CN207144822U - A kind of mining mounting formula automatic indexing rig - Google Patents

A kind of mining mounting formula automatic indexing rig Download PDF

Info

Publication number
CN207144822U
CN207144822U CN201720354810.6U CN201720354810U CN207144822U CN 207144822 U CN207144822 U CN 207144822U CN 201720354810 U CN201720354810 U CN 201720354810U CN 207144822 U CN207144822 U CN 207144822U
Authority
CN
China
Prior art keywords
rig
mining
gearcase
indexing
formula automatic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720354810.6U
Other languages
Chinese (zh)
Inventor
陈凯旋
张立祥
曹晓
代以
陈月月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201720354810.6U priority Critical patent/CN207144822U/en
Application granted granted Critical
Publication of CN207144822U publication Critical patent/CN207144822U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

It the utility model is related to a kind of mining mounting formula automatic indexing rig, including Drilling device, hoistable platform and frame, the Drilling device is made up of unit head, clamper and apparatus for feeding, the frame includes base, column, crossbeam, the column is bolted on the both sides of base, the crossbeam is bolted with column, and described mining mounting formula automatic indexing rig also includes indexing mechanism, and described indexing mechanism is made up of connecting plate, steering gear and planetary gear train.The utility model can realize the mechanization regulation of rig angle and height, simplify the operating process of rig angular adjustment, reduce the labor intensity of worker, improve rig angle and the efficiency and security of height regulation.

Description

A kind of mining mounting formula automatic indexing rig
Technical field
Mining machinery field is the utility model is related to, specifically a kind of mining mounting formula automatic indexing rig.
Background technology
Hydraulic drill rig is a kind of common mining machinery in coal mining field, and mounting formula tunnel hydraulic drill rig is usually used in underground Water hole, drawing-off gas hole etc. are drilled, drilling depth is by several meters to rice up to a hundred.When carrying out bore operation, according to actual work Condition often needs that rig angle is adjusted.At present, mounting formula tunnel hydraulic drill rig uses more and first tears anchor ear on the column of front end open Remove, control hydraulic jack promotes strut to jack up apparatus for feeding to realize the regulation at rig inclination angle, and such a regulative mode is apparent The defects of be exactly complex operation, to expend man-hour, safety coefficient low and needs to adjust repeatedly and jacks up oil cylinder and can be only achieved preset angle Degree, control accuracy are poor.When most mounting formula underground drill rigs carries out lift adjustment, it is necessary to by unit head, clamper and feed Device is removed from column, is retightened in new height, and it is very inconvenient to get up in limited underground spatial operation.
The content of the invention
In order to solve the above problems, the utility model provides a kind of mining mounting formula automatic indexing rig, can realize brill The mechanization regulation of machine angle and height, simplifies the operating process of rig angular adjustment, reduces the labor intensity of worker, carry The high efficiency and security of rig angle and height regulation.
Technical scheme is used by the utility model solves its technical problem:A kind of mining mounting formula automatic indexing is bored Machine, including Drilling device, hoistable platform and frame, the Drilling device is made up of unit head, clamper and apparatus for feeding, described Frame includes base, column, crossbeam, and the column is bolted on the both sides of base, and the crossbeam passes through spiral shell with column Bolt is fixed, and described mining mounting formula automatic indexing rig also includes indexing mechanism, and described indexing mechanism is by connecting plate, steering Device and planetary gear train composition, the connecting plate are provided with loading end, gearcase and arc plate, and the arc plate weld is under loading end End, and gearcase both sides are arranged symmetrically in, the loading end is provided with screwed hole, and the gearcase is provided with straight pin and bearing Hole, the both sides of the arc plate, which are provided with, picks up the ears;The steering gear is provided with circular groove, mesopore and fang platform, and the mesopore is opened in steering At device center side, the fang platform is welded on circular groove bottom;The planetary gear train is provided with three planetary gears and an internal gear, institute State planetary gear to engage with internal gear, the internal gear gear ring is provided with equidistant positioning hole;The steering gear is arranged on arc plate Place, and arc plate, with picking up the ears to be embedded in circular groove, the planetary gear train is fixed in gearcase by straight pin;
The hoistable platform is provided with mounting box, and the mounting box is welded in the middle part of hoistable platform upper surface, institute in pairs State mounting box side and be provided with screens groove and through hole;
The base is provided with deep gouge, and the frame also includes reference circle rail and anchor ear, and the reference circle rail both ends are fixed On crossbeam, be provided with graduation mark at the reference circle rail circumference sideline, the graduation mark is 5 degree every angle, the anchor ear into To on reference circle rail, the anchor ear is made up of clamping plate, bolt and fastening block, the bolt connection two clamping plates are described It is connected through a screw thread between fastening block and bolt, the clamping plate is bonded with reference circle rail;
The apparatus for feeding front end is fixed on reference circle rail by anchor ear, and the indexing mechanism in the middle part of apparatus for feeding with leading to Cross bolt to fix, the hoistable platform is arranged on indexing mechanism lower end, and fang platform is bolted with mounting box, the lifting Mesa base is fixed in deep gouge.
As optimal technical scheme of the present utility model, the gearcase profile is round, one side closed, the bearing hole At center side, the straight pin is divided into two sections, and bottom diameter is bigger 4mm than upper end diameter, the straight pin vertical welding On gearcase side, and circumferentially array is arranged.
As optimal technical scheme of the present utility model, the fang platform is provided with rectangular strip and bolt hole, the rectangular strip Two sides of fang platform are arranged side by side at, the rectangular strip is erected in corresponding screens groove.
As optimal technical scheme of the present utility model, the center of circle of the bearing hole is conllinear with the center of circle of mesopore.
The utility model has the advantages that:
The defects of improving traditional mounting formula underground drill rig angular adjustment, the angular adjustment for tunnel hydraulic drill rig provides A kind of new technical scheme, reduce during tilt adjustment needed for labourer's amount.
Using planetary gear train and steering gear as indexing mechanism, make tilt adjustment process more steady, safe, improve angle Spend the precision of control.
Hydraulic up-down platform is added as lowering or hoisting gear, mechanization is realized and substitutes manual operation, can be easily The height of rig is controlled, enhances the practicality and security of rig.
Brief description of the drawings
Fig. 1 is general structure schematic diagram of the present utility model;
Fig. 2 is Drilling device structural representation of the present utility model;
Fig. 3 is indexing mechanism structural representation of the present utility model;
Fig. 4 is connecting board structure schematic diagram of the present utility model;
Fig. 5 is diverter structure schematic diagram of the present utility model;
Fig. 6 is connecting plate of the present utility model and planetary gear train assembling schematic diagram;
Fig. 7 is hoistable platform structural representation of the present utility model;
Fig. 8 is rack construction schematic diagram of the present utility model;
Fig. 9 is reference circle rail of the present utility model and anchor ear assembling schematic diagram;
Figure 10 is the partial enlarged drawing at A in Fig. 9.
In figure, 1-Drilling device, 2-indexing mechanism, 3-hoistable platform, 4-frame, 101-unit head, 102-folder Holder, 103-apparatus for feeding, 201-connecting plate, 202-steering gear, 203-planetary gear train, 301-mounting box, 401-bottom Seat, 402-column, 403-crossbeam, 404-reference circle rail, 405-anchor ear, 2011-loading end, 2012-gearcase, 2013-arc plate, 2021-circular groove, 2022-mesopore, 2023-fang platform, 2031-planetary gear, 2032-internal gear, 4041- Graduation mark, 4051-clamping plate, 4052-bolt, 4053-fastening block, 2011a-screwed hole, 2012a-straight pin, 2012b- Bearing hole, 2013a-pick up the ears, 2023a-rectangular strip, 2023b-bolt hole, 2032a-positioning hole, 301a-screens groove, 301b-through hole.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining The utility model, it is not used to limit the utility model.
As shown in Fig. 1-Figure 10, a kind of mining mounting formula automatic indexing rig, including Drilling device 1, hoistable platform 3 and machine Frame 4, the Drilling device 1 are made up of unit head 101, clamper 102 and apparatus for feeding 103, and unit head 101 is in apparatus for feeding Straight reciprocating motion is carried out on 103, clamper 102 can assist in drilling and the replacing that unit head 101 carries out drilling rod.The frame 4 include base 401, column 402, crossbeam 403, and the column 402 is bolted on the both sides of base 401, the crossbeam 403 are bolted with column 402, and column 402 and crossbeam 403 can be that Drilling device 1 provides support and fixed.Described Mining mounting formula automatic indexing rig also includes indexing mechanism 2, and described indexing mechanism 2 is by connecting plate 201, the and of steering gear 202 Planetary gear train 203 forms.The connecting plate 201 is provided with loading end 2011, gearcase 2012 and arc plate 2013, the arc plate 2013 are welded on the lower end of loading end 2011, and are arranged symmetrically in the both sides of gearcase 2012, and the loading end 2011 is provided with screw thread Hole 2011a, the gearcase 2012 is provided with straight pin 2012a and bearing hole 2012b, the both sides of the arc plate 2013 are provided with Pick up the ears 2013a.The steering gear 202 is provided with circular groove 2021, mesopore 2022 and fang platform 2023, and the profile of circular groove 2021 is annular, And two side sealings, for providing the track rotated for arc plate 2013;The mesopore 2022 is opened in the center side of steering gear 202 Place, the diameter of mesopore 2022 is about 150mm, sets mesopore 2022 to be easy for installing power transmission shaft for planetary gear train 203;The fang platform 2023 are welded on the bottom of circular groove 2021.The planetary gear train 203 is provided with three planetary gears 2031 and an internal gear 2032, institute State planetary gear 2031 to engage with internal gear 2032, the gear ring of internal gear 2032 is provided with equidistant positioning hole 2032a, positioning Hole 2032a and straight pin 2012a, which coordinates, to be installed, and internal gear 2032 can be fixed in gearcase 2012.The steering gear 202 At arc plate 2013, and in arc plate 2013 and 2013a insertion circular grooves 2021 of picking up the ears, arc plate 2013 is a kind of smooth abrasion-proof material Material, it can be rotated in circular groove 2021, slewing area is spent to 90 degree for -90, and the 2013a that picks up the ears increases arc plate 2013 and circular groove 2021 contact surface, the planetary gear train 203 are fixed in gearcase 2012 by straight pin 2012a.
The hoistable platform 3 is provided with mounting box 301, and the mounting box 301 is welded in the upper surface of hoistable platform 3 in pairs Middle part, the side of mounting box 301 is provided with screens groove 301a and through hole 301b, and mounting box 301 is used to install and fixing indexing Steering gear 202 in mechanism 2.
The base 401 is provided with deep gouge 401a, and deep gouge 401a is used to install hoistable platform 3, and the frame 4 also includes Reference circle rail 404 and anchor ear 405, the both ends of reference circle rail 404 are fixed on crossbeam 403, and crossbeam 403 is on column 402 Height can be adjusted, and height of the reference circle rail 404 on crossbeam 403 can also be adjusted.At the circumference sideline of reference circle rail 404 Provided with graduation mark 4041, the graduation mark 4041 is 5 degree every angle, reference of the graduation mark 4041 as angular adjustment process, Graduation mark 4041 can be refined, be accurate to 1 degree, can also be when adjusting angle, precision of arranging in pairs or groups is that 1 degree of slide calliper rule enter to rig Row angle positions.The mounted in pairs of anchor ear 405 is on reference circle rail 404, and the anchor ear 405 is by clamping plate 4051, bolt 4052 Formed with fastening block 4053, the bolt 4052 connects two clamping plates 4051, leads between the fastening block 4053 and bolt 4052 Threaded connection is crossed, the clamping plate 4051 is bonded with reference circle rail 404, the connecting cleat 4051 of bolt 4052, makes clamping plate 4051 with dividing Degree circle rail 404 lock, the semicircular in shape of fastening block 4053, two fastening blocks 4053 cooperatively form one closure circular hole, be easy to by The front end of apparatus for feeding 103 is fixed.
The front end of apparatus for feeding 103 is fixed on reference circle rail 404 by anchor ear 405, and two on reference circle rail 404 The individual collocation of anchor ear 405 is used, and apparatus for feeding 103 is fastened on reference circle rail 404, the indexing mechanism 2 and apparatus for feeding 103 Middle part is bolted, and indexing mechanism 2 is connected to the middle part of the lower end of apparatus for feeding 103, is bolted to connection together, Indexing mechanism 2 can drive apparatus for feeding 103 to be rotated in perpendicular, and the hoistable platform 3 is arranged under indexing mechanism 2 End, and fang platform 2023 is bolted with mounting box 301, the bottom of hoistable platform 3 is fixed in deep gouge 401a, lifting Platform 3 can realize regulation and support of the rig in longitudinal height.
As shown in Fig. 3, Fig. 4, Fig. 6, the profile of gearcase 2012 is round, and one side closed, the bearing hole 2012b is set At center side, the straight pin 2012a is divided to for two sections, and bottom diameter is bigger 4mm than upper end diameter, the straight pin 2012a It is vertically welded on the side of gearcase 2012, and circumferentially array is arranged, when planetary gear train 203 assembles with gearcase 2012, Straight pin 2012a is engaged with the positioning hole 2032a on internal gear 2032, on positioning hole 2032a diameter and straight pin 2012a The diameter at end is equal, and after installation, internal gear 2032 leaves certain interval with the side of gearcase 2012, and the gap is just straight pin The length of 2012a bottoms.
As shown in Fig. 3, Fig. 5, Fig. 7, the fang platform 2023 is provided with rectangular strip 2023a and bolt hole 2023b, the rectangle Bar 2023a is arranged side by side at two sides of fang platform 2023, and the rectangular strip 2023a is erected in corresponding screens groove 301a, Rectangular strip 2023a and screens groove 301a, which coordinate, to be installed, and can preferably improve that fang platform 2023 is connected with mounting box 301 consolidates Property.
As shown in figures 3 to 6, the center of circle of the bearing hole 2012b is conllinear with the center of circle of mesopore 2022, when for planetary gear train During 203 installation power transmission shaft, one end of axle is arranged in bearing hole 2012b by bearing, the other end of axle by mesopore 2022 from The side of steering gear 202 is stretched out, and is connected with external power source.
Its embodiment is:When rig is installed, fix four with bolt in the both sides at the front end of base 401 and middle part and stand Post 402, crossbeam 403 is installed between front end two root posts 402 and middle part two root posts 402 respectively, fastened using bolt, then A pair of anchor ears 405 are arranged on reference circle rail 404, the both ends of reference circle rail 404 are fixedly connected with crossbeam 403 respectively, indexing The lower end of circle rail 404 keeps vertical, upper end keep level, and hoistable platform 3 is arranged on into 401a in the deep gouge on base 401, risen Drop and indexing mechanism 2 is installed on platform 3, the lower end of apparatus for feeding 103 and indexing mechanism 2 are fixed with bolt, will be given by anchor ear 405 Enter the front end of device 103 to be fastened on reference circle rail 404.
When rig works, indexing mechanism 2 use fluid motor-driven, hoistable platform 3 realized using hydraulic cylinder lift, it is necessary to When carrying out the regulation of angle, the anchor ear 405 on reference circle rail 404 is unclamped, starts hydraulic motor, drives planetary gear train 203, it is interior The rotation of gear 2032 drives connecting plate 201 to rotate, and then drives apparatus for feeding 103 around the center rotating of steering gear 202, with indexing Graduation mark 4041 on circle rail 404 is reference, when reaching predetermined angle, the position of mobile anchor ear 405, before apparatus for feeding 103 End is fastened on new position, continues drill process.The tunnel of different height is run into, it is necessary to adjust the longitudinal direction height of rig When, start the jack-up oil cylinder in hoistable platform 3, then crossbeam 403 releases to fastening from column 402, hoistable platform 3 is by rig When rising to object height, crossbeam 403 is fixed on column 402 again.
The advantages of general principle of the present utility model, principal character and the utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, on the premise of the spirit and scope of the utility model is not departed from, the utility model is also Various changes and modifications are had, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model Claimed scope is by appended claims and its equivalent thereof.

Claims (4)

1. a kind of mining mounting formula automatic indexing rig, including Drilling device, hoistable platform and frame, the Drilling device is by moving Power head, clamper and apparatus for feeding composition, the frame include base, column, crossbeam, and the column is bolted on bottom The both sides of seat, the crossbeam are bolted with column, it is characterised in that:Described mining mounting formula automatic indexing rig is also Including indexing mechanism, described indexing mechanism is made up of connecting plate, steering gear and planetary gear train, and the connecting plate is provided with carrying Face, gearcase and arc plate, the arc plate weld is arranged symmetrically in gearcase both sides in loading end lower end, on the loading end Provided with screwed hole, the gearcase is provided with straight pin and bearing hole, and the both sides of the arc plate, which are provided with, picks up the ears;In the steering gear Provided with circular groove, mesopore and fang platform, the mesopore is opened at steering gear center side, and the fang platform is welded on circular groove bottom;Institute State planetary gear train to engage with internal gear provided with three planetary gears and an internal gear, the planetary gear, on the internal gear gear ring Provided with equidistant positioning hole;The steering gear is arranged at arc plate, and arc plate and picks up the ears to be embedded in circular groove, the planetary gear train It is fixed on by straight pin in gearcase;
The hoistable platform is provided with mounting box, and the mounting box is welded in the middle part of hoistable platform upper surface, the peace in pairs Mounted box side is provided with screens groove and through hole;
The base is provided with deep gouge, and the frame also includes reference circle rail and anchor ear, and the reference circle rail both ends are fixed on horizontal stroke Liang Shang, graduation mark is provided with the reference circle rail circumference sideline, the graduation mark is 5 degree every angle, and the anchor ear is pacified in pairs On reference circle rail, the anchor ear is made up of clamping plate, bolt and fastening block, the bolt connection two clamping plates, the fastening It is connected through a screw thread between block and bolt, the clamping plate is bonded with reference circle rail;
The apparatus for feeding front end is fixed on reference circle rail by anchor ear, and the indexing mechanism in the middle part of apparatus for feeding with passing through spiral shell Bolt is fixed, and the hoistable platform is arranged on indexing mechanism lower end, and fang platform is bolted with mounting box, the hoistable platform Bottom is fixed in deep gouge.
A kind of 2. mining mounting formula automatic indexing rig according to claim 1, it is characterised in that:The gearcase profile One side closed to be round, the bearing hole is at center side, and the straight pin is divided into two sections, and bottom diameter is more straight than upper end The big 4mm in footpath, the straight pin are vertically welded on gearcase side, and circumferentially array is arranged.
A kind of 3. mining mounting formula automatic indexing rig according to claim 1, it is characterised in that:The fang platform is provided with Rectangular strip and bolt hole, the rectangular strip are arranged side by side at two sides of fang platform, and the rectangular strip is erected at corresponding screens In groove.
A kind of 4. mining mounting formula automatic indexing rig according to claim 1, it is characterised in that:The circle of the bearing hole The heart is conllinear with the center of circle of mesopore.
CN201720354810.6U 2017-04-06 2017-04-06 A kind of mining mounting formula automatic indexing rig Expired - Fee Related CN207144822U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720354810.6U CN207144822U (en) 2017-04-06 2017-04-06 A kind of mining mounting formula automatic indexing rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720354810.6U CN207144822U (en) 2017-04-06 2017-04-06 A kind of mining mounting formula automatic indexing rig

Publications (1)

Publication Number Publication Date
CN207144822U true CN207144822U (en) 2018-03-27

Family

ID=61658036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720354810.6U Expired - Fee Related CN207144822U (en) 2017-04-06 2017-04-06 A kind of mining mounting formula automatic indexing rig

Country Status (1)

Country Link
CN (1) CN207144822U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106801580A (en) * 2017-04-06 2017-06-06 安徽理工大学 A kind of mining mounting formula automatic indexing rig
CN113404525A (en) * 2021-07-21 2021-09-17 太原理工大学 Ring type drilling and anchoring machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106801580A (en) * 2017-04-06 2017-06-06 安徽理工大学 A kind of mining mounting formula automatic indexing rig
CN113404525A (en) * 2021-07-21 2021-09-17 太原理工大学 Ring type drilling and anchoring machine
CN113404525B (en) * 2021-07-21 2022-06-28 太原理工大学 Ring type drilling and anchoring machine

Similar Documents

Publication Publication Date Title
CN102182400B (en) Double-guide-rail drill wagon for coal mine
CN207144822U (en) A kind of mining mounting formula automatic indexing rig
CN101392629B (en) Portable all-hydraulic core drilling rig
CN101864901A (en) Drilling machine capable of rapidly and accurately locating
CN113090300B (en) Drilling and grouting integrated anchor rod drill carriage
CN104625143B (en) Drilling machine with multiple drill bits in linkage
CN201687399U (en) Drilling machine capable of positioning fast and accurately
CN106801580A (en) A kind of mining mounting formula automatic indexing rig
CN104612154B (en) Afterburning self tapping stake stake machine
CN108071339A (en) A kind of full-automatic underground drill rig
CN102678047B (en) Rig and drill arm mechanism thereof
CN205012942U (en) Derrick formula coiled tubing centering structure
CN110293515B (en) Pin pulling device and working method thereof
CN110821400A (en) Multifunctional pneumatic crawler-type drilling machine
CN106351576A (en) All-around deep-hole drill rig under coal mine well
CN207892528U (en) A kind of full-automatic underground drill rig
CN106401478A (en) Main machine assembly structure of coal mine drilling machine
CN107676053B (en) Modular ocean injection head operation platform
CN206509679U (en) The mounting and positioning device of cast pipe union
CN206614051U (en) A kind of drilling machine
CN210317180U (en) Universal supporting base special for drilling machine supporting frame
CN211422521U (en) Multifunctional pneumatic crawler-type drilling machine
CN207144812U (en) A kind of indexing mechanism of tunnel hydraulic drill rig
CN201265354Y (en) Light full-hydraulic core drilling rig
CN209704486U (en) Full-hydraulic gear rack drilling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180327

Termination date: 20190406