CN208916754U - Work handling device is used in a kind of construction of high-tension line high-altitude - Google Patents
Work handling device is used in a kind of construction of high-tension line high-altitude Download PDFInfo
- Publication number
- CN208916754U CN208916754U CN201821612854.5U CN201821612854U CN208916754U CN 208916754 U CN208916754 U CN 208916754U CN 201821612854 U CN201821612854 U CN 201821612854U CN 208916754 U CN208916754 U CN 208916754U
- Authority
- CN
- China
- Prior art keywords
- support
- tension line
- handling device
- work handling
- construction work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of high-tension line high-altitude construction work handling devices, including pedestal, first support and second support, first support and second support are fixedly mounted on pedestal, side at the top of first support is equipped with guide sleeve, the first groove is machined in the short transverse along second support in second support, guide rod is fixedly installed in first groove, guide rod passes through guide sleeve and is slidably matched with guide sleeve, the first elevating mechanism that driving second support is up and down reciprocatingly slided is installed in first support, and with the second elevating mechanism is installed in the second support of guide rod opposite side, tool box is connected on second elevating mechanism.The Work tool needed in work progress not only can be fast and efficiently transmitted to the height of needs by the present apparatus, it will not generating tool the phenomenon that falling, and use is safer, has not only improved the work safety of staff, but also reduces the carrying burden of staff.
Description
Technical field
The utility model power construction equipment technical field, and in particular to a kind of construction of high-tension line high-altitude is transmitted with workpiece
Device.
Background technique
In the construction of high-tension line, the tool for needing to use multiplicity works.Currently, because without special work device
Have means of transportation, when in high-altitude staff when needing Work tool, Work tool can only be put into package by ground staff,
High-altitude framework is climbed into transmit Work tool from ladder again, and this Work tool transfer mode, the kit for transmitting personnel is heavier, needs
Will repeatedly up and down, first is that the process of work can be interrupted, be influenced, second is that transmitting personnel are largely to carry out high-altitude by ladder
Transmitting, tool are hung over transmitting personnel, while increasing transmitting person works' burden, since the angle of part ladder is larger
When, personal safety is greatly threatened, it is easy to cause the major accident of personal injury.Therefore, a kind of use is developed
The transmission of convenient, flexible, time saving and energy saving, tool efficiently, be not easy to fall and can the high-tension line high-altitude of effective guarantee life safety apply
Work is desirability with work handling device.
Summary of the invention
The purpose of this utility model is to provide a kind of easy to use, flexible, time saving and energy saving, tool transmission efficiently, is not easy
Fall and can effective guarantee life safety high-tension line high-altitude construction work handling device.
The purpose of this utility model is achieved in that, including pedestal, first support and second support, first support is fixed
It is mounted on the base, the side at the top of first support is equipped with guide sleeve, in the height side along second support in second support
To the first groove is machined with, guide rod is fixedly installed in the first groove, guide rod passes through guide sleeve and matches with guide sleeve sliding
It closes, the first elevating mechanism that driving second support is up and down reciprocatingly slided is installed, and opposite with guide rod one in first support
Second elevating mechanism is installed in the second support of side, is connected with tool box on the second elevating mechanism.
Further, the first elevating mechanism includes motor, drive lead screw and sliding sleeve, and drive lead screw is vertically arranged, and is driven
The both ends of screw rod are rotatably installed in first support, one end of sliding sleeve be installed on drive lead screw and with drive lead screw screw thread
Cooperation, the other end of sliding sleeve is fixedly connected with the lower end of second support, and motor is mounted on the top of first support and and driving wire
The upper end of bar is sequentially connected.
Further, the second elevating mechanism includes that sliding rail, sliding block and electronic reel, sliding rail are fixedly mounted on second support
On, sliding block is slidably installed on the slide rail, and tool box is detachably arranged on sliding block, and electronic reel is mounted on second support
Top, and wirerope is wound on electronic reel, it is fixedly connected on the upside of the lower end of wirerope and sliding block.
Further, the rotating mechanism of driving first support rotation is installed, rotating mechanism includes active rotating shaft on pedestal
And driven spindle, the upper surface installation of pedestal are equipped with bearing, active rotating shaft and driven spindle in mounting hole there are two mounting hole
It is separately mounted on the bearing in two mounting holes, the bottom of first support is fixedly mounted on driven spindle upper end, turns in active
Active runner is installed on axis, driven runner is installed on driven spindle, by driven between active runner and driven runner
Belt connection, and driver is installed in the upper surface of active runner, driver is manual bull stick or motor.
Further, the lower surface of pedestal is provided at least two and bores slottingly.
Tool box equipped with Work tool can be smoothly transmitted to by the utility model by the second elevating mechanism of setting
Tool box can be transmitted to higher height, mistake of the entire tool box in transmission by the first elevating mechanism by certain height
It runs smoothly in journey, using also relatively flexible and convenient, such structure design not only can fast and efficiently will be in work progress
The Work tool needed is transmitted to the height of needs, will not both improve and using safer generating tool the phenomenon that falling
The work safety of staff, and the carrying burden of staff is reduced, and aloft work personnel fetch tool and also compare side
Just, have the advantages that simple in structure, time saving and energy saving, easy to use, flexible, practical strong, there is preferable utilization and extention value.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
In figure: 1- is bored slottingly, 2- pedestal, the manual bull stick of 3-, 4- active runner, 5- active rotating shaft, 6- driving belt, 7- from
Turn wheel, 8- driven spindle, 9- sliding sleeve, 10- first support, 11- drive lead screw, 12- motor, the electronic reel of 13-, 14- steel
Cord, 15- guide sleeve, 16- guide rod, 17- second support, 18- sliding rail, 19- sliding block, the tool box 20-, 21- bearing.
Specific embodiment
The utility model will be further described below with reference to the accompanying drawings, but is not subject in any way to the utility model
Limitation instructs made any changes and modifications based on the utility model, belongs to the protection scope of the utility model.
As shown in Figure 1, the utility model includes pedestal 2, first support 10 and second support 17, pedestal 2 uses thick steel plate
Production, first support 10 and second support 17 are made of channel steel or I-steel, and the first support 10 is fixedly mounted on bottom
On seat 2, the side at 10 top of the first support is equipped with guide sleeve 15, along second support 17 in the second support 17
Short transverse be machined with the first groove, be fixedly installed with guide rod 16 in first groove, the guide rod 16 is passed through and led
It is slidably matched to set 15 and with guide sleeve 15, is equipped with what driving second support 17 was up and down reciprocatingly slided in the first support 10
First elevating mechanism, and with the second elevating mechanism is installed in the second support 17 of 16 opposite side of guide rod, described second
It is connected with tool box 20 on elevating mechanism, tool box 20 can be sent to by the second elevating mechanism by certain height, passed through
Second support 17 can be sent to higher height by the first elevating mechanism.
First elevating mechanism and the second elevating mechanism can be by the way of sprocket wheel transmissions, it is preferable that first lifting
Mechanism includes motor 12, drive lead screw 11 and sliding sleeve 9, and the drive lead screw 11 is vertically arranged, and the both ends of drive lead screw 11 can
Be rotatably mounted in first support 10, one end of the sliding sleeve 9 be installed on drive lead screw 11 and with 11 screw thread of drive lead screw
Cooperation, the other end of sliding sleeve 9 are fixedly connected with the lower end of second support 17, and the motor 12 is mounted on the top of first support 10
And it is sequentially connected with the upper end of drive lead screw 11.Driving motor 12 drives drive lead screw 11 to rotate, and drive lead screw 11 is in screw thread
The linear motion for converting rotary motion under effect sliding sleeve 9 is passed so that second support 17 be made to pump using screw rod
Dynamic mode is to be able to guarantee that second support 17 has enough support degrees, and second support 17 is allowed to be not easy to put in uphill process
It is dynamic, it also can guarantee the stationarity of transmission under higher height.
Preferably, second elevating mechanism includes sliding rail 18, sliding block 19 and electronic reel 13, and the sliding rail 18 is fixed
It is mounted in second support 17, the sliding block 19 is slidably mounted on sliding rail 18, and the tool box 20 is detachably arranged in cunning
On block 19, the electronic reel 13 is mounted on the top of second support 17, and wirerope 14 is wound on electronic reel 13,
The lower end of the wirerope 14 is fixedly connected with the upside of sliding block 19, and driving reel 13 carries out coiling work, coiling work
Sliding block 19 is moved up along sliding rail 18 simultaneously, so that it may which tool box 20 is transmitted to certain height by the second elevating mechanism.
The working principle of the present apparatus is: the present apparatus is moved to job site, and the tool that needs are used by staff
In inserter case 20, restarts electronic reel 13 and receive wirerope, allow wirerope 14 to move up with movable slider 19, sliding block 19
It drives tool box 20 to move up, after tool box 20 is moved upwards up to the height of needs, closes electronic reel 13, staff
Tool in tool box 20 is taken out and is used, after construction, electronic reel 13 is again started up and puts wirerope 14, so that tool
Case 20 is because the gravity born moves down reset.When staff is when higher height is constructed, by tool inserter case 20,
Start electronic reel 13 and receive wirerope 14, wirerope 14 is moved up with movable slider 19, and sliding block 19 drives tool box 20 upward
It is mobile, when sliding block 19 is moved upwards up to the top of sliding rail 18, electronic reel 13 is closed, restarts motor 12,12 band of motor
Dynamic drive lead screw 11 rotates, and drive lead screw 11 converts rotary motion under the action of screw thread the linear motion of sliding sleeve 9, thus
It drives second support 17 to move up, after tool box 20 is moved upwards up to the height of needs, closes motor 12, staff
Tool in tool box 20 is taken out and is used, after construction, staff starts motor 12, and drive lead screw 11 is driven reversely to revolve
Turn, so that second support 17 be driven to move down, after second support 17 moves down reset, closes motor 12, restart electricity
Dynamic reel 13 puts wirerope 14 so that tool box 20 is because the gravity born moves down, tool box 20 with movable slider 19 to
Lower movement closes electronic reel 13 after sliding block 19 moves down reset.
In order to further increase the adaptation range of device, driving first support 10 is installed on the pedestal 2 and is revolved
The rotating mechanism turned may be implemented first support 10 on pedestal 2 by rotating mechanism and rotate 360 °, the rotating mechanism
Including active rotating shaft 5 and driven spindle 8, the installation of the upper surface of the pedestal 2 is equipped with there are two mounting hole in the mounting hole
Bearing 21, the active rotating shaft 5 and driven spindle 8 are separately mounted on the bearing 21 in two mounting holes, the first support
10 bottom is fixedly mounted on 8 upper end of driven spindle, and active runner 4 is equipped on active rotating shaft 5, pacifies on driven spindle 8
Equipped with driven runner 7, the active runner 4 and driven runner 7 between connected by follower belt 6, and in the upper of active runner 4
Surface is equipped with driver, it is preferable that the driver is manual bull stick 3 or motor 12,4 He of driver drives active runner
5 shaft of active rotating shaft, active runner 4 drive driven runner 5 and driven spindle 8 to rotate, and driven spindle 8 drives while rotation
First support 10 rotates, and so as to which tool box 20 is turned to the direction that staff is suitble to fetching tool, works as staff
After fetching tool, driver stops working.
Further, the lower surface of the pedestal 2 is provided at least two and bores 1 slottingly, in field construction, in order to prevent
The phenomenon that pedestal 2 slides in workpiece transmit process, can be inserted into below ground for boring 1 slottingly, and pedestal 2 is avoided to generate sliding.
Claims (7)
1. a kind of high-tension line high-altitude construction work handling device, it is characterised in that: including pedestal (2), first support (10)
With second support (17), the first support (10) is fixedly mounted on pedestal (2), the side at the top of the first support (10)
It is equipped with guide sleeve (15), it is recessed in the short transverse along second support (17) to be machined with first on the second support (17)
Slot is fixedly installed with guide rod (16) in first groove, and the guide rod (16) passes through guide sleeve (15) and and guide sleeve
(15) it is slidably matched, the first elevator that driving second support (17) is up and down reciprocatingly slided is installed on the first support (10)
Structure, and with the second elevating mechanism, second elevator are installed in the second support (17) of guide rod (16) opposite side
Tool box (20) are connected on structure.
2. construction work handling device in a kind of high-tension line high-altitude according to claim 1, it is characterised in that: described the
One elevating mechanism includes motor (12), drive lead screw (11) and sliding sleeve (9), and the drive lead screw (11) is vertically arranged, and is driven
The both ends of screw rod (11) are rotatably installed on first support (10), and one end of the sliding sleeve (9) is installed on drive lead screw
(11) it is threadedly engaged on and with drive lead screw (11), the other end of sliding sleeve (9) is fixedly connected with the lower end of second support (17), institute
Motor (12) is stated to be mounted on the top of first support (10) and be sequentially connected with the upper end of drive lead screw (11).
3. construction work handling device in a kind of high-tension line high-altitude according to claim 1, it is characterised in that: described the
Two elevating mechanisms include sliding rail (18), sliding block (19) and electronic reel (13), and the sliding rail (18) is fixedly mounted on second
On frame (17), the sliding block (19) is slidably mounted on sliding rail (18), and the tool box (20) is detachably arranged in sliding block
(19) on, the electronic reel (13) is mounted on the top of second support (17), and is wound with steel on electronic reel (13)
Cord (14) is fixedly connected on the upside of the lower end and sliding block (19) of the wirerope (14).
4. a kind of high-tension line high-altitude construction work handling device according to claim 1, it is characterised in that: the bottom
The rotating mechanism of driving first support (10) rotation is installed on seat (2).
5. a kind of high-tension line high-altitude construction work handling device according to claim 4, it is characterised in that: the rotation
Rotation mechanism includes active rotating shaft (5) and driven spindle (8), and there are two mounting hole, the peaces for the upper surface installation of the pedestal (2)
Dress is equipped with bearing (21) in hole, and the active rotating shaft (5) and driven spindle (8) are separately mounted to the bearing in two mounting holes
(21) on, the bottom of the first support (10) is fixedly mounted on driven spindle (8) upper end, is equipped on active rotating shaft (5)
Active runner (4) is equipped with driven runner (7) on driven spindle (8), between the active runner (4) and driven runner (7)
It is connected by follower belt (6), and driver is installed in the upper surface of active runner (4).
6. a kind of high-tension line high-altitude construction work handling device according to claim 5, it is characterised in that: the drive
Dynamic device is manual bull stick (3) or motor (12).
7. a kind of high-tension line high-altitude construction work handling device according to claim 1, it is characterised in that: the bottom
The lower surface of seat (2) is provided at least two and bores (1) slottingly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821612854.5U CN208916754U (en) | 2018-09-30 | 2018-09-30 | Work handling device is used in a kind of construction of high-tension line high-altitude |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821612854.5U CN208916754U (en) | 2018-09-30 | 2018-09-30 | Work handling device is used in a kind of construction of high-tension line high-altitude |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208916754U true CN208916754U (en) | 2019-05-31 |
Family
ID=66708043
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821612854.5U Expired - Fee Related CN208916754U (en) | 2018-09-30 | 2018-09-30 | Work handling device is used in a kind of construction of high-tension line high-altitude |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208916754U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110655003A (en) * | 2019-10-17 | 2020-01-07 | 国家电网有限公司 | Wear-resistant rope supporting device for power transmission major |
CN111377382A (en) * | 2020-04-10 | 2020-07-07 | 株洲市东亨科技有限责任公司 | Working platform for subway tunnel construction |
CN113482311A (en) * | 2021-06-29 | 2021-10-08 | 中交二公局第七工程有限公司 | Construction auxiliary mounting frame for green engineering construction |
-
2018
- 2018-09-30 CN CN201821612854.5U patent/CN208916754U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110655003A (en) * | 2019-10-17 | 2020-01-07 | 国家电网有限公司 | Wear-resistant rope supporting device for power transmission major |
CN111377382A (en) * | 2020-04-10 | 2020-07-07 | 株洲市东亨科技有限责任公司 | Working platform for subway tunnel construction |
CN113482311A (en) * | 2021-06-29 | 2021-10-08 | 中交二公局第七工程有限公司 | Construction auxiliary mounting frame for green engineering construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208916754U (en) | Work handling device is used in a kind of construction of high-tension line high-altitude | |
CN203635997U (en) | Lifting drilling equipment | |
CN209071954U (en) | Livewire work operating platform on a kind of bar | |
CN104326390B (en) | Transmission tower high-rise working instrument traction apparatus | |
CN208981734U (en) | A kind of management support platform convenient for article conveying | |
CN212425357U (en) | High altitude construction lift support frame for electric power engineering | |
CN207002073U (en) | A kind of Manual descending system of masts type lift | |
CN208327235U (en) | A kind of building machinery hoistable platform convenient for adjusting | |
CN105649524A (en) | Power maintenance elevator | |
CN205876185U (en) | Drilling machine | |
CN210370489U (en) | Movable support mechanism of lifting device of long spiral drilling machine | |
CN116667221A (en) | Wire lifting device for power transmission line erection | |
CN104686214A (en) | Electric saw for pruning operation in power industry | |
CN207003987U (en) | A kind of novel building equipment hanging basket | |
CN202078661U (en) | High-altitude slow descent device | |
CN206841564U (en) | A kind of industrial cat ladder Zhu Pa robots | |
CN206156676U (en) | Portable hoisting device for engineering | |
CN204157340U (en) | A kind of electric power pruning operation electric saw | |
CN204584336U (en) | A kind of ring mould puncher | |
CN106988596B (en) | Electric power tower | |
CN212706786U (en) | Throwing device for underwater robot | |
CN205687069U (en) | Moving lifting conveying worm | |
CN203094065U (en) | Electric rope storing device | |
CN202428072U (en) | Threading machine | |
CN216755328U (en) | Electric power pole climbing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190531 Termination date: 20190930 |