CN208934432U CN201821287225.XU CN201821287225U CN208934432U CN 208934432 U CN208934432 U CN 208934432U CN 201821287225 U CN201821287225 U CN 201821287225U CN 208934432 U CN208934432 U CN 208934432U
Authority
CN
China
Prior art keywords
reinforcing steel
presstressed reinforcing
anchorage system
support
tube chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821287225.XU
Other languages
Chinese (zh)
Inventor
栾文彬
周先财
龚斌文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU XINZHU PRESTRESSED ENGINEERING Co Ltd
Nanjing New Building Reinforcement Engineering Co Ltd
Jiangsu Xinzhu Tongchuang Civil Engineering Co Ltd
Original Assignee
JIANGSU XINZHU PRESTRESSED ENGINEERING Co Ltd
Nanjing New Building Reinforcement Engineering Co Ltd
Jiangsu Xinzhu Tongchuang Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU XINZHU PRESTRESSED ENGINEERING Co Ltd, Nanjing New Building Reinforcement Engineering Co Ltd, Jiangsu Xinzhu Tongchuang Civil Engineering Co Ltd filed Critical JIANGSU XINZHU PRESTRESSED ENGINEERING Co Ltd
Application granted granted Critical
Publication of CN208934432U publication Critical patent/CN208934432U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • E04C5/12Anchoring devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/22Containers for fluent solids, e.g. silos, bunkers; Supports therefor
    • E04H7/24Constructions, with or without perforated walls, depending on the use of specified materials
    • E04H7/26Constructions, with or without perforated walls, depending on the use of specified materials mainly of concrete, e.g. reinforced concrete or other stone-like materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Engineering & Computer Science (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model provides a kind of round concrete tube chamber structure without support prestressed reinforcement equipment, including presstressed reinforcing steel and anchorage system, presstressed reinforcing steel lateral circular is on silo side wall, and pass through anchorage system stretch-draw anchor, the presstressed reinforcing steel is soap-free emulsion polymeization epoxy coating strand presstressed reinforcing steel, and the anchorage system is totally-enclosed no support anchorage system.The utility model quick construction, low in cost, safety of structure, durability can be effectively ensured, and have biggish Social benefit and economic benefit.

Description

It is a kind of circle concrete tube chamber structure without support prestressed reinforcement equipment
Technical field
The utility model relates to round concrete silo structural strengthening fields more particularly to a kind of use presstressed reinforcing steel to carry out The equipment that concrete silo is reinforced.
Background technique
Round concrete tube chamber structure is widely used in grain, cement, electric power, metallurgy industry.Because of design, constructional deficiency
Or improper use often results in bulkhead and generates the Vertical Cracks for being difficult to be closed and influence its service life.Traditional reinforcing Method, which has, increases bulkhead section, and outside winding is carbon cloth reinforced, the methods of winding deformed bar.Before being used in Practical Project The silo of two kinds of reinforcement means still cannot effective control critical eigenvalue development, and it is lower to wind common presstressed reinforcing steel efficiency, answers in advance Frictional force between power muscle and bulkhead leads to greatly very much that effective prestressing force is low or quantity of reinforcement increases.Presstressed reinforcing steel outer layer protection mortar is easy Cracking, structure durability are difficult to ensure.
How conveniently effectively to be reinforced to generating defect and silo currently in use, and guarantees that structure is durable Property, reduce reinforcement cost will be problem to be solved in the utility model.
Summary of the invention
The utility model is to solve the above problems, provide a kind of round concrete silo knot easy to operate, durability is strong Structure ruggedized equipment.
Circle concrete silo construction pre-stress ruggedized equipment described in the utility model, including presstressed reinforcing steel and anchorage body System, presstressed reinforcing steel lateral circular pass through anchorage system stretch-draw anchor on silo side wall;The presstressed reinforcing steel is soap-free emulsion polymeization ring Oxygen coating tendon of steel strand, the anchorage system are totally-enclosed no support anchorage system.
The soap-free emulsion polymeization epoxy coating strand presstressed reinforcing steel refers to: steel strand wires monofilament or integral spray have etch-proof ring The unbonded prestressing tendon of oxygen resinous coat.
The totally-enclosed no support anchorage system refers to: pulling anchor cable stage can self-sustained, working stage can self-protection Osculant presstressed reinforcing steel anchorage.
The utility model replaces common steel strand wires that can be greatly reduced between presstressed reinforcing steel and bulkhead using non-bending steel cable Frictional force, significantly improve effective prestressing force, reduce quantity of reinforcement, the outer protective sleeves of steel strand wires, grease, epoxy coating are to steel strand wires Three protection are formed, structure durability is effectively ensured.
Meanwhile construction journey can be reduced without otherwise designed installation anchoring pilaster using totally-enclosed no support anchorage system Sequence reduces reinforcement cost.
It is more preferably designed as, the anchorage system is arranged along silo sidewall symmetry.Under this setting, it is looped around silo Loss of prestress can reduce half when tension of prestressed tendon on side wall, and the precompression established after tensioning is more uniform.
The utility model reasonable stress is clear, can implement during production, not damaged to former library wall, without carrying out high-altitude mould Plate and reinforced concrete construction, quick construction is low in cost, and safety of structure, durability can be effectively ensured, and has larger Social benefit and economic benefit.
Detailed description of the invention
Fig. 1 is silo structure floor map;
Fig. 2 is silo structure diagrammatic cross-section;
Fig. 3 is silo structure expanded schematic diagram;
In figure: 1, soap-free emulsion polymeization epoxy coating strand presstressed reinforcing steel;2, totally-enclosed no support anchorage system;3, former bulkhead; 4, annular driven hanging basket.
Specific embodiment
Ruggedized equipment described in the utility model is for reinforcing round concrete tube chamber structure.
As shown in Figure 1, circle concrete tube chamber structure described in the utility model is without support prestressed reinforcement equipment, soap-free emulsion polymeization Epoxy coating strand presstressed reinforcing steel 1 and totally-enclosed no support anchorage system 2, soap-free emulsion polymeization epoxy coating strand presstressed reinforcing steel 1 On silo side wall, totally-enclosed no support anchorage system 2 is symmetrically anchored at circular soap-free emulsion polymeization epoxy coating steel and twists lateral circular 1 two sides of line presstressed reinforcing steel.
The utility model reasonable stress is clear, can implement during production, not damaged to former library wall, without carrying out high-altitude mould Plate and reinforced concrete construction, quick construction is low in cost, and safety of structure, durability can be effectively ensured, and has larger Social benefit and economic benefit.

Claims (2)

1. a kind of circle concrete tube chamber structure is without support prestressed reinforcement equipment, including presstressed reinforcing steel and anchorage system, special Sign is: presstressed reinforcing steel lateral circular passes through anchorage system stretch-draw anchor on silo side wall;The presstressed reinforcing steel is without viscous Epoxy coating strand presstressed reinforcing steel is tied, the anchorage system is totally-enclosed no support anchorage system.
2. circle concrete tube chamber structure according to claim 1 is without support prestressed reinforcement equipment, it is characterised in that: institute Anchorage system is stated to be arranged along silo sidewall symmetry.
CN201821287225.XU 2018-01-19 2018-08-09 It is a kind of circle concrete tube chamber structure without support prestressed reinforcement equipment Active CN208934432U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201820099354 2018-01-19
CN201820099354X 2018-01-19

Publications (1)

Publication Number Publication Date
CN208934432U true CN208934432U (en) 2019-06-04

Family

ID=63760915

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201810902423.0A Pending CN108643583A (en) 2018-01-19 2018-08-09 A kind of circle concrete silo construction pre-stress ruggedized equipment and method
CN201821287225.XU Active CN208934432U (en) 2018-01-19 2018-08-09 It is a kind of circle concrete tube chamber structure without support prestressed reinforcement equipment

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201810902423.0A Pending CN108643583A (en) 2018-01-19 2018-08-09 A kind of circle concrete silo construction pre-stress ruggedized equipment and method

Country Status (1)

Country Link
CN (2) CN108643583A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643583A (en) * 2018-01-19 2018-10-12 江苏新筑企业管理有限公司 A kind of circle concrete silo construction pre-stress ruggedized equipment and method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114482665B (en) * 2022-02-09 2024-03-29 中国电建集团西北勘测设计研究院有限公司 Prestressed prefabricated concrete storage tank and assembling method

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101597960B (en) * 2009-07-17 2011-06-15 李延春 Large-tonnage jack tension construction technology for non-bonded prestressed silo
CN102102442A (en) * 2010-12-01 2011-06-22 中煤第六十八工程处 Construction method for plugging end of prestress pilaster steel strand of concrete silo
CN102121316B (en) * 2011-01-12 2012-12-12 北京交通大学 Construction method for reinforcing circular structures by pre-tensioned high-strength fiber cloth
CN102251684A (en) * 2011-05-30 2011-11-23 北京交通大学 Construction method for circumferential pretensioning steel strand reinforcement circular structure or construction member
CN102418424B (en) * 2011-09-28 2013-07-31 南京林业大学 Method for reinforcing silo in circumferential direction
CN102635238A (en) * 2012-05-03 2012-08-15 中国十九冶集团有限公司 Large-scale coal bunker wall prestress anchor sealing construction method and structure
CN103147589B (en) * 2013-02-26 2015-05-27 北京交通大学 Construction method for reinforcing circular structure with large diameter by symmetric double-anchor-head pretension steel stranded wires
CN103114753A (en) * 2013-03-01 2013-05-22 杨晨 Prestressed cylindrical silo with concealed anchoring end and processing method of stretch opening thereof
CN108643583A (en) * 2018-01-19 2018-10-12 江苏新筑企业管理有限公司 A kind of circle concrete silo construction pre-stress ruggedized equipment and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643583A (en) * 2018-01-19 2018-10-12 江苏新筑企业管理有限公司 A kind of circle concrete silo construction pre-stress ruggedized equipment and method

Also Published As

Publication number Publication date
CN108643583A (en) 2018-10-12

Similar Documents

Publication Publication Date Title
WO2018006558A1 (en) Confined high-strength concrete support system applicable to underground tunnel
CN103821677B (en) Prefabricated PC RPC wind power tower
CN101597960B (en) Large-tonnage jack tension construction technology for non-bonded prestressed silo
CN208934432U (en) It is a kind of circle concrete tube chamber structure without support prestressed reinforcement equipment
CN203270457U (en) Suspension bar anchoring structure capable of initiatively reinforcing concrete tied-arch bridge
CN103994034B (en) Connection device of prestress concrete and steel combination wind power generation tower
CN104947589B (en) Multistrand finished cable type anchorage prestress anchor device and construction method thereof
CN107435293B (en) Pre-stress FRP bar stretching and anchoring device and its construction method for precast assembly bridge pier
CN108708368A (en) Multistage anchoring prestress muscle continuous underground wall structure and its construction method
CN102296829A (en) Method for constructing three-dimensional cable net curtain wall and node connection member used in same
CN205421022U (en) Suspension bridge stiffening beam handing equipment that slides
CN205604547U (en) Anti GBF tubular construction that floats
CN104234325B (en) The installation method of FRP rib tape screw plug bond type anchorage
CN106930587B (en) Novel pre-stressed cement produced with the dry method silo and reinforcement means
WO2020259266A1 (en) Novel mining double-layer borehole wall having root-type anchoring
CN106120573B (en) Multispan cable-carried arch bridge self-balancing button over strait hangs construction method
CN109914267B (en) Prefabricated upright post lifting appliance structure
CN208009251U (en) A kind of single extruding dragline anchorage
CN202543803U (en) Finished cable consisting of steel strands
CN109113354B (en) Whole-course cableway type windproof real-time pulled cable wind system and construction method thereof
CN104005340B (en) Continuous beam elongated prestressing tendon lashing construction method
CN204531571U (en) The segmented cement electric pole of the pre-buried flange of a kind of cement electric pole and application thereof
CN210013129U (en) Prefabricated stand hoist structure
CN107762238A (en) A kind of king-post prestressed strand lifts position control method
CN208265608U (en) Large-tonnage hoisting device for reinforcement cage