CN208917713U - Just beam ruggedized construction for switch section - Google Patents

Just beam ruggedized construction for switch section Download PDF

Info

Publication number
CN208917713U
CN208917713U CN201821647168.1U CN201821647168U CN208917713U CN 208917713 U CN208917713 U CN 208917713U CN 201821647168 U CN201821647168 U CN 201821647168U CN 208917713 U CN208917713 U CN 208917713U
Authority
CN
China
Prior art keywords
stringer
crossbeam
rail
oblique
ribbed stiffener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821647168.1U
Other languages
Chinese (zh)
Inventor
高占军
谢爱华
蒋中明
程泳
马遥遥
张俊英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Fifth Survey and Design Institute Group Co Ltd
Original Assignee
China Railway Fifth Survey and Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Fifth Survey and Design Institute Group Co Ltd filed Critical China Railway Fifth Survey and Design Institute Group Co Ltd
Priority to CN201821647168.1U priority Critical patent/CN208917713U/en
Application granted granted Critical
Publication of CN208917713U publication Critical patent/CN208917713U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of just beam ruggedized constructions for switch section, two stringers including being arranged in route two sides, two stringers are respectively to be parallel to the positive stringer in main track direction and be parallel to the oblique stringer in siding direction, more crossbeams are connected between two stringers, crossbeam is passed through along main track switch tie direction by gap between resting the head on, one end of the beam is orthogonal to positive stringer, and the other end is diagonal to oblique stringer, passes through lateral Bolted angle connection between more crossbeams.Stringer is equipped with ribbed stiffener, and the arrangement spacing of ribbed stiffener is consistent with switch tie spacing;The ribbed stiffener of positive stringer is perpendicular to positive stringer axis;The ribbed stiffener and oblique stringer axis of oblique stringer are in oblique, and it is consistent with crossbeam to walk direction.Crossbeam both ends are connected using the ribbed stiffener of connecting plate and upper and lower bracket and stringer.The rail clip of main track is connect using bolt with crossbeam top flange, and rail clip and the crossbeam top flange of siding are welded and fixed, and all there is certain regulated quantity.The utility model does not destroy existing switch structure, and reinforcing section is wider, and vertical, horizontal rigidity is big, and assembling and disassembling is convenient.

Description

Just beam ruggedized construction for switch section
Technical field
The utility model relates to a kind of bridge Construction Technologies more particularly to a kind of just beam for switch section to reinforce knot Structure.
Background technique
It is worn in engineering under railway, often encounters and wear the complex situations such as yard, switch section, switch area iron leg under needs Route mutually crosses, and line spacing and sweep are small, and the relevant devices such as goat, signal lamp, switch rod are more, line requirements Height would generally select to avoid switch section to wear engineering down, but in recent years with the development of urban traffic engineering, more and more Route inevitably need underpasses branch off section.Reinforcement technique such as beam method in length and breadth is worn under traditional, downline setting Stake position is more, and the other side rides over the culvert top of lower section frame culvert, if frame culvert occurs pricking head, deviation during pushing tow, is easy to make At the inclination or excessive deformation of route, once excessive in tongue section or the appearance deformation of railway frog section, tongue is not closely connected with stock rail, Situations such as turn-out track portion widening of gauge, it will jeopardize traffic safety.Therefore railway department and unit in charge of construction are more likely to use The mode of construction beam carries out the reinforcing in track switch location, is more advantageous to the Deformation control of route.
The line requirements of switch section are higher, and the track stress between straight stock and bent stock is also more complicated, the sinking of roadbed Disease is easily caused with differential settlement, switch section is reinforced using just beam and is equal to interface height, since switch area is from switch blade area To railway frog area, number of, lines changes, and the region to need reinforcement is wider.Therefore need a kind of vertical, horizontal rigidity big, section Width can avoid substituting in construction the reinforcing mode of switch tie, and construction and recovery line speed are fast, do not cut off traffic, do not have also at present There is a kind of just beam reinforcement technique for being applicable to switch section for being able to satisfy above-mentioned requirements.
Utility model content
The purpose of the utility model is to provide a kind of just beam ruggedized constructions for switch section.
The purpose of this utility model is achieved through the following technical solutions:
The just beam ruggedized construction for switch section of the utility model, two stringers including being arranged in route two sides, Two stringers are respectively to be parallel to the positive stringer in main track direction and be parallel to the oblique stringer in siding direction, are connected between two stringers More crossbeams are connected to, the crossbeam is passed through along main track switch tie direction by gap between resting the head on, and one end of the beam is orthogonal to the positive stringer, separately One end is diagonal to the oblique stringer, passes through lateral Bolted angle connection between more crossbeams.
It is provided by the embodiment of the utility model it can be seen from above-mentioned technical solution provided by the utility model to be used for track switch The just beam ruggedized construction of section can not destroy existing switch structure, and reinforcing section is wider, and vertical, horizontal rigidity is big, assembling and disassembling It is convenient.Just Liang Jiagu suitable for railway switch section.
Detailed description of the invention
Fig. 1 is the just beam ruggedized construction planar structure schematic diagram provided by the embodiment of the utility model for switch section.
Fig. 2 is the just beam ruggedized construction section structure diagram provided by the embodiment of the utility model for switch section.
In figure:
The positive stringer of 1-;The oblique stringer of 2-;3- crossbeam;The upper bracket of 4-;5- connecting plate;Bracket under 6-;7- lateral angle steel;8- siding Rail clip;8-1-- steel sole plate;8-2-- plate washer;8-3-- sliding block;8-4-- screw rod;9- main line track fastener;10- electro-insulating rubber Block;11- rubber mat plate;12- anchor bolt and steel plate;13- limits angle steel (13-1-- longitudinal spacing angle steel;13-2-- cross spacing angle Steel);14- laminated rubber bearing.
Specific embodiment
The utility model embodiment will be described in further detail below.Do not make in the utility model embodiment in detail The content of description belongs to the prior art well known to professional and technical personnel in the field.
The just beam ruggedized construction for switch section of the utility model, preferable specific embodiment is:
Two stringers including being arranged in route two sides, two stringers are respectively the positive stringer for being parallel to main track direction Be parallel to the oblique stringer in siding direction, more crossbeams are connected between two stringers, the crossbeam is along main track switch tie direction by resting the head on Between gap pass through, one end of the beam is orthogonal to the positive stringer, and the other end is diagonal to the oblique stringer, by flat between more crossbeams Join Bolted angle connection.
The stringer is equipped with ribbed stiffener, and the arrangement spacing of the ribbed stiffener is consistent with switch tie spacing;The positive stringer adds Strength rib is perpendicular to positive stringer axis;The ribbed stiffener and oblique stringer axis of the oblique stringer are in oblique, and walk direction one with crossbeam It causes.
The crossbeam using steel I-beam production fish-bellied type structure or wait height structure, both ends using connecting plate and it is upper, Lower bracket is connect with the ribbed stiffener of the stringer.
The lateral angle steel is connected more crossbeams in a manner of intersecting greatly the keyhole that crossbeam lower flange is arranged.
Equidistant keyhole is set on the stringer ribbed stiffener, crossbeam connects according to the distance and ribbed stiffener keyhole of rail bottom to beam bottom It connects.
The stringer is fallen on caisson, borehole stake top cast-in fixing bolt and steel plate, and board-like rubber branch is placed on pre-embedded steel slab Seat, longeron end set cross spacing angle steel and longitudinal spacing angle steel, cross spacing angle steel and longitudinal spacing angle steel and pre-embedded steel slab It is welded after positioning, the gap limited between angle steel and stringer is stoppered with neoprene plate or batten.
The rail clip of main track is connect using bolt with crossbeam top flange, and the rail clip of siding and crossbeam top flange are welded It is fixed;
The rail clip of siding includes that steel sole plate, plate washer, screw rod, sliding block and nut are constituted, wherein steel sole plate, open on plate washer If circular hole, screw rod circular hole on plate washer and steel sole plate is integrally welded therewith, the relative position and siding of steel sole plate and plate washer Direction matches, and sliding block and nut are disassembled component, open up slotted hole on sliding block, has sliding block along siding rail direction and slides Dynamic regulated quantity;
Rubber mat plate is set below rail, electro-insulating rubber block is set between sliding block and rail;
It crosses position in two rail, when can not place 2 fasteners simultaneously among two rails, only installation one, withholds it In a rail, withhold another rail when using in adjacent beams, while adding rail distance rod.
The just beam ruggedized construction for switch section of the utility model, does not destroy existing switch structure, reinforce section compared with Width, vertical, horizontal rigidity is big, and assembling and disassembling is convenient.
In the rail clip of siding, sliding block and nut are disassembled component, open up slotted hole on sliding block, sliding block can be made along trouble Line rail direction sliding, to avoid construction error bring fastener and dilatation joint from influencing there are certain regulated quantity.Two Bar rail crosses position, when can not place 2 fasteners simultaneously among two rails, can only installation one, withhold a bar steel therein Rail, but another rail must be withheld when use in adjacent beams, while adding rail distance rod, guarantee the distance between two rails.
Equidistant keyhole is set on stringer ribbed stiffener, crossbeam can be according to the distance of rail bottom to beam bottom, along stringer ribbed stiffener keyhole Carry out upper and lower position adjusting, adjustable berth away from reduction, be preferably adapted to rail bottom to beam bottom required distance it is stringent under wear work Journey.
Specific embodiment, as shown in Figure 1 and Figure 2:
4 caissons are set at a hole track switch just 4 fulcrums of beam, it is in stake top that dowel, steel plate is pre-buried good;Caisson Laminated rubber bearing is placed at top.
Positive stringer elder generation kerve falls beam, and first-class connecting plate, connecting plate can not tightened first in advance.
Spacing and the direction for adjusting switch area sleeper, keep siding sleeper direction identical as main track sleeper direction and spacing.
Using skylight point, interval removes the ballast between concrete pillow, walks crossbeam, the web of one end of the beam is directly pre- to stringer is entered First first-class connecting plate, suitably tightens bolt with connecting plate for one end of the beam web and fixes, while installing upper and lower bracket, spiral shell Bolt tightness is moderate.
Another end web of crossbeam first-class connecting plate in advance is used so that siding skew back stringer falls beam contraposition.Between the crossbeam of siding side It is closely knit that plug is returned with ballast.
The rail clip of main track and the rail clip of siding are installed on the every crossbeam penetrated.Rubber is filled in below rail Backing plate.
Oblique stringer kerve falls beam, and oblique stringer ribbed stiffener is suitably tightened spiral shell to entering crossbeam connecting plate first-class in advance Bolt fixes, while installing the upper and lower bracket in this side.
After crossbeam is all walked, just girder construction is checked, and tighten connecting plate, upper and lower bracket bolt.
With in the digging process of lower section, lateral angle steel is installed in time.
The utility model does not destroy existing switch structure, and reinforcing section is wide, and vertical, horizontal rigidity is big, assembling and disassembling in construction Fast and easy.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art can readily occur in the technical scope that the utility model discloses Change or replacement, should be covered within the scope of the utility model.Therefore, the protection scope of the utility model should Subject to the scope of protection of the claims.

Claims (7)

1. a kind of just beam ruggedized construction for switch section, which is characterized in that two stringers including being arranged in route two sides, Two stringers are respectively to be parallel to the positive stringer in main track direction and be parallel to the oblique stringer in siding direction, are connected between two stringers More crossbeams are connected to, the crossbeam is passed through along main track switch tie direction by gap between resting the head on, and one end of the beam is orthogonal to the positive stringer, separately One end is diagonal to the oblique stringer, passes through lateral Bolted angle connection between more crossbeams.
2. the just beam ruggedized construction according to claim 1 for switch section, which is characterized in that the stringer, which is equipped with, to be added The arrangement spacing of strength rib, the ribbed stiffener is consistent with switch tie spacing;The ribbed stiffener of the positive stringer is perpendicular to positive stringer axis;Institute The ribbed stiffener and oblique stringer axis for stating oblique stringer are in oblique, and it is consistent with crossbeam to walk direction.
3. the just beam ruggedized construction according to claim 2 for switch section, which is characterized in that the crossbeam uses work The fish-bellied type structure of word girder steel production waits height structure, and both ends are put more energy into using connecting plate and upper and lower bracket and the stringer Rib connection.
4. the just beam ruggedized construction according to claim 3 for switch section, which is characterized in that the lateral angle steel is logical The keyhole for crossing the setting of crossbeam lower flange is connected more crossbeams in a manner of intersecting greatly.
5. the just beam ruggedized construction according to claim 4 for switch section, which is characterized in that the stringer ribbed stiffener On set equidistant keyhole, crossbeam is connect according to the distance of rail bottom to beam bottom with ribbed stiffener keyhole.
6. the just beam ruggedized construction according to any one of claims 1 to 5 for switch section, which is characterized in that described Stringer is fallen on caisson, borehole stake top cast-in fixing bolt and steel plate, places laminated rubber bearing on pre-embedded steel slab, longeron end is set Cross spacing angle steel and longitudinal spacing angle steel, cross spacing angle steel and longitudinal spacing angle steel weld after positioning with pre-embedded steel slab, limit Gap between parallactic angle steel and stringer is stoppered with neoprene plate or batten.
7. the just beam ruggedized construction according to claim 6 for switch section, which is characterized in that the rail clip of main track It is connect using bolt with crossbeam top flange, rail clip and the crossbeam top flange of siding are welded and fixed;
The rail clip of siding includes that steel sole plate, plate washer, screw rod, sliding block and nut are constituted, wherein steel sole plate, open up circle on plate washer Hole, screw rod circular hole on plate washer and steel sole plate is integrally welded therewith, the relative position and siding direction of steel sole plate and plate washer Match, sliding block and nut are disassembled component, open up slotted hole on sliding block, so that sliding block is there is sliding along siding rail direction and adjust Section amount;
Rubber mat plate is set below rail, electro-insulating rubber block is set between sliding block and rail;
It crosses position in two rail, when can not place 2 fasteners simultaneously among two rails, only installation one, is withheld therein One rail withholds another rail when using in adjacent beams, while adding rail distance rod.
CN201821647168.1U 2018-10-11 2018-10-11 Just beam ruggedized construction for switch section Withdrawn - After Issue CN208917713U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821647168.1U CN208917713U (en) 2018-10-11 2018-10-11 Just beam ruggedized construction for switch section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821647168.1U CN208917713U (en) 2018-10-11 2018-10-11 Just beam ruggedized construction for switch section

Publications (1)

Publication Number Publication Date
CN208917713U true CN208917713U (en) 2019-05-31

Family

ID=66708814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821647168.1U Withdrawn - After Issue CN208917713U (en) 2018-10-11 2018-10-11 Just beam ruggedized construction for switch section

Country Status (1)

Country Link
CN (1) CN208917713U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098102A (en) * 2018-10-11 2018-12-28 中铁第五勘察设计院集团有限公司 Just beam ruggedized construction for switch section

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098102A (en) * 2018-10-11 2018-12-28 中铁第五勘察设计院集团有限公司 Just beam ruggedized construction for switch section
CN109098102B (en) * 2018-10-11 2024-04-30 中铁第五勘察设计院集团有限公司 A just roof beam reinforced structure for switch district section

Similar Documents

Publication Publication Date Title
CN201400850Y (en) Large-span steel girder for straddle single-track traffic system
CN102926299B (en) Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN201843076U (en) Groove-shaped steel bridge deck structure of high-speed railway steel tied arched bridge
CN109098102A (en) Just beam ruggedized construction for switch section
CN107227694A (en) A kind of concrete-bridge transversely strengthening construction
US4905896A (en) Railroad roadway for high speed rail-mounted vehicles
CN109183530A (en) A kind of interim overhead device of route for non-fragment orbit Disease Treatment and method
CN108166336A (en) A kind of I-steel in length and breadth and D beams combined system reinforce the construction method of switch area
CN105178164B (en) Prefabrication and lifting fish belly Wavelike steel webplate prestressing with bond combined box beam and its construction method
CN107905083A (en) A kind of the inversion type clod wash U-shaped steel combination beam bridge and construction method of lacing connection
CN208917713U (en) Just beam ruggedized construction for switch section
CN108677679A (en) Overhead steel reinforced concrete combination beam
CN107974878B (en) A kind of rail yard track switch reinforcement means and structure
KR101262755B1 (en) Plate girder railway bridge having integrated cross beam and construction method using the same
CN210118138U (en) Reinforcing structure for large-span tunnel to pass existing railway downwards
CN208830061U (en) A kind of assembled non-fragment orbit cell board and fragment-free track slab
KR100759923B1 (en) Low height and longspan girder for a railway
CN106192610A (en) Track three-throw turnout
CN112727495B (en) Bracing structure for controlling deformation of bottom of tunnel
CN113463447A (en) Large-span longitudinal and transverse beam structure for assisting tunnel to penetrate existing linear track
JPH11336001A (en) Sleeper and track structure using it
CN210087340U (en) High-speed railway tunnel detects and maintenance platform truck
CN209128815U (en) The dedicated expansion joint rubber water-proof connecting plate of high-speed rail
CN202865708U (en) Railway aerial fixing device
CN206070342U (en) A kind of large span construction beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: QINHUANGDAO ZHONGKE RAILWAY STEEL STRUCTURE Co.,Ltd.

Assignor: CHINA RAILWAY FIFTH SURVEY AND DESIGN INSTITUTE GROUP Co.,Ltd.

Contract record no.: X2020110000018

Denomination of utility model: Temporary beam reinforcement structure for turnout section

Granted publication date: 20190531

License type: Common License

Record date: 20200730

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: QINHUANGDAO ZHONGKE RAILWAY STEEL STRUCTURE Co.,Ltd.

Assignor: CHINA RAILWAY FIFTH SURVEY AND DESIGN INSTITUTE GROUP Co.,Ltd.

Contract record no.: X2020110000026

Denomination of utility model: Temporary beam reinforcement structure for turnout section

Granted publication date: 20190531

License type: Common License

Record date: 20201223

EC01 Cancellation of recordation of patent licensing contract
EC01 Cancellation of recordation of patent licensing contract

Assignee: QINHUANGDAO ZHONGKE RAILWAY STEEL STRUCTURE Co.,Ltd.

Assignor: CHINA RAILWAY FIFTH SURVEY AND DESIGN INSTITUTE GROUP Co.,Ltd.

Contract record no.: X2020110000018

Date of cancellation: 20220908

Assignee: QINHUANGDAO ZHONGKE RAILWAY STEEL STRUCTURE Co.,Ltd.

Assignor: CHINA RAILWAY FIFTH SURVEY AND DESIGN INSTITUTE GROUP Co.,Ltd.

Contract record no.: X2020110000026

Date of cancellation: 20220908

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: QINHUANGDAO ZHONGKE RAILWAY STEEL STRUCTURE Co.,Ltd.

Assignor: CHINA RAILWAY FIFTH SURVEY AND DESIGN INSTITUTE GROUP Co.,Ltd.

Contract record no.: X2022980019632

Denomination of utility model: Temporary beam reinforcement structure for turnout section

Granted publication date: 20190531

License type: Common License

Record date: 20221027

AV01 Patent right actively abandoned

Granted publication date: 20190531

Effective date of abandoning: 20240430

AV01 Patent right actively abandoned

Granted publication date: 20190531

Effective date of abandoning: 20240430