CN208917761U - A kind of quick assembling flood control small dike - Google Patents

A kind of quick assembling flood control small dike Download PDF

Info

Publication number
CN208917761U
CN208917761U CN201821182952.XU CN201821182952U CN208917761U CN 208917761 U CN208917761 U CN 208917761U CN 201821182952 U CN201821182952 U CN 201821182952U CN 208917761 U CN208917761 U CN 208917761U
Authority
CN
China
Prior art keywords
support
daughter board
flood control
avris
carrier bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821182952.XU
Other languages
Chinese (zh)
Inventor
白向辰
白乐祺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Chengjiang Emergency Equipment Technology Co Ltd
Original Assignee
Hebei Chengjiang Emergency Equipment Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Chengjiang Emergency Equipment Technology Co Ltd filed Critical Hebei Chengjiang Emergency Equipment Technology Co Ltd
Priority to CN201821182952.XU priority Critical patent/CN208917761U/en
Application granted granted Critical
Publication of CN208917761U publication Critical patent/CN208917761U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Abstract

The utility model discloses a kind of quick assembling flood control small dikes, the support frame including water fender and the support water fender;The water fender includes the water blocking board group that several groups are successively spliced, and the water blocking board group includes multiple being located in the middle center daughter board and two avris daughter boards for being located at center daughter board two sides;The avris daughter board is successively hinged by hinge with the center daughter board, and guide runner is provided along its length at the outer rim of the avris daughter board, and the guide runner is equipped with hangers;Support frame as described above is equipped with the hook matched with the hangers.The component of this flood control small dike stores and convenient transportation, and entire flood control small dike installation quickly, realizes basic flood control function, is rapidly achieved the task of emergency flood fighting.

Description

A kind of quick assembling flood control small dike
Technical field
The utility model relates to emergency flood fighting apparatus fields, and in particular to a kind of quick assembling flood control small dike.
Background technique
Flood control small dike is to prevent flood from overflowing levee crown, is a kind of existing in the interim small dike that the levee crown of the neighbouring water surface is repaired Field assembly type secondary dyke.It speedily carries out rescue work equipment deposit usually as country, basin or provinces and cities' fixed point warehouse, is also directly equipped on each province urban district Model of mobile emergency handling team in.
Existing flood control small dike is many kinds of, but there are many problems: first is that, various components space occupied is big, is not easy to Storage and transport;Second is that in emergency flood fighting, it is erroneous for installation, it needs that multiple fasteners and connector are installed manually, increases significantly Set-up time of entire flood control small dike, strong influence work of flood prevention;Third is that the flood control small dike after installation is inadequate when in use Securely.
Utility model content
To solve the above problems, the utility model provides a kind of quick assembling flood control small dike, the component of this flood control small dike Storage and convenient transportation, quickly, securely, stability is good for entire flood control small dike installation.
To achieve the above object, the technical solution adopted in the utility model are as follows: a kind of quick assembling flood control small dike, including gear Water plate and the support frame for supporting the water fender;
The water fender includes the water blocking board group that several groups are successively spliced, and the water blocking board group includes multiple is located in the middle Center daughter board and two avris daughter boards positioned at center daughter board two sides;The avris daughter board and the center daughter board pass through conjunction Page is successively hinged, and guide runner is provided along its length at the outer rim of the avris daughter board, and the guide runner is equipped with hangers;
Support frame as described above is equipped with the hook matched with the hangers.
Further: support frame as described above includes several support tripods and several is removably mounted to the support triangle frame Between cross bar;The support triangle sets up the stitching portion for being placed in the two neighboring water blocking board group, the support triangle frame packet The carrier bar for supporting the water fender and two support type bars are included, is all provided on each described carrier bar there are two the extension Hook, the upper and lower side of the carrier bar are also respectively provided with upper hinge support and lower hinge support, one end of support type bar described in two Hingedly, the other end of two support type bars is plugged and fixed with the upper hinge support and lower hinge support respectively.
It is further: to be equipped with mounting base on the carrier bar and support type bar, jack, institute are offered in the mounting base The first pin hole offered on the inner wall of jack through the mounting base side wall is stated, the first elasticity is installed at first pin hole Key, the both ends of the cross bar are equipped with the inserted block matched with the jack, and the inserted block is equipped with and the first pin hole phase First spring catch of cooperation.
Further: the cross bar includes the connection cross bar being set between the support type bar and is set to the carrying Support rail between bar;The support rail includes the support cross that the carrier bar top is rotatably dispose in by rotating device Kelly and the horizontal pressure pin of support for being set to the carrier bar lower part;The section of the support horizontal jamming rod is rectangle, the rotation dress Set including the fixing axle that is fixedly installed on the carrier bar and the axle sleeve being sheathed in the fixing axle, the axle sleeve with it is described The mounting base at support horizontal jamming rod both ends is fixedly connected, and the arc groove of a quarter, the circle are offered on the inner wall of the axle sleeve The both ends of arc slot offer the second pin hole through the side wall of shaft sleeve, are respectively equipped with the second bullet at two second pin holes Property key and third flexible keypad, the fixing axle is equipped with the second spring pin matched with second pin hole, described the Two spring catch are slideably positioned in the arc groove;It is equipped with and the support rail card on the avris daughter board and center daughter board The fixed fastener connect, the fixed fastener include the fixed base plate being fixedly installed on the avris daughter board and center daughter board, if The arc hanging plate being placed on the fixed base plate and the grab plate being set on the fixed base plate, the grab plate include one The tranverse connecting plate of design, perpendicular connecting plate and horizontal snap-gauge.
Have the beneficial effect that entire water fender is successively spliced by multiple water blocking board groups caused by by adopting the above technical scheme and At and the avris daughter board in each water blocking board group and center daughter board are successively hinged by hinge, so when not in use or transport When, water blocking board group can be folded and be placed, be greatly reduced occupied area, convenient transportation and storage.
It is first that support frame fixed placement is good when needing to build flood control sub-embankment, it is unfolded by water blocking board group, and by water blocking Board group is put on support frame, so that the guide runner on avris daughter board is slided along the hook on support frame, until hook is hung on On hangers, the installation of one piece of water blocking board group can be completed at this time, then remaining water blocking board group is successively installed.Entirely installed Journey does not need other fixed fastener, and building substantially for flood control sub-embankment can be completed, and realizes basic flood control function, quickly reaches To the task of emergency flood fighting.
Support frame includes support triangle frame and cross bar, and wherein support triangle frame is detachably installed with cross bar, support triangle The carrier bar and support type bar of frame can also be installed by grafting.Cross bar need to only insert inserted block when being installed on support triangle frame Enter in jack, and is caught in the first spring catch in the first pin hole.Mounting rack entire so when not in use, can be very convenient Be split as multiple bar shaped bars, in convenient transportation, storage take up space it is small, and when in use can conveniently, rapidly complete to install.
Cross bar includes connection cross bar and support rail, and support rail includes support horizontal jamming rod and supports horizontal pressure pin, wherein propping up The section design of support horizontal jamming rod is rectangular and be rotatably dispose on carrier bar, and can matching by the second pin hole and second spring pin Conjunction is fixed.It is equipped with fixed fastener on avris daughter board and center daughter board, fixed fastener includes arc hanging plate and grab plate.? When water blocking board group is installed, support horizontal jamming rod is adjusted, so that its biggish face is parallel with avris daughter board and center daughter board, until arc Hanging plate is hung on the horizontal pressure pin of support, is rotated further by support horizontal jamming rod, so that biggish face is vertical with avris daughter board and center daughter board, this When support the biggish face of horizontal jamming rod can offset with the horizontal snap-gauge of grab plate, realization entire water blocking board group is connected and fixed, prevent It slides from support frame.Process entirely is connected and fixed, can be completed only by the rotation of control support horizontal jamming rod, relative to It needs to install for multiple fasteners in existing technology, it is easy to operate, fast, the installation of entire flood control small dike can be quickly completed.
Detailed description of the invention
Fig. 1 show the structural schematic diagram that the utility model is mounted to entire small dike;
Fig. 2 show the structural schematic diagram of the utility model;
Fig. 3 show the partial schematic diagram of avris daughter board;
Fig. 4 show the portion the D enlarged diagram of Fig. 2;
Fig. 5 show carrier bar structural schematic diagram;
The perspective view of the explosion that Fig. 6 show cross bar and mounting base is detachably connected;
Fig. 7 show the portion the C enlarged diagram of Fig. 2;
Fig. 8 show the schematic diagram of rotating device;
Fig. 9 show the isometric cross-sectional view in the face B-B of Fig. 8;
Figure 10 show the isometric cross-sectional view in the face A-A of Fig. 8;
Figure 11 show structural schematic diagram when water fender connects and fixes;
Wherein: 1, rotating device, 11, axle sleeve, 111, arc groove, the 112, second pin hole, the 113, second flexible keypad, 114, Third flexible keypad, 12, fixing axle, 121, second spring pin;2, support frame, 21, support triangle frame, 211, carrier bar, 2111, Upper hinge support, 2112, lower hinge support, 212, support type bar, 22, cross bar, 221, inserted block, 2211, guide rail, the 222, first spring Pin;3, water blocking board group, 31, center daughter board, 32, avris daughter board, 321, guide runner, 322, hangers;4, cross bar is connected;5, support is horizontal Bar, 51, support horizontal jamming rod, 52, the horizontal pressure pin of support;6, hinge;7, it links up with;8, mounting base, 81, jack, the 812, first elasticity are pressed Key, 82, guide groove;9, fixed fastener, 91, fixed base plate, 92, arc hanging plate, 93, grab plate, 931, tranverse connecting plate, 932, perpendicular company Plate, 933, horizontal snap-gauge.
Specific embodiment
The embodiments of the present invention is described in further detail with reference to the accompanying drawings and examples.Following embodiment For illustrating the utility model, but cannot be used to limit the scope of the utility model.
When actually carrying out emergency flood fighting installation flood control small dike, (under normal circumstances, small dike's design axis of dam meets water side first The slot trough side levee crown edge 50cm that meets water is advisable), flood control small dike is installed on smooth levee foundation surface again later.
Fig. 1 to Figure 11 is a specific embodiment of the utility model:
Installation support frame 2: two support type bars 212 of support triangle frame 21 are plugged and fixed respectively and are mounted on carrier bar In the upper hinge support 2111 and lower hinge support 2112 of 211 upper and lower ends, the installation of support triangle frame 21 is completed.It again respectively will be horizontal The inserted block 221 at 22 both ends of bar is inserted into the jack 81 of mounting base 8, and the first spring catch 222 is caught in the first pin hole. Successively support triangle frame 21 is installed at interval again later and the installation of entire support frame 2 can be completed in cross bar 22.For convenience quickly Realization cross bar 22 and 21 upper mounting seat 8 of support triangle frame installation, offer guide groove 82 on the inner wall of the jack 81, it is described The opening of guide groove 82 is equipped with fillet, is provided with the guide rail 2211 matched with the guide rail guide groove 82 on the inserted block 221.Only Guide rail 2211 need to be slided along guide groove 82, the first spring catch 222 can easily be made to be caught in the first pin hole.
Water fender is installed: the water blocking board group 3 that collapsed transportable is come, and water blocking board group 3 is put in 2 top of support frame, make side The guide runner 321 of side daughter board 32 is stuck on the hook 7 of carrier bar 211, and gradually makes 3 slide downward of water blocking board group, until leading Hangers 322 on sliding slot 321 is hung on hook 7.Installation water blocking board group 3 can be completed to entire flood control small dike one by one again later Installation.
This flood control small dike is easy for installation quickly, can fast implement the task of flood control.
After completing the task of flood control, when needing to dismantle flood control small dike, it is lifted up water blocking board group 3, so that hook 7 It is detached from, is being folded from the hangers 322 of guide runner 321.Later when dismantling support frame 2, pressed at the first pin hole with hand The first flexible keypad 812 can be easily by cross bar 22 from mounting base 8 so that the first spring catch 222 is popped up from the first pin hole On remove, the separation of support triangle frame 21 and cross bar 22 is realized, finally by two support type bars 212 of support triangle frame 21 from holding It carries in the upper hinge support 2111 and lower hinge support 2112 of 211 upper and lower ends of bar and extracts, realize the disassembly of entire flood control small dike. Various components after this flood control small dike disassembly occupy little space, and facilitate storage and transport.
Water fender is connected and fixed in order to realize, support horizontal jamming rod 51 is rotatably arranged on carrier bar by rotating device 1 On 211, and the fixed fastener 9 being clamped with support rail 5 is provided on avris daughter board 32 and center daughter board 31.When installation is kept off When water plate, first by pressing the second flexible keypad 113 so that second spring pin 121 from the second flexible keypad 113 second It is skidded off in pin hole 112, and rotary axle box 11, so that second spring pin 121 is slided along arc groove 111, until support horizontal jamming rod 51 Biggish face is parallel with avris daughter board 32 and center daughter board 31, and second spring pin 121 is caught at third flexible keypad 114 at this time In two pin holes 112.Water fender is installed in the way of upper one embodiment again, until the hangers 322 on guide runner 321 hangs on extension When hook 7, arc hanging plate 92 is hung over just on the horizontal pressure pin 52 of support at this time, third flexible keypad 114 is finally pressed again, so that second Spring catch 121 is skidded off from the second pin hole 112 from third flexible keypad 114, and rotary axle box 11, until second spring pin 121, which slide into realization in the second pin hole 112 at the second flexible keypad 113, fixes.The support biggish face of horizontal jamming rod 51 and card at this time The horizontal snap-gauge 933 of hook plate 93 offsets, and realizes connecting and fixing to entire water blocking board group 3, prevents it from sliding from support frame 2.It is whole It is a to connect and fix process, only by control support horizontal jamming rod 51 rotation can be completed, compared with the prior art in need It installs for multiple fasteners, it is easy to operate, fast, the installation of entire flood control small dike can be quickly completed.
Finally, it should be noted that above embodiments are only to illustrate the technical solution of the utility model, rather than its limitations; Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art should understand that: It can still modify to technical solution documented by previous embodiment, or be equal to part of technical characteristic Replacement;And these are modified or replaceed, the utility model embodiment technical solution that it does not separate the essence of the corresponding technical solution Spirit and scope.

Claims (4)

1. a kind of quick assembling flood control small dike, it is characterised in that: the support frame (2) including water fender and the support water fender;
The water fender includes the water blocking board group (3) that several groups are successively spliced, and the water blocking board group (3) includes multiple positioned at centre Center daughter board (31) and two be located at center daughter board (31) two sides avris daughter board (32);The avris daughter board (32) with The center daughter board (31) is successively hinged by hinge (6), is provided along its length at the outer rim of the avris daughter board (32) Guide runner (321), the guide runner (321) are equipped with hangers (322);
Support frame as described above (2) is equipped with the hook (7) matched with the hangers (322).
2. a kind of quick assembling flood control small dike according to claim 1, it is characterised in that: support frame as described above (2) is if include The Heavenly Stems and Earthly Branches support tripod (21) and several cross bars (22) being removably mounted between the support triangle frame (21);The support three Corner bracket (21) is set to the stitching portion of the two neighboring water blocking board group (3), and the support triangle frame (21) includes described in support The carrier bar (211) of water fender and two support type bars (212), are all provided with that there are two described on each described carrier bar (211) Hook (7), the upper and lower side of the carrier bar (211) is also respectively provided with upper hinge support (2111) and lower hinge support (2112), One end of support type bar (212) described in two is hinged, the other end of two support type bars (212) respectively with it is described upper Hinged-support (2111) and lower hinge support (2112) are plugged and fixed.
3. a kind of quick assembling flood control small dike according to claim 2, it is characterised in that: the carrier bar (211) and branch It is equipped on support type bar (212) mounting base (8), is offered jack (81) on the mounting base (8), the inner wall of the jack (81) On offer the first pin hole through the mounting base (8) side wall, the first flexible keypad is installed at first pin hole (812), the both ends of the cross bar (22) are equipped with the inserted block (221) matched with the jack (81), set on the inserted block (221) There is the first spring catch (222) matched with first pin hole.
4. a kind of quick assembling flood control small dike according to claim 3, it is characterised in that: the cross bar (22) includes setting Connection cross bar (4) between the support type bar (212) and the support rail (5) being set between the carrier bar (211); The support rail (5) includes being rotatably dispose in the support horizontal jamming rod (51) on the carrier bar (211) top and being set to described The horizontal pressure pin of support (52) of carrier bar (211) lower part;The section of support horizontal jamming rod (51) is rectangle, the support horizontal jamming rod (51) mounting base (8) at both ends is rotatably dispose on the carrier bar (211) by rotating device (1), the rotating device (1) Including the fixing axle (12) being fixedly installed on the carrier bar (211) and the axle sleeve being sheathed on the fixing axle (12) (11), the axle sleeve (11) with it is described support horizontal jamming rod (51) both ends mounting base (8) be fixedly connected, the axle sleeve (11) it is interior The arc groove (111) of a quarter is offered on wall, the both ends of the arc groove (111) are offered through the axle sleeve (11) The second pin hole (112) of side wall is respectively equipped with the second flexible keypad (113) and third bullet at two second pin holes (112) Property key (114), the fixing axle (12) is equipped with the second spring pin (121) that matches with second pin hole (112), institute Second spring pin (121) is stated to be slideably positioned in the arc groove (111);On the avris daughter board (32) and center daughter board (31) It is equipped with the fixed fastener (9) with support rail (5) clamping, the fixed fastener (9) includes being fixedly installed on avris Fixed base plate (91) on plate (32) and center daughter board (31), the arc hanging plate (92) being set on the fixed base plate (91) and The grab plate (93) being set on the fixed base plate (91), the grab plate (93) include integrated design tranverse connecting plate (931), Perpendicular connecting plate (932) and horizontal snap-gauge (933).
CN201821182952.XU 2018-07-25 2018-07-25 A kind of quick assembling flood control small dike Active CN208917761U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821182952.XU CN208917761U (en) 2018-07-25 2018-07-25 A kind of quick assembling flood control small dike

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821182952.XU CN208917761U (en) 2018-07-25 2018-07-25 A kind of quick assembling flood control small dike

Publications (1)

Publication Number Publication Date
CN208917761U true CN208917761U (en) 2019-05-31

Family

ID=66701045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821182952.XU Active CN208917761U (en) 2018-07-25 2018-07-25 A kind of quick assembling flood control small dike

Country Status (1)

Country Link
CN (1) CN208917761U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236248A (en) * 2020-01-16 2020-06-05 赤峰市金川市政建设工程有限公司 Foundation ditch supporting device for civil engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236248A (en) * 2020-01-16 2020-06-05 赤峰市金川市政建设工程有限公司 Foundation ditch supporting device for civil engineering

Similar Documents

Publication Publication Date Title
RU2709041C2 (en) Trench frame and method for assembly thereof
CN208917761U (en) A kind of quick assembling flood control small dike
CN209346354U (en) It is a kind of to facilitate the detachable bookshelf assembled
CN209949700U (en) Liftable tray for cabinet
CN204263830U (en) A kind of double-faced drawing board
KR200463856Y1 (en) Wall union type up and down sliding hanger
CN208896764U (en) A kind of folding artistic design sketch plate
CN212878668U (en) Exhibition device convenient to remove exhibition
CN205788997U (en) Folded flex frame
KR20180033918A (en) Clothing hanger for camping
CN207744873U (en) A kind of combined garderobe convenient for collapsed transportable
CN205203617U (en) Metal box with a net
CN210319908U (en) Stage lamp support
KR20090014836A (en) Laundry hanger
CN217447004U (en) Table
CN215056059U (en) Supporting device for building engineering construction
CN109619860A (en) Foldable dismounting formula file cabinet
CN211036759U (en) Warning sign tablet is used in construction
CN219813464U (en) Side table convenient to dismantle transportation
CN219556700U (en) Rack for placing articles
CN213308240U (en) Outdoor folding table
CN212852843U (en) Folding desk
CN217429483U (en) Folding cover plate of sliding cover
CN211507040U (en) Colleges and universities administrative work bulletin board
CN212430188U (en) Survey and drawing support suitable for open-air survey and drawing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant