CN208917789U - The integration pump brake gear of hydraulic lifting - Google Patents

The integration pump brake gear of hydraulic lifting Download PDF

Info

Publication number
CN208917789U
CN208917789U CN201821338846.6U CN201821338846U CN208917789U CN 208917789 U CN208917789 U CN 208917789U CN 201821338846 U CN201821338846 U CN 201821338846U CN 208917789 U CN208917789 U CN 208917789U
Authority
CN
China
Prior art keywords
hydraulic lifting
gate
main gate
pump
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821338846.6U
Other languages
Chinese (zh)
Inventor
田冬
朱崇照
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Supumps Environment Technology Changzhou Co ltd
Supumps Pump Industry Shanghai Co ltd
Original Assignee
Shu Pengshi Pumps (shanghai) Co Ltd
Shu Peng Shi Environmental Technology (changzhou) Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shu Pengshi Pumps (shanghai) Co Ltd, Shu Peng Shi Environmental Technology (changzhou) Ltd By Share Ltd filed Critical Shu Pengshi Pumps (shanghai) Co Ltd
Priority to CN201821338846.6U priority Critical patent/CN208917789U/en
Application granted granted Critical
Publication of CN208917789U publication Critical patent/CN208917789U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model relates to a kind of integration pump brake gears of hydraulic lifting, including the pump gate assembly being arranged between continental river and exorheic river, pumping gate assembly includes submersible pump assembly, main gate, hydraulic lifting apparatus and electric control gear, electric control gear respectively with submersible pump assembly, hydraulic lifting apparatus connection, installation through-hole is offered on main gate, submersible pump assembly is fixed in installation through-hole, hydraulic lifting apparatus includes hydraulic cylinder and support base, hydraulic cylinder and support base are connect with main gate respectively, hydraulic cylinder can drive main gate to rotate the open and close to realize main gate around support base.The integration pump brake gear of the hydraulic lifting can effectively solve that existing traditional pump station is big in the presence of investment, the construction period is long, take up a large area, river drain off floodwaters and the problem of water body exchange capacity difference, have the characteristics that easy for installation, quick construction, reduce investment, it is easy to maintain.

Description

The integration pump brake gear of hydraulic lifting
Technical field:
The utility model relates to hydraulic and hydroelectric engineering and municipal river drainage system technical field, more particularly to one kind are hydraulic The integration pump brake gear of lifting.
Background technique:
With the variation of global climate and the quickening of urbanization process, extreme weather is frequent, after heavy rain, low laying areas river Road and city, small towns freshwater line rapid increase, the pumping plant ability of controlling flood and draining flooded fields that early stage establishes have been unable to meet requirement, this is just needed Increase the ability of controlling flood and draining flooded fields of pumping plant, creates more or greater flow drainage pumping stations.But by the system in urban architecture space About, it builds traditional pump station on a large scale to be restricted, while the traditional pump station building scale of construction is huge, takes up a large area, construction period The problem long, construction cost is high, building and surrounding enviroment are uncoordinated is prominent, it has also become the bottleneck of newly-built traditional pump station.
Integration pump lock is to be mounted directly submerged pump system by bindiny mechanism to be fixed on gate, and full-tubular is made to dive under water The device that electric pump and gate are integrated.System structure is simple, easy to operate, when freshwater line is high, opens gate, interior river water From flowing into Wai He;When freshwater line is low, when outer stream stage is high, closed shutter starts water pump, and interior river water is pumped to entering outer river.One Change pump facility of the brake system without the artificial limitation river cross-section of river, river is connected to section and improves 1 times or more than traditional lock station, effectively Increase water-based connection between inside and outside river.
For existing pump station engineering by the way of gate, pumping plant fission arrangement, the cross-section of river of intermediate gate is small, reduces river Road drain off floodwaters and water body exchange capacity, there are gate and pump installation are complicated, time-consuming, and technical requirements are high, hoist type lifting mechanism The problems such as building amount is big, poor with surrounding enviroment degrees of fusion.Therefore, be badly in need of it is a kind of it is compact-sized, occupied area is small, quick construction, The environmentally friendly integration pump brake gear reduced investment outlay.
Utility model content:
The purpose of this utility model be in view of the drawbacks of the prior art, solve at present in city inland river flood control capacity it is poor, Water quality inferiority, weak certainly quoted from row's ability, river discharge area is small, and in Plain and Bin Hu, riparian area construction pumping plant investment is big, builds Period is long, the problems such as taking up a large area, and proposes the one of a kind of hydraulic lifting for combining full through-flow submersible pump, gate Bodyization pumps brake gear.
The utility model is achieved by the following technical solution: a kind of integration pump brake gear of hydraulic lifting, including Pump gate assembly between continental river and exorheic river is set, and the pump gate assembly includes submersible pump assembly, main gate, hydraulic Lifting device and electric control gear, the electric control gear are connect with submersible pump assembly, hydraulic lifting apparatus respectively, the work lock Installation through-hole is offered on door, the submersible pump assembly is fixed in installation through-hole, and the hydraulic lifting apparatus includes hydraulic Oil cylinder and support base, the hydraulic cylinder and support base are connect with main gate respectively, hydraulic cylinder can drive main gate around Support base rotates the open and close to realize main gate.
Due to after using for a longer period, sludge often being accumulated at the door or gate slot below main gate, if too late Shi Qingli after the time is longer, it is stuck to will lead to main gate, therefore be correspondingly arranged below main gate for flushing work The flusher of gate door, the flusher include the immersible pump and nozzle being connected.
Since inland river often has some floating materials, if directly easilying lead to its blocking by submersible pump assembly, Therefore the water inlet side of submersible pump assembly is provided with sewage blocking device, certain filtering is carried out to water inlet.
For the ease of maintenance, the inlet and outlet side of the submersible pump assembly is respectively arranged with bulkhead gate.
For the ease of assembly, the submersible pump assembly is fixedly connected by flange with main gate, submersible pump assembly Junction between main gate is provided with sealing ring.
In order to reduce water resistance, the water outlet of the submersible pump assembly is provided with buoyancy tank flap valve.
The beneficial effects of the utility model are: the integration pump brake gear of the hydraulic lifting can effectively solve existing tradition Pumping plant has that investment is big, the construction period is long, takes up a large area, river drain off floodwaters and the problem of water body exchange capacity difference, have and pacify The features such as filling convenience, quick construction, reducing investment, is easy to maintain, can improve water drainage ability, effectively clear up gate siltation and cause Sealing problem, and can be carried out water body exchange, improve continental river water water body environment purpose.
Detailed description of the invention:
Fig. 1 is the structural schematic diagram of the integration pump brake gear of the hydraulic lifting of the utility model;
Fig. 2 is the structural schematic diagram of the installation through-hole of the integration pump brake gear of the hydraulic lifting of the utility model;
Fig. 3 is the structural schematic diagram of the hydraulic cylinder of the integration pump brake gear of the hydraulic lifting of the utility model;
In figure: 1. bulkhead gates, 2. sewage blocking devices, 3. hydraulic cylinders, 4. support bases, 5. submersible pumps are overall, 6. buoyancy tanks Flap valve, 7. bulkhead gates, 8. electric control gears, 9. immersible pumps, 10. bolts, 11. nozzles, 12. main gate doors, 13. installations are logical Hole, 14. support bases.
Specific embodiment:
The preferred embodiment of the utility model is described in detail with reference to the accompanying drawing, so that the advantages of the utility model It can be easier to be understood by those skilled in the art with feature, to make apparent specific boundary to the protection scope of the utility model It is fixed.Direction term that the utility model is previously mentioned, such as "upper", "lower", "front", "rear", "left", "right", "top", "bottom" etc., It is only the direction with reference to annexed drawings.Therefore, the direction term used be to illustrate and understand the utility model, rather than to Limit the utility model.
As shown in Figure 1-3, a kind of integration pump brake gear of hydraulic lifting, including be arranged in continental river and exorheic river (Fig. 1 Middle left side be exorheic river, right side is continental river) between pump gate assembly, the pump gate assembly include submersible pump assembly 5, work Gate 4, hydraulic lifting apparatus and electric control gear 8, the electric control gear connect with submersible pump assembly 5, hydraulic lifting apparatus respectively It connects, installation through-hole 13 is offered on the main gate 4, the submersible pump assembly 5 is fixed in installation through-hole 13, latent The water inlet side of water power pump assembly 5 is provided with sewage blocking device 2, and the water outlet of submersible pump assembly 5 is equipped with buoyancy tank flap valve 6, To reduce water resistance, the hydraulic lifting apparatus includes hydraulic cylinder 3 and support base 14, the hydraulic cylinder 3 and support base 14 connect with main gate 4 respectively, and hydraulic cylinder 3 is provided with multiple and is uniformly distributed along main gate 4, and hydraulic cylinder 3 can drive Dynamic main gate 4 rotates the open and close to realize main gate 4 around support base 14.
The utility model offers installation through-hole 13 on main gate 4, as shown in figure 3, its size and full-tubular are dived under water Electric pump assembly 5 matches, and installation through-hole 13 is provided with flange, and submersible pump assembly 5 passes through the installation through-hole on main gate 4 13, by the flanged joint in flange bolt 10 and installation through-hole 13, it is equipped with O-ring seal between two flanges, prevents from leaking. Bottom and gate slot sealing surface in main gate 4, are embedded with the immersible pump 9 being rinsed for the silt to main gate door 12 And nozzle 11, pressure supply water, the silt of flush gate door and door 12, to solve the underwater siltation of gate are mentioned by immersible pump 9 And sealing problem, it maintains easily, guarantees the sealed reliable of gate.In the inlet and outlet two sides of submersible pump assembly 5 point It is not correspondingly arranged on bulkhead gate 1, bulkhead gate 7, for safeguarding.The sewage blocking device of the utility model can block dirt using grid The filter screen of corresponding mesh number can also be used in machine.
In use, opening main gate 5 when freshwater line is high, interior river water flows automatically into Wai He;When freshwater line is low, outside When stream stage is high, main gate 5 is closed, starts submersible pump assembly 5, interior river water is pumped to entering outer river, very convenient.
Above-described embodiments merely represent several embodiments of the utility model, the description thereof is more specific and detailed, But it cannot be understood as the limitations to utility model patent range.It should be pointed out that for the common skill of this field For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to The protection scope of the utility model.

Claims (6)

1. a kind of integration pump brake gear of hydraulic lifting, including the pump gate assembly being arranged between continental river and exorheic river, Be characterized in that: the pump gate assembly includes submersible pump assembly, main gate, hydraulic lifting apparatus and electric control gear, the electricity Control device is connect with submersible pump assembly, hydraulic lifting apparatus respectively, and installation through-hole is offered on the main gate, described latent Water power pump assembly is fixed in installation through-hole, and the hydraulic lifting apparatus includes hydraulic cylinder and support base, the hydraulic cylinder And support base is connect with main gate respectively, hydraulic cylinder can drive main gate to rotate around support base to realize main gate It opens and closes.
2. the integration pump brake gear of hydraulic lifting according to claim 1, it is characterised in that: below the main gate It is correspondingly arranged on the flusher for flushing work gate door, the flusher includes the immersible pump being connected and spray Mouth.
3. the integration pump brake gear of hydraulic lifting according to claim 2, it is characterised in that: the submersible pump assembly Water inlet side be provided with sewage blocking device.
4. the integration pump brake gear of hydraulic lifting according to claim 3, it is characterised in that: the submersible pump assembly Inlet and outlet side be respectively arranged with bulkhead gate.
5. the integration pump brake gear of hydraulic lifting according to claim 1, it is characterised in that: the submersible pump assembly It is fixedly connected by flange with main gate, the junction between submersible pump assembly and main gate is provided with sealing ring.
6. the integration pump brake gear of hydraulic lifting according to claim 1, it is characterised in that: the submersible pump assembly Water outlet be provided with buoyancy tank flap valve.
CN201821338846.6U 2018-08-17 2018-08-17 The integration pump brake gear of hydraulic lifting Active CN208917789U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821338846.6U CN208917789U (en) 2018-08-17 2018-08-17 The integration pump brake gear of hydraulic lifting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821338846.6U CN208917789U (en) 2018-08-17 2018-08-17 The integration pump brake gear of hydraulic lifting

Publications (1)

Publication Number Publication Date
CN208917789U true CN208917789U (en) 2019-05-31

Family

ID=66702204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821338846.6U Active CN208917789U (en) 2018-08-17 2018-08-17 The integration pump brake gear of hydraulic lifting

Country Status (1)

Country Link
CN (1) CN208917789U (en)

Similar Documents

Publication Publication Date Title
CN208363235U (en) Overflow well with flow of intercepting pipeline controlled by floating barrel and pulley
CN105780906B (en) A kind of dirty exhaust system of fragment abandoned stream section
CN207878397U (en) Integration pump brake gear and the lock station that brake gear is pumped with the integration
CN106836439A (en) One kind is emergent from opening device
CN107162238B (en) Gravity stream sewage enters corridor system
CN206206294U (en) A kind of the siphon priming device
CN105178425A (en) Flood-drainage, water-supplementing and water-changing pump station junction design for cities and towns
CN211172272U (en) System for flushing and shunting municipal sewage pipe
CN208917789U (en) The integration pump brake gear of hydraulic lifting
CN205636892U (en) Reposition of redundant personnel of regional burst rainwater, regulation and processing system based on mixed flow tubulation net
CN210163860U (en) Landscape sluice that bottom outlet flowed
US20030039512A1 (en) Method & apparatus for recycling hydro power
CN104631599B (en) A kind of urgent flood discharge of rain flood
CN208363234U (en) Overflow well with float flashboards for controlling flow of closure pipeline
CN215482414U (en) Siltation preventing device for mixed flow pipe culvert intercepting groove
CN213653711U (en) Novel intensive hydraulic rotary intercepting well structure
CN205637027U (en) Reposition of redundant personnel of regional burst rainwater, regulation and processing system based on confluence tubulation net
CN212336273U (en) Reduce rainwater regulation pump station of initial stage rainwater pollution and flood peak flow simultaneously
CN210482518U (en) Prefabricated formula floodgate that dams
CN210684857U (en) Bidirectional tubular pump station using one-way tubular pump
CN209277121U (en) Pump lock double-layer drainage structure
CN211080350U (en) Leachate sewage pool dredging system
CN210917247U (en) Multifunctional sluice capable of realizing bidirectional pumping through gate translation switching
CN209227711U (en) Rainwater cabin and have utility tunnel in rainwater cabin
CN207863122U (en) A kind of intelligence Vatch basin

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 213000, No. 399 Jingde West Road, Wujin District, Changzhou City, Jiangsu Province

Patentee after: SUPUMPS ENVIRONMENT TECHNOLOGY (CHANGZHOU) Co.,Ltd.

Country or region after: China

Patentee after: SUPUMPS PUMP INDUSTRY (SHANGHAI) CO.,LTD.

Address before: 213000 Qingjiang Road, Xinbei District, Changzhou, Jiangsu 28

Patentee before: SUPUMPS ENVIRONMENT TECHNOLOGY (CHANGZHOU) Co.,Ltd.

Country or region before: China

Patentee before: SUPUMPS PUMP INDUSTRY (SHANGHAI) CO.,LTD.