CN208965712U - Cone shell space truss builds system - Google Patents

Cone shell space truss builds system Download PDF

Info

Publication number
CN208965712U
CN208965712U CN201821326526.9U CN201821326526U CN208965712U CN 208965712 U CN208965712 U CN 208965712U CN 201821326526 U CN201821326526 U CN 201821326526U CN 208965712 U CN208965712 U CN 208965712U
Authority
CN
China
Prior art keywords
fixing groove
side wall
fixed
link block
truss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821326526.9U
Other languages
Chinese (zh)
Inventor
周建元
罗淮耀
孟露
杨兰
胡逸轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING CONSTRUCTION NINTH ENGINEERING Co Ltd
Original Assignee
CHONGQING CONSTRUCTION NINTH ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING CONSTRUCTION NINTH ENGINEERING Co Ltd filed Critical CHONGQING CONSTRUCTION NINTH ENGINEERING Co Ltd
Priority to CN201821326526.9U priority Critical patent/CN208965712U/en
Application granted granted Critical
Publication of CN208965712U publication Critical patent/CN208965712U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

This patent discloses a kind of cone shell space trusses to build system, including prefabricated side wall and top truss, the prefabricated side wall is prefabricated reinforced concrete, the prefabricated side wall top is equipped with several sliding slots, the sliding slot is communicated with fixing groove, top truss edge is fixed with several link blocks, the link block can be slided and be fixed in fixing groove in sliding slot, the prefabricated side wall top is equipped with several fastening assemblies for being used to seal fixing groove, and link block can be fixed in fixing groove by the fastening assembly.This programme solves the problems, such as to build that space truss is time-consuming and laborious, inefficiency in the prior art.

Description

Cone shell space truss builds system
Technical field
The utility model relates to steel construction monolithic architecture construction field, specifically a kind of cone shell space truss, which is built, is System.
Background technique
Space truss, i.e. ball-joint frame belong to one geometric pattern of light rigid structure contexture.Ball-joint frame usually uses One multidirectional spacing, the structure being made of tension rail and press rods, now the large scales such as bridge, gymnasium, airport, station and Special formed build on object is widely used, and is a more and more common Building technology, is particularly suitable for large-scale roof covering, example: Commercial and industrial plant gate eaves, wherein cone shell space truss is using widest in area.
It in the prior art, is mostly to be connected using by headspace truss and the reinforced frame of building side wall, and pour mixed Solidifying soil completes building for space truss, and this mode will take considerable time in production steel bar framework, connection and manpower, efficiency It is lower.
Utility model content
The utility model is intended to provide a kind of cone shell space truss and builds system, to solve to build space in the prior art The problem of truss is time-consuming and laborious, inefficiency.
In order to achieve the above object, the base case of the utility model is as follows: cone shell space truss builds system, including Prefabricated side wall and top truss, the prefabricated side wall are prefabricated reinforced concrete, and the prefabricated side wall top is equipped with several sliding slots, The sliding slot is communicated with fixing groove, and top truss edge is fixed with several link blocks, and the link block can be in sliding slot It slides and is fixed in fixing groove, the prefabricated side wall top is equipped with several fastening assemblies for being used to seal fixing groove, described tight Gu link block can be fixed in fixing groove by component.
Base case the utility model has the advantages that (1) is fixed with top truss using prefabricated side wall, realize building for space truss, It only needs that manually the junction of prefabricated side wall and top truss be fixed, eliminates artificial side wall and the top truss built Time, to achieve the purpose that save manpower, improve efficiency.
(2) truss edge in top is equipped with link block, by the way that link block to be fixed in fixing groove, realizes to top truss It is fixed, it on the one hand can prevent top truss from generating shaking during placement and be not easy to install, another program, fixing groove Bottom surface provides support force to link block, and compared with being commonly directly screwed, this mode is more firm, is unlikely to deform or damages It is bad.
(3) be arranged sliding slot, enter in fixing groove, play the guiding role convenient for link block so that installation top truss when It waits more convenient.
Further, the top truss includes central block, gusset and connecting line, during the gusset is circumferentially uniformly fixed on Around heart block, the connecting line, which circularizes, to be fixed on gusset, and the link block is fixed on the end of gusset.Gusset is as top Link block is arranged on gusset the main supporting part for holding truss, so that the fixation of top truss is more firm.
Further, the fastening assembly includes limit plate and screw, and the limit plate is fastened by screw and prefabricated side wall Connection.After link block is put into fixing groove, so that limit plate covers link block and fixing groove, and limit plate is fixed by screw On prefabricated side wall, limit plate prevents connecting plate from skidding off from fixing groove.
Further, be equipped with threaded hole in the link block and fixed groove sidewall, the link block and fixed groove sidewall it Between bolt is installed.Link block is connect with fixed groove sidewall, increases the stability that link block is connect with prefabricated side wall.
Further, the fixing groove bottom wall is equipped with several drainage holes, and described drainage hole one end is located at fixing groove bottom wall, described The drainage hole other end is located at the outer surface of prefabricated side wall.It might have rainwater in sliding slot and fixing groove to fall into, if clearing up not in time, The stability that prefabricated side wall is connect with top truss may be will affect, and screw etc. gets rusty easily and damages, drainage hole can The water in sliding slot, fixing groove is discharged in time, guarantees the drying inside sliding slot and fixing groove, is more advantageous to top truss and is fixed on On prefabricated side wall.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model embodiment;
Fig. 2 is the structural schematic diagram of the link block and fixing groove cooperation in the utility model embodiment;
Fig. 3 is the side view of Fig. 2.
Specific embodiment
It is further described below by specific embodiment:
Appended drawing reference in Figure of description includes: prefabricated side wall 1, central block 2, gusset 3, connecting line 4, link block 5, slides Slot 6, fixing groove 7, limit plate 8, screw 9, drainage hole 10.
Embodiment
Substantially cone shell space truss builds system, including prefabricated side wall 1 and top truss, prefabricated side wall as shown in Figure 1: 1 is prefabricated reinforced concrete, and top truss includes 2,16 pieces of gussets 3 of central block and connecting line 4, and gusset 3 is circumferential uniformly solid It is scheduled on around central block 2, connecting line 4, which circularizes, to be fixed on gusset 3.In conjunction with shown in Fig. 2, Fig. 3, prefabricated 1 top of side wall is set There are 16 sliding slots 6, sliding slot 6 is communicated with fixing groove 7, and the end of gusset 3 is welded with link block 5, and link block 5 can be in sliding slot 6 Interior sliding is simultaneously fixed in fixing groove 7, and threaded hole, link block 5 and 7 side of fixing groove are equipped on 7 side wall of link block 5 and fixing groove Bolt is installed between wall.Prefabricated 1 top of side wall is equipped with several fastening assemblies for being used to seal fixing groove 7, and fastening assembly includes Limit plate 8 and screw 9, limit plate 8 are fastenedly connected by screw 9 with prefabricated side wall 1.Fastening assembly can be fixed by link block 5 In fixing groove 7.
7 bottom wall of fixing groove is equipped with several drainage holes 10, and 10 one end of drainage hole is located at 7 bottom wall of fixing groove, and drainage hole 10 is another End is located at the outer surface of prefabricated side wall 1.
Specific implementation process is as follows: it will be fixed on bottom surface by the prefabricated prefabricated side wall 1 of armored concrete, it then will molding Top surface truss sling with loop wheel machine and be transported to the surface of prefabricated side wall 1.It guides link block 5 to enter in sliding slot 6 and gradually will Truss decentralization in top surface then rotates top surface truss and link block 5 is entered in fixing groove 7.Limit plate 8 is manually passed through into screw 9 It is fixed at link block 5, prevents link block 5 from skidding off outside fixing groove 7, and manually make link block 5 and fixing groove 7 using bolt Side wall is fixed.
It might have rainwater in sliding slot 6 and fixing groove 7 to fall into, if clearing up not in time, prefabricated side wall 1 and top may be will affect The stability of truss connection is held, and screw 9 etc. gets rusty easily and damages, drainage hole 10 can be in time by sliding slot 6, fixing groove 7 In water discharge, guarantee the drying inside sliding slot 6 and fixing groove 7, be more advantageous to top truss and be fixed on prefabricated side wall 1.
Above-described is only the embodiments of the present invention, the common sense such as well known specific structure and/or characteristic in scheme It does not describe excessively herein.It should be pointed out that for those skilled in the art, before not departing from the utility model structure It puts, several modifications and improvements can also be made, these also should be considered as the protection scope of the utility model, these all will not shadow Ring effect and patent practicability that the utility model is implemented.This application claims protection scope should be in its claim Subject to appearance, the records such as specific embodiment in specification can be used for explaining the content of claim.

Claims (5)

1. cone shell space truss builds system, it is characterised in that: including prefabricated side wall and top truss, the prefabricated side wall is Prefabricated reinforced concrete, the prefabricated side wall top are equipped with several sliding slots, and the sliding slot is communicated with fixing groove, the top truss Edge is fixed with several link blocks, and the link block can be slided and be fixed in fixing groove in sliding slot, the prefabricated side wall Top is equipped with several fastening assemblies for being used to seal fixing groove, and link block can be fixed in fixing groove by the fastening assembly.
2. cone shell space truss according to claim 1 builds system, it is characterised in that: during the top truss includes Heart block, gusset and connecting line, the gusset are circumferentially uniformly fixed on around central block, and the connecting line, which circularizes, to be fixed on On gusset, the link block is fixed on the end of gusset.
3. cone shell space truss according to claim 2 builds system, it is characterised in that: the fastening assembly includes limit Position plate and screw, the limit plate are fastenedly connected by screw and prefabricated side wall.
4. cone shell space truss according to claim 1 builds system, it is characterised in that: the link block and fixing groove It is equipped with threaded hole on side wall, bolt is installed between the link block and fixed groove sidewall.
5. cone shell space truss according to claim 4 builds system, it is characterised in that: the fixing groove bottom wall is equipped with Several drainage holes, described drainage hole one end are located at fixing groove bottom wall, and the drainage hole other end is located at the outer surface of prefabricated side wall.
CN201821326526.9U 2018-08-15 2018-08-15 Cone shell space truss builds system Active CN208965712U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821326526.9U CN208965712U (en) 2018-08-15 2018-08-15 Cone shell space truss builds system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821326526.9U CN208965712U (en) 2018-08-15 2018-08-15 Cone shell space truss builds system

Publications (1)

Publication Number Publication Date
CN208965712U true CN208965712U (en) 2019-06-11

Family

ID=66752239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821326526.9U Active CN208965712U (en) 2018-08-15 2018-08-15 Cone shell space truss builds system

Country Status (1)

Country Link
CN (1) CN208965712U (en)

Similar Documents

Publication Publication Date Title
CN208965712U (en) Cone shell space truss builds system
CN201439213U (en) Long-mould manufacturing device for centrifugal concrete pile
CN107246147A (en) A kind of method of vertical duct sealing hole
CN208363118U (en) Node is installed in beam stake for assembled ground
CN214243537U (en) Telescopic tower crane attached stay bar
CN208267438U (en) A kind of new reinforcing steel bar machining shed
CN209742428U (en) Building engineering safety protection reinforcing bar protection canopy
CN204024060U (en) Taper detachable sealing Limit screw
CN107351228A (en) A kind of prefabricated wind power tower mould equipment and its construction technology
CN208608021U (en) The adjustable rain cover of GIS sunk type CT terminal box umbrella shape
CN208545967U (en) A kind of contrary sequence method ring beam construction bottom die setting tool
CN202370251U (en) Through-wall combined water stopping screw rod
CN205100552U (en) Enclosure assembling die that bears down on one
CN204571321U (en) A kind of integrated form steel bar meter booth structure
CN209144856U (en) A kind of formwork support structure of cup foundation inverted trapezoidal rim of a cup
CN207660084U (en) A kind of rainwater-collecting recycling constructing device
CN211690318U (en) Combined pile for civil construction engineering
CN114150706A (en) Deformable dual-purpose manhole cover and using method thereof
CN207484499U (en) A kind of Novel free clears up sump glass shell
CN209211793U (en) A kind of assembled water-proof railing
CN206607580U (en) A kind of steel reinforcement cage hanging steel bar of reusable edible
CN208202559U (en) A kind of reserved steel bar mouth integrated template for the casting of material distributing machine mouth
CN206053402U (en) Assembled architecture overlaps plate bracing frame
CN207134913U (en) A kind of rain-proof device for generator set
CN210622342U (en) Be applied to detachable novel platform of unloading of encorbelmenting of assembled steel construction building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant