CN208267438U - A kind of new reinforcing steel bar machining shed - Google Patents

A kind of new reinforcing steel bar machining shed Download PDF

Info

Publication number
CN208267438U
CN208267438U CN201820661025.XU CN201820661025U CN208267438U CN 208267438 U CN208267438 U CN 208267438U CN 201820661025 U CN201820661025 U CN 201820661025U CN 208267438 U CN208267438 U CN 208267438U
Authority
CN
China
Prior art keywords
shed
finished product
canopy
machining
machining shed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820661025.XU
Other languages
Chinese (zh)
Inventor
冯涛
吴涛
郝立泽
李波
李兴国
宋尚宗
付新梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201820661025.XU priority Critical patent/CN208267438U/en
Application granted granted Critical
Publication of CN208267438U publication Critical patent/CN208267438U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of new reinforcing steel bar machining sheds, including the former material material shed for storing raw material of reinforcement rebar, for raw material of reinforcement rebar to be processed as to the machining shed of reinforcing bar finished product, and the finished product for stacking reinforcing bar finished product stacks canopy, successively arrangement is connected on mattess for former material material shed, machining shed and finished product stacking canopy;The mattess is equipped with a plurality of track parallel to each other, former material material shed, machining shed and finished product are stacked is equipped with the idler wheel that can move back and forth in orbit below at left and right sides of canopy, the inner face size of former material material shed is greater than the outside size that finished product stacks canopy, and the inner face size that finished product stacks canopy is greater than the outside size of machining shed.The utility model can use lifting equipment handling raw material of reinforcement rebar, additionally it is possible to use lifting equipment handling reinforcing bar finished product, not need manual handling raw material of reinforcement rebar and reinforcing bar finished product, can save a large amount of time and artificial.

Description

A kind of new reinforcing steel bar machining shed
Technical field
The utility model is specifically related to a kind of new reinforcing steel bar machining shed.
Background technique
Reinforcing steel processing shed faces construction and applies as construction site is necessary, and standardized reinforcing steel processing shed is creation security civilization The essential condition in construction standardization building site.Construction site is common, and set up is fastener type steel pipe reinforcing steel processing shed, sets up and removes Fastener type steel pipe reinforcing steel processing shed needs to install or remove the material of entire reinforcing steel processing shed, needs to consume in the process a large amount of Artificial and material.Simultaneously as fastener type steel pipe scaffold set up that length and width span limited by tube material all cannot be too big, set up When need to set up steel pipe riser and diagonal brace, cause raw material of reinforcement rebar that cannot hang in fastener type steel pipe steel bar meter using hanging device Storage and processing, can only take manual handling raw material of reinforcement rebar and reinforcing bar finished product in canopy, need to take a substantial amount of time and manually.
In addition, conventional fastener formula steel pipe reinforcing steel processing shed construction cost in setting up dismounting and use process is higher, by The influence of sleet and strong wind weather will be unable to carry out steel bar meter, while be unfavorable for building for safety construction standardization building site If.
Utility model content
The shortcomings that the purpose of the utility model is to overcome the prior arts provides a kind of new reinforcing steel bar machining shed, to solve Conventional fastener formula steel pipe reinforcing steel processing shed can only take manual handling raw material of reinforcement rebar and reinforcing bar finished product, need to take a substantial amount of time And artificial problem.
To achieve the above object, technical solution adopted in the utility model is: providing a kind of new reinforcing steel bar machining shed, wraps The former material material shed for storing raw material of reinforcement rebar is included, for raw material of reinforcement rebar to be processed as to the machining shed of reinforcing bar finished product, Yi Jiyong Canopy is stacked in the finished product for stacking reinforcing bar finished product, former material material shed, machining shed and finished product stack canopy and successively arrange on mattess Connection;The mattess is equipped with a plurality of track parallel to each other, and former material material shed, machining shed and finished product are stacked at left and right sides of canopy It is equipped with the idler wheel that can move back and forth in orbit below, the inner face size of former material material shed is greater than finished product and stacks the outer of canopy Face size, the inner face size that finished product stacks canopy are greater than the outside size of machining shed.
Preferably, it includes canopy body skeleton and covering plate, covering plate that the former material material shed, machining shed and finished product, which stack canopy, Cover that canopy body skeleton is left and right and above, and covering plate is connect with canopy body skeleton by self-tapping screw.
Preferably, being evenly equipped with four at left and right sides of the canopy body skeleton respectively is vertically fixed on standing on mattess Column, uniformly distributed there are four the truss vertical with its axis above canopy body skeleton, the front and rear sides of truss both ends and the upper end of the column are all provided with There is angled piece, the angled piece on truss and column flushes and fixation is bolted.
Preferably, being evenly equipped with several purlins parallel with its axis above the canopy body skeleton, purlin passes through with truss Self-tapping screw connection.
Preferably, described canopy body skeleton or so two sides is evenly distributed with several reinforcing rods parallel with its axis, reinforcing rod and vertical Column is connected by self-tapping screw.
Preferably, the former material material shed, machining shed and finished product stack be equipped on the upside of canopy or so two sides be fixed on it is vertical The left and right two sides outside of the hanging ring screw of column upper end, mattess is embedded with several Prefabricated Concrete blocks, is equipped in Prefabricated Concrete block The earth anchor paid upwards has hung stainless steel turnbuckle on earth anchor, and stainless steel turnbuckle and hanging ring screw pass through cable wind rope Connection.
Preferably, being equipped with gutter parallel to each other on the outside of the left and right two sides of the mattess, former material material shed adds Builder's temporary shed and finished product stacking canopy are parallel to each other with two gutters, and gutter is between Prefabricated Concrete block and former material material shed.
It is located on mattess preferably, being equipped in the former material material shed for storing the material stock of raw material of reinforcement rebar Platform.
Preferably, the track is made of angle steel, idler wheel is made of V-type pulley.
The utility model has the following beneficial effects:
1. the utility model can use lifting equipment handling raw material of reinforcement rebar, additionally it is possible to use lifting equipment handling reinforcing bar Finished product does not need manual handling raw material of reinforcement rebar and reinforcing bar finished product, can save a large amount of time and artificial.Former material material shed adds What builder's temporary shed and finished product stacking canopy can be independent of each other slides back and forth in orbit, and former material material shed, machining shed and finished product stack canopy very It can extremely overlap, have that span adjusting range is big, effective headroom utilization rate is high in the case where meeting requirement Advantage both can store raw material of reinforcement rebar, moreover it is possible to carry out steel bar meter and stack reinforcing bar finished product.
2. it includes canopy body skeleton and covering plate, covering plate that the utility model former material material shed, machining shed and finished product, which stack canopy, It is connect with canopy body skeleton by self-tapping screw;Canopy body skeleton includes column and truss, the angled piece at truss both ends and the upper end of the column Fixation is bolted;Therefore, it is removably that installation is torn open that former material material shed, machining shed and finished product, which stack each junction of canopy, It unloads that process is more convenient, can be torn open after the steel bar meter in a building site is complete and transport to next building site recycling.
3. being evenly equipped with the purlin that several and truss is connected by self-tapping screw, canopy body bone above the utility model canopy body skeleton Frame or so two sides is evenly distributed with the reinforcing rod that several and column is connected by self-tapping screw, enough effectively improves the entirety of the reinforcing steel processing shed Intensity.
4. the utility model former material material shed, machining shed and finished product, which are stacked, is equipped with hanging ring screw on the upside of canopy or so two sides, The earth anchor paid upwards is equipped on the outside of the left and right two sides of mattess in inbuilt Prefabricated Concrete block, hanging ring screw passes through stainless steel Turnbuckle and cable wind rope are connect with earth anchor, and the reinforcing steel processing shed is enable to bear biggish wind and snow load.
5. be equipped with gutter on the outside of the left and right two sides of the utility model mattess, can be effectively reduced former material material shed, Machining shed and finished product stack the risk that the place below canopy is flooded.
6. the material stock platform being located on mattess is equipped in the utility model former material material shed, convenient for stacking reinforcing bar former material Material.
7. the utility model track is made of angle steel, idler wheel is made of V-type pulley, and such track is not easy to be blocked up by foreign matter Plug enables former material material shed, machining shed and finished product to stack canopy and smoothly slidably reciprocates.
Detailed description of the invention
Fig. 1 is the structural schematic diagram one of new reinforcing steel bar machining shed;
Fig. 2 is the structural schematic diagram two of new reinforcing steel bar machining shed;
Fig. 3 is the partial enlarged view in the portion A of new reinforcing steel bar machining shed;
Fig. 4 is the partial enlarged view in the portion B of new reinforcing steel bar machining shed;
Fig. 5 is the partial enlarged view in the portion C of new reinforcing steel bar machining shed;
Fig. 6 is the partial enlarged view in the portion D of new reinforcing steel bar machining shed.
Wherein: 1, finished product stacks canopy;2, reinforcing steel processing shed;3, former material material shed;4, purlin;5, truss;6, reinforcing rod;7, it stands Column;8, track;9, canopy body skeleton;10, covering plate;11, cable wind rope;12, gutter;13, earth anchor;14, Prefabricated Concrete block;15, no Become rusty steel turnbuckle;16, hanging ring screw;17, idler wheel;18, bolt;19, angled piece;20, mattess.
Specific embodiment
It is specific below in conjunction with the utility model to keep the purpose of this utility model, technical solution and advantage clearer Technical solutions of the utility model are clearly and completely described in embodiment and corresponding attached drawing.
With reference to Fig. 1-6, the present embodiment provides a kind of new reinforcing steel bar machining sheds, including the former material for storing raw material of reinforcement rebar Material shed 3, the finished product for raw material of reinforcement rebar to be processed as to the machining shed 2 of reinforcing bar finished product, and for stacking reinforcing bar finished product are stacked Canopy 1, successively arrangement is connected on mattess 20 for former material material shed 3, machining shed 2 and finished product stacking canopy 1;The mattess 20 are equipped with a plurality of track 8 parallel to each other, and former material material shed 3, machining shed 2 and finished product, which are stacked 1 left and right sides of canopy and be equipped with below, to be made Its idler wheel 17 that can move back and forth on track 8, the inner face size of former material material shed 3 are greater than the outside size that finished product stacks canopy 1, The inner face size that finished product stacks canopy 1 is greater than the outside size of machining shed 2.
It includes canopy body skeleton 9 and covering plate 10, covering plate 10 that the former material material shed 3, machining shed 2 and finished product, which stack canopy 1, Cover that canopy body skeleton 9 is left and right and above, and covering plate 10 is connect with canopy body skeleton 9 by self-tapping screw.
9 left and right sides of canopy body skeleton is evenly equipped with four columns being vertically fixed on mattess 20 7, canopy respectively Body skeleton 9 is uniformly distributed above, and there are four the truss 5 vertical with its axis, and the front and rear sides of 7 upper end of 5 both ends of truss and column are equipped with Angled piece 19, the angled piece 19 on truss 5 and column 7 are flushed and are connected and fixed by bolt 18.
The canopy body skeleton 9 is evenly equipped with several purlins 4 parallel with its axis above, and purlin 4 and truss 5 pass through self tapping spiral shell Silk connection.
9 or so the two sides of canopy body skeleton is evenly distributed with several reinforcing rods 6 parallel with its axis, and reinforcing rod 6 passes through with column 7 Self-tapping screw connection.
The former material material shed 3, machining shed 2 and finished product, which are stacked to be equipped on the upside of 1 or so two sides of canopy, is fixed on 7 upper end of column Hanging ring screw 16, be embedded with several Prefabricated Concrete blocks 14 on the outside of the left and right two sides of mattess 20, set in Prefabricated Concrete block 14 There is the earth anchor 13 paid upwards, stainless steel turnbuckle 15, stainless steel turnbuckle 15 and hanging ring screw have been hung on earth anchor 13 16 are connected by cable wind rope 11.
Gutter 12 parallel to each other, former material material shed 3, machining shed are equipped on the outside of the left and right two sides of the mattess 20 2 and finished product stack canopy 1 it is parallel to each other with two gutters 12, gutter 12 is between Prefabricated Concrete block 14 and former material material shed 3.
It is equipped with and is located on mattess 20 for storing the material stock platform of raw material of reinforcement rebar in the former material material shed 3.
The track 8 is made of angle steel, and idler wheel 17 is made of V-type pulley.
In implementation process, the inner face size of former material material shed 3 is greater than the outside size that finished product stacks canopy 1, and finished product stacks canopy 1 Inner face size be greater than the outside size of machining shed 2, so that former material material shed 3, machining shed 2 and finished product is stacked canopy 1 and be independent of each other Slided back and forth on track 8.Raw material of reinforcement rebar mobile raw material canopy 3 after marching into the arena, exposes the stacking field below former material material shed 3 Ground is entered using lifting equipment handling raw material of reinforcement rebar and stacks place, former material material shed 3 is then moved back to original position.Processing staff exists Raw material of reinforcement rebar is taken in former material material shed 3, raw material of reinforcement rebar is processed as reinforcing bar below with steel bar processing machinery in machining shed 2 Then reinforcing bar finished product is deposited in finished product and stacked in canopy 1 by finished product.When reinforcing bar finished product storage below finished product stacking canopy 1 is enough, move Dynamic finished product stacks the reinforcing bar finished product of the exposing of canopy 1 below, using lifting equipment handling reinforcing bar finished product and is transported to erecting bed peace Dress.When needing that the mechanical equipment in machining shed 2 is installed or removed, mobile machining shed 2 directlys adopt lifting equipment handling Steel bar processing machinery is installed or is removed.Therefore, the utility model can use lifting equipment handling raw material of reinforcement rebar, also Lifting equipment handling reinforcing bar finished product can be used, manual handling raw material of reinforcement rebar and reinforcing bar finished product are not needed, can be saved a large amount of Time and artificial.What former material material shed 3, machining shed 2 and finished product stacking canopy 1 can be independent of each other slides back and forth on track 8, former Material shed 3, machining shed 2 and finished product, which stack canopy 1, can even overlap, and have span in the case where meeting requirement The advantage that adjusting range is big, effective headroom utilization rate is high, both can store raw material of reinforcement rebar, moreover it is possible to carry out steel bar meter and heap Put reinforcing bar finished product.
It includes canopy body skeleton 9 and covering plate 10 that former material material shed 3, machining shed 2 and finished product, which stack canopy 1, covering plate 10 and canopy Body skeleton 9 is connected by self-tapping screw;Canopy body skeleton 9 includes column 7 and truss 5, the right angle of 7 upper end of 5 both ends of truss and column Part 19 is connected and fixed by bolt 18;Therefore, it is detachable that former material material shed 3, machining shed 2 and finished product, which stack each junction of canopy 1, , installing and dismounting process is more convenient, can tear open after the steel bar meter in a building site is complete and transport to next building site recycling.
Canopy body skeleton 9 is evenly equipped with several purlins 4 connecting with truss 5 by self-tapping screw, canopy body skeleton 9 or so two above Face is evenly distributed with several reinforcing rods 6 connecting with column 7 by self-tapping screw, enough effectively improves the integral strength of the reinforcing steel processing shed.
Former material material shed 3, machining shed 2 and finished product, which are stacked, is equipped with hanging ring screw 16, concrete ground on the upside of 1 or so two sides of canopy The earth anchor 13 paid upwards is equipped on the outside of the left and right two sides in face 20 in inbuilt Prefabricated Concrete block 14, hanging ring screw 16 passes through stainless steel Turnbuckle 15 and cable wind rope 11 are connect with earth anchor 13, and the reinforcing steel processing shed is enable to bear biggish wind and snow load.
It is equipped with gutter 12 on the outside of the left and right two sides of mattess 20, can be effectively reduced former material material shed 3, machining shed 2 The risk that the place below canopy 1 is flooded is stacked with finished product.
The material stock platform being located on mattess 20 is equipped in former material material shed 3, convenient for stacking raw material of reinforcement rebar.
Track 8 is made of angle steel, and idler wheel 17 is made of V-type pulley, and such track 8 is not easy to make original by foreign matters from being blocked Material shed 3, machining shed 2 and finished product, which stack canopy 1, smoothly to slidably reciprocate.
Above embodiment is used to illustrate the utility model, rather than limits the utility model, in this reality With in novel spirit and scope of protection of the claims, to any modifications and changes that the utility model is made, this is both fallen within The protection scope of utility model.

Claims (9)

1. a kind of new reinforcing steel bar machining shed, it is characterised in that: including the former material material shed (3) for storing raw material of reinforcement rebar, be used for Raw material of reinforcement rebar is processed as to the machining shed (2) of reinforcing bar finished product, and the finished product for stacking reinforcing bar finished product stacks canopy (1), it is former Material shed (3), machining shed (2) and finished product stack canopy (1), and successively arrangement is connected on mattess (20);The concrete ground Face (20) is equipped with a plurality of track (8) parallel to each other, and former material material shed (3), machining shed (2) and finished product are stacked at left and right sides of canopy (1) It is equipped with the idler wheel (17) that can move back and forth on track (8) below, the inner face size of former material material shed (3) is greater than finished product The outside size of canopy (1) is stacked, the inner face size that finished product stacks canopy (1) is greater than the outside size of machining shed (2).
2. new reinforcing steel bar machining shed according to claim 1, it is characterised in that: the former material material shed (3), machining shed (2) With finished product stack canopy (1) include canopy body skeleton (9) and covering plate (10), covering plate (10) cover canopy body skeleton (9) it is left and right with Above, covering plate (10) is connect with canopy body skeleton (9) by self-tapping screw.
3. new reinforcing steel bar machining shed according to claim 2, it is characterised in that: divide at left and right sides of the canopy body skeleton (9) Be not evenly equipped with four columns (7) being vertically fixed on mattess (20), canopy body skeleton (9) above it is uniformly distributed there are four and its The front and rear sides of the vertical truss of axis (5), truss (5) both ends and column (7) upper end are equipped with angled piece (19), truss (5) It flushes with the angled piece (19) on column (7) and is connected and fixed by bolt (18).
4. new reinforcing steel bar machining shed according to claim 3, it is characterised in that: the canopy body skeleton (9) is evenly equipped with above Several purlins (4) parallel with its axis, purlin (4) are connect with truss (5) by self-tapping screw.
5. new reinforcing steel bar machining shed according to claim 4, it is characterised in that: canopy body skeleton (9) the left and right two sides is equal Several reinforcing rods (6) parallel with its axis of cloth, reinforcing rod (6) are connect with column (7) by self-tapping screw.
6. new reinforcing steel bar machining shed according to claim 5, it is characterised in that: the former material material shed (3), machining shed (2) It is stacked with finished product and is equipped with the hanging ring screw (16) for being fixed on column (7) upper end, mattess on the upside of canopy (1) left and right two sides (20) it is embedded with several Prefabricated Concrete blocks (14) on the outside of left and right two sides, is equipped with the earth anchor paid upwards in Prefabricated Concrete block (14) (13), it has been hung stainless steel turnbuckle (15) on earth anchor (13), stainless steel turnbuckle (15) and hanging ring screw (16) pass through Cable wind rope (11) connection.
7. new reinforcing steel bar machining shed according to claim 1-6, it is characterised in that: the mattess (20) Left and right two sides on the outside of be equipped with gutter (12) parallel to each other, former material material shed (3), machining shed (2) and finished product stack canopy (1) Parallel to each other with two gutters (12), gutter (12) are located between Prefabricated Concrete block (14) and former material material shed (3).
8. new reinforcing steel bar machining shed according to claim 7, it is characterised in that: be equipped with and be located in the former material material shed (3) For storing the material stock platform of raw material of reinforcement rebar on mattess (20).
9. new reinforcing steel bar machining shed according to claim 7, it is characterised in that: the track (8) is made of angle steel, rolling Wheel (17) is made of V-type pulley.
CN201820661025.XU 2018-05-05 2018-05-05 A kind of new reinforcing steel bar machining shed Active CN208267438U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820661025.XU CN208267438U (en) 2018-05-05 2018-05-05 A kind of new reinforcing steel bar machining shed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820661025.XU CN208267438U (en) 2018-05-05 2018-05-05 A kind of new reinforcing steel bar machining shed

Publications (1)

Publication Number Publication Date
CN208267438U true CN208267438U (en) 2018-12-21

Family

ID=64682075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820661025.XU Active CN208267438U (en) 2018-05-05 2018-05-05 A kind of new reinforcing steel bar machining shed

Country Status (1)

Country Link
CN (1) CN208267438U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005229A (en) * 2019-05-08 2019-07-12 五冶集团上海有限公司 A kind of construction site movable type machining shed
CN110499937A (en) * 2019-09-17 2019-11-26 中国水利水电第四工程局有限公司 A kind of packaged type steel bar meter booth structure
CN110778153A (en) * 2019-10-29 2020-02-11 武汉一冶建筑安装工程有限责任公司 Construction site material processing shed

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005229A (en) * 2019-05-08 2019-07-12 五冶集团上海有限公司 A kind of construction site movable type machining shed
CN110499937A (en) * 2019-09-17 2019-11-26 中国水利水电第四工程局有限公司 A kind of packaged type steel bar meter booth structure
CN110778153A (en) * 2019-10-29 2020-02-11 武汉一冶建筑安装工程有限责任公司 Construction site material processing shed

Similar Documents

Publication Publication Date Title
CN208267438U (en) A kind of new reinforcing steel bar machining shed
CN101832049B (en) Concrete-structured conjoined cylindrical shell construction device and method therefor
CN202416184U (en) Construction device for formwork for longitudinal wet joint of box girder
CN106088337A (en) Large cantilever steel frame structure with pull rod and construction method thereof
CN207030727U (en) A kind of hanging device
CN101775896B (en) Rigid suspended scaffold for installing pipeline of steel roof equipment
CN203441073U (en) Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column
CN106801511A (en) A kind of super large reserved opening hanging mould structure and its construction method
CN206942245U (en) Prefabricated case beam tie with reinforcing bar construction frame
CN206530050U (en) A kind of super large reserved opening hanging mould structure
CN105781142B (en) The ruggedized construction and reinforcement means of post are taken out for building structure top layer
CN206289945U (en) A kind of assembled Portable safety crosshead
CN108222062A (en) A kind of underground pipe gallery framework of steel reinforcement temporary fixing rack and longitude and latitude binding method
CN205907812U (en) large cantilever steel frame structure with pull rod
CN205840337U (en) A kind of complete bolted reinforcing steel processing shed
CN104790299B (en) Internal-span unsupported convenient construction support and method for bridge cast-in-place box beam
CN111535628B (en) Construction method for upper structure of C-shaped stock ground
CN112854757A (en) Construction method for integrally towing conical truss support by slip form of large silo
CN209603589U (en) A kind of no column prefabricated case beam rain and sun canopy
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN209308433U (en) A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation
CN214575745U (en) A template support system that is used for rubbish pond full cast in situ concrete side wall
CN202559727U (en) Load-bearing support structure of template of overhead long-span floor slab of building
CN205823298U (en) Existing operation tunnel defect processing template fixed structure
CN213572931U (en) Hydraulic climbing operation platform for chimney construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant