CN208918467U CN201821128456.6U CN201821128456U CN208918467U CN 208918467 U CN208918467 U CN 208918467U CN 201821128456 U CN201821128456 U CN 201821128456U CN 208918467 U CN208918467 U CN 208918467U
Authority
CN
China
Prior art keywords
vehicle frame
electric drill
cylinder
sliding
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821128456.6U
Other languages
Chinese (zh)
Inventor
王继忠
杨卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Weijie Rui Railway Engineering Co Ltd
Original Assignee
Shanxi Weijie Rui Railway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Weijie Rui Railway Engineering Co Ltd filed Critical Shanxi Weijie Rui Railway Engineering Co Ltd
Priority to CN201821128456.6U priority Critical patent/CN208918467U/en
Application granted granted Critical
Publication of CN208918467U publication Critical patent/CN208918467U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a kind of equipment that automatic capturing benchmark is accurately positioned drilling in subway tunnel wall, passes through electrical PLC control system, acquisition displacement transducer signal, obliquity sensor signal;Oil transportation is carried out to different support cylinders by control hydraulic power unit, entire track vehicle frame is made to be in the horizontal position in subway tunnel section;The height of entire track vehicle frame is adjusted by the data input of height laser rangefinder, horizontal direction laser range finder, the rack and pre-selection for making track vehicle frame top have the benchmark to work according to the foraminous die plate that Tunnel-hole positions manufacture, multiple groups foraminous die plate can be moved along sliding rail, to which multiple hole drill operation can be carried out continuously after a vehicle frame positions.The utility model realizes positioning automation, multiple batches of bore operation can be continuously carried out in track vehicle frame entire length, and multiple groups rack can be arranged to work at the same time according to the size and project progress of workload, multiple batches of operation, it is easy to realize the double of efficiency in ground.

Description

The equipment that automatic capturing benchmark is accurately positioned drilling in tunnel wall
Technical field
The utility model is suitable for technical field of rail traffic more particularly to a kind of subway tunnel inner wall is largely drilled Method.
Background technique
In the constructing tunnel later period of rail traffic, due to needing to install a large amount of equipment in tunnel, such as cable, people's row mistake Road, water pipe, tracheae etc. will carry out batch bore operation to tunnel wall, and existing bore mode only uses artificial crossed, people Work positioning is successively drilled using electric tool.Inefficiency, precision is low, and construction environment is poor, large labor intensity, work danger Danger.
Since tunnel has the necessary conditions such as terminal and city topography to be limited, the higher turning radius of the gradient is smaller in tunnel, Therefore, in tunnel the center reference face in track basal plane and tunnel usually not on a datum level.So if will be in tunnel Other the problem of drilling of implementation batch, first have to solve the problem of is exactly automatic capturing benchmark is exactly dimension precision between the holes, and more Hole drill, using widely, using bore template, extraordinary can solve the problems, such as dimension precision between the holes in machinery field.
Utility model content
For above situation, the purpose of this utility model is that: it is accurately fixed in tunnel wall to provide a kind of automatic capturing benchmark The equipment of position drilling is determined the two-dimensional coordinate benchmark in the benchmark of tunnel boring equipment and tunnel section by sensor Position.
To achieve the above object, technical solution adopted in the utility model is: providing a kind of automatic capturing benchmark in tunnel The equipment that road wall is accurately positioned drilling, structure includes the track vehicle frame of 1435 gauges, is equipped with brake on railcar unwheeling wheel Device, vehicle bottom are equipped with electrical PLC control system, walking displacement sensing system, inclination angle sensor-based system, hydraulic power unit and support oil Cylinder;Support cylinder one end is fixedly installed in frame downward, and piston crown extended position is equipped with the branch to match with rail level shape Bracer.
Track vehicle frame top by sliding rail, sliding-rail sliding, axial feed motor, worm screw, rack gear, slider locking device, Rack, telescopic arm, bore template, electric drill feed arrangement and electric drill composition;The sliding rail is fixedly connected with cunning with track vehicle frame top Rail, installation direction are and parallel track;The sliding-rail sliding and sliding rail sliding constraint linear motion;The slider locking device leans on Hydraulic clamp;The rack is fixedly installed on sliding-rail sliding, and rack is by two groups of fixed plates and axial feed motor form, institute It states axial feed motor to be fixedly installed in rack, motor head worm screw engages with snail item on track vehicle frame is fixed on;It is described solid Short transverse laser range finder horizontal direction laser range finder is installed on fixed board, is provided with semi-circular notch in fixed plate.
The telescopic arm is made of large arm, forearm, hydraulic cylinder, and large arm is that cannulated sleeve structure is installed on two groups of rack and fixes Among plate, there is centre bore in large arm one end, and there is clamping screw outstanding at middle part, and large arm centre bore passes through in hinge restraining and fixed plate Large arm is fixed on the position of annular notches in fixed plate by locking nut by the connection of heart hole, the clamping screw at middle part;The forearm It is installed within large arm, the hinge with the centre bore of large arm by forearm telescopic oil cylinder one end is connect, cylinder piston head and forearm Connection, forearm can do flexible linear motion by the linear running of oil cylinder in large arm.
The bore template is made of the foraminous die plate of the position depending on tunnel hole site, and drill bit moves in pattern hole, mould Plate is fixedly installed in forearm outer end;The electric drill feed arrangement is fixed by cylinder, guide rail, guide rail slide block, guide rail fixing seat, electric drill Set composition.The cylinder is fixed on foraminous die plate, and cylinder head is fixedly connected with guide rail slide block, guide rail fixing seat and multiple-hole die Plate is fixedly connected, and electric drill fixing sleeve is connect with guide rail slide block, and cylinder operation drives guide rail slide block movement, and guide rail slide block movement drives The movement of electric drill fixing sleeve.The electric drill is fixedly connected with electric drill fixing sleeve, and the movement of electric drill fixing sleeve drives electric drill straight-line feed.
The utility model can acquire displacement transducer signal, the obliquity sensor of input by electrical PLC control system Signal gives different support cylinder progress oil transportations by control hydraulic power unit in turn, and entire track vehicle frame is made to be in subway tunnel The horizontal position in section, and entire track is adjusted by the data input of height laser rangefinder, horizontal direction laser range finder The height of vehicle frame makes the rack on track vehicle frame top and pre- in this way, by the foundation of horizontal reference, altitude datum, center reference Choosing has the benchmark of work according to the foraminous die plate of Tunnel-hole positioning manufacture, and multiple groups foraminous die plate can be moved along sliding rail, from And after a vehicle frame positions, multiple hole drill operation can be carried out continuously.
In operational process, track vehicle frame is run on track by the wheel of 1435 gauges, the fixed peace of track frame downward Equipped with support cylinder, data is acquired by displacement sensing system, inclination angle sensor-based system, output, support are controlled by PLC electric hydraulic Track vehicle frame is adjusted to parallel with tunnel horizontal reference by oil cylinder;Laser range finder in rack carries out the measurement of short transverse, The whole height that track vehicle frame is controlled by PLC reaches the preset height of drilling.In track vehicle frame entirety posture and After the positioning of position, rack starts along guide rail axially to operation to bore position, and forearm telescopic oil cylinder working forearm is stretched out, forearm end Bore template contact abutting with tunnel wall, sliding rail clamping cylinder clamps, and cylinder, which stretches out, pushes electric drill to stretch out, and electric drill starts to rotate Work drilling.It runs after cylinder to stroke limit, electric drill stops working, and cylinder retracts, and forearm retracts, sliding rail clamping cylinder pine It opens, rack drives worm screw to run along sliding rail to bore position once in snail item by axial feed motor, and it is straight to continue preceding step It runs to rack 7 to the track vehicle frame other end.At this point, support cylinder emptying, track vehicle frame proceed to next section it is isometric with vehicle frame Operating position.And it is finished according to above-mentioned steps cycle operation to whole tunnel boring.
The beneficial effects of the utility model are: by horizontal reference, altitude datum and center reference three-point fix, it is accurate true Determine tunnel internal drilling position, and after positioning, continuously can carry out multiple batches of bore operation in track vehicle frame entire length, And multiple groups rack can be arranged to work at the same time, multiple batches of operation, it is easy to ground according to the size and project progress of workload Realize the double of efficiency.
Detailed description of the invention
Fig. 1 is tunnel difference camber sectional view;
Fig. 2 is the structural schematic diagram for the equipment that tunnel wall is accurately positioned drilling;
Fig. 3 is front view
Fig. 4 is rack axial direction operating mechanism figure;
Fig. 5 is telescopic arm structure schematic diagram;
Fig. 6 is electric drill operating mechanism schematic diagram;
In figure: 1, on the outside of tunnel wall;2, on the inside of tunnel wall;3, vehicle gauge is run;4, cable bearer;5, water pipe;6 is electrical Case;7, rack;8, bore template;9, electric drill;10, guide rail fixing seat, 11, cylinder;12, forearm;13, large arm;14, locking screw Bolt;15, laser range finder;16, sliding-rail sliding;17, sliding rail clamping cylinder;18, sliding rail;19, track vehicle frame;20, support cylinder; 21, supporting block;22, electrical and oil pressure cntrol cabinet;23, axial feed motor;24, snail item;25, worm screw, 26 forearm telescopic oil cylinders.
Specific embodiment
Embodiment is described further with reference to the accompanying drawing.
Shown in Fig. 1, be in subway tunnel in different cambers, tunnel section horizontal vertical benchmark and track and railway roadbed, Run the angle change between vehicle gauge.And 4 cable beareves and 5 Water pipe brackets and 6 electrical box brackets are both needed in tunnel wall Carry out drilling fixation, the position of this some holes be it is associated with the horizontal vertical benchmark in tunnel section, therefore, it is necessary to a kind of automatic Centering benchmark is accurately positioned in subway tunnel wall and bores porous method.
As shown in figures 2-6, the application provides equipment and the side that a kind of automatic capturing benchmark is accurately positioned drilling in tunnel wall Method, device structure include the track vehicle frame 19 of 1435 gauges, brake gear are equipped on 19 wheel of track vehicle frame, vehicle bottom is equipped with Electrical PLC control system, walking displacement sensing system, inclination angle sensor-based system, hydraulic power unit and support cylinder 20;Support cylinder 20 One end is fixedly installed in 19 lower part of track vehicle frame, and piston crown extended position is equipped with the supporting block to match with rail level shape 21。
19 top of track vehicle frame is by sliding rail 18, sliding-rail sliding 16, axial feed motor 23, worm screw 25, rack gear, slider locking Device, rack, telescopic arm, bore template, electric drill feed arrangement and electric drill 9 form;The sliding rail is fixed with track vehicle frame top Connecting sliding rail, installation direction are and parallel track;The sliding-rail sliding and sliding rail sliding constraint linear motion;Slider locking device By hydraulic clamp;The rack 7 is fixedly installed on sliding-rail sliding 16, and rack is by two groups of fixed plates and axial feed motor 23 Composition, the axial feed motor 23 is fixedly installed in rack 7, motor head worm screw 25 and is fixed on snail on track vehicle frame 19 Item 24 engages;The laser range finder 15 of 15 horizontal direction of laser range finder of short transverse is installed in the fixed plate, it is fixed Semi-circular notch is provided on plate.
As shown in figure 5, telescopic arm is made of large arm 13, forearm 12, hydraulic cylinder, large arm 13 is that cannulated sleeve structure is installed on Among 7 two groups of fixed plates of rack, there is centre bore in 13 one end of large arm, and there is clamping screw 14 outstanding at middle part, and 13 centre bore of large arm is logical It crosses hinge restraining to connect with fixed plate centre bore, large arm 13 is fixed in fixed plate by the clamping screw 14 at middle part by locking nut The position of annular notches;The forearm 12 is installed within large arm 13, leans on 12 telescopic oil cylinder one of forearm with the centre bore of large arm 13 The hinge at end connects, and cylinder piston head is connect with forearm, and forearm 12 can be done in large arm by the linear running of oil cylinder to be stretched Contracting linear motion.
Bore template is made of the foraminous die plate of the position depending on tunnel hole site, and drill bit moves in pattern hole, and template is solid Dingan County is loaded on 12 outer end of forearm;9 feed arrangement of electric drill is by cylinder 11, guide rail, guide rail slide block, guide rail fixing seat 10, electric drill Fixing sleeve composition;Cylinder is fixed on foraminous die plate, and cylinder head is fixedly connected with guide rail slide block, guide rail fixing seat and multiple-hole die Plate is fixedly connected, and electric drill fixing sleeve is connect with guide rail slide block, and cylinder operation drives guide rail slide block movement, and guide rail slide block movement drives The movement of electric drill fixing sleeve.The electric drill is fixedly connected with electric drill fixing sleeve, and the movement of electric drill fixing sleeve drives electric drill straight-line feed.
Track vehicle frame 19 is run on track by the wheel of 1435 gauges, and 19 lower part of track vehicle frame is fixedly installed with support Oil cylinder 10 acquires data by displacement sensing system, inclination angle sensor-based system and controls output, support cylinder 20 by PLC electric hydraulic Track vehicle frame 19 is adjusted to parallel with tunnel horizontal reference;Laser range finder 15 in rack 7 carries out the measurement of short transverse, The whole height that track vehicle frame 19 is controlled by PLC reaches the preset height of drilling.In the whole appearance of track vehicle frame 19 After state and position positioning, rack 7 starts along guide rail axially to operation to bore position, and 26 working forearm 12 of forearm telescopic oil cylinder is stretched Out, the bore template 8 at 12 end of forearm contacts abutting with tunnel wall, and sliding rail clamping cylinder 17 clamps, and cylinder 11, which stretches out, pushes electric drill 9 It stretches out, electric drill 9 starts rotary work drilling.After the operation to stroke limit of cylinder 11, electric drill 9 stops working, and cylinder 11 retracts, Forearm 12 retracts, and sliding rail clamping cylinder 17 unclamps, and rack 7 drives worm screw 25 in snail item 24 along sliding rail by axial feed motor 23 It runs to bore position once, and continues preceding step until rack 7 is run to 19 other end of track vehicle frame.At this point, support cylinder 10 emptyings, track vehicle frame 19 proceed to the next section of operating position isometric with vehicle frame.And according to above-mentioned steps cycle operation to whole Tunnel boring finishes.
When carrying out porous processing in tunnel, as long as the benchmark of drilling device is consistent with the origin reference location in tunnel section, So only need the position for adjusting a foraminous die plate that can secure this position, thus in the tunnel of same drawing, It only needs to determine opposite position of the drilling device relative to the length travel data in tunnel and two-dimensional coordinate in tunnel section every time It sets, and according to the position of these data point reuse drilling devices, so that it may the position of drilling be determined, so as to recycle carry out tunnel The bore operation of road wall.
The foregoing is merely the preferential case study on implementation of the utility model, are not intended to limit the patent model of the utility model It encloses, it is all using equivalent structure or equivalent flow shift made by the utility model book and accompanying drawing content, directly or indirectly transport Used in other relevant technical fields, it is also included in the patent protection scope of the utility model.

Claims (2)

1. the equipment that a kind of automatic capturing benchmark is accurately positioned drilling in subway tunnel wall, it is characterised in that: device structure includes The track vehicle frame of 1435 gauges is equipped with brake gear on railcar unwheeling wheel, and vehicle bottom is equipped with electrical PLC control system, row Walk displacement sensing system, inclination angle sensor-based system, hydraulic power unit and support cylinder;Wherein, support cylinder one end is fixedly installed in vehicle Frame lower part, piston crown extended position are equipped with the supporting block to match with rail level shape;
Track vehicle frame top by sliding rail, sliding-rail sliding, axial feed motor, worm screw, rack gear, slider locking device, rack, Telescopic arm, bore template, electric drill feed arrangement and electric drill composition;Wherein, sliding rail is fixedly connected with sliding rail with track vehicle frame top, peace Dress direction is and parallel track;Sliding-rail sliding and sliding rail sliding constraint linear motion;The slider locking device leans on hydraulic clamp; The rack is fixedly installed on sliding-rail sliding, rack by two groups of fixed plates and axial feed motor form, the axial direction into It is fixedly installed in rack to motor, motor head worm screw engages with snail item on track vehicle frame is fixed on;Pacify in the fixed plate Equipped with short transverse laser range finder, horizontal direction laser range finder, semi-circular notch is provided in fixed plate;
The telescopic arm is made of large arm, forearm, hydraulic cylinder, and large arm is that cannulated sleeve structure is installed in two groups of fixed plates of rack Between, there is centre bore in large arm one end, and there is clamping screw outstanding at middle part, and large arm centre bore passes through hinge restraining and fixed plate centre bore Large arm is fixed on the position of annular notches in fixed plate by locking nut by connection, the clamping screw at middle part;The forearm installation Within large arm, centre bore with large arm, the hinge by forearm telescopic oil cylinder one end is connected, and cylinder piston head and forearm connect It connects, forearm can do flexible linear motion by the linear running of oil cylinder in large arm;
The bore template is made of the foraminous die plate of the position depending on tunnel hole site, and drill bit moves in pattern hole, and template is solid Dingan County is loaded on forearm outer end;The electric drill feed arrangement is by cylinder, guide rail, guide rail slide block, guide rail fixing seat, electric drill fixing sleeve group At;
The cylinder is fixed on foraminous die plate, and cylinder head is fixedly connected with guide rail slide block, guide rail fixing seat and foraminous die plate It is fixedly connected, electric drill fixing sleeve is connect with guide rail slide block, and cylinder operation drives guide rail slide block movement, and guide rail slide block movement drives electricity Bore fixing sleeve movement;The electric drill is fixedly connected with electric drill fixing sleeve, and the movement of electric drill fixing sleeve drives electric drill straight-line feed.
2. the equipment that a kind of automatic capturing benchmark according to claim 1 is accurately positioned drilling in subway tunnel wall, special Sign is: the whole service of the equipment is controlled by PLC, is installed on walking displacement sensing system on car body, inclination angle Location information of the entire drilling device in tunnel is delivered in PLC control system by sensor-based system, laser range finder, PLC control Processing procedure sequence carry out operation, the result after operation be transported to hydraulic control system control support cylinder, by export control signal to Forearm telescopic oil cylinder, the movement of electric drill feed arrangement.
CN201821128456.6U 2018-07-17 2018-07-17 The equipment that automatic capturing benchmark is accurately positioned drilling in tunnel wall Expired - Fee Related CN208918467U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821128456.6U CN208918467U (en) 2018-07-17 2018-07-17 The equipment that automatic capturing benchmark is accurately positioned drilling in tunnel wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821128456.6U CN208918467U (en) 2018-07-17 2018-07-17 The equipment that automatic capturing benchmark is accurately positioned drilling in tunnel wall

Publications (1)

Publication Number Publication Date
CN208918467U true CN208918467U (en) 2019-05-31

Family

ID=66694174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821128456.6U Expired - Fee Related CN208918467U (en) 2018-07-17 2018-07-17 The equipment that automatic capturing benchmark is accurately positioned drilling in tunnel wall

Country Status (1)

Country Link
CN (1) CN208918467U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108915587A (en) * 2018-07-17 2018-11-30 山西伟捷瑞铁路工程有限公司 Automatic capturing benchmark is accurately positioned the device and method of drilling in tunnel wall
CN114293909A (en) * 2021-12-29 2022-04-08 中建安装集团有限公司 Intelligent drilling management system and method based on tunnel rail-mounted drilling robot
CN117569738A (en) * 2024-01-16 2024-02-20 中铁一局集团电务工程有限公司 Drilling control system and method for tunnel construction trolley

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108915587A (en) * 2018-07-17 2018-11-30 山西伟捷瑞铁路工程有限公司 Automatic capturing benchmark is accurately positioned the device and method of drilling in tunnel wall
CN108915587B (en) * 2018-07-17 2024-08-23 山西伟捷瑞铁路工程有限公司 Device and method for accurately positioning drilling holes in tunnel wall by automatic alignment reference
CN114293909A (en) * 2021-12-29 2022-04-08 中建安装集团有限公司 Intelligent drilling management system and method based on tunnel rail-mounted drilling robot
CN114293909B (en) * 2021-12-29 2024-06-07 中建安装集团有限公司 Intelligent drilling management system and method based on tunnel track type drilling robot
CN117569738A (en) * 2024-01-16 2024-02-20 中铁一局集团电务工程有限公司 Drilling control system and method for tunnel construction trolley
CN117569738B (en) * 2024-01-16 2024-05-17 中铁一局集团电务工程有限公司 Drilling control system and method for tunnel construction trolley

Similar Documents

Publication Publication Date Title
CN108915587A (en) Automatic capturing benchmark is accurately positioned the device and method of drilling in tunnel wall
CN208918467U (en) The equipment that automatic capturing benchmark is accurately positioned drilling in tunnel wall
CN101281085B (en) Car white vehicle body structure static angular rigidity testing system and testing method thereof
CN102841602B (en) Robot single-leg assembly control development performance test platform and method
CN106436759B (en) The assembled trolley of prefabricated components assembly type subway station is used for open cut formula
CN201193971Y (en) Car white vehicle body structure static angular rigidity testing system
CN205002959U (en) Measuring instrument of axial clearance of bearing
CN103207072A (en) Testing machine for adjusting durability of car steering column
CN107859493A (en) Multi-functional drill table top, which pushes away, helps guiding manipulator
CN103692251A (en) Cylindrical part bending angle measuring and horizontal and vertical surface drilling jig
CN102279077B (en) Calibration device for double-force-source six-dimensional force sensor
CN104294864B (en) Shallow foundation V-H-M space loading experiments of measuring device
CN106988689B (en) A kind of land science probing drilling tool automatic migration device of drilling machine
CN107130793A (en) Form frame system with exactly vertical elevation and horizontal location function
CN107159930A (en) A kind of mounting structure of numerical control drilling machine
CN108526510B (en) Automation position detecting system based on drilling pipe punching lathe
CN104723301B (en) A kind of control apparatus for general purpose engine piston rod measurement horizontal table
CN110847936B (en) Intelligence tunnel section levels device
RU2577349C1 (en) Hydraulic rig leveling mechanism
CN207092529U (en) Die carrier structure with exactly vertical elevation and horizontal location function
CN213812284U (en) Positioning device for foundation engineering
CN207144822U (en) A kind of mining mounting formula automatic indexing rig
CN214330523U (en) Simple drilling device for geological mineral exploration
CN211939177U (en) Drilling machine for drilling insert
CN105057729B (en) Live working boring-machine automatic positioning processing and detection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190531