CN208950314U - A kind of falsework device for quickly disassembling - Google Patents

A kind of falsework device for quickly disassembling Download PDF

Info

Publication number
CN208950314U
CN208950314U CN201821671515.4U CN201821671515U CN208950314U CN 208950314 U CN208950314 U CN 208950314U CN 201821671515 U CN201821671515 U CN 201821671515U CN 208950314 U CN208950314 U CN 208950314U
Authority
CN
China
Prior art keywords
support frame
upper support
bracket
main body
falsework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821671515.4U
Other languages
Chinese (zh)
Inventor
于明
万中正
周猛勇
杨植
安旭东
解旭
高俊
王安明
尹康
王雨
李�瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of CTCE Group
Original Assignee
Third Construction Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of CTCE Group filed Critical Third Construction Co Ltd of CTCE Group
Priority to CN201821671515.4U priority Critical patent/CN208950314U/en
Application granted granted Critical
Publication of CN208950314U publication Critical patent/CN208950314U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a kind of falsework device for quickly disassembling, including upper support frame, U-shaped support and lift bracket, the upper support frame is co-axially mounted together by lower nut and lower bracing frame, the upper support frame coaxial threaded connects adjusting nut, the lift bracket that can be moved up and down is installed on upper support frame at the top of the adjusting nut, U-shaped support is fixedly mounted at the top of the upper support frame, the lift bracket in the bracket main body and bottom plate of the U-shaped structure to stand upside down by constituting, the bottom plate is packed in the bottom of bracket main body, and the bracket main body is trapezium structure.The present apparatus is applied in template Fast-dismantle system, under the premise of ensuring building floor safety, makes full use of the early strength of concrete, the construction method that segment template is removed in advance.The utility model can accelerate material turnover, reduce investment, reduce cost, accelerate construction progress, shorten the construction period, and realize that the quick turnover of the turnovers material such as falsework utilizes, have significant economic benefit and good social benefit.

Description

A kind of falsework device for quickly disassembling
Technical field
The utility model belongs to the realm of building construction, is related to a kind of falsework device for quickly disassembling, especially apply greatly across Casting top slab falsework demolishing process.
Background technique
During the full hall disk of tradition buckles support frame erection construction, usually strength of mould stripping is fully achieved in concrete and carry out again Falsework is removed.It is provided according to " concrete structure engineering construction quality accident specification " GB 50204-2015, is existed for span The concrete board constructions of 2~8m, design strength reach 75%, that is, after pouring completion 7 days.
Above-mentioned traditional construction period is too long, and the quick turnover that cannot achieve turnover material utilizes, and economic benefit is low.
To sum up, it is badly in need of developing a falsework device for quickly disassembling.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, a kind of shortening construction period is provided, improves construction The falsework device for quickly disassembling of template turnover utilization rate.
The embodiment of the utility model is achieved in that
A kind of falsework device for quickly disassembling, including upper support frame, U-shaped support and lift bracket, the upper support frame pass through Lower nut and lower bracing frame are co-axially mounted together, which connects adjusting nut, adjusting nut top Upper support frame on install the lift bracket that can be moved up and down, U-shaped support is fixedly mounted at the top of the upper support frame.
Moreover, the lift bracket in the bracket main body and bottom plate of the U-shaped structure to stand upside down by constituting, which is packed in support The bottom of frame body, the bracket main body are trapezium structure.
The advantages and positive effects of the utility model are as follows:
1, the present apparatus is made of upper support frame, U-shaped support and lift bracket, and structure is simple, easy to operate, it is easy to accomplish.
2, by constituting in the bracket main body and bottom plate of the U-shaped structure to stand upside down, which is fixedly mounted with the lift bracket in the present apparatus In the bottom of bracket main body, the bracket main body is trapezium structure.The lift bracket is hollow structure, and body is smaller, light-weight, tears open Dress and convenient transportation.
3, the present apparatus is applied in template Fast-dismantle system, under the premise of ensuring building floor safety, makes full use of coagulation The early strength of soil tears segment template open when concrete strength reaches the 50% of design strength (after pouring completion 3 days) in advance The construction method removed saves about 4 days than conventional construction method (demoulding again after concreting 7 days).
4, the utility model can accelerate material turnover, reduce investment, reduce cost, improve work efficiency, accelerate construction progress, and contract Casual labourer's phase realizes that the quick turnover of the turnovers material such as falsework utilizes;And installation is easy to operate, convenient, construction efficiency of constructing High, construction speed improves, and has significant economic benefit and good social benefit.
Detailed description of the invention
Fig. 1 is the main view of the utility model;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is that the utility model sets up complete schematic diagram;
Fig. 4 is the utility model falsework demolishing process schematic diagram;
Fig. 5 is schematic diagram after the utility model falsework is removed.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing and by specific embodiment.
A kind of falsework device for quickly disassembling, as shown in Figure 1 and Figure 2, including upper support frame 2, U-shaped support 1 and lift bracket 3, The upper support frame is co-axially mounted together by lower nut 5 and lower bracing frame 6, and upper support frame coaxial threaded connection adjusts spiral shell Mother 4 installs the lift bracket that can be moved up and down on the upper support frame at the top of the adjusting nut, is fixedly mounted with U at the top of the upper support frame Type support.The utility model is by increasing early-dismantling device on the basis of the lower bracing frame of conventional disc button, including " lifting is held in the palm Frame ", " adjusting nut " and " U-shaped support ", are mounted on vertical supporting, can fall keel and template, realize early-dismantling.
In the present embodiment, the structure of the lift bracket is as shown in Figure 1 and Figure 2, by the bracket master in the U-shaped structure to stand upside down Body 3A and bottom plate 3B is constituted, which is packed in the bottom of bracket main body, and the bracket main body is trapezium structure.The lift bracket Structure it is simple, body is smaller, light-weight, dismounting and convenient transportation.
The application method of the utility model is as follows:
(1) step 1: as shown in figure 3, strength of mould stripping judges that in-situ reinforced concrete slab first time strength of mould stripping is by same The condition curing test block intensity that presses determines that the intensity of test block is not lower than 10Mpa when demoulding.The wherein lumps of wood 7 in U-shaped support, top The lumps of wood 8, aluminium beam 9 between support.
(2) step 2: as shown in figure 4, being made after proof strength reaches first time strength of mould stripping by rotating adjusting nut The lumps of wood on bracket, girder and girder integrally falls.
(3) step 3: the completion as shown in figure 5, template Fast-dismantle system falls, template is torn open between the progress lumps of wood, aluminium beam and jacking It removes, retains the lumps of wood and its cope plate on jacking and continue to support stress.Disturbance is forbidden to retain the support system of part in demolishing process.
The utility model is provided according to " concrete structure engineering construction quality accident specification " GB50204-2015, is summarized big Early-dismantling engineering practice is measured, is analyzed by the calculating of early-dismantling, vertical supporting, longitudinal pitch are defined as can within 2m Guarantee construction safety and construction quality.
It is emphasized that embodiment described in the utility model be it is illustrative, without being restrictive, therefore this reality It is all practical new according to this by those skilled in the art with novel including being not limited to embodiment described in specific embodiment The other embodiments that the technical solution of type obtains also belong to the range of the utility model protection.

Claims (2)

1. a kind of falsework device for quickly disassembling, it is characterised in that: including upper support frame, U-shaped support and lift bracket, the upper branch Support is co-axially mounted together by lower nut and lower bracing frame, which connects adjusting nut, the adjusting The lift bracket that can be moved up and down is installed on the upper support frame of nut top, and U-shaped support is fixedly mounted at the top of the upper support frame.
2. falsework device for quickly disassembling according to claim 1, it is characterised in that: the lift bracket is by the U to stand upside down The bracket main body and bottom plate of type structure are constituted, which is packed in the bottom of bracket main body, and the bracket main body is trapezium structure.
CN201821671515.4U 2018-10-16 2018-10-16 A kind of falsework device for quickly disassembling Expired - Fee Related CN208950314U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821671515.4U CN208950314U (en) 2018-10-16 2018-10-16 A kind of falsework device for quickly disassembling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821671515.4U CN208950314U (en) 2018-10-16 2018-10-16 A kind of falsework device for quickly disassembling

Publications (1)

Publication Number Publication Date
CN208950314U true CN208950314U (en) 2019-06-07

Family

ID=66741662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821671515.4U Expired - Fee Related CN208950314U (en) 2018-10-16 2018-10-16 A kind of falsework device for quickly disassembling

Country Status (1)

Country Link
CN (1) CN208950314U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114150860A (en) * 2021-12-23 2022-03-08 安徽劲达科技工程有限公司 Cast-in-situ concrete slab fast-assembling early-dismantling formwork system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114150860A (en) * 2021-12-23 2022-03-08 安徽劲达科技工程有限公司 Cast-in-situ concrete slab fast-assembling early-dismantling formwork system

Similar Documents

Publication Publication Date Title
CN104763446B (en) The multi-functional chassis of metro station construction
CN102936962A (en) Construction method of slanting cantilever steel structure supported by temporary steel frame
CN103114681A (en) To-be-poured structure and construction method of high-altitude large-span reinforced concrete beam
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN107044090B (en) A kind of construction method of dual deck bridge
CN105220619B (en) A kind of method of quick manufacture two-wire nose circle solid pier
CN105464216B (en) Construction method based on integral lifting formwork-strengthening system superelevation super-section batter post
CN106592965A (en) Quick support system of high-rise steel structure house composite floor slab
CN106193588B (en) A kind of method pouring building post-cast strip and pour mould
CN109267487A (en) A kind of long big section bent cap bracket system of overhanging
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN103276894A (en) Support system of large-cross-section girder transfer floor of hollow floor system and construction technology
CN208950314U (en) A kind of falsework device for quickly disassembling
CN205976472U (en) Pour mould of building post -cast strip
CN113339055B (en) Filling body pouring and curing device and using method thereof
CN110043035A (en) A kind of novel post empiricism method for supporting
CN207244961U (en) A kind of Prefabricated stacking floor with side flanging for being used to drop plate region
CN205296829U (en) Superelevation super large cross -section batter post integrally lift up formula template reinforcerment system
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage
CN107938907A (en) A kind of inclined roof exempts from formwork construction method
CN203924652U (en) The operation platform of periphery shear wall between a kind of precast stair
CN207244957U (en) A kind of modularization Prefabricated stacking floor for being used to drop plate region
CN202007527U (en) Cast-in-place steel reinforcing bar concrete column template fixing device
CN205532627U (en) Highway tunnel cable duct formworking jumbo
CN207988487U (en) The constructing device of diameter Silo conical shell

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190607

Termination date: 20191016