CN208950314U - A kind of falsework device for quickly disassembling - Google Patents
A kind of falsework device for quickly disassembling Download PDFInfo
- Publication number
- CN208950314U CN208950314U CN201821671515.4U CN201821671515U CN208950314U CN 208950314 U CN208950314 U CN 208950314U CN 201821671515 U CN201821671515 U CN 201821671515U CN 208950314 U CN208950314 U CN 208950314U
- Authority
- CN
- China
- Prior art keywords
- support frame
- upper support
- bracket
- main body
- falsework
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to a kind of falsework device for quickly disassembling, including upper support frame, U-shaped support and lift bracket, the upper support frame is co-axially mounted together by lower nut and lower bracing frame, the upper support frame coaxial threaded connects adjusting nut, the lift bracket that can be moved up and down is installed on upper support frame at the top of the adjusting nut, U-shaped support is fixedly mounted at the top of the upper support frame, the lift bracket in the bracket main body and bottom plate of the U-shaped structure to stand upside down by constituting, the bottom plate is packed in the bottom of bracket main body, and the bracket main body is trapezium structure.The present apparatus is applied in template Fast-dismantle system, under the premise of ensuring building floor safety, makes full use of the early strength of concrete, the construction method that segment template is removed in advance.The utility model can accelerate material turnover, reduce investment, reduce cost, accelerate construction progress, shorten the construction period, and realize that the quick turnover of the turnovers material such as falsework utilizes, have significant economic benefit and good social benefit.
Description
Technical field
The utility model belongs to the realm of building construction, is related to a kind of falsework device for quickly disassembling, especially apply greatly across
Casting top slab falsework demolishing process.
Background technique
During the full hall disk of tradition buckles support frame erection construction, usually strength of mould stripping is fully achieved in concrete and carry out again
Falsework is removed.It is provided according to " concrete structure engineering construction quality accident specification " GB 50204-2015, is existed for span
The concrete board constructions of 2~8m, design strength reach 75%, that is, after pouring completion 7 days.
Above-mentioned traditional construction period is too long, and the quick turnover that cannot achieve turnover material utilizes, and economic benefit is low.
To sum up, it is badly in need of developing a falsework device for quickly disassembling.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, a kind of shortening construction period is provided, improves construction
The falsework device for quickly disassembling of template turnover utilization rate.
The embodiment of the utility model is achieved in that
A kind of falsework device for quickly disassembling, including upper support frame, U-shaped support and lift bracket, the upper support frame pass through
Lower nut and lower bracing frame are co-axially mounted together, which connects adjusting nut, adjusting nut top
Upper support frame on install the lift bracket that can be moved up and down, U-shaped support is fixedly mounted at the top of the upper support frame.
Moreover, the lift bracket in the bracket main body and bottom plate of the U-shaped structure to stand upside down by constituting, which is packed in support
The bottom of frame body, the bracket main body are trapezium structure.
The advantages and positive effects of the utility model are as follows:
1, the present apparatus is made of upper support frame, U-shaped support and lift bracket, and structure is simple, easy to operate, it is easy to accomplish.
2, by constituting in the bracket main body and bottom plate of the U-shaped structure to stand upside down, which is fixedly mounted with the lift bracket in the present apparatus
In the bottom of bracket main body, the bracket main body is trapezium structure.The lift bracket is hollow structure, and body is smaller, light-weight, tears open
Dress and convenient transportation.
3, the present apparatus is applied in template Fast-dismantle system, under the premise of ensuring building floor safety, makes full use of coagulation
The early strength of soil tears segment template open when concrete strength reaches the 50% of design strength (after pouring completion 3 days) in advance
The construction method removed saves about 4 days than conventional construction method (demoulding again after concreting 7 days).
4, the utility model can accelerate material turnover, reduce investment, reduce cost, improve work efficiency, accelerate construction progress, and contract
Casual labourer's phase realizes that the quick turnover of the turnovers material such as falsework utilizes;And installation is easy to operate, convenient, construction efficiency of constructing
High, construction speed improves, and has significant economic benefit and good social benefit.
Detailed description of the invention
Fig. 1 is the main view of the utility model;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is that the utility model sets up complete schematic diagram;
Fig. 4 is the utility model falsework demolishing process schematic diagram;
Fig. 5 is schematic diagram after the utility model falsework is removed.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing and by specific embodiment.
A kind of falsework device for quickly disassembling, as shown in Figure 1 and Figure 2, including upper support frame 2, U-shaped support 1 and lift bracket 3,
The upper support frame is co-axially mounted together by lower nut 5 and lower bracing frame 6, and upper support frame coaxial threaded connection adjusts spiral shell
Mother 4 installs the lift bracket that can be moved up and down on the upper support frame at the top of the adjusting nut, is fixedly mounted with U at the top of the upper support frame
Type support.The utility model is by increasing early-dismantling device on the basis of the lower bracing frame of conventional disc button, including " lifting is held in the palm
Frame ", " adjusting nut " and " U-shaped support ", are mounted on vertical supporting, can fall keel and template, realize early-dismantling.
In the present embodiment, the structure of the lift bracket is as shown in Figure 1 and Figure 2, by the bracket master in the U-shaped structure to stand upside down
Body 3A and bottom plate 3B is constituted, which is packed in the bottom of bracket main body, and the bracket main body is trapezium structure.The lift bracket
Structure it is simple, body is smaller, light-weight, dismounting and convenient transportation.
The application method of the utility model is as follows:
(1) step 1: as shown in figure 3, strength of mould stripping judges that in-situ reinforced concrete slab first time strength of mould stripping is by same
The condition curing test block intensity that presses determines that the intensity of test block is not lower than 10Mpa when demoulding.The wherein lumps of wood 7 in U-shaped support, top
The lumps of wood 8, aluminium beam 9 between support.
(2) step 2: as shown in figure 4, being made after proof strength reaches first time strength of mould stripping by rotating adjusting nut
The lumps of wood on bracket, girder and girder integrally falls.
(3) step 3: the completion as shown in figure 5, template Fast-dismantle system falls, template is torn open between the progress lumps of wood, aluminium beam and jacking
It removes, retains the lumps of wood and its cope plate on jacking and continue to support stress.Disturbance is forbidden to retain the support system of part in demolishing process.
The utility model is provided according to " concrete structure engineering construction quality accident specification " GB50204-2015, is summarized big
Early-dismantling engineering practice is measured, is analyzed by the calculating of early-dismantling, vertical supporting, longitudinal pitch are defined as can within 2m
Guarantee construction safety and construction quality.
It is emphasized that embodiment described in the utility model be it is illustrative, without being restrictive, therefore this reality
It is all practical new according to this by those skilled in the art with novel including being not limited to embodiment described in specific embodiment
The other embodiments that the technical solution of type obtains also belong to the range of the utility model protection.
Claims (2)
1. a kind of falsework device for quickly disassembling, it is characterised in that: including upper support frame, U-shaped support and lift bracket, the upper branch
Support is co-axially mounted together by lower nut and lower bracing frame, which connects adjusting nut, the adjusting
The lift bracket that can be moved up and down is installed on the upper support frame of nut top, and U-shaped support is fixedly mounted at the top of the upper support frame.
2. falsework device for quickly disassembling according to claim 1, it is characterised in that: the lift bracket is by the U to stand upside down
The bracket main body and bottom plate of type structure are constituted, which is packed in the bottom of bracket main body, and the bracket main body is trapezium structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821671515.4U CN208950314U (en) | 2018-10-16 | 2018-10-16 | A kind of falsework device for quickly disassembling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821671515.4U CN208950314U (en) | 2018-10-16 | 2018-10-16 | A kind of falsework device for quickly disassembling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208950314U true CN208950314U (en) | 2019-06-07 |
Family
ID=66741662
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821671515.4U Expired - Fee Related CN208950314U (en) | 2018-10-16 | 2018-10-16 | A kind of falsework device for quickly disassembling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208950314U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114150860A (en) * | 2021-12-23 | 2022-03-08 | 安徽劲达科技工程有限公司 | Cast-in-situ concrete slab fast-assembling early-dismantling formwork system |
-
2018
- 2018-10-16 CN CN201821671515.4U patent/CN208950314U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114150860A (en) * | 2021-12-23 | 2022-03-08 | 安徽劲达科技工程有限公司 | Cast-in-situ concrete slab fast-assembling early-dismantling formwork system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104763446B (en) | The multi-functional chassis of metro station construction | |
CN102936962A (en) | Construction method of slanting cantilever steel structure supported by temporary steel frame | |
CN103114681A (en) | To-be-poured structure and construction method of high-altitude large-span reinforced concrete beam | |
CN105804395B (en) | Stair continuously poured in one molding construction method based on monoblock type typified form | |
CN107044090B (en) | A kind of construction method of dual deck bridge | |
CN105220619B (en) | A kind of method of quick manufacture two-wire nose circle solid pier | |
CN105464216B (en) | Construction method based on integral lifting formwork-strengthening system superelevation super-section batter post | |
CN106592965A (en) | Quick support system of high-rise steel structure house composite floor slab | |
CN106193588B (en) | A kind of method pouring building post-cast strip and pour mould | |
CN109267487A (en) | A kind of long big section bent cap bracket system of overhanging | |
CN103485574B (en) | A kind of granulation tower tower top structure of reinforced concrete method | |
CN103276894A (en) | Support system of large-cross-section girder transfer floor of hollow floor system and construction technology | |
CN208950314U (en) | A kind of falsework device for quickly disassembling | |
CN205976472U (en) | Pour mould of building post -cast strip | |
CN113339055B (en) | Filling body pouring and curing device and using method thereof | |
CN110043035A (en) | A kind of novel post empiricism method for supporting | |
CN207244961U (en) | A kind of Prefabricated stacking floor with side flanging for being used to drop plate region | |
CN205296829U (en) | Superelevation super large cross -section batter post integrally lift up formula template reinforcerment system | |
CN205617664U (en) | Prefabricated pier stud locating rack for steel reinforcement cage | |
CN107938907A (en) | A kind of inclined roof exempts from formwork construction method | |
CN203924652U (en) | The operation platform of periphery shear wall between a kind of precast stair | |
CN207244957U (en) | A kind of modularization Prefabricated stacking floor for being used to drop plate region | |
CN202007527U (en) | Cast-in-place steel reinforcing bar concrete column template fixing device | |
CN205532627U (en) | Highway tunnel cable duct formworking jumbo | |
CN207988487U (en) | The constructing device of diameter Silo conical shell |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190607 Termination date: 20191016 |