CN108166336A CN201810028667.0A CN201810028667A CN108166336A CN 108166336 A CN108166336 A CN 108166336A CN 201810028667 A CN201810028667 A CN 201810028667A CN 108166336 A CN108166336 A CN 108166336A
Authority
CN
China
Prior art keywords
steel
switch
breadth
length
railway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810028667.0A
Other languages
Chinese (zh)
Inventor
李扣宁
袁志富
杨文成
渠小伟
谷金明
王贵文
任三小
张建平
王金辉
许月香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Taiyuan Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP, China Railway Sixth Group Co Ltd filed Critical TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
Priority to CN201810028667.0A priority Critical patent/CN108166336A/en
Publication of CN108166336A publication Critical patent/CN108166336A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The present invention relates to switch area jacking construction methods, specially a kind of I-steel in length and breadth and D beams combined system reinforce the construction method of switch area, this method research is not in the case where needing to change organization of driving, not needing to remove track switch equipment, circuit is reinforced between track switch, track switch is not influenced normally to position, turn to and use, and greatly ensure that the normal hauling operation in station.Using construction method of the present invention, compared with conventional construction method, switch area not only it had been applicable in and had reinforced, but also suitable for track strengthening, security and stability height.The operation of existing railway is not influenced, will not change the organization of driving of building up station, railway transportation is influenced small;The dismounting of existing equipment can be reduced, removal quantities can complete the various operating modes that conventional construction method can not be completed, and the short time is only needed to interrupt railway operation per station track, and easy to operate, construction cost is low, can be minimized the influence constructed to railway operation.

Description

A kind of I-steel in length and breadth and D beams combined system reinforce the construction method of switch area
Technical field
The present invention relates to switch area jacking construction method, specially a kind of I-steel in length and breadth and D beams combined system reinforce road The construction method of Cha Qu, this method research is not in the case where needing to change organization of driving, not needing to remove track switch equipment, to road Circuit is reinforced between trouble, is not influenced track switch and is normally positioned, turns to and use, and greatly ensure that work is normally transported at station Industry, main points are few, do not change station organization of driving, do not need to block power failure, construction cost is low, wide adaptability with blocking for this method The features such as.
Background technology
The construction addressing of existing railway line jacking bridge and culvert is generally selected in interval circuit, should not be in hinge station, tunnel face, track switch Area, the position that road-bridge transition section, existing equipment is more, to tear down and reconstruct difficulty big.North and south bottle-neck section can not avoid switch area really AT STATION When, it should first consider to avoid main line turnout, because main track transport is busy, track switch utilization rate is high, running velocity height etc..Next is examined Worry is selected in land between track switch trouble head and trouble head and reinforces, it is impossible to be selected in jacking under entire track switch.Finally it is also contemplated that around both There is equipment to influence situation, such as:Whether the equipment such as contact net bar, signal lamp, cable, removal difficulty are big.
Under supersevereconditions, in switch area jacking construction, common, most safe, most easy method is that dismounting is existing Track switch equipment, is replaced with circuit, according to common line reinforcement means.But this method has to Railway Bureau, Department of Transportation The agreement of door, and railway transportation now is all very busy, as a consequence it is hardly possible to it realizes.Another method is also intended to by railway Office, transportation department agree to, track switch is surely solid, locking, is only opened to straight stock, needs special D types just beam, and it is big to reinforce difficulty, wind of constructing Danger is high.
Both the above construction method influences very big, railway transportation department and equipment management list to railway transportation organization of driving Position hardly agrees to that block will put that the time is long, and equipment replacement difficulty is big, scope of application very little, especially present hinge station, Busy switch area is transported unlikely to realize.This poses a new construction difficult problems, are badly in need of studying a kind of new construction Method, it is small on the driving transport influence of railway, do not change organization of driving, block main points are few, and use scope is wide, and construction cost is low, It is safe and reliable in switch area jacking construction method.
Invention content
In order to ensure not having to remove existing equipment, do not change organization of driving, the influence to railway transportation is reduced to minimum Degree, easy construction, at low cost, safe and reliable, a kind of I-steel in length and breadth of present invention offer and D beams combined system reinforcing track switch The construction method in area.
The present invention adopts the following technical scheme that realization:A kind of I-steel in length and breadth and D beams combined system reinforce track switch The construction method in area, including I-steel pair in length and breadth across with D shaped steel just beam main span reinforcement means,
Wherein just beam main span reinforcement means includes the following steps D shaped steel:
(1)First go out the axis of jacking bridge and culvert according to construction drawing surveying and locating before constructing first, contour line, support stake position, buttress stake Position;It goes slowly Construction Support stake, buttress stake to the application of railway transportation department, using artificial digging pile pore-forming on roadbed, under merogenesis Steel reinforcement cage is put, binds, weld in hole, using tremie placing concrete, strictly control stake top absolute altitude;
(2)According to the coordinate position of gooseneck, gooseneck is penetrated among switch tie;
(3)It is set up on the outside of existing curb and moves Liang Pingtai, 2 steel are set up respectively at distance D shaped steel just 3.5 meters of beam both ends position Rail slideway laterally elapses D shaped steel just beam using the big coaster of standard gauge on railway, and by D shaped steel, just beam passage, will to supporting in stake Just beam connects D shaped steel with gooseneck;
(4)Set I-steel carling that the switch tie in the range of 3 meters of goat and rail are lifted under point machine concrete switch sleeper Get up, I-steel carling be connected on gooseneck by U-shaped double sunpenders, in order to ensure track switch normally turn to, actuating, Turnout baseplate is set on gooseneck under point tongue;
I-steel pair includes the following steps across reinforcement means in length and breadth:
(1)On the outside of per share rail, pair is manually penetrated across longitudinal I-steel and lateral I-steel, longitudinal I-steel one end is located at branch It supports in stake, one end is located on concrete buttress, and I-steel is connected using U-shaped pull rod in length and breadth;
(2)Pair respectively reinforces 12.5 rice noodles roads in pair according to 3-5-3 button rails after the completion of the reinforcing of I-steel in length and breadth across both ends, arrives this, Entire reinforcement system is completed, and is formed by original roadbed railway roadbed stress check calculation pile basic stress.
The present invention is busy suitable for railway transportation, and track switch cannot remove, follow closely solid situation switch area circuit.It applies also for pushing up In the case of containing both sides and having contact net bar, electrified column, signal lamp that cannot remove, change and move, excavate slope rate and be unsatisfactory for 1:1 is steady Ratio of slope is determined, by extension wire reinforcing scope, so as to ensure the stability of jacking excavation slope.
Using construction method of the present invention, compared with conventional construction method, switch area not only it had been applicable in and had reinforced, but also be suitable for Track strengthening, security and stability are high.The operation of existing railway is not influenced, will not change the organization of driving of building up station, to iron Road transport influences small;The dismounting of existing equipment can be reduced, removal quantities can complete what conventional construction method can not be completed Various operating modes only need the short time to interrupt railway operation per station track, and easy to operate, construction cost is low, can transport construction to railway The influence of battalion is minimized.
Description of the drawings
Fig. 1 is the flow chart of the present invention.
Fig. 2 reinforces plan view for the present invention.
Fig. 3 reinforces front elevation for the present invention.
Fig. 4 reinforces figure for goat position.
Fig. 5 is the sectional view of Fig. 4.
In figure:Just beam, 2- goosenecks, 3- switch ties, 4- rail, the double sunpenders of 5-U types, 6- longitudinal directions I-steel, 7- are horizontal for 1-D shaped steel To I-steel, 8- support stakes, 9- concrete buttress, 10- I-steel carlings, 11- goats, 12- rail tracks.
Specific embodiment
Claimed technical solution is illustrated with reference to attached drawing.
1st, gooseneck and traversing D shaped steel just beam manually are worn
Due to being not need to upright concrete switch sleeper in switch area, upright and adjustment sleeper spacing, direct basis can not be shifted to an earlier date The coordinate position of gooseneck penetrates gooseneck 2 among switch tie.Using artificial traversing D shaped steel just beam 1, in advance in existing curb Outside, which is set up, moves Liang Pingtai, moves Liang Pingtai and has to securely, highly high no more than rail top mark;At distance D shaped steel just beam both ends 2 rail slideways are set up in 3.5 meters of positions respectively, and D shaped steel just beam 1 is laterally elapsed using the big coaster of standard gauge on railway;Into A piece of beam during beam among advanced station track first goes out the beam in outside when going out beam, in order to reduce traversing distance, reduce vertical skylight Main points are blocked, preferably distinguish traversing D shaped steel just beam from circuit both sides.Traverse beam process middle slideway must set up level, direction Perpendicular to circuit, two slideway personnel are evenly distributed, and the division of labor is clear and definite, accepts unified command.
2nd, track strengthening
Totally according to main span D shaped steel just beam is first reinforced, then reinforce both ends pair across steel I-beam in length and breadth, finally rail is detained according to 3-5-3 The sequence of hardened link carries out track strengthening.Since the limitation of 11 position of point machine cannot penetrate gooseneck 2 when reinforcing main span, It needs to lift the switch tie 3 in the range of 3 meters of goat and rail 4 in the setting I-steel of concrete switch sleeper 3 times carlings 10, lead to High-strength U-shaped double sunpenders 5 are crossed to be connected on 4 goosenecks 2.In order to ensure track switch normally turn to, actuating, under point tongue Setting customization slide plate on gooseneck, the installation of slide plate have to pass through the confirmation of electric business, station, work business.Main span privileged sites All connection equipment reexamine one time and fastening one time after reinforcing, it is ensured that indeformable under train operation, be not subjected to displacement. Main span confirm all reinforce in place after, reinforce both ends in length and breadth I-steel pair across;Pair is first manually penetrated across longitudinal I-steel 6, it is per share 2 I 45C I-steel on the outside of rail, longitudinal direction is 4.5 meters long, and lateral I-steel 7 uses 9 I 40C I-steel, laterally 5 meters long, longitudinal direction I-steel one end be located at support stake 8 on, one end is located on concrete buttress 9, lateral I-steel 7 be supported on longitudinal I-steel and Rail is used to support, I-steel locally has contact net bar, semaphore to be indulged when influences using 2 high-strength U-shaped pull rod connections in length and breadth Horizontal I-steel can be adjusted according to field condition.Pair across I-steel in length and breadth reinforcing after the completion of according to 3-5-3 button rail pair across Both ends respectively reinforce 12.5 rice noodles roads, and button rail selects the waste and old steel rail of a model lower than institute's hardened link rail, generally below both There is rail level 15-20mm, rail end is arranged to shuttle head with reference to guard rail form.This is arrived, entire reinforcement system is completed, and is formed by original Roadbed railway roadbed stress check calculation pile basic stress, rigid railway roadbed can be carried out excavating top after equipment unit is inspected for acceptance Into construction.

Claims (1)

1. a kind of I-steel in length and breadth and D beams combined system reinforce the construction method of switch area, it is characterised in that including I-shaped in length and breadth Steel and D shaped steel just beam main span reinforcement means,
Wherein just beam main span reinforcement means includes the following steps D shaped steel:
(1)First go out the axis of jacking bridge and culvert according to construction drawing surveying and locating before constructing first, contour line, support stake position, buttress stake Position;It goes slowly Construction Support stake, buttress stake to the application of railway transportation department, using artificial digging pile pore-forming on roadbed, under merogenesis Steel reinforcement cage is put, binds, weld in hole, using tremie placing concrete, strictly control stake top absolute altitude;
(2)According to the coordinate position of gooseneck, gooseneck is penetrated among switch tie;
(3)It is set up on the outside of existing curb and moves Liang Pingtai, 2 steel are set up respectively at distance D shaped steel just 3.5 meters of beam both ends position Rail slideway laterally elapses D shaped steel just beam using the big coaster of standard gauge on railway, and by D shaped steel, just beam passage, will to supporting in stake Just beam connects D shaped steel with gooseneck;
(4)Set I-steel carling that the switch tie in the range of 3 meters of goat and rail are lifted under point machine concrete switch sleeper Get up, I-steel carling be connected on gooseneck by U-shaped double sunpenders, in order to ensure track switch normally turn to, actuating, Setting customization slide plate on gooseneck under point tongue;
I-steel pair includes the following steps across reinforcement means in length and breadth:
(1)On the outside of per share rail, pair is manually penetrated across longitudinal I-steel and lateral I-steel, longitudinal I-steel one end is located at branch It supports in stake, one end is located on concrete buttress, and I-steel is connected using U-shaped pull rod in length and breadth;
(2)Pair respectively reinforces 12.5 rice noodles roads in pair according to 3-5-3 button rails after the completion of the reinforcing of I-steel in length and breadth across both ends, arrives this, Entire reinforcement system is completed, and is formed by original roadbed railway roadbed stress check calculation pile basic stress.
CN201810028667.0A 2018-01-12 2018-01-12 A kind of I-steel in length and breadth and D beams combined system reinforce the construction method of switch area Pending CN108166336A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810028667.0A CN108166336A (en) 2018-01-12 2018-01-12 A kind of I-steel in length and breadth and D beams combined system reinforce the construction method of switch area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810028667.0A CN108166336A (en) 2018-01-12 2018-01-12 A kind of I-steel in length and breadth and D beams combined system reinforce the construction method of switch area

Publications (1)

Publication Number Publication Date
CN108166336A true CN108166336A (en) 2018-06-15

Family

ID=62514452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810028667.0A Pending CN108166336A (en) 2018-01-12 2018-01-12 A kind of I-steel in length and breadth and D beams combined system reinforce the construction method of switch area

Country Status (1)

Country Link
CN (1) CN108166336A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593030A (en) * 2019-09-12 2019-12-20 中铁二局第二工程有限公司 Line turnout area reinforcing system for D-shaped beam frame
CN111576111A (en) * 2020-05-29 2020-08-25 中铁六局集团有限公司 Frame bridge jacking railway turnout reinforcement construction method
CN112878216A (en) * 2020-11-30 2021-06-01 中国十七冶集团有限公司 Suspension type railway underpass box culvert jacking track reinforcing method
CN113652902A (en) * 2021-08-13 2021-11-16 中铁第五勘察设计院集团有限公司 Reinforced structure in railway switch area and frame bridge structure of existing railway of lower cross
CN114922015A (en) * 2022-06-09 2022-08-19 中国铁路太原局集团有限公司 D-shaped temporary beam assembly and line local reinforcement construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130116561A (en) * 2012-04-16 2013-10-24 (주)삼현피에프 Transverse support device of girders
CN103726451A (en) * 2014-01-16 2014-04-16 中铁六局集团有限公司 Railway construction method of dismantling existing girder bridge and pushing frame structure in situ
CN105019366A (en) * 2014-04-29 2015-11-04 中铁六局集团有限公司 Strengthening construction method for railway switch area line
CN204940141U (en) * 2015-07-31 2016-01-06 中铁六局集团有限公司 The reinforcement system of existing line in Framed underpass bridge process
CN105239475A (en) * 2015-11-04 2016-01-13 中铁六局集团有限公司 Line reinforced structure in culvert jacking process under complex existing railway line
CN105887658A (en) * 2014-12-16 2016-08-24 房士杰 Multi-purpose continuous construction temporary beam structure and construction method thereof
CN106592449A (en) * 2016-12-22 2017-04-26 中铁二十三局集团第二工程有限公司 D-shaped beam reinforced existing double-railway line structure and construction method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130116561A (en) * 2012-04-16 2013-10-24 (주)삼현피에프 Transverse support device of girders
CN103726451A (en) * 2014-01-16 2014-04-16 中铁六局集团有限公司 Railway construction method of dismantling existing girder bridge and pushing frame structure in situ
CN105019366A (en) * 2014-04-29 2015-11-04 中铁六局集团有限公司 Strengthening construction method for railway switch area line
CN105887658A (en) * 2014-12-16 2016-08-24 房士杰 Multi-purpose continuous construction temporary beam structure and construction method thereof
CN204940141U (en) * 2015-07-31 2016-01-06 中铁六局集团有限公司 The reinforcement system of existing line in Framed underpass bridge process
CN105239475A (en) * 2015-11-04 2016-01-13 中铁六局集团有限公司 Line reinforced structure in culvert jacking process under complex existing railway line
CN106592449A (en) * 2016-12-22 2017-04-26 中铁二十三局集团第二工程有限公司 D-shaped beam reinforced existing double-railway line structure and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张克雷: "站内道岔区顶进框架桥架空加固与防护技术", 《铁道建筑技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593030A (en) * 2019-09-12 2019-12-20 中铁二局第二工程有限公司 Line turnout area reinforcing system for D-shaped beam frame
CN111576111A (en) * 2020-05-29 2020-08-25 中铁六局集团有限公司 Frame bridge jacking railway turnout reinforcement construction method
CN112878216A (en) * 2020-11-30 2021-06-01 中国十七冶集团有限公司 Suspension type railway underpass box culvert jacking track reinforcing method
CN113652902A (en) * 2021-08-13 2021-11-16 中铁第五勘察设计院集团有限公司 Reinforced structure in railway switch area and frame bridge structure of existing railway of lower cross
CN114922015A (en) * 2022-06-09 2022-08-19 中国铁路太原局集团有限公司 D-shaped temporary beam assembly and line local reinforcement construction method

Similar Documents

Publication Publication Date Title
CN108166336A (en) A kind of I-steel in length and breadth and D beams combined system reinforce the construction method of switch area
CN103437254B (en) Framed underpass bridge railway trouble district track strengthening device
CN102979041B (en) Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway
CN105464008B (en) Large longitudinal beam system line reinforcement construction device and method
CN102926299A (en) Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN101736692A (en) Construction technology for passenger railway line spanning existing railway cast-in-place box beam bracket
CN102505697A (en) Method for excavating deep foundation pits under temporary bridge of main line railway
CN204112346U (en) High slope massif grid beams under complex geological condition
CN104612056B (en) The overall quickly pushing tow method for traversing of a kind of frame bridge
CN104775368B (en) Prefabricated jacking box culvert provided with steel blade corners
CN105239475A (en) Line reinforced structure in culvert jacking process under complex existing railway line
CN113832947A (en) Device and method for reinforcing multiple-track railway with small space passing under shield tunnel
CN107974878B (en) A kind of rail yard track switch reinforcement means and structure
CN109098102A (en) Just beam ruggedized construction for switch section
CN210118138U (en) Reinforcing structure for large-span tunnel to pass existing railway downwards
CN100535392C (en) Bridge type shield construction method for box type bridge
CN107447598A (en) A kind of building method of railway roadbed changeover portion support meanss and railway roadbed changeover portion support system
CN217300589U (en) Reinforcing system of subway shield tunnel underpass operation railway frame bridge
US6795992B2 (en) Bridge construction method
CN102628278B (en) 'U-pipe pier' urban underground railroad
CN208917713U (en) Just beam ruggedized construction for switch section
CN203440720U (en) Line reinforcing device of railway turnout area in frame bridge jacking
CN113833022A (en) Railway line reinforcing system and construction method
CN107119568A (en) A kind of high-level bridge construction method
CN102505626A (en) Temporary bridge for trunk railway

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180615