;It is opposite that first prefabricated board and the second prefabricated board are supported on beam respectively
Two sides on, and the second tank-type connecting component is inserted into the first tank-type connecting component, pin is inserted into the first tank-type connecting component, the
In the first pin hole and the second pin hole of two tank-type connecting components, the first tank-type connecting component and the second tank-type connecting component are consolidated
It is fixed;Self-compacting concrete band is poured in plate stitch between first prefabricated board and the second prefabricated board, so that the first prefabricated board,
It is linked to be entirety between two prefabricated boards and beam three.
4. connection structure according to claim 3, it is characterised in that: the first pin hole of first tank-type connecting component and
Second pin hole of the second tank-type connecting component is slotted hole, and the first pin hole and the perpendicular setting of the second pin hole.
5. connection structure according to claim 3, it is characterised in that: the first tank-type connecting component notch clear height is than second
The big 10mm of notch clear height of tank-type connecting component.
6. connection structure according to claim 3, it is characterised in that: the plate stitch between the first prefabricated board and the second prefabricated board
Inside pour the strength grade level-one higher than the strength grade of the first prefabricated board and the second prefabricated board of self-compacting concrete band.
7. connection structure according to claim 3, it is characterised in that: first prefabricated board and the second prefabricated board are list
To plate, the first tank-type connecting component and the connection of the second groove profile are respectively equipped on the short side of first prefabricated board and the second prefabricated board
The upper tongue and groove being mutually twisted and lower tongue and groove are respectively arranged in the long side of part, first prefabricated board and the second prefabricated board.
8. connection structure according to claim 7, it is characterised in that: be embedded with peg, the upper enterprise on the lower tongue and groove
The peg hole to match with the peg on lower tongue and groove is reserved on mouth.
9. connection structure according to claim 3, it is characterised in that: first prefabricated board and the second prefabricated board use phase
The orthogonal mode in adjacent column net standard width of a room in an old-style house prefabricated board plate-laying direction is arranged.
10. connection structure according to claim 9, it is characterised in that: wrong between the contiguous prefabricated plate of equidirectional upper laying
It sews cloth and sets.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821681888.XU CN208965867U (en) | 2018-10-17 | 2018-10-17 | The connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821681888.XU CN208965867U (en) | 2018-10-17 | 2018-10-17 | The connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208965867U true CN208965867U (en) | 2019-06-11 |
Family
ID=66760050
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821681888.XU Expired - Fee Related CN208965867U (en) | 2018-10-17 | 2018-10-17 | The connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208965867U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184070A (en) * | 2018-10-17 | 2019-01-11 | 钱至棽 | A kind of connection type of prefabricated board and prefabricated board and prefabricated board, beam |
CN110306681A (en) * | 2019-06-28 | 2019-10-08 | 毛易州 | A kind of crystalline p p sheet |
CN110409630A (en) * | 2019-07-16 | 2019-11-05 | 绍兴文理学院 | A kind of prefabricated plate end joint connection in site method |
CN110593473A (en) * | 2019-10-12 | 2019-12-20 | 西藏涛扬新型建材科技有限公司 | Adopt steel construction building floor structure of light floor |
CN110670758A (en) * | 2019-10-12 | 2020-01-10 | 西藏涛扬新型建材科技有限公司 | Fabricated steel structure building based on fiber reinforced clad wood substrate and construction method |
CN112431115A (en) * | 2020-11-12 | 2021-03-02 | 张国彦 | Bridge superstructure precast slab mounting and lapping device for road engineering and use method thereof |
CN109184070B (en) * | 2018-10-17 | 2024-10-29 | 钱至棽 | Prefabricated plate and connection method of prefabricated plate and beam |
-
2018
- 2018-10-17 CN CN201821681888.XU patent/CN208965867U/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184070A (en) * | 2018-10-17 | 2019-01-11 | 钱至棽 | A kind of connection type of prefabricated board and prefabricated board and prefabricated board, beam |
CN109184070B (en) * | 2018-10-17 | 2024-10-29 | 钱至棽 | Prefabricated plate and connection method of prefabricated plate and beam |
CN110306681A (en) * | 2019-06-28 | 2019-10-08 | 毛易州 | A kind of crystalline p p sheet |
CN110409630A (en) * | 2019-07-16 | 2019-11-05 | 绍兴文理学院 | A kind of prefabricated plate end joint connection in site method |
CN110409630B (en) * | 2019-07-16 | 2020-11-06 | 绍兴文理学院 | On-site connection method for end of prefabricated slab |
CN110593473A (en) * | 2019-10-12 | 2019-12-20 | 西藏涛扬新型建材科技有限公司 | Adopt steel construction building floor structure of light floor |
CN110670758A (en) * | 2019-10-12 | 2020-01-10 | 西藏涛扬新型建材科技有限公司 | Fabricated steel structure building based on fiber reinforced clad wood substrate and construction method |
CN110593473B (en) * | 2019-10-12 | 2021-02-26 | 西藏涛扬新型建材科技有限公司 | Adopt steel construction building floor structure of light floor |
CN110670758B (en) * | 2019-10-12 | 2021-04-06 | 西藏涛扬新型建材科技有限公司 | Fabricated steel structure building based on fiber reinforced clad wood substrate and construction method |
CN112431115A (en) * | 2020-11-12 | 2021-03-02 | 张国彦 | Bridge superstructure precast slab mounting and lapping device for road engineering and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208965867U (en) | The connection structure that a kind of prefabricated board and prefabricated board are connect with prefabricated board, beam | |
CN208981603U (en) | A kind of assembly concrete laminated floor slab connection structure | |
CN106401036B (en) | A kind of assembled steel frame prefabricated concrete floor structure | |
CN113202219B (en) | Fully prefabricated assembled steel-concrete composite floor system and design calculation method | |
CN109667374B (en) | Assembled steel-concrete combined floor system adopting prefabricated plates with no ribs at plate ends | |
CN110512765A (en) | A kind of fabricated shear wall and construction method with steel plate peg combined type diagonal brace | |
WO2020253811A1 (en) | Local composite slab connection node, and construction method therefor | |
CN110512730B (en) | Assembled concrete primary and secondary roof beam connection structure | |
CN106760036A (en) | A kind of prefabricated steel combined concrete shear wall | |
CN208918133U (en) | A kind of assembly concrete beam connection structure | |
CN110439142A (en) | A kind of assembly concrete shear wall and construction method with H profile steel diagonal brace | |
CN108412099A (en) | Bar connecting formula concrete prefabricated board and connection method are buried after through thickness | |
CN109184070A (en) | A kind of connection type of prefabricated board and prefabricated board and prefabricated board, beam | |
CN109653375A (en) | It separates monoblock type and overlaps concrete structural system | |
CN215977981U (en) | Assembled floor piece joint connected node | |
CN212078858U (en) | Assembled reinforced concrete pond | |
CN207959642U (en) | A kind of bidirectional hollow laminated floor slab | |
CN209163035U (en) | A kind of assembled group frame beam column construction | |
CN207959532U (en) | A kind of structure that wallboard is connect with coupling beam | |
CN208441257U (en) | A kind of mounting structure of assembling-type precast hybrid beam and stiffened column | |
CN207749699U (en) | Superimposed sheet splicing seams construction based on reinforcement bolt connection | |
JP2790959B2 (en) | Underground beam construction method | |
CN214364312U (en) | Full-prefabricated bidirectional stressed floor slab and connection node | |
CN218264364U (en) | Connection proof of superimposed sheet | |
CN217204699U (en) | A integral seam structure of coincide floor post-cast in concrete for standard bottom plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190611 |