CN208943644U - Mud and water separating equipment for mud caused by shield machine digging operation - Google Patents

Mud and water separating equipment for mud caused by shield machine digging operation Download PDF

Info

Publication number
CN208943644U
CN208943644U CN201820937611.2U CN201820937611U CN208943644U CN 208943644 U CN208943644 U CN 208943644U CN 201820937611 U CN201820937611 U CN 201820937611U CN 208943644 U CN208943644 U CN 208943644U
Authority
CN
China
Prior art keywords
storage tank
slurry storage
slurry
mud
level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820937611.2U
Other languages
Chinese (zh)
Inventor
陈振军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kang Mingke Adams (beijing) Electromechanical Equipment Co Ltd
Original Assignee
Kang Mingke Adams (beijing) Electromechanical Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kang Mingke Adams (beijing) Electromechanical Equipment Co Ltd filed Critical Kang Mingke Adams (beijing) Electromechanical Equipment Co Ltd
Priority to CN201820937611.2U priority Critical patent/CN208943644U/en
Application granted granted Critical
Publication of CN208943644U publication Critical patent/CN208943644U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Treatment Of Sludge (AREA)

Abstract

The utility model proposes a kind of mud and water separating equipments for mud caused by shield machine digging operation, due to increasing sand washer washing process in level-one cyclone bottom, clay component is set to separate with sandstone material, the deficiency of existing Slurry treatment technique is overcome well, it specifically includes: first, the clay content of two-stage dewatering screen oversize sand material, water content substantially reduces, building sand building stones standard is reached, so that the dregs largely discarded originally is become qualified concrete material and obtains recycling and reusing, both economic benefit is created, resource is protected not to be wasted again;Second, reduce discarded dregs discharge amount, reduce transportation cost, save discarded dregs to appropriation of land, also effectively reduces transportational process and drop and stack bring environmental pollution;Third, due to falling into the material on vibration screen without clay mortar, sieve is not easy to be blocked, and improves screening efficiency, ensure that the safe and stable operation of construction production.

Description

Mud and water separating equipment for mud caused by shield machine digging operation
Technical field
The utility model relates to the mud and water separating equipments for mud caused by shield machine digging operation.
Background technique
In traditional Slurry treatment technique, as shown in Figure 1, from shield machine be discharged mud (containing ball clay, stone, Sand, clay etc.) enter the decompression of decompression cabinet 102 at first, pre- sub-sieve 101 is subsequently entered, oversize is the object that granularity is greater than 4mm Material is stacked into cinder field;Material of the granularity less than 4mm enters A slurry storage tank 1013 and B slurry storage tank in communication through sieve 1012, level-one cyclone 104 is pumped by 1# Pulp pump 1011, the overflow fine grained slurries of level-one cyclone 104 enter C storage slurry Slot 1010 carries out secondary separation or returns to the recycling of B slurry storage tank 1012 or enter sedimentation basin 109;The underflow of level-one cyclone 104 Coarse granule slurries inject level-one dehydration and vibration sieve 103, and oversize is the material of 2~4mm, stack into cinder field;Granularity is less than 2mm Material recycled through entering B slurry storage tank 1011 after sieve, or pass through the communicating pipe 105 of B slurry storage tank and C slurry storage tank Into C slurry storage tank 1010, second cyclone 107, the overflow fine grained slurries of second cyclone 107 are pumped by 2# Pulp pump 108 It is recycled into sedimentation basin 109 or return C slurry storage tank 1010, the bottom slurry of second cyclone 107 enters second level dehydration Vibrating screen 106, oversize are the material of 0.074~2mm, are stacked into cinder field;Through the fine particle of second level dewatering screen 106 Material enters C slurry storage tank 1010 and is recycled or be discharged into sedimentation basin 109.
Utility model content
One aspect according to the present utility model provides the muddy water point for mud caused by shield machine digging operation From equipment, characterized by comprising:
Interconnected the first slurry storage tank and the second slurry storage tank,
First Pulp pump and level-one cyclone, the second slurry storage tank are connected to level-one by the first Pulp pump of slurry channel and revolve Flow device;
Third slurry storage tank and sedimentation basin, level-one cyclone are connected to third slurry storage tank by overflow fine grained slurry channels;
Sand washer and level-one dehydration and vibration sieve, level-one cyclone are connected to sand washer by underflow coarse granule slurry channels, Sand washer is connected to the second slurry storage tank by clay mortar overflow ducts,
Level-one dehydration and vibration sieve;
Second slurry storage tank in the material downstream of the sieve of level-one dehydration and vibration sieve is set;
Second Pulp pump and second cyclone, third slurry storage tank is through material channel and by the second Pulp pump and second level eddy flow Device connection, second cyclone are connected to sedimentation basin and/or third slurry storage tank by overflow fine grained slurry channels;
Second level dehydration and vibration sieve, second cyclone are connected to second level dehydration and vibration by bottom slurry channel and sieve.
Detailed description of the invention
Fig. 1 is the schematic diagram of the Slurry treatment technique of the prior art.
Fig. 2 is the schematic diagram of the mud-water separation scheme of the shield machine mud of one embodiment according to the present utility model.
Fig. 3 is three slurry storage tanks in the mud-water separation scheme of the shield machine mud of one embodiment according to the present utility model The schematic diagram of interconnection.
Specific embodiment
The present inventor has found in engineering practice, in shield machine tunneling in the stratum containing husky, stone and clay, Containing a large amount of sticky mud components in its dregs discharged, carried out when using the process flow of prior art shown in FIG. 1 When dregs mud-water separation, since sand, stone, clay component coexist on the sieve of two-stage dewatering screen, in screenings, this will lead to following three A negative consequence, first, the concrete as civil engineering can not be recycled since the soil content in oversize sand material is exceeded Raw material cause the valuable sand material wasting of resources;Second, even if by being discharged as discarded dregs, also due to the shadow of clay Sound makes dregs be difficult to be dehydrated, and causes water content in dregs exceeded, is easy to drop when outlet is transported, pollutes road surface and surrounding Environment;Third, clay, which is easy blocking vibration, sieves sieve, being normally carried out for production is influenced.
In order to overcome the shortcomings of above-mentioned Slurry treatment technique, as a result of repeated studies by the present inventors, proposing a kind of novel The mud and water separating equipment of shield machine mud, wherein increase sand washer in level-one cyclone bottom.
As shown in Fig. 2, in the mud and water separating equipment of shield machine mud according to an embodiment of the invention, from shield The mud (wherein containing ball clay, stone, sand, clay etc.) of machine discharge initially enters the decompression of decompression cabinet 202, subsequently enters Pre- sub-sieve 201, oversize are the material that granularity is greater than 4mm, are admitted to cinder field stacking;Material of the granularity less than 4mm is through pre- point The sieve of sieve 201 sequentially enters A slurry storage tank 2014 and B slurry storage tank 2013 in communication, then is pumped into one by 1# Pulp pump 2012 Grade cyclone 205;The overflow fine grained slurries of level-one cyclone 205, which enter C slurry storage tank 2011, to carry out secondary separation or returns to B Slurry storage tank 2013 carries out recycling or entering sedimentation basin 2010;The underflow coarse granule slurries of level-one cyclone 205 enter sand washer 204, after sand washer 204 plus water sufficiently wash, the clay mortar being washed out overflows to B slurry storage tank 2013 and enters next follow Ring, sandstone material not argillaceous enters level-one dehydration and vibration sieve 203 after washed;Level-one dehydration and vibration sieve 203 oversize be The material of 2~4mm is admitted to cinder field stacking;Granularity is laggard through the sieve of level-one dehydration and vibration sieve 203 less than the material of 2mm Enter B slurry storage tank 2013;Material into B slurry storage tank 2013 is recycled, or passes through the communicating pipe of B slurry storage tank and C slurry storage tank 206 enter C slurry storage tank 2011, and are pumped into second cyclone 208 by 2# Pulp pump 209.The overflow fine grained of second cyclone 208 Slurries, which enter the discharge of sedimentation basin 2010 or return to C slurry storage tank 2011, to be recycled, and the bottom slurry of second cyclone 208 enters The oversize of second level dehydration and vibration sieve 207, second level dehydration and vibration sieve 207 is the material of 0.074~2mm, is admitted to cinder field heap It puts;Enter C slurry storage tank 2011 through the fine granular materials of second level dewatering screen 207 and recycled or be discharged into sedimentation basin 2010.
As shown in figure 3, in the configuration of the slurry storage tank of one embodiment according to the present utility model, A slurry storage tank 301 and B Slurry storage tank 303 is connected directly by gasket 302, and flexible gasket 302 is clipped among two slots to prevent slurries from seeping Leakage, B slurry storage tank 303 and C slurry storage tank 305 are connected by unicom pipeline 304, and three slurry storage tanks are commonly mounted on pedestal 306 On.
In one embodiment of the utility model, the slurry storage tank 2014,2013,2011 in Fig. 2 is respectively corresponded in Fig. 3 Slurry storage tank 301,303,305.
Other side according to the present utility model provides a kind of for mud caused by shield machine digging operation Mud-water separation method, characterized by comprising:
It is depressurized with mud of the decompression cabinet to pending mud-water separation,
The mud from decompression cabinet is sieved with pre- sub-sieve, the oversize of pre- sub-sieve is sent into cinder field and is stacked, is made The second slurry storage tank that the material of the sieve of pre- sub-sieve sequentially enters the first slurry storage tank and is connected to the first slurry storage tank is crossed,
Material is pumped into level-one cyclone from the second slurry storage tank using the first Pulp pump;
Make the overflow fine grained slurries of level-one cyclone enter third slurry storage tank to carry out secondary separation or return to the second storage slurry Slot carries out recycling or entering sedimentation basin;
Sand washer and level-one dehydration and vibration sieve,
The underflow coarse granule slurries of level-one cyclone are made to enter sand washer, it is viscous what is washed out after sand washer adds water washing Native mud overflow to the second slurry storage tank with enter subsequent cycle, make the sandstone material not argillaceous after sand washer adds water washing into Enter level-one dehydration and vibration sieve;
The oversize of level-one dehydration and vibration sieve is sent out;
The material of sieve through level-one dehydration and vibration sieve is sent into the second slurry storage tank;
The material in third slurry storage tank is set to be pumped into second cyclone by the second Pulp pump,
Make the overflow fine grained slurries of second cyclone enter sedimentation basin discharge or return to third slurry storage tank to be recycled,
The bottom slurry of second cyclone is set to enter second level dehydration and vibration sieve,
The oversize of second level dehydration and vibration sieve is discharged,
Fine granular materials through second level dewatering screen are sent into third slurry storage tank, it is heavy to be recycled and/or be discharged into Shallow lake pond.
The advantages of mud and water separating equipment and method of the shield machine mud according to the present utility model includes: due in level-one Cyclone bottom increases sand washer washing process, and a large amount of clay components is enable to separate with sandstone material, overcomes well existing There is the deficiency of Slurry treatment technique, specifically include:
First, clay content, the water content of two-stage dewatering screen oversize sand material substantially reduce, and have reached building sand building stones Standard makes the dregs largely discarded originally become qualified concrete material and obtains recycling and reusing, both created high Economic benefit, and national resources is protected not to be wasted;
Second, discarded dregs discharge amount is greatly reduced, transportation cost is not only reduced, but also saves discarded dregs to city Periphery appropriation of land also effectively reduces transportational process and drops and stack bring environmental pollution;
Third, due to falling into the material on vibration screen without clay mortar, sieve is not easy to be blocked, and improves screening effect Rate ensure that the safe and stable operation of construction production.

Claims (3)

1. the mud and water separating equipment for mud caused by shield machine digging operation, characterized by comprising:
Interconnected the first slurry storage tank (2014) and the second slurry storage tank (2013),
First Pulp pump (2012) and level-one cyclone (205), the second slurry storage tank (2013) pass through the first slurry of slurry channel Pump (2012) is connected to level-one cyclone (205);
Third slurry storage tank (2011) and sedimentation basin (2010), level-one cyclone (205) are connected by overflow fine grained slurry channels To third slurry storage tank (2011);
Sand washer (204) and level-one dehydration and vibration sieve (203), level-one cyclone (205) are connected by underflow coarse granule slurry channels It being connected to sand washer (204), sand washer (204) is connected to the second slurry storage tank (2013) by clay mortar overflow ducts,
Level-one dehydration and vibration sieves (203);
The second slurry storage tank (2013) in the material downstream of the sieve of level-one dehydration and vibration sieve (203) is set;
Second Pulp pump (209) and second cyclone (208), third slurry storage tank (2011) is through material channel and passes through the second slurry Pump (209) is connect with second cyclone (208), and second cyclone (208) is connected to precipitating by overflow fine grained slurry channels Pond (2010) and/or third slurry storage tank (2011);
Second level dehydration and vibration sieves (207), and second cyclone (208) is connected to second level dehydration and vibration by bottom slurry channel and sieves (207)。
2. mud and water separating equipment according to claim 1, it is characterised in that:
First slurry storage tank and the second slurry storage tank are connected directly by gasket (302), and flexible gasket (302) is clipped in the To prevent slurries from leaking among one slurry storage tank and the second slurry storage tank,
Second slurry storage tank is connected to third slurry storage tank by communicating pipe (206,304);
First slurry storage tank, the second slurry storage tank and third slurry storage tank are installed on common pedestal (306).
3. mud and water separating equipment according to claim 1, it is characterised in that further comprise:
The decompression cabinet (202) that the mud of input is depressurized,
To the pre- sub-sieve (201) that is sieved of mud from decompression cabinet (202),
Pre- sub-sieve (201) is arranged on the material upstream of the first slurry storage tank (2014), enters through the material of the sieve of pre- sub-sieve First slurry storage tank.
CN201820937611.2U 2018-06-16 2018-06-16 Mud and water separating equipment for mud caused by shield machine digging operation Active CN208943644U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820937611.2U CN208943644U (en) 2018-06-16 2018-06-16 Mud and water separating equipment for mud caused by shield machine digging operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820937611.2U CN208943644U (en) 2018-06-16 2018-06-16 Mud and water separating equipment for mud caused by shield machine digging operation

Publications (1)

Publication Number Publication Date
CN208943644U true CN208943644U (en) 2019-06-07

Family

ID=66731180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820937611.2U Active CN208943644U (en) 2018-06-16 2018-06-16 Mud and water separating equipment for mud caused by shield machine digging operation

Country Status (1)

Country Link
CN (1) CN208943644U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112794606A (en) * 2020-12-24 2021-05-14 山东大学 Muck treatment system and method for shield
CN113210120A (en) * 2021-04-15 2021-08-06 温州大学 Mud/sand resource separation device combined with resonance pretreatment and implementation method
CN114516690A (en) * 2022-02-24 2022-05-20 武汉地质勘察基础工程有限公司 Waste slurry treatment system and method
CN114737899A (en) * 2022-02-22 2022-07-12 深圳市工勘岩土集团有限公司 Mud purification and separation structure
CN114961603A (en) * 2022-02-22 2022-08-30 深圳市工勘岩土集团有限公司 Assembled mud multistage slagging-off purifies circulating device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112794606A (en) * 2020-12-24 2021-05-14 山东大学 Muck treatment system and method for shield
CN113210120A (en) * 2021-04-15 2021-08-06 温州大学 Mud/sand resource separation device combined with resonance pretreatment and implementation method
CN114737899A (en) * 2022-02-22 2022-07-12 深圳市工勘岩土集团有限公司 Mud purification and separation structure
CN114961603A (en) * 2022-02-22 2022-08-30 深圳市工勘岩土集团有限公司 Assembled mud multistage slagging-off purifies circulating device
CN114516690A (en) * 2022-02-24 2022-05-20 武汉地质勘察基础工程有限公司 Waste slurry treatment system and method

Similar Documents

Publication Publication Date Title
CN208943644U (en) Mud and water separating equipment for mud caused by shield machine digging operation
CN108654205A (en) Mud and water separating equipment and method for mud caused by shield machine digging operation
CN110695064A (en) Shield muck zero-discharge treatment system and method
CN104858048B (en) The environmental friendly regenerated processing method of earth pressure balanced shield, EPBS dregs and equipment
CN102225834B (en) Sludge treatment method and device for urban drainage pipe network
CN110340112B (en) Method and system for comprehensively treating and ecologically utilizing soil pressure balance shield muck and resources
CN109516665B (en) Shield residue soil dehydration equipment and shield residue soil dehydration method
CN104724893A (en) Dredging and classified dewatering treatment method and system for sludge in urban river box culvert
CN210305011U (en) Shield constructs construction dregs processing system
CN203525901U (en) Slurry treatment device for slurry shield construction
CN203862376U (en) Gravel washing, recovering and dewatering all-in-one machine
CN206383298U (en) A kind of concrete grout water reclamation system
CN211100741U (en) Shield muck zero-emission treatment system
CN108160456A (en) A kind of High-efficient Water circulating sand screening plant
CN207971076U (en) A kind of High-efficient Water circulating sand screening plant
CN108993767B (en) Mud-water separation equipment
CN108480188A (en) A kind of building sandstone screening plant
CN111410337A (en) One-stop treatment system and method for foundation pit soil
CN209188998U (en) A kind of mud and water separating equipment
CN112780289B (en) Dual-mode shield muck treatment system
CN104069936A (en) Coal slime water treatment process of mine water coal
CN204365697U (en) Sand pebble layer shield driving dregs is separated emission-reducing system
CN208786676U (en) A kind of fine sand recycling dehydrating integrated machine
CN215784045U (en) Shield muck treatment device for efficient sand washing
CN101367630A (en) Sand-washing technique of slate flour